introduction to e-waste ( management & handling) rules, 2011 and guidelines

28
Introduction to E-Waste (Management & Handling) Rules, 2011 and Guidelines By Anand Kumar Senior Environmental Engineer Central Pollution Control Board (Ministry of Environment and Forests, Govt. of India) 03-12- 2013

Upload: kyna

Post on 24-Feb-2016

61 views

Category:

Documents


0 download

DESCRIPTION

Introduction to E-Waste ( Management & Handling) Rules, 2011 and Guidelines. By Anand Kumar Senior Environmental Engineer Central Pollution Control Board (Ministry of Environment and Forests, Govt. of India) 03-12- 2013. Initial Interventions. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Introduction to

E-Waste (Management & Handling) Rules, 2011

and Guidelines

By

Anand KumarSenior Environmental Engineer

Central Pollution Control Board(Ministry of Environment and Forests, Govt. of India)

03-12- 2013

Page 2: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Initial Interventions

“Guidelines for Environmentally Sound Management of E-waste” notified by Government in March 2008.

E-waste included in the schedule IV of the HAZARDOUS WASTE Rules, on 24th September, 2008 Implies that the generators of e-waste has to give this waste only to a registered recyclers who has the environmentally sound facilities for dismantling & recycling of e-waste

Page 3: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

The E-Waste (Management and Handling) Rules, 2011

Notified in May 2011 and Became effective from May 2012

RoHS Provisions will become effective from May 2014

Page 4: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

E-Waste Management and Handling Rules, 2011

Six Chapters, Three Schedule and Five FormsChapter 1 – Has definitions of various termsChapter 2 – Responsibilities of Producers, Collection Centers, Dismantler, Recycler and Bulk ConsumerChapter 3 - Procedure for seeking Authorization & RegistrationChapter 4 - Storage of E-WasteChapter 5 - RoHSChapter 6 – Duties of Regulatory Authorities, Annual Report from Producers, Collection Centers, Dismantlers Recyclers, Transportation, Accident ReportingSchedule – I : List of Equipment, Schedule – II : Exemptions list for RoHSSchedule – III: Duties of Regulatory Authorities

Page 5: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Objectives of E-Waste Rules Minimize illegal recycling / recovery operations Environmentally Safe & Sound Recycling by

channelizing E-waste to registered E-waste recyclers

Extended Responsibilities to producers to manage a system of E-waste collection/take back and channelizing to a registered dismantler/recycler.

Responsibilities to Urban Local Bodies for orphan products and for waste found mixed with MSW

To Create an E-waste collection channelization system

Reduce Hazardous substances in Electrical and Electronic components

Page 6: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Important definitionsE-waste means waste electrical and

electronic equipment, whole or in part or rejects from their manufacturing and repair process, which are intended to be discarded;

Electrical and electronic equipment means equipment which is dependent on electrical currents or electro-magnetic fields to be fully functional;

Page 7: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Important definitions

Producer: means any person who, irrespective of the selling technique used

manufactures and offers to sell electrical and electronic equipment under his own brand; or

offers to sell under his own brand, assembled electrical and electronic equipment produced by other manufacturers or suppliers; or

offers to sell imported electrical and electronic equipment;

Page 8: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Important DefinitionsHistorical E-Waste - E-waste generated

from electrical and electronic equipment as listed in Schedule I, which was available on the date from which these rules come into force

Orphaned Products – Non branded or assembled electrical and electronic equipment as listed in Schedule I or those produced by a company, which has closed its operations or has stopped product support

Page 9: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Important Definitions

Bulk Consumers - Bulk users of electrical and electronic equipment such as central government or state government departments, public sector undertakings, banks, educational institutions, multinational organizations, international agencies and private companies that are registered under the Factories Act, 1948 and Companies Act, 1956

Extended Producer Responsibility - Responsibility of any producer of electrical or electronic equipment, for their products beyond manufacturing until environmentally sound management of their end of life products

Page 10: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Categories of EEE covered IT and telecommunication equipment: Centralized data processing; Mainframes, Minicomputers;

Personal computing; Personal computers (Central processing unit with input and output devices), Laptop computers (Central processing unit with input and output devices), Notebook computers, Notepad computers, Printers including cartridges, Copying equipment, Electrical and electronic typewriters, User terminals and systems, Facsimile, Telex, Telephones, Pay telephones, Cordless telephones, Cellular telephones, Answering systems

Consumer electronics: Television sets (including sets based on (Liquid Crystal Display

and Light Emitting Diode technology ), Refrigerator, Washing Machine, Air-Conditioners excluding centralized air conditioning plants,.

Page 11: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

E-waste Rules, 2011- Stake Holders

Every producer, consumer or bulk consumer, involved in the manufacture, sale, and purchase and processing of electrical and electronic equipment or components as specified in schedule I

Collection Centers, Dismantlers & Recyclers of E-waste

Bulk Consumer/Consumer MoEF/CPCB/SPCBs/PCCs. ULBs

Page 12: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Collection of e-waste generated from the ‘end of life’ of their products in line with the principle of ‘Extended Producer Responsibility’ (EPR), or generated during manufacturing of electrical and electronic equipment and channelization of such waste to registered dismantler or recyclers.

Setting up collection centres or take back systems either individually or collectively

Financing and organizing a system to meet the costs involved in the environmentally sound management of e-waste generated from the ‘end of life’ of its own products and historical waste available on the date from which these rules come in to force. The financing arrangement of such a system shall be transparent. The producer may choose to establish such financial system

either individually or collectively by joining a collective scheme.

Responsibility of Producer

Page 13: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibility of ProducerContd……c

to facilitate return of used electrical and electronic equipment by providing contact details such as address, telephone numbers/helpline number of authorized collection centers to consumer(s) or bulk consumer(s)

creating awareness through publications, advertisements, posters, or by any other means of communication and information booklets accompanying the equipment, with regard to:

information on hazardous constituents as detailed in sub-rule 1 of rule 13 in EEE information on hazards of improper handling, accidental breakage, damage

and/or improper recycling of e-waste instructions for handling the equipment after its use, along with the Do’s and

Don’ts affixing a visible, legible and indelible symbol on the products or information

booklets to prevent e-waste from being dropped in garbage bins

Page 14: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibility of ProducerContd……c

Obtaining an authorization from the concerned State Pollution Control Board or Pollution Control Committee in accordance with the procedure under rule 9

Maintaining records in Form 2 of the e-waste handled and make such records available for scrutiny by the State Pollution Control Board or the Committee concerned

Filing annual returns in Form 3, to the State Pollution Control Board or Pollution Control Committee concerned, on or before the 30th day of June following the financial year to which that return relates

Page 15: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Scope of EPR

Responsibility of ProducerContd……

The producer may opt to implement EPR on his own individually or collectively:

individual producer responsibility where producer implements EPR on his own by setting up his own authorized collection centres or

collective producers responsibility, where producers may authorize common collection centres (CCC) independently or by joining a consortium as a member.

may expand collection reach by working between consumer – retailer – collection center - recycler

Page 16: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibility of Producer

Contd…REDUCTION IN THE USE OF HAZARDOUS SUBSTANCES (RoHS)

Every producer of EEE shall achieve the thresh hold limits as prescribed in rule 13 (1) within a period of three years from the published notification.

Imports of EEE shall be permitted only for those equipments, which are RoHS compliant.

Page 17: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Maximum permissible concentration of lead, mercury, hexavalent chromium, polybrominated biphenyls and polybrominated diphenyl ethers is 0.1% and in respect of cadmium the maximum concentration value is 0.01% in homogenous materials of electrical and electronic equipment as listed in Schedule I (by weight)

39 categories of equipments as listed in schedule II and equipment used for defence and strategic applications have been exempted from this provisions

The above limits will not apply to components of electrical and electronic equipment manufactured or placed in the market six years before the date of commencement of these rules

Responsibility of Producer Contd…REDUCTION IN THE USE OF HAZARDOUS SUBSTANCES

(RoHS)

Page 18: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibilities of Collection Centers To obtain an authorization in accordance with the procedure

under rule 9 from the concerned SPCB or PCC and provide details such as address, telephone numbers/helpline number, e-mail, etc. of such collection centre to the general public

To ensure secure storage of the e-waste collected till it is sent

to registered dismantler(s) or recycler(s)

To ensure safe transportation of e-waste

To file annual returns in Form 3, to the SPCB or PCC concerned on or before the 30th day of June following the financial year to which that return relates

To maintain records of the e-waste handled in Form 2 and make such records available for scrutiny by the SPCB or PCC .

Page 19: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibilities of Bulk Consumer

To ensure that e-waste generated is channelized to authorized collection centers or registered dismantlers or recyclers or is returned to pick-up or take back services provided by the producers;

Maintain records of e-waste generated by them in Form 2 and make such records available for scrutiny by the SPCBs/PCCs.

Page 20: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibilities of Dismantler & Recycler To obtain authorization and registration from the

SPCB/PCC (rule 9 & 11) To ensure that no damage is caused to the environment

during storage and transportation of e-waste To ensure that the dismantling/recycling processes do

not have any adverse effect on the health and the environment

To ensure that the facilities and dismantling & recycling processes are in accordance with the standards or guidelines published by the CPCB from time to time

Dismantler to ensure that dismantled e-waste are segregated and sent to the registered recycling facilities for recovery of materials

Page 21: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibilities of Dismantler & Recycler

Contd…… Dismantlers shall not process any e-waste for recovery and/or refining of materials, unless registered as recycler for refining and recovery of materials.

To make available all records to the CPCB or SPCB/PCC for inspection

To ensure that residue generated after recycling is disposed of in a hazardous waste Treatment Storage Disposal Facility (TSDF)

To file annual returns in Form 3

Page 22: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

SPCBs/PCCs has been assigned the following duties: preparation of inventory of e-waste granting authorization granting registration monitoring of compliance of authorization and registration

conditions maintaining information on the conditions imposed for

authorization taking action against violations of these rules ensure that collection centre should not store e-waste

for a period exceeding one hundred and eighty days.

Responsibility of State Pollution Control Boards/ Pollution Control Committees

Page 23: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibility of Central Pollution Control Boards

Coordination with State Pollution Control Boards/ Committees of Union territories

Preparation of Guidelines for Environmentally Sound Management of e-waste

Conduct assessment of e-waste generation and processing

Recommend standards and specifications for processing and recycling e-waste

Documentation, compilation of data on e-waste and uploading on websites of Central Pollution Control Board

Page 24: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Conducting training & awareness programmes

Submit Annual Report to the Ministry of Environment & Forests

Enforcement of provisions regarding reduction in use of hazardous substances in manufacture of electrical and electronic equipment

Initiatives for IT industry for reducing hazardous substances

Set targets for compliance to the reduction in use of hazardous substance in manufacture of electrical and electronic equipment

Responsibility of Central Pollution Control Boards Contd……

Page 25: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Responsibility of Municipal Authority

The Municipal Authorities are responsible for:

Channelization of e-waste after segregation to either authorized collection centre or dismantler or recycler if found to be mixed with MSW.

Collection and channelization of e-waste

generated from non branded or assembled electrical and electronic equipment to either authorized collection centre or dismantler or recycler.

Page 26: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Guidelineson

Implementation of E-Waste Rules 2011

Page 27: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

A guidance document for implementation of the provisions of the E-Waste (Management & Handling) Rules, 2011

To help Producers, Consumer & Bulk Consumer, Collection Center, Dismantler, Recycler and Regulatory agencies (SPCBs/PCCs) in effective compliance/implementation of these rules.

To provide guidance to collection center, dismantler and recycler

To help Producers for understanding the concept and scope of “extended producer responsibility”(EPR).

Guidelineson

Implementation of E-Waste Rules 2011

Page 28: Introduction  to E-Waste  ( Management  &  Handling)  Rules,  2011 and  Guidelines

Thanks