Introduction to Project Management,
PMI & PMI Credentials
Presented by
Hari Prasad Thapliyal
PMO Architect & Project Management Trainer
PM-Learn.com
In general interest of the public, aspiring PMP, project managers
![Page 2: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/2.jpg)
This presentation is for general public about
the Project Management Profession. Hope
you would enjoy this
![Page 3: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/3.jpg)
Top 5 Tech Skills for 2010
Project Management
Security
Network Administration
Cloud Virtualization
Business Analysis
Source: 2010 IT Skills and salary report, Global knowledge and TechRepublic:
Nov’2009 Survey
![Page 4: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/4.jpg)
Project Manager is not Designation but a Profession.
To adopt any profession we need to have education, skills & experience of that profession!
Most of the life we live like unconscious project manager!
Anybody who is working to bring change in… is part of project team. Scope of that project may vary. Ask
yourself who is the project manager of that change?
![Page 5: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/5.jpg)
So be proud that you are on right track
By choosing
“Project Management” Profession
![Page 6: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/6.jpg)
What is a project?
A project is temporary endeavor undertaken to create unique product, service or result
Temporary: Beginning and end
End is reached when objectives have been achieved or project terminated or objective cannot be met
Temporary: Does not apply to Product, service or result but to endeavour
Unique: Either product is unique, customer is new or location is new or input to project is new
A project can involve a single person, a single org unit or multiple org units
![Page 7: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/7.jpg)
Project Produces :- Product, Service or Result
Product Residential Apartment
Setup a factory
Application enhancement of a banking software application
Develop a new software application
Service Establish a training department which can take care of organizational training need
Establish a presale department which can take care of all new business initiatives
Setup a call centre
Enabling a feature so that you start getting msg for every deposit or withdrawal from your account
Define a new product release process
Result Passed in PMP exam, GMAT exam etc
Health cured
Illiteracy removed
AIDS or Hepatitis B removed from the surface of earth
Sanitary and hygiene education for all
Hair cutting at saloon
Conduct annual appraisals
Conduct training programs
Take food at a restaurant
![Page 8: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/8.jpg)
Define Product, Service or Result
From previous slide can you state non
overlapping definition of product, service or
result?
![Page 9: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/9.jpg)
Projects and Operations
Projects and Operations
Develop one application and use it
Enhance certain feature in application and use those
Elect politicians, form government and run government
Setup airport and operanionalize
Setup school and operanionalize
Setup factory and operanionalize
Address the AIDS problems and make sure that no new case comes up
Find a job and do the job
Get married and maintain the marriage
Launch satellite in space and get the benefits
Get the peace and maintain it
Start a new branch office and run it
Open business new account and provide services
Built a national monuments and maintain it for public use
Spent money and use the product/ start the service/ get the result (realize benefits)
![Page 10: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/10.jpg)
Market place/
community Organization Any Portfolio
Particular
Portfolio
Need Top Management
Validate the need, potential business
opportunity, assign the need to
portfolio/experts for creating a business
case, business proposal is made
Org. Leadership
Unknown source
Org Leadership
Prioritize the business proposal based
on org vision/mission/value system of
organization/ value the project’s product
adds to stakeholders. Create
portfolio/assign the business proposal to
portfolio
Portfolio Management
Create the programs, projects proposals
from the selected business proposal.
Outflow of values/ ROI
• Strategic Decision
• Enterprise Level Decision
• Fairly good amount $ @ stake
• Long term commitment
• Corporate image
• Portfolio Manager is concern
about the actual returns of the
outcome of project but not in
control after project/program
has achieve its goal and
outcome of project
(service/product) in being
used for giving services.
Operation manager in control
now
Top Management & Projects
![Page 11: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/11.jpg)
How project/program starts?
Consideration
Evaluation
Prioritization
Assignment
Delivery
Operationalization
Need
Strategic Mgmt
Portfolio
Program/ Project
Management
Operation Mgmt
![Page 12: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/12.jpg)
How project/program starts?
There is a need
Consideration: Should we address this need or ignore it- If not aligned to org goal/mission/objective/value systems then ignore it otherwise pick up for evaluation
Evaluation: What value it adds to organization/ stakeholders correspond to price need to be paid by stakeholders. ROI/ BCR
Prioritization: How much important this need is compare to other needs; because of resource constraints we cannot do all pickup few most important
Assignment: Assign the opportunity to portfolio and allocate the funds. Creates programs, projects.
Delivery: Programs, projects planned and delivered by program/project team
Operationalization: Benefits of Product/Result/Service of project are realized by user/community/stakeholders
![Page 13: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/13.jpg)
Who owns the project/program
Program/Project
Identified in Sponsor
Org
Make of By Decision
Identify Project/Program
Manager
Define the overall scope
Develop Overall Project
plan & estimates
Plan the phase/release
Execute release plan
Stakeholder verify the
results
Document lessons
learned
Close release/phase
Project Execution
& Communication
Project Closure
Project in Performing Organization
Product, Service or
Result realized
Project Closure
Project Execution
![Page 14: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/14.jpg)
Make of By Decision
Buy Decision
RFP Floated by
Sponsor
Bidder Conference
Proposal Submitted by
Vendor
Contract awarded
Project Executed
Project Closure
Identify Project/Program
Manager
![Page 15: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/15.jpg)
Population, Megacities & Project
Management Need
2004 There were only 2 megacities (10 mn population)
In 2010 there are 21 megacities 11 in Asia, 4 in Latin America, 2 each in Africa, Europe and North
America
Today’s 21 megacities account for 9% of the world’s urban population
By 2025 there will be 29 megacities
Three are expected to emerge from China & similarly from India
By 2050, 70% of the worlds anticipated population (10 bn) will be urban dwellers
Source PMNetwork Aug’10
![Page 16: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/16.jpg)
India’s Infrastructure Blitz
INR 46.4 Tn: The amount India plans to spend on infra between 2014 and 2017
22%: The rate India’s infrastructure industry grew between 2008 – 2009
41%: The portion of infrastructure project completed in India between Apr’1992-Mar’2009 that faced cost overruns
82%: The portion of projects in that time period that missed their deadlines
74%: Believe that the shortage of PM is the main factor influencing infra project delivery
Source: Study on drivers of success in infra projects 2010, PMI & KPMG : PMNetwork: Jul’2010
![Page 17: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/17.jpg)
India Infrastructure Investment 2014-2017
Housing , $300 , 29%
Security, $160 , 15%
Education, $150 , 15%
Healthcare, $120 , 12%
Roads, $100 , 10%
Power, $120 , 12%
Sanitation, $40 , 4%
Water, $30 , 3%
Housing
Security
Education
Healthcare
Roads
Power
Sanitation
Water
Source: From the Report, prepared by Booz & Company in association with Cisco Systems for CII
![Page 18: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/18.jpg)
Demand vs Supply of PMs
How we are going to meet this huge demand of project managers who should manage INR 47 Tn projects?
How many rightly experienced people are available today?
How many rightly educated people are available today?
Many projects (especially education, health) are managed by NGOs
Do Indian NGOs have required project management skills?
Do Indian government department have project management skills
Efforts in PM education, certification & experience can fill the gap.
![Page 19: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/19.jpg)
Project Management Myth Vs Realty
It is inaccurate to think that only people
designated as Project Managers have
project management skills or use project
management methodologies
Any person who needs to manage multiple
task, involving multiple people and has
deadline can use project management skills
and knowledge
![Page 20: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/20.jpg)
Ubiquitous nature of Project Management
![Page 21: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/21.jpg)
Sales & Marketing
Campaign Management
Brand Management
Event Management
Product Lifecycle Management
Market Research
Public Relation
![Page 22: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/22.jpg)
Human Resource
Training & Development
Recruitment Planning & Exec
Appraisal Execution
Organization development planning
Growth Planning
![Page 23: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/23.jpg)
Finance
Budgeting
Variance Monitoring
Investment Planning
Merger & Acquisition Planning
IPO Planning & Execution
Following complains and disclosure
procedures
![Page 24: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/24.jpg)
Top Management
Strategic Planning
Monitoring initiative across department
Cash flow monitoring
Resource Planning
Expansion Planning
Managing Value Lifecycles
Crisis Management
![Page 25: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/25.jpg)
Manufacturing
Process improvement
Capacity Expansion Planning
Building New factories
Quality Management
Defect Management
Kaizen
![Page 26: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/26.jpg)
Home Users
Planning Parties or wedding
Building repair or house
Managing Proposals Finance
Tracking investments
Buying/selling property
Managing Cash flow
Moving residence from one place to other
![Page 27: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/27.jpg)
Any Role
Manage complex interdependent task
efficiently
![Page 28: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/28.jpg)
PMI® & PMP®
An Overview
![Page 29: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/29.jpg)
PMI® - Overview
Largest Not-for-Profit Organization for Project Management Professionals
PMI has 12 standards for project, program and portfolio management and
they are most widely recognized standards in the profession
Credentials, Research, Standards, Promotion of Project Management
Profession
PMI offers 5 global certifications
More than 250 chapters, and 30 industry or interest-based communities of
practice
Truly global membership with representation in 190+ countries
PMI has 1400 REPs across the global
![Page 30: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/30.jpg)
PMI® - Overview…
PMI Offices is in Newtown Square, Pennsylvania in the USA.
Founded in 1969 by working project managers
Governed by a Board of Directors; elected “volunteer” members
Chapters act as “franchises”, providing education and networking
Opportunities
Specific Interest Groups (SIGs), for similar industries or similar interests.
More than half million members and credential holders worldwide
![Page 31: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/31.jpg)
PMI® – Membership Benefits
Member’s only services and discounts on many of PMI’s valuable
products
Free Copy of the latest edition of the PMBOK® Guide CD ROM
Subscriptions to PM Network®, Project Management Journal® and
PMI Today™
Join PMI’s Chapters, Specific Interest Groups (SIGs) and Colleges
Access the Members Area of the Web site
Access the PMI Member Community online
http://www.pmi.org/Membership/Pages/Types-of-Memberships.aspx
![Page 32: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/32.jpg)
Provides professional and personal recognition
Expedites professional advancement
Creates job growth and opportunities within an organization
Provides a framework for standardized project management requirements
Increases an employee’s value to the organization
A major benefit that organizations - a truly global
certification.
PMI Certified Project Managers are a preferred lot by any organization
worldwide
High Demand due to short supply of Certified Project Managers
Increase in compensation within the organization
PMP® – Certification Benefits
![Page 33: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/33.jpg)
Projects
1. PMBOK 4th Edition, 2008
2. Schedule Management
3. Risk Management
4. Configuration Management
5. Practice Standard for Work Break Down Structure
6. Practice Standard for Earn Value Management
7. Construction Extension
8. Government Extensions
Project Management Standards
![Page 34: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/34.jpg)
Portfolio
9. Portfolio Management
Program 10. Program Management
Organization 11. OPM3
People 12. Project Manager Competency Development
Framework Profession
Project Management Standards
![Page 35: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/35.jpg)
PMP Journey
![Page 36: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/36.jpg)
Secondary Diploma + 5 Years Experience in Projects+
7500 Hours + 35 PDU
Or
4 years degree + 3 Years Experience in Projects+ 4500
Hours + 35 PDU
PMP Prerequisite
![Page 37: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/37.jpg)
Seven steps in the Journey towards
PMP®
Become a PMI member. Cost 129 US $.
Time span : On line or One week
Mandatory training/PM education for
35 hours of credits (chapter,university,institute or REP)
Prepare for Exam
1
2
Submit Fees (Cost : US$ 405)
get eligibility letter schedule Exam
Execute,Succeed & Celebrate
Time : 4 Hours
PMP
3
5
6
Receipt of PMP examination eligibility
notice from PMI ( (Time : 5 Days)) 4
7
R
E
F
E
R
E
N
C
E
B
O
O
K
S
Submit PMP examination Application.
(You get 90 days to complete application)
![Page 38: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/38.jpg)
PMP Costs of Certification
Registration fees for 35 Contact Hours program through a R.E.P
PMI Membership Fees for General Candidates: $129
PMP Examination Fees Non-Members USD $555
PMI Members USD $405
Re-Examination Fees Non-Members USD $375
PMI Members USD $275
![Page 39: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/39.jpg)
Post Successful PMP Certification
Certificate is valid for 3 years
Within three years individual need to earn
60 PDU
Go to www.pmi.org for registering 60 PDU
& paying 60$ (current fee)
Your certificate will be renewed for next
three years
![Page 40: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/40.jpg)
12 Ways of earning PDU
1. PMI's Knowledge Shelf
2. PMI® Publication Quizzes
3. Volunteer Service
4. Registered Education Provider (R.E.P.) Courses
5. PMI® Global Congresses
6. PMI Community Offerings
7. SeminarsWorld®
8. eSeminarsWorldSM
9. Web-based Self-Study
10. Professional Activities (10-30 PDU)
11. Self-Directed Learning
12. Educational Programs by Outside Providers
http://www.pmi.org/Certification/Twelve-Ways-to-Earn-PDUs.aspx
![Page 41: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/41.jpg)
CAMP Journey
![Page 42: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/42.jpg)
A secondary diploma (high school or the
global equivalent)
AND
At least 1,500 hours experience OR 23
hours of project management education.
CAPM Prerequisite
![Page 43: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/43.jpg)
Seven steps in the Journey towards
CAMP®
Become a PMI member. Cost 40 US $.
Time span : On line or One week
1500 Hours experience OR PM training for
23 hours of credits (chapter, university, institute or REP)
Prepare for Exam
1
2
Submit Fees (Cost : US$ 225)
get eligibility letter to schedule Exam
Execute, Succeed & Celebrate
Time : 3 Hours
CAMP
3
5
6
Receipt of CAPM examination eligibility
notice from PMI ( (Time : 5 days)) 4
7
Submit CAMP examination Application.
(You have 90 days to complete application)
R
E
F
E
R
E
N
C
E
B
O
O
K
S
![Page 44: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/44.jpg)
CAPM Costs of Certification
Registration fees for 23 Contact Hours program through a R.E.P
PMI Membership Fees for Students : $40 / Year
CAMP Examination Fees
Non-Members USD $300
PMI Members USD $225
![Page 45: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/45.jpg)
Post Successful CAPM Certification
CAPM certificate is valid only for 5 years
Re-exam (CAPM or PMP) is required for
recertification
![Page 46: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/46.jpg)
PM-Learn Services
Trainings & Workshops Project Management Capsule Trainings
PMP Trainings
CAPM Training
MSP 2007/ 2010 Trainings
Earn Value Management Training
Function Point Estimation
Project Risk Management
Project Schedule Management
MS Office Productivity Tools
Assessment Project Management Maturity Assessment of Project Managers
Consulting PMO Consulting
EPM 2007/2010 Implementation
CMMI Consulting & Assessment
![Page 47: Introduction to PMI and PMP](https://reader034.vdocuments.us/reader034/viewer/2022050722/5483f6c5b4af9f730d8b4a63/html5/thumbnails/47.jpg)
www.pm-Learn.com Project Management Maturity Assessment Portal
Hari P Thapliyal, PMP, MCITP, MBA, MCA, PGDFM
PMO Architect & Project Management Trainer
Reach Me:
[email protected], [email protected]
Skype: hari.thapliyal, YM: hari_thapliyal, Twitter: harithapliyal
Profile: http://in.linkedin.com/in/harithapliyal
Blog: http://pm-bestpractices.blogspot.com/
Website: www.pm-learn.com, https://sites.google.com/site/lifeisprojectplus