Lessons Learned / Intern Experience Achievements / Results / Outcomes Program Name / Project Descriptions Internship at Right Away A/C College of the Desert Project 1: Mini-Splits Installed mini-split systems in a hotel. The system was ductless, so we connected the suction and liquid line to the outside condenser. We also connected the drain hose from the indoor coil and wired the system’s circuits. Project 2: New Evaporator Coils We removed the coil and installed a new one at a residence. We also removed the duct installed to the coil. There was a gas pipe line that we had ran directly in front of the new coil. Then, we reinstalled the duct systems into the new coil unit and attached the new coil to the furnace. We performed a static pressure test after the install to make sure there is maximum and efficient air flow. Overview of lessons learned… Successful Strategies: 1. Wiring a mini split circuitry . 2. Use a torque wrench. 3. Leveling the indoor coil. Recommendations for Improvement / Program Expansion: 1. More hands on training with tools 2. More hands on training in class 3. More shop work Jorge Mendez HVAC Major Student at College of The Desert in Palm Desert, CA Acknowledgements: Patrick and Jerry from Right Away A/C Project 1: Mini-splits During the first part of my internship, I learned how to install mini-split systems. We installed 35 mini-split units. To do this, we would run the refrigerant lines, drain hose, and electrical line through a set of drilled holes leading to the outside condenser. Project 2: New Evaporator Coils The second phase of my internship focused on how to replace evaporator coils. I removed an old coil system in a residence crawl space. In the pictures below, the evaporator coil has been removed and all you see is the furnace. Intern Photo

Upload: others

Post on 20-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Internship at Right Away A/C - ENERGIZE COLLEGES€¦ · The second phase of my internship focused on how to replace evaporator coils. I removed an old coil system in a residence

Lessons Learned / Intern Experience

Achievements / Results / OutcomesProgram Name / Project Descriptions

Internship at Right Away A/CCollege of the Desert

Project1:Mini-SplitsInstalledmini-splitsystemsinahotel.Thesystemwasductless,soweconnectedthe

suctionandliquidlinetotheoutsidecondenser.Wealsoconnectedthedrainhosefromtheindoorcoilandwiredthesystem’scircuits.

Project2:NewEvaporatorCoilsWeremovedthecoilandinstalledanewoneataresidence.Wealsoremovedtheduct

installedtothecoil.Therewasagaspipelinethatwehadrandirectlyinfrontofthenewcoil.Then,wereinstalledtheductsystemsintothenewcoilunitandattachedthenewcoiltothefurnace.Weperformedastaticpressuretestaftertheinstalltomakesurethereismaximumandefficientairflow.

Overviewoflessonslearned…

SuccessfulStrategies:1. Wiringaminisplitcircuitry.2. Useatorquewrench.3. Levelingtheindoorcoil.

RecommendationsforImprovement/ProgramExpansion:1. Morehandsontrainingwithtools2. Morehandsontraininginclass3. Moreshopwork

Jorge MendezHVAC Major Student at College of The Desert in Palm Desert, CA

Acknowledgements:Patrick and Jerry from Right Away A/C

Project1:Mini-splitsDuringthefirstpartofmyinternship,Ilearnedhowtoinstallmini-splitsystems.Weinstalled35mini-splitunits.Todothis,wewouldruntherefrigerantlines,drainhose,andelectricallinethroughasetofdrilledholesleadingtotheoutsidecondenser.

Project2:NewEvaporatorCoilsThesecondphaseofmyinternshipfocusedonhowtoreplaceevaporatorcoils.Iremovedanoldcoilsysteminaresidencecrawlspace.Inthepicturesbelow,theevaporatorcoilhasbeenremovedandallyouseeisthefurnace.

InternPhoto