introduction ntpc ltd
TRANSCRIPT
8/8/2019 Introduction NTPC Ltd
http://slidepdf.com/reader/full/introduction-ntpc-ltd 1/3
8/8/2019 Introduction NTPC Ltd
http://slidepdf.com/reader/full/introduction-ntpc-ltd 2/3
Generator is three phases, two pole air cooled machine.
The mechanical energy generated by turbine is converted to electrical energy by the generator and appear in thestator winding in the form of current and voltage. This balances the torque of the gas turbine.
It lead the magnetic flux, and carries the field winding, the generator is self excited. The power required for theexcitation is taken from the generator terminals and fed to the field winding through the excitation transformer andthe thyristor- controlled rectifier units.
Waste Heat Recovery Boiler Anta Combined cycle power plant also known as Waste Heat Recovery Boilers (WHRB) plant, which are of non-fired, dual pressure and forced circulation type. The boiler has two different water/steam cycle known as high-pressure system and low-pressure system.
Components of WHRBThe main components of the WHRB can be divided into following categories:LP Economizer LP Drum & Evaporator LP Super-heater HP Economizer HP Drum & Evaporator
LP Economizer In economizer the flue gas heats up the feed water.After the economizer the feed water enters the LP evaporator and then to LP drum boiler.
HP BOILER PARTSHP Economizer The HP economizer coils are in two part one part is just below the LP economizer and other part is below LP super heater and both the coils are connected in series
HP Boiler Drum & Evaporator The feed water in the HP-boiler drum is pumped through the evaporator by means of 2 x 100 % HP circulationpumps.
HP Super-Heater The HP super heater consists of two parts with a spray attemperator between them. This configuration allows the
temperature control of the super heated steam.
Condensate Pre-Heater The main condensate is pumped by condensate extraction pumps (CEPs) to the feed water tank.
Before entering the feed water tank the condensate is passed through the condensate pre-heaters, which aresituated at the tail end of the WHRBs and heated by the flue gas to achieve the highest cycle efficiency.Cooling tower
Unit Auxiliary Transformer (UAT) Specification of three winding UAT : Rated power 6300 MVA Rated voltage noload HV 15.75 KV Rated voltage no load LV side 2.55 KV and 0.433 KV Rated current HV side 230.9 A Ratedcurrent LV side 1143 A and 1667 A Frequency 50 HzTransformer protectionsTransformer Differential protection.Three phase over current protection.Earth fault relayRestricted earth fault relayBuchholz relay
Generator ProtectionsGenerator Differential ProtectionGenerator Stator earth fault protectionGenerator rotor earth fault protection
8/8/2019 Introduction NTPC Ltd
http://slidepdf.com/reader/full/introduction-ntpc-ltd 3/3
Switchyard and transmission equipmentTransformer IsolatorsCircuit breakersEarth switchesWave trapLightning arrestor Current transformer
Potential transformer Bus bars
Bus Switching SchemesADVANTAGES OF GAS BASED PLANTSHIGH THERMAL EFFICIENCYLOW WATER REQUIREMENTSENVIRONMENT FRIENDLINESSFAST START - UP
LOW INSTALATION COSTPOWER EVACUATION FROM NTPC ANTAThere are total six 220 kv transmission lines for evacuation of power generated at Anta.two lines for Bhilwara,two lines for Jaipur andone line for Kota andone line for Rawatbhata power plant
Reference: http://www.seminarprojects.com/Thread-industrial-training-at-ntpc-anta-gas-power-plant-full-report#ixzz0v6451isv