Page 1: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Commissioning Presentation

For

Society of American Military Engineers (SAME)

George Washington University Chapter

February 25, 2011

Page 2: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Anthony Pellegrino, PE

My name is Anthony Pellegrino. I am a licensed Professional Engineer with 17 years of experience in the Design and Construction Industry.

I am a Senior Mechanical Engineer at URS and function as a specialist at both Commissioning and Control System Design.

I have been responsible for the development of commissioning specifications and test plans; third party reviews of mechanical, plumbing and electrical design; and management of commissioning projects as a Commissioning Agent.

I have also been responsible for witnessing and documenting mechanical, plumbing and electrical building commissioning activities as well as post-construction troubleshooting

Page 3: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I

Agenda

•Introduction to Commissioning•Building Systems which are Commissioned•Description of the Commissioning Process•Documentation used in the Commissioning Process•Conclusion

Page 4: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

What is Commissioning?

• The Process is based on the ASHRAE Guidelines 0-2005 and 1-1996

• A Quality Based Method adopted by the Owner to achieve a successful construction project.

• As Defined by ASHRAE “Commissioning is a systematic process of ensuring that all building systems perform interactively according to the design intent and the owner’s operational needs.”

Page 5: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I

What is the Purpose of Commissioning?

• Serves as a means to provide documented confirmation that the facility fulfills the requirements of the owner.

• To verify and document compliance with design criteria throughout construction, start-up, and the initial period of operation.

• To confirm that operating staff are trained and have the necessary documentation to maintain the facility.

• It includes and coordinates the separate functions of system documentation, equipment startup, control system calibration, testing and balancing and performance testing.

Page 6: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

When is Commissioning NOT Optional?

• Code requirements for all new buildings over 50,000 SF (ASHRAE 90.1) require HVAC systems be commissioned.

• US Green Building Council requires Fundamental Commissioning as a pre-requisite for LEED Certification.

• Additional points can be earned with Enhanced Commissioning.

Page 7: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I

Who Should be Doing Commissioning?

Ideally, Commissioning should be performed by an Independent Company that has no affiliation with:

•Manufacturers of equipment or system components•Installing Contractors•Designers•Any other person or company which could affect the ability of the Commissioning Agent to render an Independent Commissioning Report

Page 8: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

What is a Commissioning Agent?

• The Commissioning company will assign a Commissioning Agent (CxA) to the project.

• The primary role of the CxA is to develop, coordinate and execute testing plans, document performance and confirm proper system functionality.

• The CxA leads, plans, schedules and coordinates the Commissioning Team.

Page 9: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

What is a Commissioning Team?

• The Commissioning Team consists of representatives from the various parties involved in the construction effort.

• They are responsible for implementing the commissioning process.

Page 10: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

What Gets Commissioned???

Page 11: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Heating Ventilation & Air Conditioning (HVAC) Systems

• Air Handling Units• Roof Top Units• Fan Coil Units• VAV Boxes• Chillers• Boilers• Pumps• Exhaust Fans

Page 12: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Plumbing

• Potable Hot Water• Domestic Hot Water• Sanitary Water• Storm Water• Water Softener• Toilets• Sinks• Urinals• Showers

Page 13: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Electrical

• Transformers• Switchgears• Power Distribution

Units• Motor Control Centers• Engine Generators• Breaker Panels• Automatic Transfer

Switches

Page 14: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Fire Protection

• Fire Pumps• Wet Pipe Sprinkler

System• Dry Pipes Sprinkler

System• Pre-Action Sprinkler

System• Kitchen Hood Fire

Suppression System

Page 15: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Telecommunications

• Information Technology Systems

• Telephone Systems• Intranet

Page 16: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Security

• Card Access Systems• CCTV Systems• Alarm Systems

Page 17: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Building Envelope

• Doors• Windows• Building

Pressurization• Exterior Walls• Roof

Page 18: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Specialty Equipment

Laboratory Fume Hood Laboratory Exhaust System

Page 19: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Fire Alarm

Fire Alarm System Fire Alarm Control Panel

Page 20: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Controls

Building Automation System Control Panel

Page 21: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

The Commissioning Process

• The Commissioning Process is a Quality-Focused Process for enhancing the delivery of a project.

• The process focuses upon verifying and documenting that the facility is planned, designed, installed and tested to meet the design intent.

Page 22: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Four Phases of Commissioning

The Commissioning Process can be broken down into four phases:

•Design Phase Activities•Construction Phase Activities•Acceptance Phase Activities•Post Acceptance Phase Activities

Page 23: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Design Phase

During the Design Phase, the CxA:

•Reviews the Owner’s Project Requirements.•Reviews the Design Documents.•Develops Commissioning Specifications.•Develops a Preliminary Commissioning Plan.•Conducts a Kickoff Meeting.

Page 24: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Construction Phase

During the Construction Phase, the CxA:

•Develops the final Commissioning Plan.•Holds regular Commissioning Meetings.•Incorporates Commissioning milestones into the project schedule.•Reviews modifications to the Contract Documents.•Reviews approved submittals for equipment being Commissioned.•Develops the Construction Verification Checklists (CVC).

Page 25: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Construction Phase (Continued)

During the Construction Phase, the CxA:

•Randomly visits the site to verify installation of equipment.•Creates and Maintains a Commissioning Issue Log.•Reviews CVCs startup checklists completed by Contractor.•Develops Functional Performance Tests (FPT).•Reviews Operation & Maintenance Manual Documentation.•Verifies adequate training is provided by the Contractor.

Page 26: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Acceptance Phase

During the Acceptance Phase, the CxA:

•Witnesses initial Testing, Adjusting and Balancing (TAB) of building systems.•Directs and Witnesses FPTs performed by the Contractor.•Documents the results of FPTs and notes all deficiencies found.•Directs and Witnesses re-testing of items that failed initial testing.•Maintains and Updates the Commissioning Issue Log.•Works with the Contractor to resolve outstanding issues.

Page 27: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Post Acceptance Phase

During the Post Acceptance Phase, the CxA:

•Directs and witnesses off-season testing.•Maintains and updates the Commissioning Issue Log.•Works with the contractor to resolve outstanding issues.•Conducts a final interview with the Owner.•Writes the Final Commissioning Report.

Page 28: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Documents Used in the Commissioning Process

• Design Intent Document• Construction Documents• Contract Documents• Commissioning Plan• Field Reports• Construction Verification Checklists (CVC)• Functional Performance Tests (FPT)• Commissioning Issue Log• Operation & Maintenance Manuals• Final Commissioning Report

Page 29: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Design Intent Document

• Details the functional requirements of a project and how it will be used.

• It includes project goals, performance criteria, cost considerations, benchmarks and success criteria.

• It is translated into the construction documents.• It is the ultimate measure of the project’s

technical success.

Page 30: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Construction Documents:

•These include a range of documents that vary with the Owner’s needs, regulations and laws.•Includes specifications, drawings and general terms and conditions of the contract.

Contract Documents:

•These include price agreements, construction management process, subcontractor agreements and/or requirements, requirements and procedures for submittals, changes, other construction requirements, timeline for completion, and the Construction Documents.

Page 31: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Commissioning Plan:

•A written plan of how the commissioning process will be accomplished.

Field Reports:

•A document generated after each CxA site visit to record commissioning related event.

Commissioning Issue Log:

•A formal vehicle to track commissioning issues, their status and resolution.

Page 32: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of a Commissioning Plan

Page 33: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of a Field Report

Page 34: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of a Commissioning Issue Log

Page 35: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Construction Verification Checklists (CVC)

• Activities that must be performed for the proper storage, handling and installation of building components.

• CVC’s must be completed by the Contractor prior to Functional Performance Testing.

Page 36: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of a Construction Verification Checklist (CVC)

Page 37: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Functional Performance Testing (FPT)

• A procedure designed to verify the functional performance of equipment or systems under a full range of operating conditions and loads, as specified by the contract documents.

• Each test is a written protocol that defines methods, personnel, and expectations for tests conducted on components, equipment, assemblies, systems, and interfaces among systems.

• The Contractor performs the FPT’s and provides necessary test equipment to complete the tests.

• The CxA directs, witnesses, and documents the FPT’s.

Page 38: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of Functional Performance Tests (FPT)

Page 39: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of Functional Performance Tests (FPT) (Cont.)

Page 40: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of Functional Performance Tests (FPT) (Cont.)

Page 41: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Operation & Maintenance Manuals

• Provided by Contractor at the completion of the project.

• Describes the as-built conditions.

• Describes how systems operate.

• Includes information on products concerning repair and replacement.

Page 42: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Final Commissioning Report

• Documents the Activities which occurred during the Building Commissioning Process.

• Provides the Final Results of the overall Building Commissioning Effort.

Page 43: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

Example of a Final Commissioning Report

Page 44: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

And FINALLY….

Page 45: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

What are the Benefits of Commissioning?

• A fully Functional System that minimizes the number of occupant complaints.

• A fine-tuned system improves the economy of operation.

• Knowledge and Resources are available to maintain systems as they were originally intended.

• Reduces the number of problems upon initial occupancy.

• Improves the reliability of building systems.

• Saves money through more efficient operation of building systems.

Page 46: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

QUESTIONS?

Q&A

TIME

Page 47: INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION Commissioning Presentation For Society of American Military Engineers

INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION INTRODUCTION I BUILDING SYSTEMS I COMMISSIONING PROCESS I DOCUMENTATION I CONCLUSION

THANK YOU!