INTRODUCTION AND OVERVIEW OF MANAGING ENVIRONMENTAL REGULATOR ASPECTS OF AIRPORT PROJECTS
Darren Betters, Lehigh-
Northampton Airport Authority
Eric H. Buncher, Allegheny
County Airport Authority
Nicholas M. Clabbers,
Kaplan Kirsch & Rockwell
![Page 2: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/2.jpg)
Airport planning basics – why does it matter and how does it
affect environmental review?
Federal environmental review for airport projects
New way to potentially avoid federal environmental review
2
TODAY’S SESSION
Questions, please!
![Page 3: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/3.jpg)
The sponsor’s strategy for the development of the airport
Usually a 20 (or more)-year look ahead
Master Plan is basis for Airport Layout Plan (ALP)
-- Airport Master Planning Guidance - FAA Advisory
Circular 150/5070-6BA
3
AIRPORT MASTER PLANS
![Page 4: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/4.jpg)
Graphic representation of future airport development
Opportunity to address relevant issues
Air service capacity and forecasting
Realistic schedule for project implementation
Financial plan
Framework for continuous planning process
Opportunity to engage public and stakeholders
4
MASTER PLAN – KEY COMPONENTS
![Page 5: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/5.jpg)
An Airport Layout Plan is a scaled drawing of existing and proposed land and facilities necessary for the operation and development of the airport
ALPs must be maintained in accordance with FAA requirements
-- FAA Order 5190.6B, FAA Airport Compliance Manual, Appendix R
5
AIRPORT LAYOUT PLANS
![Page 6: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/6.jpg)
ALPs may be conditionally or unconditionally approved by the FAA
The distinction between these approvals is important Approval is a federal action!
FAA funding of projects and approval for implementation
require unconditional ALP approval
6
AIRPORT LAYOUT PLANS, CONTINUED
![Page 7: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/7.jpg)
Definition of “airport property”
Federally obligated
Subject to regulation
Changes trigger FAA review or approval (in some instances)
and thus environmental review
More on that in a moment
Both a hammer and a shield
7
SIGNIFICANCE OF ALP IN ENVIRONMENTAL CONTEXT
![Page 8: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/8.jpg)
Establishes environmental policies and goals for the country
When the federal government takes an action that may have
environmental impacts, it must:
Take a hard look at the impacts
Provide information about environmental effects to decision-
makers and the public
Intent is to improve decision making
8
NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) OVERVIEW
![Page 9: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/9.jpg)
9
NEPA: THREE FORMS
Categorical Exclusion (CATEX)
Environmental Assessment (EA)
EIS
![Page 10: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/10.jpg)
Sponsor Planning
1
Notice of Intent
2
Scoping
3
Draft EIS/ EA
4
Final EIS/ EA and Record of Decision
5
10
NEPA PROCESS
![Page 11: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/11.jpg)
11
A SPONSOR’S ROLE
• Coordinate with
state and local
processes
• Watch for other
environmental
requirements –
especially state law
• Contracting with
consultant preparing
the EA/EIS
• Pre-NEPA strategy
• Scrutinize
purpose and
need
• Protect sponsor’s
objectives
• Coordinate
environmental review
with planning
![Page 12: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/12.jpg)
NEPA process is not a good place to be doing fundamental
planning
Alternatives need to be defined (and eliminated) in the
planning process (to consider cost, for example)
Use planning to set limits for the NEPA review (to identify
what you cannot do)
LESSONS LEARNED
![Page 13: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/13.jpg)
Not starting the NEPA process with unanswered planning
questions
Overlapping the NEPA and planning process
Developing a supportable purpose and need during the planning
process
Complete alternatives analysis during the planning process
Integrating environmental issues in the planning process
13
SMOOTH PLANNING/NEPA INTEGRATION
![Page 14: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/14.jpg)
FAA Reauthorization Act of 2018
14
POTENTIALLY AVOIDING NEPA: A NEW LEGAL FRAMEWORK
Pub. L. 115-254, 131 Stat. 1129
![Page 15: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/15.jpg)
FAA may not directly or indirectly regulate—
(1) the acquisition, use, lease, encumbrance, transfer, or
disposal of land by an airport owner or operator;
(2) any facility upon such land; or
(3) any portion of such land or facility.
15
NEW PROHIBITION ON REGULATING AIRPORT PROPERTY
EXCEPT…
![Page 16: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/16.jpg)
This prohibition does not apply to:
(1) any regulation ensuring –
(A) the safe and efficient operation of aircraft or safety of people and property
on the ground related to aircraft operations;
(B) that an airport owner or operator receives not less than fair market value …; or
(C) that the airport pays not more than fair market value … .
(2) Any regulation imposed with respect to land or a facility acquired or
modified using Federal funding; or
(3) Any authority contained in –
(A) A Surplus Property Act instrument of transfer, or
(B) Section 40117 of title 49, United States Code [PFCs]
16
EXCEPTIONS
![Page 17: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/17.jpg)
(c) Rule of Construction –
Nothing in this section shall be construed to affect the
applicability of [revenue use restrictions in] sections 47107(b)
and 47133 …
17
SECTION 163(c): RULES OF CONSTRUCTION
![Page 18: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/18.jpg)
FAA now only has authority to review and approve ALP changes that:
materially impact the safe and efficient operation of aircraft at,
to, or from the airport or
would adversely affect the safety of people or property on the
ground adjacent to the airport as a result of aircraft operations, or
adversely affect the value of prior Federal investments to a
significant extent;
18
LIMITS ON ALP APPROVALS
![Page 19: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/19.jpg)
ALP amendments now require examination of the impact on the FAA’s three
“zones of interest.” Does the change:
• materially impact the safe and efficient operation of aircraft at, to, or from the
airport?
• adversely affect the safety of people or property on the ground adjacent to the
airport as a result of aircraft operations?
• adversely affect the value of prior Federal investments to a significant extent.
If not, FAA has no jurisdiction or authority to approve the ALP change.
FAA required to review and approve ALPs that implicate any of these.
Now, certain projects – and their corresponding ALP changes – may not
trigger NEPA.
19
SO WHAT?
![Page 20: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/20.jpg)
FAA still working out the kinks
Currently, all requests run through FAA HQ via ADOs
Sponsors can submit request to FAA to show that the project
is eligible for Section 163
Ask for forgiveness or permission?
20
HOW DOES THIS WORK?
![Page 21: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/21.jpg)
Raleigh-Durham, NC (RDU)
21
EARLY ILLUSTRATIVE EXAMPLE
![Page 22: INTRODUCTION AND OVERVIEW OF MANAGING … · The sponsor’s strategy for the development of the airport Usually a 20 (or more)-year look ahead Master Plan is basis for Airport Layout](https://reader035.vdocuments.us/reader035/viewer/2022071501/61212240c2646c70c36086e5/html5/thumbnails/22.jpg)
QUESTIONS?