intermittent pond

29
NAD 1983 UTM 17N Document Path: PGH \\tts010fs2\GIS\GIS\EQT_MVP\Mapdocs\Wetlands\!Individual_Permit\WV\MVP_IP_Detail_WV_WetzelCo_Feb2021.mxd Legend ! H Milepost Alignment Centerline Access Road Temporary LOD Access Road Permanent LOD Permanent Facility Limit of Disturbance Bore Pit Culvert Stream Intermittent Perennial Ephemeral Pond Wetland Palustrine Forested Palustrine Emergent Palustrine Scrub-Shrub Mountain Valley Pipeline Project Figure 4-1 Wetzel County, West Virginia Detail Map Individual Permit Application Data Sources: WV GIS Technical Center Imagery Service 2019 Note: Map insets are at a scale of 1 inch = 50 feet unless otherwise noted. February 2021 4-1 4-2 4-3 4-4 Mobley Interconnect W-ME2 W-ME3 W-ME1 S-J63 Feature crossings complete for Mobley Interconnect (Table 11). S-ST14 Stream entirely spanned by temporary stream crossing structure during construction. No temporary in-stream work. No impact to S-WX2. S-ST10 S-WX2 S-ST13 S-WX3 0.1 0.2 0.0 1370 1350 1320 1300 1280 1250 1200 1180 1170 1150 1120 1100 1080 1360 1340 1310 1290 1260 1240 1210 1190 1160 1140 1110 1090 1070 1270 1230 1220 1130 1060 1050 1000 950 920 1330 1040 1230 1220 1200 1180 1150 1120 1100 1080 1060 1050 1000 1190 1170 1160 1140 1110 1070 1040 1020 990 1210 1130 1030 1010 980 1210 1200 1190 1180 1170 1150 1120 1100 1080 1060 1050 1020 1160 1140 1110 1070 1040 1000 1030 1010 990 1350 1320 1300 1290 1280 1360 1340 1310 1030 1020 1010 990 980 970 960 940 930 1090 970 960 1220 1130 980 970 960 960 960 940 910 / 200 0 200 160 120 80 40 Feet 1 in = 200 ft Note: Refer to Table 2 (Streams) and Table 3 (Wetlands) in the Individual Permit Application for information on resource impacts.

Upload: others

Post on 24-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-1Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-1 4-2

4-3

4-4

4-54-6

Mobley Interconnect

W-ME2

W-ME3

W-ME1

S-J63

Feature crossings complete for Mobley Interconnect (Table 11).

S-ST14

Stream entirely spanned by temporary stream crossing structure during construction.

No temporary in-stream work. No impact to S-WX2.

S-ST10

S-WX2

S-ST13

S-WX3

0.1

0.2

0.0

137013

50132013

00128012

50

120011

80117011

50112011

001080

136013

40131012

90126012

401210119

01160114

01110109010

70

1270

12301220

1130

10601050

100095

0920

1330

1040

1230

1220

1200

1180

1150

1120

1100

1080

1060

1050

1000

11901170

11601140

1110

10701040

1020990

1210

1130

1030

1010

980

12101200119011801170

1150

11201100108010601050

1020

11601140

1110

1070

1040

1000

10301010990

1350

1320

1300

1290

1280

1360

1340

1310

1030

1020

1010

990

980970

960

940930

1090

970

960

12201130980

970960

960

960

940

910

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 2: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-2Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-1 4-2

4-3

4-4

4-54-6

S-J63

Temporary stream crossing during construction; no permanent fill placement.

Temporary impact to S-ST18.

S-ST18

S-ST1412

301220120

01180115

01120110

01080105

01020100

0

14201400138

013601350

1320130012801250

1210119011601140

10601040

990

980960

14101390

1370

133013

10129012

601240

1170113

01110109

0

13701350

1320

13001280

125012301200

1150

1120

1100

1080

1360

1340

1330

1310

1290

1270

1240

1220

1210

1190

1260

1160

1140

1170

1110

11301090

12401220

12001180

11401110

1100

1190

1180

1150

1120

11001080

1050

10201000

1160

1140

1110

10601040

1070

1030

13401320130012901280

12501230

1350

1330

1310

1260

1240

13101300 12

80

1240

1230

12001190

1290

1270

12801250

12601240

11901160

115011401120

14401430

1420

1410

1340

1270

1070

1030

1010 132

0

1170

1010

1360

1270

1220

1210

1160

1100

1230

1060

1430

1400

1260 1090

1050 104

0

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 3: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-3Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-1 4-2

4-3

4-4

4-54-6

4-7 4-8 4-12

4-13

W-ME3

S-DH14

S-WX2

W-DH06

W-A3a

E&S BMP protection for S-WX2.No impact.

W-DH06 entirely spanned bytemporary crossing structure.

No impact.

W-A2aTemporary crossing structure impact.

W-A1a Proposed open cutTemporary impact

S-A1a Proposed open cutTemporary impact

W-A1aW-A2aS-A1a

E&S BMP protection for S-DH14. No impact.

0.3

0.4

0.5

0.6

0.7

13501320130012901280126012501240

1200118011701150

11201100108010501000990

950920900890

13701360

1340

1310

1270

1230

1210

1190

1160

1140

1220

11301110

1090

106010401020

980960940

12401220

12001180

11501120

11001080

1050

1000

960

11901160

1140

1110

1090

1060

1040

990

950

900

10701020

980940

1010970

920

108010

50102010

00

10901060

1040

1070

1030

950

920900

910

890

1240 1220

1380

1330

1070

1030

1010

970

930910

8801130

910

1010

1000

920

900

890

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 4: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-4Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-1 4-2

4-3

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

S-CV36S-CV37

S-J65

S-A3a Proposed open cutTemporary impact

Slip mitigation ATWS,no impact to S-CV36,

S-CV37, S-J65.

S-A3a

E&S BMP protection along access road. No impact to S-A3a on access road.

0.8

0.9

1

1.1

1400

1350

13201300

12801250

12301200

1160

11201100

10801050

1000960

14101380

13601340

13101290

126012401220

11901180

11701150

11101090

10601040

1020990

9501270

1210

1010

980

970

940

123012001180

11501120

110010801060

10401020

990

12101190

11601140

11101090

10701050

1030

1010

1000

980970

120011501120110010801060

11401110

1090107010

50

1220

1180

1330

1300

14301410

930920

910900

1390

1370

1330

1140

1130

1070

1030

1240

1220

1170

1130

960

1310

1290

1420

1400

1440

1340

890

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 5: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-5Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-1 4-2

4-3

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

Stream entirely spanned by temporary stream crossing structure in access

road during construction.No temporary in-stream work.

No impact to S-J66 in access road.

S-J66 crossing complete (Table 10). Temporary crossing structure impact (Table 2).

W-A4a crossing complete (Table 10). Temporary crossing structure impact (Table 3).

W-A4a

E&S BMP protection in ATWS. No impact in ATWS.

S-J66

S-J65

Existing culvert. No impact to S-J65.

1.2

1.3

1.4

1.5

1.6

1520150014801450

14001380

135013201300128012601250

1210

1180

11501120

1070

14101390137013601340

131012901270

12401200

11601140110010801050

15101490147014401420

1330

11901170

1130

1110

1090

1060

14401420

14001380

1350

13201300

1280

12501240

1200

1160

1430

14101390

13701360

1340

13101290

1260

1230

1210

1170

1330

1270

1220

1180

124012301200

1150112011101100

1220

116011401130

1080

12101180

13801360

1350

13701340

1320

12501240

1200

1420

1400

980 96

0

1460

1430

1230

1220

1040

1030

1020

1010

1000

1190

1150

1140

1170

1090

1330

1220

1210 1520 1530

1440

14001270

1260

970

1250

1070

990

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 6: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-6Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-1 4-2

4-3

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

1550

1500

14701450

14201400138013601350

13401330

1320

1300

1280

12401220

1200

1560

1520

1490

1480146

01440

1410

13901370

11601150

12301210

1170

1140

1120

1100

1250

1180

1130

1580

15301510

129012

70

14801450141014001380136013501340132013001290

1470144

014

20139013

701330128

0

1440

1400 1380

1360

1350

1330

1320

1310

1280

1260

1410

1390

1370

1340

1300 1270

1400

1380

1370

1360

1350

1320

1620

1600

1570

1540

1430

1310

1260

1190

1460

1430

1430

1420

1290

1390

1610

1590

14301420

1500

14901500

1480

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 7: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-7Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-3

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

1570

1550

1520

1500

1480

1450

1420

1410

1400

1380

1350

1320 1300

1280

1540

1530

1510 1490

1470

1440 1390

1360 1340

1310

1290

1430

1370 1330

1270

1250 1200 1150 1120

1600159015801570

1550

15201500

14801450

14001380

1360

13501320

14901470

14401410

13901370

13301310

1250

12201200

1460

1420

14001380

1350

1320

13001280

12701410

1390

13601340

1310

1420

1370

13301290

1260

1450

1410140013801360

144014201390 15

9015

6015

5015

30

1570

1540

1520

11801160

1450

1440

15001490

12501240

1560

1460

1260

1240

1230 1220

1210

1190 1180

1170

1160

11401130

1560

1540

1530

1510

1430

1340

1300

1290

1270

1260

1240

1430

1230

1110

1600

14501220

1100

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 8: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-8Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-3 4-44-5

4-64-7

4-8

4-9

4-10

4-11

4-12

4-134-14

4-15

4-16

S-JM23

S-A5a

S-RS07

Slip mitigation ATWS, no impact to S-RS07 & S-A5a.

1.7

1.8

1.9

2

2.1

2.2

1550

1520

15001480

1450

1400

1380

13601350

1340

13201300

12801270

14101390

1370

13301310

1290

12501240

1200

1170

1150

14701460

1440

1420

1260

1230

1180

1140

11201100

1510

1490

12201210

1190

1440

14001350

132013001290128012

60

12501240

145014201410138013601330131012701230

1370

1340

12201200

1180

1280

1250

1200

1150

11201090

1290

1260

1240

1220

1180

1270

12301210

1190

11601140

1510148

0145014

20

150014

701440

155015201500

157015601540

11001080

10601050

11101090

1070

1560

1540

1530

1430

1430

1390

1210

1190

1170

1130

1100

1490

1530

1190

1170

1150

1160

1130

1190

1510

1570

/

200 0 200160 120 80 40Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 9: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-9Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

4-154-16

S-RS07

S-RS07

S-A5a crossing complete (Table 10). Temporary crossing structure impact (Table 2).

S-A6a crossing complete (Table 10). Temporary crossing structure impact (Table 2).

Slip mitigation ATWS, no impact to S-RS07 & S-A5a.

S-BB11

S-A6a

S-A5a

2.3

2.4

2.52.6

2.7

2.8

2.9

1600

1590

1550

1520

15001480

1450

14001380

13501340

1320

1310

1300

1290

12801270

1250124012201200118

0

11501120

1100

1080

149014

70144014

101390

136013

30

12301210119

01160114

01110109

01050

1610

15601530

1510

1460

1420

1370

1240

1220

1200

1170

1150

1140

1080

1060

1050

1180

1160

1120

1100

1070

1040

1110

1090

1530

1520

1500

1480

1450

1540

15101490

1240

1200

11501130

11601140

1230

1200

1160

1220

1170

1150

11401120

10801060

1050

1030

15801570

1540

1430

1260

1170

1070

1060

1180

1210

1190

1130

1070

1510

1500

1610

1620

1130

1550

1490

1220

1130

1030

1020

1010 /200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 10: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-10Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

4-154-16

BradshawCompressor Station

1520

1500

14801470

1450

14101400

1380

1350

1320

1300

12801260

1390

1360

1340

1330

1310

1290

1270

1250

1230

1200

1150

1420

1370

1490

1460

1530

1510

14401430

14701450

14101400

1390

1380

1350

13201300

12401230

1200

148014

60144014

20

136013

40

1310

125012

20

1430

1370

1330

12801260

13001280

1250

1210

11501200

1160

1540

1530

15201510

15201500

1490

15501530

150014901480

1240

1220

1190

1290

1290

1190

1180

1500

1510

1290

1350 1340

1470

1520

1160

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 11: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-11Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

4-154-16

S-KL11

E&S BMP protection for S-BB11.No impact.

S-A6a crossing complete (Table 10). Temporary crossing structure impact (Table 2).

Slip mitigation ATWS, no impact to S-KL11.

S-BB11

1410140

01390

138013

50133013

20

1300

1280

1250123012

001150

1120

1530152015001480145014

201360134013

10129012

601240

15101490

14701440

1370

1270

1220

1460

1430

1250

1230

1220

1200

1150

1140

1120

1100

10801210

1160

11301110

10901070

1060

1270

1190

1240

1170

123012201200

11501120

1100

1210116

01140113

011101080

1170

10601050

1350

13201310

129012801260

1340

13001270

12001180

11501140

12501230

1200 12401220

1200 1170

1220 1190

11801150

1210

1190

1090

1070

1170

1190

1180

1160

1270

1220

1260

1210

1190

1040

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 12: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-12Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-3

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

Feature crossings completed for BradshawCompressor Station in 2018 under Permit Number LRH-2015-592-GBR. Impacts notincluded in Individual Permit application.

W-YZ8

S-KL11

1350

1330

12501200119

011

8011701160

136013

401320

13001280

1310

1290126012401220

12701230

12501230

1200

1180

133013001290

1320

1310

13401330

14001390

1210

1280

1190

1240

1210

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 13: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-13Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-3

4-4

4-54-6

4-7 4-8

4-9 4-10

4-114-12

4-13

4-14

1480

1450

14001380

135013201300

1230

1500

1470

1440

1410

148014501440

142014101400

13901380

13601340

13201300

15001470

1430

15101490 1520

1160

1510

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 14: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-14Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-5

4-64-7

4-8

4-9

4-10

4-11

4-12

4-134-14

4-15

4-16

4-17

4-18

4-19

4-21

2.9

3

3.1

3.2

3.3

3.4

153015201510

1480

1450

140013801370

135013201300

1280

15701560

1550

1500

14701460

1440

12001150

1540

1490

14101360134013101290

1250

1330

12601240

143014201390

12701230

15101500

1480

1450

1420

1400

1380

1370

1350

1320131013001280

1260

14901470

14601440

14101390

13601340

12901270 12

50

1430

1330

1240 1190

1520

1500

1480

1450

1400

1380

1370

1360

1530

1510

1490

1470

1440

1420

1350

13201310

1300

1280

1250

1330

1290

12601240

1200

1340

1270

1350

1320

130012901280

1260

137013

60134013

101250

12801260 1230

12701250 12

20

16101560

15501530

15601540

1520

157015501530 15601540

1620

1590

1230

1210

1540

1330 1240

1590

1580

1570

1210

1180

1600

1580

1570

1230

1220

1210 1190

1190

1150

/

200 0 200160 120 80 40Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 15: Intermittent Pond

N AD 1983 U TM 17N

Document Path: PGH \\tts010fs2\GIS\GIS\EQT_MVP\Mapdocs\Wetlands\!Individual_Permit\WV\MVP_IP_Detail_WV_WetzelCo_Feb2021.mxd

Legend!H M ilep ost

Alignm entCenterlineAccess Roa dTem p orary LODAccess Roa dPerm a nent LODPerm a nentFa cilityLim it ofDisturb a nceBore PitCulvert

Strea mInterm ittentPerennia lEp hem era lPond

Wetla ndPa lustrine ForestedPa lustrine Em ergentPa lustrine Scrub -Shrub

Mountain Valley Pipeline Project

Figure 4-15Wetzel County, West Virginia

Detail MapIndividual Permit Application

Da ta Sources: WV GIS Technica l Center Im a gery Service 2019N ote: M a p insets are a t a sca le of 1 inch = 50 feetunless otherwise noted.

Feb ruary 2021

4-7

4-8

4-9

4-10

4-11

4-12

4-144-15

4-16

4-17

4-18

4-19

4-204-21

S-DQ2

S-HK01

S-HK07

W-HK01

S-HS02

S-HS01

S-HK09

S-HK08

W-HS06

W-HK02

Slip m itiga tion ATWS, no im p a ct to S-DQ2.

Slip m itiga tion ATWS, no im p a ct to S-HK01.

Slip m itiga tion ATWS,no im p a ct to W-HK01,

W-HS06, S-HK07,S-HK08,S-HK09, S-HS01 & S-HS02.

W-HK01 – p reviously com p leted with slip m itiga tion. Im p a ct not included in Individua l Perm it Ap p lica tion

3.5

3.6 3.7

3.8

3.9

1520150014801450

14001380

135013201300

1280

125012301200

1150

11301120111010801060

1510

1470

1440

14101390

1370

13601340

1310

1290

12601240

1540

1530

1490

1460

1420

1330

1270

1220

1170

1430

1180

1160

1450

14301420141014001390138013701350132013001280

1250

12001170

1500

1480

1440

13601340

1310

1290

1270

12401210

1470

1260

1230

1190

1490

1460

1330

1370

13501320131013001280

1250

1200

1330

1290

12601240

1210

1150

13601340

12701230121011801160

12401220

12001170

1380

1360

1350

1330

1370

1340

1200

1170

151015001480

11501130

1120

11701150 13

101300

1210 1190

1100

1520

1220

1230

1170

1190

1190

1180

1490

1140

1210

15201510

1400

1180

1110 1070

/

200 0 20016012080 40Feet

1 in = 200 ft

N ote:Refer to Ta b le 2 (Strea m s) a nd Ta b le 3 (Wetla nds) in theIndividua l Perm it Ap p lica tion for inform a tion on resourceim p a cts.

Page 16: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-16Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-8

4-9

4-10

4-11 4-144-15

4-16

4-17

4-18

4-19

4-204-21

S-HS04

S-HS03

S-HK0

7

S-HS01

Slip mitigation ATWS,no impact to S-HS01,

S-HS02, S-HS03,S-HS04 & S-HK07.

13401320131013001280

12501240

1200117011601360

1120

1100

12901270

135013

30

133013

10130012

80125012

00

1150

1290127012601240

1180

1210

119011601140112

0110

0

1130

1110

1080

1270

1250

1240

1200

1160

1150

1100

1260

1230

1170

1140

1120

12001170115011301120

1140 1070

1170

1140 1130

1370

1260

1180

1090

11501130

1080

/

200 0 200160 120 80 40Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 17: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-17Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-9 4-144-15

4-16

4-17

4-18

4-19

4-204-21

4-22

W-DQ4

W-DQ3

S-HK

06

S-HK

05

Slip mitigation ATWS, no impact to S-HK05.

Slip mitigation ATWS, no impact to W-DQ3.

Slip mitigation ATWS, no impact to W-DQ4.

4

4.1

4.24.3

4.4

4.5

1450

140013801370

1350

132013001280

12501230

1200

1150

10801050

10201000

14601440

14101390

136013401330

1310

1290

1260

1240

1220

1170

1420

1270

1210

11801160

1190

1140

11201100

1470 1430

13101300

1280

12501230

1200

11601140

11201100

1080

12901270

12601240

1220

11701150

11301110

10901070

1180

1050

1100

1060

15201510

1500

1490

12401230

1200

114011

20

152015101500

1480

1470

14301420

14901470

1130

1110

1090 1040

1210

1190

1110

1480

1220

1210

1460

1080

1480

1190

1530 1530

110010601030

1020

/

200 0 200160 120 80 40Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 18: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-18Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-144-15

4-16

4-17

4-18

4-19

4-204-21

4-224-23 4-24

W-IJ31

1280 1270 1260 1250 1240 1230 1210 1200 1180 1160 1150 1140 1130 1120 1100 10

80

1050

1020

10901060

1040

1000990

950

900880

850

1220

11901170

1110

1070

11001080

105010201000

990

96095092

090088

0860

1200116

0114011201090106010401010980

930

1030

970940910

11501130

11101070

1210

1180

1170

1160

1150

1140

1130

1120 1100 1080 1050 1020

1000

990

980

950

1230

1200

11101090

10601040

1010

960940

1070

1030

970

930

1170

1150

11201100

1080

10501030

1140

11101090

106010

40

1160

1130

1070

1020

13001310

1030

1010

980

970

960

940

930920

910

890

870

860

890

870

12401190

1190

1010

1110

1100

1200

1200

1080

880

870

/

200 0 200160 120 80 40Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 19: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-19Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-144-15

4-16

4-17

4-18

4-19

4-204-21

4-224-23 4-24

S-PP6

S-A125 crossing complete (Table 10). Temporary crossing structure impact (Table 2).

S-A124 Proposed open cutTemporary impact

W-A36

S-A126

S-A125

S-A124

S-A126 entirely spanned by temp stream crossing structure during construction.

No temp in-stream work.No impact

E&S BMP protection for W-A36. No impact.

4.6

4.7

4.8

4.9

5

5.1

5.2

13001280

12501230

1200

115011401120

11001080

105010201000980 96

0 930 900

870

12401220

1180

1110

1090

10601040

990970

950

920890

880

1030 10

10

940910

1070

860

1150

112011001080

105010201000

950930

880

1290

125012401230

1200

11601140

11101090

10301010

1220

1170

1130

1060

12801260

115011201100108010501020

1000

11601140

11101090

106010401010

1170

10701030

1080 1050 1030

1020

1000 990

980 970 960 950

940

1040

1010

920

11501120

1020

10101000

12901270

1210

1190

1170

1160

1130

12701210

1190

1070

1040

990

980

970

960

940

920

910

900

890

1130

930

910

1110

870

/

200 0 200160 120 80 40Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 20: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-20Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-154-16

4-17

4-18 4-194-20

4-21

4-22

4-23

4-24

Stream entirely spanned by temporary stream crossing

structure during construction.No temporary in-stream work.

No Impact.

S-DQ2

0S-DQ21

Existing culvert.No impact.

W-HK06

S-HK16

S-HK15

W-A27-PEM Proposed open cutTemporary impact

S-A118 Proposed open cutTemporary impact

W-A27-PFO Proposed open cutTemporary impact

S-A118

W-A27-PFOW-A27-PEM

Slip mitigation ATWS, no impact to S-DQ20 & S-DQ21.

Slip mitigation ATWS, no impact to S-HK15.

Slip mitigation ATWS, no impact to S-HK11.

S-A118

S-A117

5.3

5.4

5.5

5.6

5.7

13601350

13201300

12801250

12301200

11501140

1120

1080

1000

950

900

1390

1340

1310

1290

1270

1260

1240

1220

1180

1160

1130

1110

12101190

1170

1100

1050

1020

990

960

930920

1090

10601040

1010980

940

1280125

012201200118

01150113011

20110010

80105010

201000

1260

1240

1210

1190

1170

1160

1140

11101090

1060

1040

1070

103010

10

1190

115011401120

11001080

105010201000

950

1160

1130

1110

1090

1060

1040

1010990

10701030980

890

880

1370

1330

1070

1030

970

910

1270

990

1180

1170

970

960

900

1200

990

1140

1030

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 21: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-21Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-14

4-154-16

4-17

4-18 4-194-20

4-21

4-22

4-23

Stream entirely spanned by temporary stream crossing structure during construction.

No temporary in-stream work.No Impact.

Stream entirely spanned by temporary stream crossing structure during construction.

No temporary in-stream work. No Impact.

S-A116

S-A115

1180117011601150114011301120111011001080107010601050

1020

1000990980970

950940920900

1010

960930

870890880

1060

1050

1040

1030

1020

1000970950920900880

1150112011001080

1010990

960

930

1130111010901070

980

940910

870

11201110

1100

10601050

1020

1000

1080

1040

1010

990

1030

980

920900

880

910

890

1190

1090

1040

1030

910

1160

890

1130

11801140

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 22: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-22Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-17

4-18 4-194-20

4-21

4-22

4-23

4-24

4-25

S-ST

103

Slip mitigation ATWS, no impact to S-ST103.

5.8

5.9

6

6.1

6.2

15101500

14801450

14001380

1350

13201300

12801260

1250

1200

1170

1120111

01100109

01080

1060

15701560 15

50 1520 1490

14601440

14101390

1360 1340

1230119

0118

01150113

0

1310

1290

1270

1530

1470

1210

1160

1420

1370

1330

12401220

1470

1450

1400

1380

1350

1340

1320

1300

1280 1250

1240

1200 1180

1480

14601440

141013901360

133013101290

1260

1230

1420

1370

1270

13201300

128012501240

1200

1150

11201100

1060

1110

1080

1070

10501040

1310

1290

1260

117011601140

1270

1230

1180

12201190

1200117

0

1210 1180

15201500

15301520

1430

1430

1130

1190

1490

1050

1170

1160

1150

1030

1020

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 23: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-23Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-18 4-194-20

4-21

4-22

4-23

4-24

4-25

4-26

S-JM2

S-JM1

S-JM3

S-JM4

S-JM5

S-A1

21

6.4

S-CA02

W-A35 crossing complete (Table 10). Temporary crossing structure impact (Table 3).

S-A119 Proposed boreCrossing structure temporary impact

S-A120 Proposed boreCrossing structure temporary impact

W-A34 Proposed boreCrossing structure temporary impact

W-A35

S-A120

W-A34

E&S BMP protection.No impact to S-JM2.

Slip mitigation ATWS, no impact S-CA02.

S-A120

S-A1

19

S-QR34

S-KL1

0

Existing culvert. No impact to S-A121.

Existing culvert. No impact to S-KL10.

E&S BMP protection for S-JM5. No impact.

Existing culvert. No impact to S-JM3.

Existing culvert. No impact to S-JM1.

Existing culvert. No impact to S-JM4.

Existing culvert. No impact to S-A119 at access road crossing.

6.3

6.4

6.5

6.6

6.7149014

8014

70

1450

1400

13801350

1320

1300

1280

1250

1440

1410

1390

1360

1340

1330

1310

1290

1260

1240

1200

1150

1210

11601140

11201100

10901080

1460

1420

1370

1230

150014801470

14501420

1400138013601350

13201300

1270

143014101390

13701340

1290

1330

1310

1280

1470

1450

14001380

1350

1320

1310

1300

1280

126012501240

1460

1440

1410

1390

1360

1340

1290

1270

1420

1370

133012

7012

5012

40

1200

1180

1230

1190

1170

14501400

1440 1410

14801470

1470

1460

1480

1470

1430

1270

1220

1190

1180

1170

1130

1110

1430

1260

1430

1420

1280 1270

1070

1060

1280

1500

1410

1250

1050

1040

1040

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 24: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-24Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-20

4-22

4-23

4-24

4-25

4-26

4-27

6.8

6.9

7

7.1

7.2

1490

1480

1450

1400

1380

1370

1360

1350

1320 1300 12

80

1250

1220 1200

16601650

16201600

1550

15201500

1470

1440

1420

1640

1610

1590

1560

1530

1570

1540

1510

1460

1430

1410

1390

1340

1330

1550152

01500148

01450

140013

80135013

30132013

001280

1470

1440

1410

1390

1360

1340

1310

1290

1270

1250

1200

11501110

1490

1460

1430

1420

1430

14001380

13501330

13201300

12801250

1410139013601340

131012901270

1420

1370

1470

1450

14201410

14601440

148014701450

14601440

1100

1080

1050

1090

10701060

15701550

15601540

1630

1580

1310

1290

1270

12601230

1540

1530

1510

1370

1260

1240

1230

1220

1210

1190

1180

1170

1160

1140

1130

1120

1190

1280

1580

1540

1490

1460

1260

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 25: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-25Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-22

4-23

4-24

4-25

4-26

4-27

4-28 4-30

Stream entirely spanned by temporary stream crossing structure during construction.

No temporary in-stream work. No Impact.

S-A114

7.3

7.4

7.5

7.6

150014801450 1400

1380

1350

1330 1320

1300 1280

1250

1200

1190

1150

1120

1110

1100 1090 1050

1030

1230

1160

1080

1060

1040

1490

1470

1460

1440

1420

12901270

12601240

1390 13

70

1430 14

10

1360

1340

1400138013

50

13401330132013001280125012

0011501120

137013

60

131012

90126012

40123011

90

113011

00

1270

1220

1160114

0

1110

1080

1050

1070

1040

1310 1300

1280

1250

12201200

1290

1260

1240

1210

1190

1150

1270

1230

1180

11601140

14801450

140014301420

12001160

1100

1080 1460

1450

1420

1450

1410

13501340

13201310

1450

1430

14701460

1100

1070

1520

1220121

0

1180

1170

1140

1130

1070

1390

1210

1180

1170

11301120

11801170

1440

1430

1330

1460

1440

1090

1470

1110

1050

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 26: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-26Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-23

4-24

4-25

4-26

4-27

4-28

4-29

4-30

4-314-32

S-DQ3

S-DQ4

S-J60 crossing complete (Table 10). Temporary crossing structure impact (Table 2).

S-J60

Existing culvert. No impact to S-DQ3.

E&S BMP protection for S-DQ4. No Impact.

7.7

7.8

7.9

8

14001380

1350134013201300

1260

12401200

11501120

1330131012

8012501230122011001080

1050

1020100

0

960

12901270

1170

1320

1310

13001280

1250

1200

1150

1120

1100

10801060

10501040

1290

126012401220

1190

116011401110

10901070

127012301210

1170

10201000

1130

1030

1010

990

11501120

11001090108010701050104010201000980

1110

106010301010990

1120

1100

1090

1080

1050

1020

1060

1040

1140

1030

1280

1250

12101260

1240

1200

1180

1150

1130

1210

1190

1160

1140

1340

1320

950

940

13501340

1190

1180

1160

1140

1130

1110

1090

1070

1060

1040

1030

1010

990

980

970

1180

1070

1010

12701230

12201170

1120

13301310

1410

1350

1330

1100

930

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 27: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-27Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-23 4-24 4-25

4-26

4-274-28

4-29

4-304-31

4-32

4-33

8.1

8.2

8.3

8.4

8.5

15301520150014801450140013801350132012801260

14101390136

01340131

01300129

0127012

50

1200118

0151

014

90147014

401370133

0

1240

119011501130 1460

1420

14001380

1350134013201310

13001280

1250

1200

1160

1360

1330

1290

12601240

1180

1370

1270

1230

1410

14001380

1360

1350

1340

13201310

1300

1290

1420

1390

1370

1330

1400

13801360

13501340

13201310

1300

13901370

1330

1280

1220120

01180115

01100

12101190116011401120

11301110

14301410

15701560

11401120

1550

1560

1540

1430

1230

1210

1390122

0

1210

1190

1170

1420

1270

1150

1130

1440

1430

1330

1270

1220

12201220

1110

/

200 0 200160 120 80 40Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 28: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-28Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-25

4-26

4-27

4-28

4-29

4-30

4-314-32

4-33

4-34

S-RS01

W-RS01

S-J56 crossing complete (Table 10). Temporary crossing structure impact (Table 2).

W-WX4W-WX5

W-J33

Slip mitigation ATWS, no impact to S-J58.Slip mitigation ATWS,

no impact to S-RS01.

Slip mitigation ATWS, no impact to W-RS01.

S-J56

S-J57

S-J58

S-J59 E&S BMP protection for W-J33. No impact.

8.5

8.6

8.7

8.8

8.9

144014001380136013501340132013001280125012001170

141013901370133013101290126012401210118011501120

1270

1220

1190

11601140

1100

1080

1050

1090

10601040

1020

13301320

1310130012801250

12201200

11501120

1290126

012401210118

011601140111

0

1230

1190

1170

1130

13401320131013001280

1250

12201200

1150

1120

1290

12601240

1210

11601140

1110

12701230

11801170

1220

1200

11601140

1120

11701150

11301110

12001170

1200 1160

11401120

11901170

1420

14101430 1230

1130 1110 1070

1030

10101000

1270

1190

1130

12101190

1180

1210

1190

1180

1210

1180

1300

1130

14401430

1420

1200

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.

Page 29: Intermittent Pond

NAD 1983 UTM 17N

Docu

ment

Path:

PGH

\\tts0

10fs2

\GIS\

GIS\E

QT_M

VP\M

apdo

cs\W

etlan

ds\!In

dividu

al_Pe

rmit\W

V\MVP

_IP_D

etail_

WV_W

etzelC

o_Fe

b202

1.mxd

Legend!H Milepost

AlignmentCenterlineAccess RoadTemporary LODAccess RoadPermanent LODPermanentFacilityLimit ofDisturbanceBore PitCulvert

StreamIntermittentPerennialEphemeralPond

WetlandPalustrine ForestedPalustrine EmergentPalustrine Scrub-Shrub

Mountain Valley Pipeline Project

Figure 4-29Wetzel County, West Virginia

Detail MapIndividual Permit Application

Data Sources: WV GIS Technical Center Imagery Service 2019Note: Map insets are at a scale of 1 inch = 50 feetunless otherwise noted.

February 2021

4-26

4-27

4-28

4-29

4-30

4-314-32

4-33

4-34

WetzelHarrison

HuntingtonPittsb

urgh

1020

990

1450

1410

1400138013501330

1340

1320

13101300

1200117

0

12801250

11801150

13901370

1350

1320

1390

1280

1300

1250

1380

1360

1370

1340

12901270

1330

1310

12401220

1050

1000

10401020 10301010

1350

13201330

1300

1340

1310

1440

1400

12101200

11801170

1360

1290

1270

1260

1240

1230

1220

1190

1160

1140

1130

1120

1110

1100

1090

1080

1070

1060

1050

1040

1030

1010

1000

1430

1420

1260

1230

1210

1360

1430

1410

1190

1110

980

/200 0 200160 120 80 40

Feet

1 in = 200 ft

Note:Refer to Table 2 (Streams) and Table 3 (Wetlands) in theIndividual Permit Application for information on resourceimpacts.