introduction

26
1 Fish Passage in Culverts; Dealing with the Multidisciplinary Framework of Biological and Engineering Information

Upload: rue

Post on 24-Feb-2016

22 views

Category:

Documents


0 download

DESCRIPTION

Fish Passage in Culverts; Dealing with the Multidisciplinary Framework of Biological and Engineering Information. Introduction. Goal : - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Introduction

1

 Fish Passage in Culverts;

Dealing with the Multidisciplinary Framework of

Biological and Engineering Information

Page 2: Introduction

Introduction

Goal: The overall outcome of this workshop is to create a common understanding  of TRANS’ process for the installation of culverts at fish bearing watercourses and describe how fish passage is achieved.

2

Page 3: Introduction

This will provide a standard practice that will lead to a streamlined approach for designing and installing culverts along provincial highways in Alberta.

3

Page 4: Introduction

Fish passage will no longer be a problem at culvert structures!

4

Page 5: Introduction

Note:

Fish passage can be achieved in different ways but this is the recommended approach for Alberta Transportation (TRANS).

5

Page 6: Introduction

What will be covered today:

6

• Brief Background on the history of culverts

• Culvert Basics• Information on fish swimming

basics and biology• How culvert structures are

designed and meet fish passag requirements

• Mixing engineering and biology• Where we are going from here

Page 7: Introduction

Background

Past discussions on fish passage between biologist and engineers have usually gone from:

7

Page 8: Introduction

………this type of ‘stimulating discussion’:

8

Page 9: Introduction

…….to this.

9

Page 10: Introduction

Or past perceptions have influenced things

10

Page 11: Introduction

11

Where’s the water?

Page 12: Introduction

12

Neither profession is right; neither profession is wrong and all the fish really care

about is getting from point A to point B.

Therefore the solution isengineers + biologists = fish

passage.

Page 13: Introduction

Historically, culverts have been a blockage to fish passage in many instances. ‘Older style’ culverts, with no embedment below the streambed, were designed to convey water but did not necessarily allow for fish passage.

13

Page 14: Introduction

Oooops!

14

Page 15: Introduction

15

• KokaneeTrying

Migrate.• Photo

• Credit: Clayton Nalder

(American Fisheries

Society 2012)

Page 16: Introduction

A really big jump

16

Page 17: Introduction

17

Houston, we have a problem.

Page 18: Introduction

18

As can be seen some of the structures weren’t particularly good at passing water, providing drainage, and did not allow fish passage.

Fortunately we are in a different world these days.

Page 19: Introduction

19

Advances in hydraulic design and an increased understanding of fish passage requirements in recent years has resulted in fish friendly culverts being installed.

Page 20: Introduction

20

Embedded Culvert

Page 21: Introduction

21

However, progress in the acceptance of culverts can pass

fish has been limited by the lack of understanding between biologists and engineers of both hydraulic

design and fish passage requirements.

Page 22: Introduction

22

For the most part, training is lacking for engineers in fish physiology and behavior etc., and training is lacking for biologists in hydraulics etc. Often

terminology is not ‘equivalent’ between the two disciplines.

Page 23: Introduction

Terminology

Terminology is a large problem – throughout todays presentations you will hear both engineering and biological terms. For example if the common biological term ordinary high water mark is use this really means nothing to an engineer. Likewise ‘bank full’ in hydrotechnical terms does not mean same thing to a biologist as it would to and engineer.

23

Page 24: Introduction

Stream Characteristics/Terminology Utilized in the Design Process

Page 25: Introduction

Biologist’s view

25

Success!

Page 26: Introduction

Engineer’s View

26

Success!