Section 5: Reticular canal system for interlinking Indian rivers; Chapter 16: Flat Primary canal (FPC1) WE & EE Lengths: 559

Upload: shivu-p

Post on 31-Jul-2015

36 views

Category:

Environment


0 download

TRANSCRIPT

Page 1: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Section 5:Reticular canal system for interlinking Indian rivers;

Chapter 16: Flat Primary canal (FPC1) WE & EE Lengths:

559

Page 2: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:FPC1WE Lengths, total length and the approximate capacity are as follows: SN. Description. Length in kms. 1.FPC1WEStart to FPC1WE Luni 500. 278.21 560

Page 3: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:

2.FPC1WE Luni to FPC1WE Bandi 500.176.56 561

Page 4: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:

3.FPC1WE Bandi to FPC1WE Sucri 50080.32 562

Page 5: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:

4.FPC1WE Sucri to FPC1WE Jawai 500.114.24 563

Page 6: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:

5.FPC1WE Jawai to FPC1WE Sabarmathi 500.148.19 564

Page 7: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:

6.FPC1WE Sabarmathi to FPC1WE Som 500.229.55 565

Page 8: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:

7.FPC1WE Som to FPC1WE End 500.83.74 566

Page 9: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 446.Topic 1: FPC1 WE Lengths and approximate capacity:

Total FPC1 WE CRL Length in Kms is 1110.81Total canal length we are going to save with CE, RE, DCC, BD in Kms.

145.49

Total length of the CE, RE, DCC, BD put together in Kms 2.54The Length (Actual) of the probable FPC1WE in Kms. 967.86The capacity (Volume) of storable water (with the canal width of 200 mts, depth of 25 mts, but the maximum level maintained will be 20 mts) in the FPC1WE (3871.44 million cubic meters) in TMC. (This volume can be filled and discharged any number of times.)

142.93 TMC

567

Page 10: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:FPC1EE Lengths, total length and the approximate capacity :SN. Description. Length in kms1.FPC1EE Heran to FPC1EE Mahanadhi 500. 106.74 568

Page 11: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

2.FPC1EE Mahanadhi to FPC1EE Son 500.274.90 569

Page 12: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:3.FPC1EE Son to FPC1EE Hasdo 500. 63.19 kms. There is an elevated area between FPC1EE Son to FPC1EE Hasdo 500 path and the maximum level we get in this path is 524 mts AMSL at (23005’2.40”N) (82001’50.03”E). DCC is required. 570

Page 13: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

4.FPC1EE Hasdo to FPC1EE Mand 500.266.49 571

Page 14: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

5.FPC1EE Mand to FPC1EE Lb 500.75.36 572

Page 15: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

6.FPC1EE Lb to FPC1EE Sankh 500.168.50 573

Page 16: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

7.FPC1EE Sankh to FPC1EE South Koel 500.147.26 574

Page 17: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

8.FPC1EE South koel to FPC1EE Subarnarekha 500.207.47 575

Page 18: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

9.FPC1EE Subarnarekha to FPC1EE Damodhar 500.166.82 576

Page 19: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

10.FPC1EE Damodhar to FPC1EE Rihand 500.594.64 577

Page 20: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:11.FPC1EE Rihand to FPC1EE Hasdo Mand path 500. 55.70kmsThere is an elevated area between FPC1EE Rihand to FPC1EE Hasdo Mand path 500 path and the maximum level we get in this path is 562 mts AMSL at (230014’8.85”N) (820039’37.29”E). DCC is required.The FPC1EE which originates from Rihand 500 will Join the Hasdo Mand path of canal at the point (230010’52.99”N) (820037’26.56”E) encircling the Hazaribagh Range of hills.

578

Page 21: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

FPC1 EE SB 500 starts at the FPC1EE Son to Hasdo canal path at the point (23005’25.60”N) (82008’30.06”E). 579

Page 22: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

12.FPC1EE SB Start to FPC1EE SB Seonath 500.553.78 580

Page 23: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:Lowest point between FPC1EE SB Start to FPC1EE SB Seonath 500 path is 366mts AMSL at (200055’3.52”N) (800034’8.53”E). We have to do BD or U tube to by pass this depression. 581

Page 24: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:13.FPC1EE SB Seonath to FPC1EE SB Mahanadhi 500. 171.54Lowest point between FPC1EE SB Seonath to FPC1EE SB Mahanadhi 500 path is 403mts AMSL at (200023’21.93”N) (81005’50.98”E). We have to do BD or U tube to by pass this depression. 582

Page 25: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:14.FPC1EE SB Mahanadhi to FPC1EE SB Tel500. 94.09There is an elevated area between FPC1EE SB Mahanadhi to FPC1EE SB Tel500 path and the maximum level we get in this path is 564 mts AMSL at (20005’0.87”N) (820012’35.49”E). DCC is required. 583

Page 26: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

15.FPC1EE SB Tel to FPC1EE SB Sabari 500.981.82 584

Page 27: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

16.FPC1EE SB Sabari to FPC1EE SB Indravathi 500.237.99 585

Page 28: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 447. Topic 2: FPC1 EE Lengths and approximate capacity:

Total FPC1 WE CRL Length in Kms is 4166.29Total canal length we are going to save with CE, RE, DCC, BD in Kms.

292.43

Total length of the CE, RE, DCC, BD put together in Kms

15.21

The Length (Actual) of the probable FPC1EE in Kms. 3889.07The capacity (Volume) of storable water (with the canal width of 200 mts, depth of 25 mts, but the maximum level maintained will be 20 mts) in the FPC1WE (15556.28 million cubic meters) in TMC. (This volume can be filled and discharged any number of times.)

574.33 TMC

586

Page 29: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Section 5:Reticular canal system for interlinking Indian rivers;

Chapter 17: Flat Primary canal (FPC1) – RE, CE, DCC, BD and others:

587

Page 30: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:FPC1 – RE, CE, DCC, BD and others:S. N.( FPC1 RE, CE, DCC, BD point) (Latitude) (Longitude)FPC1 Narmada 500 RE 588

Page 31: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Narmada 500 RE

1(FPC1 Narmada 500 RE Start) (220050’8.24”N)(800027’31.88”E)

2(FPC1 Narmada RE 465 Bottom) (220050’9.69”N)(800028’5.49”E)

3(FPC1 Narmada 500 RE End) (220050’15.89”N)(800029’8.93”E)

Length of FPC1Narmada 500 RE: 2.78kms. We will save 45 Kms of FPC1 creation.

589

Page 32: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Pennar500 to Papagni500 DCC1

1(FPC1 Pennar to Papagni DCC1 Start500)

(140015’23.06”N)(780011’29.58”E)

2(FPC1 Pennar to Papagni DCC1 Top)

(140015’15.00”N)(780012’31.70”E)

3(FPC1 Pennar to Papagni DCC1 End 500)

(140015’13.69”N)(780012’40.29”E)

Length of Pennar to Papagni DCC: 2.13kms. We will save 74.76Kms of FPC1 creation.

590

Page 33: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500DCC1591

Page 34: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500DCC1

1(FPC1 Ponniyar500 to Kaveri 500DCC1 Start)

(120017’20.90”N)(78004’40.28”E)

2(FPC1 Ponniyar500 to Kaveri500 DCC1 Top 510)

(120017’3.85”N)(78004’1.53”E)

3(FPC1 Ponniyar500 to Kaveri 500DCC1 End)

(120016’17.40”N)(78002’15.56”E)

Length of FPC1 Ponniyar500 to Kaveri 500DCC1: 4.79 kms. We will save 30Kms of FPC1 creation.

592

Page 35: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500 CE1593

Page 36: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500 CE1

1(FPC1 Ponniyar500 to Kaveri 500 CE1Start)

(120014’5.03”N)(770041’30.29”E)

2(FPC1 Ponniyar500 to Kaveri 500CE1 Bottom320)

(120014’21.55”N)(770040’50.96”E)

3(FPC1 Ponniyar500 to Kaveri 500CE1 End)

(120014’31.23”N)(770040’26.40”E)

Length of FPC1 Ponniyar500 to Kaveri 500 CE1: 2.07kms. We will save 32Kms of FPC1 creation.

594

Page 37: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500CE2595

Page 38: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500CE2

1(FPC1 Ponniyar500 to Kaveri 500CE2Start)

(120017’0.33”N)(770027’2.97”E)

2(FPC1 Ponniyar500 to Kaveri 500CE2Bottom380)

(120017’32.03”N)(770026’16.66”E)

3(FPC1 Ponniyar500 to Kaveri 500CE2End)

(120017’58.41”N)(770025’36.44”E)

Length of FPC1 Ponniyar500 to Kaveri 500CE2: 3.28kms. We will save 13Kms of FPC1 creation.

596

Page 39: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500CE3597

Page 40: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500CE3

1(FPC1 Ponniyar500 to Kaveri 500CE3Start)

(120019’40.03”N)(770013’53.39”E)

2(FPC1 Ponniyar500 to Kaveri 500CE3Bottom413)

(120019’31.71”N)(770013’48.79”E)

3(FPC1 Ponniyar500 to Kaveri 500CE3End)

(120019’22.50”N)(770013’43.66”E)

Length of FPC1 Ponniyar500 to Kaveri 500CE3: 0.61kms. We will save 15.2Kms of FPC1 creation.

598

Page 41: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500CE4599

Page 42: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Ponniyar500 to Kaveri 500CE4

1(FPC1 Ponniyar500 to Kaveri 500CE4Start)

(120018’36.84”N)(770011’8.21”E)

2(FPC1 Ponniyar500 to Kaveri 500CE4Bottom466)

(120018’31.68”N)(770011’7.72”E)

3(FPC1 Ponniyar500 to Kaveri 500CE4End)

(120018’26.00”N)(770011’7.22”E)

Length of FPC1 Ponniyar500 to Kaveri 500CE4:0.24 kms. We will save 7.34Kms of FPC1 creation.

600

Page 43: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Kaveri 500 RE:601

Page 44: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Kaveri 500 RE:

1(FPC1 Kaveri 500 RE Start) (120011’35.31”N)(770043’16.46”E)

2(FPC1 Kaveri RE Bottom266) (120010’57.01”N)(770042’36.30”E)

3(FPC1 Kaveri 500 RE End) (120010’7.23”N)(770041’43.64”E)

Length of FPC1 Kaveri 500 RE: 3.95kms. We will save(FPC1 Ponniyar to Kaveri80.54+Kaveri to Moyar117.04) 197Kms of FPC1 creation.

602

Page 45: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Kaveri 500 – Moyar500 CE1:603

Page 46: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Kaveri 500 – Moyar500 CE1:

1(FPC1 Kaveri – Moyar CE1 Start)

(12003’46.54”N)(770036’41.11”E)

2(FPC1 Kaveri – Moyar CE1 Bottom)

(12003’35.57”N)(770036’46.55”E)

3(FPC1 Kaveri – Moyar CE1 End) (12003’25.13”N)(770036’51.86”E)

Length of FPC1 Kaveri – Moyar CE1: 0.75kms. We will save 9.13Kms of FPC1 creation.

604

Page 47: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Kaveri 500 – Moyar 500 CE2:605

Page 48: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Kaveri 500 – Moyar 500 CE2:

1(FPC1 Kaveri – Moyar CE2:Start) (110056’39.35”N)(770035’33.05”E)

2(FPC1 Kaveri – Moyar CE2 Bottom287)

(110056’23.07”N)(770035’31.55”E)

3(FPC1 Kaveri – Moyar CE2 End) (110055’40.42”N)(770035’28.79”E)

Length of FPC1 Kaveri – Moyar CE2: 1.84kms. We will save 114.29Kms of FPC1 creation.

606

Page 49: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Kaveri 500 – Moyar 500 CE3:

1(FPC1 Kaveri – Moyar CE3Start) (110032’28.51”N)(770022’30.41”E)

2(FPC1 Kaveri – Moyar CE3 Bottom) (110032’19.53”N)(770021’53.73”E)

3(FPC1 Kaveri – Moyar CE3 End) (110032’1.13”N)(770020’32.78”E)

Length of FPC1 Kaveri – Moyar CE3: 3.66kms. We will save 25.84Kms of FPC1 creation.

607

Page 50: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Moyar 500 RE608

Page 51: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Moyar 500 RE

1(FPC1 Moyar RE Start500) (110033’25.21”N)(77001’8.34”E)

2(FPC1 Moyar RE Bottom308) (110032’49.26”N)(760059’56.56”E)

3(FPC1 Moyar RE End500) (110032’11.82”N)(760058’42.84”E)

Length of FPC1 Moyar RE: 4.99kms. We will save (Kaveri to Moyar 39.72+ Moyar to Bhavani 42.60) 82.32Kms of FPC1 creation.

609

Page 52: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Bhavani RE610

Page 53: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 Bhavani RE

1(FPC1 Bhavani RE Start) (110017’8.93”N)(760050’31.56”E)

2(FPC1 Bhavani RE Bottom338) (110016’25.92”N)(760050’54.91”E)

3(FPC1 Bhavani RE End) (110016’6.03”N)(760051’6.08”E)

Length of FPC1 Bhavani RE: 2.2kms. We will save (Moyar to Bhavani 26.06 + Bhavani to Noyil 31.19) 57.25Kms FPC1 creation.

611

Page 54: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 WE Sabarmati RE 500:612

Page 55: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

FPC1 WE Sabarmati RE 500:

1(FPC1WE Sabarmati RE Start 500)

(240017’31.35”N)(730015’18.89”E)

2(FPC1WE Sabarmati RE Bottom 338)

(240016’51.03”N)(730014’26.52”E)

3(FPC1WE Sabarmati RE 500) (240016’38.14”N)(730014’10.16”E)

Length of FPC1 WE Sabarmati RE: 2.54kms. We will save 145.49Kms FPC1 creation.

613

Page 56: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

SN (FPC1EE Damodhar to Rihand500 DCC1)614

Page 57: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

SN (FPC1EE Damodhar to Rihand500 DCC1)

1(FPC1EE Damodhar to Rihand500 DCC1Start500)

(230040’28.99”N)(840046’17.09”E)

2(FPC1EE Damodhar to Rihand500 DCC1 Top 526)

(230041’29.66”N)(840042’46.97”E)

3(FPC1EE Damodhar to Rihand500 DCC1 End500)

(230040’40.76”N)(840038’7.28”E)

Length of FPC1EE Damodhar 500 to EE Rihand 500 DCC1: 15.21 kms. We will save 292.43Kms of FPC1 creation.

615

Page 58: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

All these lengths are with the major curves on the surface, in the same level in case of FPC, and in declining fashion in case of PC and other canals.

616

Page 59: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

Minor curves that come in the canal paths are not focused and it is not possible by me alone.So the exact length of the canal will be known only after doing the micro survey of different segments of the canal by different teams.

617

Page 60: Interlinking rivers 12 - 7. chapter 16 & 17   7 flat primary canal1 west extension & east extension, river elevator, canal elevator, direct canal connector, u tube

Topic series: 448. Topic 1: FPC1 – RE, CE, DCC, BD and others:

My effort is to guide them in this way to make the things easy and understandable, so that there will be less errors in the future with the satellite based survey.