LICENSING & ASSESSMENT MANUAL ARPANSA-REG-LA-MAN-240W September 2018 1. Introduction....................................................... Applications for a licence, licence amendment, or exemption from a licence............................................................ Other applications relating to a licence............................... Transport applications................................................. Other assessments or reviews........................................... Legislation............................................................ 2. Overview of the Application/Request Process........................ 3. Licence application or amendment................................... 3.1 Receiving the application.......................................... 3.2 Assessing the application.......................................... 3.3 Documenting the assessment......................................... 3.4 Preparing the licence.............................................. 3.5 Review & approval.................................................. 3.6 Issue the licence................................................. 3.7 Record keeping.................................................... 3.8 Post-assessment survey............................................ 3.9 Current licensing basis........................................... 3.10 CEO’s statement of reasons........................................ 4. Requests for approval............................................. Licensing and Assessment Manual v.3.0 ARPANSA-REG-LA-MAN-240W 1 of

Upload: ngodien

Post on 12-Jan-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

LICENSING & ASSESSMENT MANUALARPANSA-REG-LA-MAN-240W

September 2018

1. Introduction...........................................................................................................................................

Applications for a licence, licence amendment, or exemption from a licence.................................................

Other applications relating to a licence............................................................................................................

Transport applications......................................................................................................................................

Other assessments or reviews..........................................................................................................................

Legislation........................................................................................................................................................

2. Overview of the Application/Request Process.......................................................................................

3. Licence application or amendment........................................................................................................

3.1 Receiving the application.......................................................................................................................

3.2 Assessing the application.......................................................................................................................

3.3 Documenting the assessment................................................................................................................

3.4 Preparing the licence..............................................................................................................................

3.5 Review & approval.................................................................................................................................

3.6 Issue the licence...................................................................................................................................

3.7 Record keeping.....................................................................................................................................

3.8 Post-assessment survey.......................................................................................................................

3.9 Current licensing basis..........................................................................................................................

3.10 CEO’s statement of reasons.................................................................................................................

4. Requests for approval..........................................................................................................................

4.1 Receiving the application.....................................................................................................................

4.2 Assessing the application.....................................................................................................................

4.3 Documenting the assessment..............................................................................................................

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 1 of

4.4 Review & approval...............................................................................................................................

4.5 Record keeping.....................................................................................................................................

4.6 Post-assessment survey.......................................................................................................................

5. Disposals & transfers............................................................................................................................

5.1 Receiving the application.....................................................................................................................

5.2 Assessing the application.....................................................................................................................

5.3 Approval...............................................................................................................................................

5.4 Notification...........................................................................................................................................

6. Extension of source working life...........................................................................................................

6.1 Receiving the application.....................................................................................................................

6.2 Assessing the application.....................................................................................................................

6.3 Documenting the assessment..............................................................................................................

6.4 Approval...............................................................................................................................................

6.5 Record keeping.....................................................................................................................................

7. Exemptions...........................................................................................................................................

7.1 Receiving the application.....................................................................................................................

7.2 Assessing the application.....................................................................................................................

7.3 Documenting the assessment..............................................................................................................

7.4 Review & Approval...............................................................................................................................

7.5 Notification...........................................................................................................................................

7.6 Record keeping.....................................................................................................................................

7.7 Revocation of exemption.....................................................................................................................

8. Surrender a licence...............................................................................................................................

8.1 Receipt of application...........................................................................................................................

8.2 Application Assessment........................................................................................................................

8.3 Documenting the assessment..............................................................................................................

8.4 Review & approval...............................................................................................................................

8.5 Notification...........................................................................................................................................

8.6 Record keeping.....................................................................................................................................

9. Transport Approvals.............................................................................................................................

9.1 Receipt of application...........................................................................................................................

9.2 Application Assessment........................................................................................................................

9.3 Documenting the assessment..............................................................................................................

9.4 Approval...............................................................................................................................................

9.5 Final notification...................................................................................................................................

9.6 Record keeping.....................................................................................................................................

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 2 of

10. Periodic Licence Review.......................................................................................................................

10.1 Review..................................................................................................................................................

10.2 Documenting the review......................................................................................................................

10.3 Approval...............................................................................................................................................

10.4 Record keeping.....................................................................................................................................

10.5 Further Regulatory Action....................................................................................................................

11. Terms and definitions...........................................................................................................................

12. Reference.............................................................................................................................................

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 3 of

1. Introduction

This Manual covers the assessment and approval of applications from stakeholders and the continuous improvement of those processes. The following applications are addressed:

Applications for a licence, licence amendment, or exemption from a licence

Source licence

Facility licence - Prescribed Radiation Facility / Nuclear Installation

o Site

o Construct

o Operate

o Possess or Control

o Decommission

Request for an exemption

Other applications relating to a licence

Request for consent to surrender a licence

Request for approval to make a relevant change

Request for approval to construct an item important for safety

Request for approval to load nuclear fuel

Request for approval to transfer or dispose of controlled apparatus or controlled material

Request to use a sealed source beyond its recommended working life

Transport applications

Request for approval to transfer a security enhanced source

Request for approval of shipment (transport) of radioactive material

Request for approval of a shipment under special arrangement

Request for Approval of Special Form Radioactive Material & Low Dispersible Radioactive Material

Request for approval of a package design

Request for approval for validation of a package

Other assessments or reviews

Periodic licence review

Licence merger process

Legislation

Australian Radiation Protection and Nuclear Safety Act 1998 (the Act)

Australian Radiation Protection and Nuclear Safety Regulations 1999 (the Regulations)

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 4 of

2. Overview of the Application/Request Process

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 5 of

3. Licence application or amendment1

3.1 Receiving the application

All applications should be received by Licence Administration (LA). If an officer receives a direct request it should be forwarded to LA.

The Safety Systems Support Officer (SSSO) saves the application in the records management system (RMS) and enters details into the Licence Administration Database (LAD).

For licence applications or amendments, the SSSO conducts an initial check to determine whether all sections of the application have been completed and the following information provided:

Details of person submitting the application

Applicant’s authorisation

Nominee details (if applicable)

Contact person’s details

RSO details

Description of conduct or dealing

For applications or amendments associated with a specific licence or licence holder, the SSSO assigns it to the lead inspector. For new applications, the Director of Facility Safety or Director Source Safety and Security will assign it to an appropriate regulatory officer (RO).

The SSSO acknowledges receipt of the application via email with a copy to the lead inspector/RO.

If the application is complete the SSSO will ask Finance to issue a debtor invoice via the RMS.

3.1.1 Public notice (regulation 40 of the Regulations)

As soon as practicable after receiving an application for a facility licence the CEO must publish a notice in a daily national newspaper and in the Gazette stating that the CEO intends to make a decision on the application.

The RO must complete a Notice of intention to make a decision on a facility licence application with the preferred publication date. This is reviewed by the Chief Regulatory Officer and sent to the SSSO who will arrange for it to be published in the newspaper and the Gazette. A copy of the gazette notice must be saved in the RMS as proof of compliance with regulation 40 of the Regulations.

1 Under s36 of the Act, the CEO may at any time amend a licence. For example, a licence may be amended to: impose additional licence conditions, remove or vary conditions already imposed, or extend or reduce the authority granted by the licence.

A decision to amend a licence may be at the request of the licence holder or may be taken by ARPANSA as, for example, enforcement action (refer to REG-COM-MAN-270W Compliance and Enforcement Manual).

An application for amendment of an existing source licence is submitted using one of the source licence application forms. Applications for amendment of a facility licence are less common and generally take the form of a written request. The assessment of an amendment generally follows a similar process to that for a licence application. Changes with significant implications in facilities are managed through regulation 51 of the Regulations and may not necessarily result in a licence amendment.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 6 of

3.2 Assessing the application

NOTE: The RO must confirm receipt of the application fee with the SSSO or Finance before starting the assessment

3.2.1 Agreed assessment time

The RO should agree a timeframe for completion of the assessment with the applicant. This should be done by email and must be recorded in ARPANSA’s intranet site. The level of assessment hence the time taken should be commensurate with the hazard of the source or facility taking into account the adequacy of information in the application; for example, the assessment of an application for a low hazard source should not take more than two working days, however the assessment of a complex facility application may take in the order of 60 - 90 days. No agreement is required if the assessment is expected to take five working days or less.

3.2.2 Assessment criteria

The RO assesses the application against safety standards relevant to the controlled facility, controlled material or controlled apparatus. The regulatory assessment report (RAR) template will guide the RO through the assessment process and the matters that must be taken into account and recorded.

Relevant codes and standards are available at https://www.arpansa.gov.au/regulation-and-licensing/regulatory-publications/radiation-protection-series/codes-and-standards

Links to international best practice can be found at http://www.arpansa.gov.au/Regulation/ibp/index.cfm

For assessment of applications for an accelerator or irradiator checklist may assist.

3.2.3 Further information & site visits

Where required, the RO will request further information via email. Note that the legal power to request additional information comes from regulation 39 of the Regulations.

Additional information may also be obtained by the RO undertaking one or more meetings or site visits. Site visits allow face to face clarification of issues as well as to acquaint the RO with the source or facility for which the authorisation is sought. Details of site visits should be recorded using the site visit report template REG-LA-FORM-242B and must also be recorded in the LAD.

This process continues until the RO is satisfied that the information provided is sufficient to make a recommendation to the CEO of ARPANSA (the CEO) or delegate. The level of detail should be commensurate with the nature of the hazards and risks associated with the proposed conduct or dealing. Facilities that are inherently more hazardous and have the potential to pose a greater risk require more detailed information.

A graded approach should also be applied to expectations around the provision of additional information. A reasonable timeframe for providing information relating to low or medium sources is 1-2 weeks; for high hazard sources and basic PRFs a reasonable time is 2-3 weeks; and for complex facilities it may take 4-6 weeks or more depending on the nature of information requested. The timeframe for provision of additional information may be renegotiated as necessary and records updated.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 7 of

If there is no response to the request for further information after six weeks, the RO should confirm whether the licence holder wishes to proceed with the application. If there is still no response after two months, the application may be considered withdrawn and the applicant advised accordingly.

3.2.4 Expert advice

Where appropriate, the RO should discuss with their director/branch head the need to seek expert advice on any specialised aspects of the application from other sections of ARPANSA or external consultants. In such cases, the terms of reference and deadlines should be clearly stated.

For applications involving medical sources or facilities, the RO should liaise with Medical Radiation Services to determine whether there are any special considerations with regard to medical exposure and patient protection. Similarly, if there is a need for expert advice on radioactive waste or environment protection issues, the RO should liaise with Radiation Health Services.

3.2.5 Endorsement of security plan

The security plan for a nuclear installation, prescribed radiation facility or security enhanced source must be endorsed by an accredited assessor. The security plan for a nuclear installation, PRF and security enhanced source cannot be endorsed without a site visit unless it has been previously approved and the new application has no impact on the current security arrangements.

3.2.6 Public consultation

If the licence application is for a nuclear installation, a public consultation process must be undertaken. This requires the RO to liaise with the Office of the CEO to arrange for the required information to be published on the website and to arrange public meetings, media releases, etc.

In accordance with paragraph 41(3)(g) of the Regulations the CEO must take the content of any public submissions into account when making a decision on whether to issue a licence. The RO must ensure that the regulatory assessment report (RAR) includes a comments resolution table in which all comments are addressed.

3.3 Documenting the assessment

The RO records the assessment of the application in a RAR using the appropriate template for facilities, for high hazard sources, or for low and medium hazard sources.

Each RAR must:

cover all matters that the CEO is required to take into account in making a decision on the issue of a licence as per subsections 32(3) or 33(3) of the Act and regulations 41 or 42 of the Regulations

include a comments resolution table if public consultation has been conducted

contain a recommendation on whether a licence should be issued

contain justification for recommending any licence condition in addition to those in the licence template or amending or deleting any condition in the licence template

be peer reviewed (usually the section director)

must be independently reviewed where ARPANSA is the applicant

be saved in the RMS

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 8 of

3.4 Preparing the licence

If a licence or an amendment to a licence is recommended, the licence/amended licence and accompanying letter to the applicant is prepared by the RO.

All details on the licence especially the licence holder’s name must match the LAD exactly.

Where the type of dealing in the application does not match an existing item in Schedule 1 of the licence template, consult the section director and branch quality officer to determine whether an additional item should be created.

A licence is subject to all relevant conditions in the Act and the Regulations. Other standard conditions are listed in Schedule 2 of the licence template. Any additional special licence conditions are based on circumstances specific to a particular application. All special licence conditions require legal review to ensure they are lawful and appropriately worded.

Special licence conditions are not to be used to overcome deficiencies in the application.

3.5 Review & approval

RARs and draft licences undergo the following reviews prior to final sign-off:

[1] Peer review by alternate inspector or other RO

Applications with high risk should be peered reviewed prior to submission to the section head. For other applications, the need for a peer review should be discussed with the section director on a case-by-case basis.

[2] Director review

The directors of Facility Safety and Source Safety and Security are responsible for the quality of RARs. They should check the following:

Correct template is used

Assessment and recommendations are clearly described

Basis for any special licence conditions including those under sub-regulation 53(4) of the Regulations are clearly described

Directors will determine whether a factual check is required by other expertise in ARPANSA and seek as necessary.

[3] Quality review

After the section director clears the draft, the RO seeks a quality review from the branch quality officer or other designated officer. The reviewing officer will provide advice on the report to the RO and section director. Acceptance of advice is at the discretion of the section director.

[4] Legal review

Legal review is required when the licence deviates from the approved template eg where a special licence condition is proposed.

[5] Independent review

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 9 of

Where ARPANSA is the applicant there must be an independent review of the assessment by a state or territory radiation regulator.

A Review & Approval Summary must be completed by the RO to show who has reviewed the documents and when. The summary should be saved in the RMS.

After all reviews are completed, links to the review summary, RAR, licence, and transmittal letter are sent to the CEO or delegate in an email.

3.6 Issue the licence

When approved, an electronic copy of the signature of the CEO or delegate will be added to the licence and letter. The approval should be recorded in the review and approval summary.

The approved licence and covering letter are converted to pdf, saved over the Word drafts in the RMS then emailed to the applicant or licence holder with copy to LA.

3.6.1 Calculation of annual licence charge

The CEO may pro-rate the licence charges from the month of licence issue as per regulation 55B of the Regulations.

Where appropriate, the RO calculates the annual charges using the appropriate form taking into account the month in which the licence is issued.

The RO will advise the SSSO of the licence charges and the SSSO will ask Finance to issue a debtor invoice via the RMS.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 10 of

3.7 Record keeping

The SSSO will:

Save the notification email in the relevant licence file and ‘alternatively within’ the outgoing correspondence container in the RMS.

Close the application file and raise a licence file in the RMS

Enter relevant information in LAD

3.8 Post-assessment survey

The lead inspector/RO should arrange for a post-assessment survey to be sent to the applicant if the assessment notification did not include the survey link.

Responses are periodically analysed to identify opportunities for improvement.

3.9 Current licensing basis

The collection of documents that provide the basis on which the licence is issued becomes the current licensing basis (CLB).

The CLB comprises the licence holder's written commitments for operation within applicable regulatory requirements and the facility-specific design basis including all modifications and additions to such commitments over the life of the licence.

For facilities, the CLB will include operational limits and conditions (OLCs), the facility-specific design-basis information documented in the most current safety analysis report (SAR), the licence holder’s plans and arrangements for managing safety, applicable standards and codes and commitments made by the licence holder in the initial application and correspondence to ARPANSA.

A summary of the CLB is maintained for all nuclear installations, complex PRFs, and complex source licences such as the Australian Centre for Neutron Scattering. Changes must be recorded to ensure the basis on which the licence is held remains current.

The summary of the CLB should be saved in the licence holder’s container in the RMS and ‘alternatively within’ the CLB container in the RMS.

3.10 CEO’s statement of reasons

The CEO may document the reasons for his decision to issue a licence using template.

A statement of reasons is prepared and published for all major facilities and any facilities determined by the CEO.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 11 of

4. Requests for approval

4.1 Receiving the application

All requests should be received by LA. If an officer receives a direct request it must be forwarded to LA.

The SSSO will enter the required information into LAD, save the application into the RMS, and assign the application to the lead inspector.

The SSSO acknowledges receipt via email to applicant with a copy to the lead inspector.

4.2 Assessing the application

The appropriate RAR template is used to document the assessment; the template will guide the lead inspector through the assessment process.

Assessment of a ‘Regulation 51 change’ follows similar processes to that for a new licence – see section 3.

4.2.1 Agreed assessment time

If no further information is required the RO should agree a timeframe for completion of the assessment with the applicant. This should be done by email and must be recorded in ARPANSA’s intranet site. No agreement is required if the assessment is expected to take five working days or less.

4.2.2 Further information & site visits

Where required, the lead inspector requests further information via email. Additional information may also be obtained by the RO undertaking one or more meetings or site visits.

A graded approach should be applied to expectations around the provision of additional information. A reasonable timeframe for providing information relating to low or medium sources is 1-2 weeks; for high hazard sources and basic PRFs a reasonable time is 2-3 weeks; and for complex facilities it may take 4-6 weeks or more depending on the nature of information requested. The timeframe may be negotiated and renegotiated as necessary and records updated.

If there is no response to the request for further information after six weeks, the RO should confirm whether the licence holder wishes to proceed with the application. If there is still no response after two months, the application may be considered withdrawn and the applicant advised accordingly.

4.2.3 Expert Advice

Where appropriate, the lead inspector should seek expert advice on any specialised aspects of the application either from other sections of ARPANSA or an external consultant. For applications involving medical sources or facilities, the lead inspector will liaise with Medical Radiation Services to determine whether there are any special considerations with regard to medical exposure and patient protection. Similarly, for advice on radioactive waste or environment protection issues, the lead inspector should liaise with Radiation Health Services.

Where the change impacts an endorsed security plan, re-endorsement of the plan must be obtained.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 12 of

4.3 Documenting the assessment

The lead inspector will complete (as appropriate):

Email to the Branch Head summarising the request and recommended action

RAR using the appropriate template

Amended facility/source licence

Amended CLB

If an amendment to a licence is recommended, the processes for preparing and issuing a licence in Section 1 should be followed.

4.4 Review & approval

The review process is the same as for a licence application/amendment in paragraph 3.5 of this manual, noting that legal review is not required for regulation 51 of the Regulations approvals where the licence does not need to be reissued.

The Branch Head will make a decision in accordance with the powers delegated by the CEO. In some circumstances the CEO may need to be the decision maker.

The inspector will advise the applicant in writing of the outcome of the assessment with relevant documents attached.

4.5 Record keeping

The lead inspector must update LAD, enter agreed timeframe in ARPANSA’s intranet site, and ensure all documents are saved in the RMS.

4.6 Post-assessment survey

The lead inspector should arrange for the post-assessment survey to be sent if the assessment notification did not include the survey link.

Responses are periodically analysed to identify opportunities for improvement.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 13 of

5. Disposals & transfers

5.1 Receiving the application

All requests should be received by LA. If an officer receives a direct request it should be forwarded to LA.

The SSSO acknowledges receipt of the application via email then refers the application to the assessing officer (AO). The AO may be a RO, or another officer supporting the application.

The AO saves the application in the RMS and records it in the LAD.

5.2 Assessing the application

The information required for disposal varies depending on whether it is a controlled apparatus or controlled material. For disposals of a controlled apparatus containing controlled material, the assessment should be based on the controlled material.

The AO will:

check that all the details on the Transfer/Disposal Request Form have been completed

check the details of the described disposal are appropriate as per Regulatory Guide REG-RC-SUP-252A

confirm with the relevant regulatory authority that any licence number provided belongs to the person/organisation quoted and is relevant for the sources concerned (for transfers)

assess the request to ensure that the pathway is appropriate and there is minimal hazard to persons or the environment relating to the disposal

recommend approval (or otherwise) by forwarding the request via email to an appropriately delegated RO with a brief description of the assessment

save relevant emails in the RMS with any other relevant information and ensure the request and decision are recorded in LAD

5.2.1 Further information

Where necessary, the AO requests further information. The relevant RO should be contacted if the AO is uncertain about any of the requirements.

5.3 Approval

Only ROs with written delegation from the CEO can approve disposals and transfers. Under section 18 of the Act, the CEO may only delegate powers to persons at senior executive (SES) or executive level (EL1 or EL2).

The delegate will:

check that the assessor has provided an appropriate statement regarding their assessment of the request and taken relevant information into account

make their decision based on the AO’s comments (and licence holder details if necessary)

if not satisfied with the assessment or information provided, send it back to AO giving suggestions for follow up

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 14 of

respond via email to the AO; where approval is granted the words Delegate of the CEO of ARPANSA should be included in the signature block

if the intention is to refuse the request, set out reasons why in an email to the AO

5.4 Notification

If approved, the AO will notify the licence holder via email that the application has been approved.

If not approved, the AO will notify the licence holder setting out the reasons why and giving them an opportunity to respond within 14 days. Any response will be forwarded to the approver who may reconsider as appropriate.

6. Extension of source working life

6.1 Receiving the application

All requests should be received by LA. If an officer receives a direct request it should be forwarded to LA.

The SSSO will save the application in the RMS, record it in LAD and assign it to the lead inspector.

The SSSO acknowledges receipt of the request via email with a copy to the lead inspector.

6.2 Assessing the application

ARPANSA permits the continued use of a sealed source beyond its recommended working life (RWL) – up to a period of one additional working life, without the need for prior approval, subject to the following conditions:

wipe or smear tested at 12 month intervals (6 months for portable density/moisture gauges)

all results of wipe or smear tests must be recorded and retained with the source records

In accordance with the ARPANSA Regulatory Guide: Wipe testing of sealed sources and use beyond recommended working life) if the wipe or smear test reveals contamination levels on the closest accessible surfaces to the sealed source in excess of 20 Bq, the source is not considered to be leak tight and should be withdrawn immediately from use

extension must be recorded in the licence holder’s source inventory workbook (SIW)

Any continued use of sealed sources beyond one RWL, other than in accordance with the above, or beyond a second recommended working life will be considered on a case-by-case basis taking into account:

activity of the source

toxicity of the radionuclide and its half-life

source construction

type of dealing

environment in which the source has been/will be used

details on source use

any other inspections or examinations that have been performed (e.g. 6 monthly or annual wipe tests)

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 15 of

6.2.1 Further information & site visits

Where appropriate, the lead inspector requests further information via email. Meetings or site visits may also be considered.

6.2.2 Expert Advice

Where the change impacts an endorsed security plan, re-endorsement of the plan may be necessary.

6.3 Documenting the assessment

The lead inspector prepares an email to the branch head with their recommendation.

6.4 Approval

The Chief Regulatory Officer or delegate may approve an extension of RWL. The lead inspector sends the approval to the applicant by email.

6.5 Record keeping

The lead inspector saves the relevant documents in the RMS and updates the LAD.

7. Exemptions

7.1 Receiving the application

All requests should be received by LA. If an officer receives a direct request it should be forwarded to LA.

The SSSO will save the application in the RMS, record it in the LAD, then forward it to the relevant section director who will assign it to a RO for assessment.

The SSSO acknowledges receipt of the request via email with a copy to the RO.

7.2 Assessing the application

7.2.1 Agreed assessment time

If no further information is required the RO should agree a timeframe for assessment with the applicant. This should be done by email and must be recorded in ARPANSA’s intranet site. No agreement is required where the assessment is expected to take five working days or less.

7.2.2 Assessment criteria

The RO will take into account the appropriate criteria in the Regulations to determine whether to recommend to the CEO or delegate that an exemption be granted.

7.2.3 Apparatus that produces harmful non- ionising radiation when energised

Under sub-regulation 4(3) of the Regulations the CEO may declare, in writing, on a case by case basis that an apparatus (prescribed in regulation 4 of the Regulations) is not a controlled apparatus thereby removing the application of regulation 4 of the Regulations on that non-ionising radiation (NIR) apparatus.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 16 of

The CEO must not declare a non-ionising radiation apparatus exempt unless satisfied that:

the apparatus does not pose an unacceptable potential hazard to the health and safety of people or to the environment; or

it would be inappropriate, in all the circumstances, for the apparatus to be a controlled apparatus.

The RO assessing an application for exemption must be satisfied that the applicant has provided sufficient evidence for the CEO to conclude that the apparatus meets the criteria under paragraphs (a) or (b) in normal or routine conditions as well as under all reasonably foreseeable abnormal events or conditions.

7.2.4 Prescribed radiation facilities

Under sub-regulation 6(3) of the Regulations the CEO may declare, in writing, on a case by case basis, that a facility is not a prescribed radiation facility (PRF) thereby removing the application of regulation 6 of the Regulations on that PRF.

The CEO must not declare a PRF exempt unless satisfied that:

a) the facility does not pose an unacceptable potential hazard to the health and safety of people or to the environment; and

b) it would be inappropriate, in all the circumstances, for the facility to be a prescribed radiation facility.

The RO assessing an application for exemption must be satisfied that the applicant has provided sufficient evidence for the CEO to conclude that the apparatus meets the criteria under paragraphs (a) and (b) in normal or routine conditions as well as under all reasonably foreseeable abnormal events or conditions.

7.2.5 One or more conducts in relation to a controlled facility

Sub-regulation 37(1) of the Regulations gives the CEO the power to exempt on a case by case basis any of the conducts mentioned in paragraphs 30(1)(a)-(e) of the Act provided it does not or will not pose an unacceptable potential hazard to the health and safety of people or to the environment.

The RO should consider whether the applicant has provided sufficient evidence for the CEO to conclude that the conduct for which the exemption is sought will not pose an unacceptable potential hazard to the health and safety of people and the environment in normal or routine conditions as well as under all reasonably foreseeable abnormal events or conditions.

NOTE: It is not appropriate to seek/grant an exemption for a conduct that is not proposed/intended. For example, a siting licence is not required for a linac therefore an exemption is also not required.

7.2.6 Controlled apparatus that produces ionising radiation or contains controlled material

Dealing with a controlled apparatus that can produce ionising radiation prescribed in Part 1 of Schedule 2 of the Regulations is exempt. However, even if a controlled apparatus or controlled material is not listed in Part 1 of Schedule 2, the CEO can, under sub-regulation 38(5) of the Regulations, exempt it provided the CEO is satisfied of certain matters prescribed in paragraphs 38(5)(a) or 38(5)(b) of the Regulations.

The application must demonstrate that for the particular dealing for which an exemption is sought:

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 17 of

The annual effective dose to an individual during normal operations is not likely to exceed 10 Sv; or

An accident, misuse or exceptional circumstance affecting the dealing is not likely to produce a dose greater than the effective dose limits. That is, for occupational exposure - not greater than 20 mSv per year averaged over 5 consecutive calendar years, and not more than 50 mSv in one year; and for the public not greater than 1 mSv annually.

The CEO has determined that the more restrictive of these two tests must be met. In most situations this will be sub-regulation 38(5)(b) of the Regulations.

The application should include a range of credible events and in the case of controlled material the RO should consider the physical and chemical form and all potential exposure pathways. The application should address:

the potential for exposure during maintenance or repair

shielding

physical barriers

location

method of operation

frequency of use

The RO must ensure there is sufficient information to satisfy the more restrictive of the requirements in sub-regulation 38(5) of the Regulations before making a recommendation to the CEO or delegate.

7.2.7 Further information & site visits

Where necessary, the RO will request further information via email. Meetings or site visits may also be considered.

7.3 Documenting the assessment

If satisfied that the applicant has addressed the relevant statutory criteria, the RO prepares an email to the CEO (or delegate) setting out the basis for recommending exemption.

If the declaration is made under sub-regulation 37(1) of the Regulations, the RO prepares a Notice of Intention to make a declaration under sub-regulation 37(1) of the Regulations, which the CEO must publish in the Gazette prior to making the declaration. The RO also prepares a Declaration of exemption (from facility licence) under sub-regulation 37(1) of the Regulations, which the CEO must publish in the Gazette as soon as practical after making the exemption.

If the declaration is made under sub-regulation 38(5) of the Regulations, the RO prepares a Declaration of exemption under sub-regulation 38(5) of the Regulations.

If the declaration is made under sub-regulation 4(3A) of the Regulations for NIR apparatus, the RO prepares a Declaration of exemption under sub-regulation 4(3) of the Regulations.

The notice of exemption should state that should circumstances change, then the exemption from the requirement for a source licence may no longer apply.

7.4 Review & Approval

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 18 of

The exemption is subject to the review process described in paragraph 3.5 of this manual.

7.5 Notification

The RO emails the appropriate approval to the applicant.

The RO will arrange for the public notice to be placed in the Gazette.

7.6 Record keeping

The RO saves all documentation in the RMS and updates the LAD.

7.7 Revocation of exemption

A declaration issued under sub-regulations 4(3), 6(3), 37(1) or 38(5) of the Regulations may be revoked by the CEO if the circumstances under which it was issued have changed in such a manner that the controlled person can no longer satisfy the statutory criteria on which it was based.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 19 of

8. Surrender a licence

8.1 Receipt of application

8.1.1 Receiving a request

All requests should be received by LA. If an officer receives a direct request it should be forwarded to LA.

Such requests will be either:

seeking approval to surrender a licence and release from regulatory control OR

seeking approval to surrender a licence and reissue of another licence

The SSSO saves the request in the RMS, records it in LAD and assigns it to the lead inspector.

The SSSO acknowledges receipt of the request via email with a copy to the lead inspector.

8.2 Application Assessment

To assist the CEO decide whether to accept the surrender of a source licence, the lead inspector will assess whether the applicant has provided evidence that they will no longer undertake dealings that require a licence. All sources must be transferred or disposed of in accordance with regulation 53 of the Regulations.

To assist the CEO decide whether to accept the surrender of a facility licence, the lead inspector must ensure that the application will satisfy the CEO that the following circumstances exist in relation to the facility:

a) The remaining structures, systems components and the environment at the location of the facility no longer contain controlled material or the activity concentrations of the remaining material(s) are exempt from regulatory control.

b) Remaining radioactivity levels associated with the facility (i.e. above natural background) do not pose an ongoing danger.

The applicant should demonstrate that the effective dose to a member of the public at the facility’s location is 10µSv per year or less2. Justification must be provided to deviate from this objective.

Where a request is being made to surrender a decommissioning licence the applicant must account for the full inventory of non-exempt waste arising from the decommissioning process that has been undertaken. The RO must be satisfied that all non-exempt waste is being appropriately managed before recommending the surrender of the licence.

8.2.1 Further information, including site visits

Where appropriate, the lead inspector requests further information via email. Meetings or site visits may also be considered.

Where appropriate, the lead inspector should request expert advice (see section 3.2).

2 IAEA Safety Standards – Radiation Protection and Safety of Radiation Sources: International Basic Safety Standards IAEA General Safety Requirements GSR Part 3 – 2014 (Schedule I, Item I.2)

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 20 of

8.3 Documenting the assessment

The review of the application should be documented in a file note. If satisfied that the applicant has addressed the guiding principles in Regulatory Guide: Surrender of a Facility Licence and Release from Regulatory Control REG-LA-SUP-246A and/or demonstrated that the source inventory has been appropriately disposed of, the lead inspector will recommend the CEO or delegate consent to the surrender of the licence.

8.4 Review & approval

The application should be subject to the review process in section 3.5 of this manual.

Only the CEO or delegate may approve the surrender of a licence.

8.5 Notification

The lead inspector will send an email to the licence holder consenting to the surrender. The licence holder may also be entitled to a refund of the annual licence charge. This should be confirmed with the relevant section director or Chief Regulatory Officer and the licence holder advised accordingly. The lead inspector should contact Finance to arrange for refund to be processed.

8.6 Record keeping

The lead inspector updates the RMS and the LAD.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 21 of

9. Transport Approvals

9.1 Receipt of application

All requests should be received by LA. If an officer receives a direct request it should be forwarded to LA.

The SSSO will save the application in the RMS, record it in LAD, and forward it to the relevant section director who will assign it to a RO for assessment.

The SSSO acknowledges receipt of the request via email with a copy to the RO.

9.2 Application Assessment

ARPANSA is the national competent authority responsible for assessment and approval of applications to transport radioactive material by the commonwealth, in accordance with the Code for Safe Transport of Radioactive Material, Radiation Protection Series No.C-2 (RPS C-2). This includes approval of low dispersible radioactive material, special form radioactive material, design of packages, validation of packages, shipment of radioactive material, radiation protection program for special use vessel and calculation of basic radionuclides value.

The assessment should be graded in terms of the available information. For example, the safety analysis report (SAR) is a key requirement for certification of design approval for a package and must be provided. However, for validation of a package, if the SAR is not available in English then a synopsis of the SAR and the regulatory assessment of the competent authority in the country of origin may be acceptable depending on the type of package and the availability of supplementary information.

9.2.1 Further information, including site visits

Where necessary, the RO requests further information via email. Meetings or site visits may also be appropriate.

If no further information is required the RO should agree a timeframe for assessment with the applicant. This should be done by email and must be recorded in ARPANSA’s intranet site. No agreement is required if the assessment is expected to take five working days or less.

9.3 Documenting the assessment

The lead inspector prepares an assessment report and makes recommendations to the CEO about whether to approve the application. A draft approval certificate is prepared – see the RMS for appropriate template.

9.4 Approval

The CEO must issue any transport approvals as competent authority.

Transport approval is granted for a specific period, for example:

Package Design is generally approved for a period of five (5) years with a possibility of recertification, subject to application Special Arrangements are approved for a nominated period depending on the type of transport

activity

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 22 of

Validation of a package is granted for the period specified in the original certificate and subject to the conditions of the original certificate.

9.5 Final notification

The lead inspector sends the approval to the applicant.

9.6 Record keeping

The lead inspector saves all records in the RMS and updates the LAD as necessary.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 23 of

10. Periodic Licence Review

Licences are reviewed periodically to ensure they remain current. The review should occur at least once every three years; when the licence template is updated; or if there is a substantial rewrite of licence conditions.

10.1 Review

The lead inspector should complete a licence review checklist. The following items should be checked as part of the review:

10.1.1 Licence template

Check that the licence is in the current format. Licence templates are subject to change as part of continuous improvement within the Regulatory Management System (RMS).

10.1.2 Name of licence holder

The name of the licence holder may change over time due to restructuring or merging events.The correct names of Australian Government Departments and Agencies can be found on the Australian Government Online Directory at http://www.directory.gov.au. Details of registered companies may be verified by checking the Australian Securities & Investment Commission internet page at http://www.asic.gov.au.

10.1.3 Licence holder primary contact details

The details of the licence holder’s primary contact should be checked and updated in LAD as required.

10.1.4 Currency of source inventory

Confirm that the SIW on file is current and has been imported into LAD. In cases where an updated SIW has not been received within the last 12 months, a current copy may be requested from the licence holder.

10.1.5 Cross check SIW with licence

The SIW should be cross-checked with the authorised dealings in Schedule 1 of the licence. This may involve checking the description of the item to ensure that it matches the classification in the SIW.

10.1.6 Currency of special licence conditions

Any special licence conditions should be verified and their validity confirmed. Removal of any special condition must be justified with evidence that the condition has been satisfied.

10.2 Documenting the review

The lead inspector should use the checklist to show that they have reviewed the licence file and checked each item. A comment may be placed in the box provided against each item.

Where changes are required, other relevant documents should be referenced.

10.3 Approval

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 24 of

If any changes are made the lead inspector should follow the relevant parts of the procedure for a regulation 51 change in section 3 of this manual.

Should the requirement to reissue the licence arise as a result of this review, the lead inspector should follow the process described in section 3.5 of this manual and advise the licence holder the reason for reissuing the licence.

10.4 Record keeping

The lead inspector will:

save the checklist to the licence file in the RMS

update the LAD and the RMS as necessary

update the CLB if required

10.5 Further Regulatory Action

Should the review identify a need for further action, the lead inspector should undertake additional actions in consultation with their section director.

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 25 of

11. Terms and definitionsTerm Definition

Bq becquerel

CEO Chief Executive Officer

CLB Current Licencing Basis

LA Licence Administration

LAD Licence Administration Database

NIR Non-Ionising Radiation

OLC Operational Limits and Conditions

PRF Prescribed Radiation Facilities

RAR Regulatory Assessment Report

RMS Regulatory Management System

RO Regulatory Officer

SAR Safety Analysis Report

SIW Source Inventory Workbook

SSSO Safety Systems Support Officer

Sv Sievert

12. ReferenceRef Abbreviation Title Issue date

The Act Australian Radiation Protection and Nuclear Safety Act 1998

Oct 2016

The Regulations Australian Radiation Protection and Nuclear Safety Regulations 1999

Jul 2018

RPS C-2 Code for Safe Transport of Radioactive Material, Radiation Protection Series Publication No C-2

2014

RPS 2.2 Safety Guide for the Approval Processes for the Safe Transport of Radioactive Materials, Radiation Protection Series Publication No 2.2

Nov 2012

REG-LA-SUP-246A REGULATORY GUIDE: Surrender of facility licence and release from regulatory control

Jun 2017

REG-RC-SUP-252A REGULATORY GUIDE: Transfer or Disposal of Sources

Aug 2015

REG-COM-MAN-270W Compliance and Enforcement Manual Sep 2018

Licensing and Assessment Manualv.3.0 ARPANSA-REG-LA-MAN-240W 26 of