INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN
UGANDA
Benon Bena and James Baanabe Ministry of Energy and Mineral Development
Uganda
EU Energy Initiative Workshop and Policy DialogueHotel VIP, Maputo, Mozambique
12-15 April 2005
![Page 2: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/2.jpg)
CONTENT OF THE PRESENTATION
Background Policies on Energy and Poverty Energy for Rural Transformation Programme Selected Case Studies
Igloo fish processing plant situated near Majanji Landing Site on lake Victoria in Busia District.
Njeru – Kayunga – Bbale Rural Electrification Project Fish processing Plant at Bukakata Ssembabule Rural Electrification Scheme Kaweri Coffee Plantation Limited Solar Electrified Areas
Conclusion
![Page 3: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/3.jpg)
BACKGROUND Uganda has a population of 26 million, 87%
rural, in scattered nature. Uganda has consistently registered high
economic performance over the last decade Growth rate averaging 6% Annual increase in per capita income of 3.7% Reduction in people living below poverty line: 56%
in 1992 to 38% in 2004 BUT
Poverty remains wide spread in rural areas Per capita income $320 Inadequate infrastructure services Lack of integration with markets
![Page 4: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/4.jpg)
Energy Situation In Uganda
Biomass represents 93% of the national energy balance
lowest per capita consumption of commercial energy in Africa
energy demand growing oil products imported (100%) renewable energies are
abundant but not largely disseminated
electricity load shedding and low electrification rate 9% constrain the economic and social development
6% 1%
93%
Biomass Oil Products
Electricity
![Page 5: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/5.jpg)
Electricity Access Access at national level only 9% Rural access to national grid only
3% Self electrification (gen-sets, PV,
car batteries) about 1%
![Page 6: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/6.jpg)
POLICIES ON ENERGY AND POVERTY
Energy Policy Poverty Eradication Action Plan
(PEAP) Power Sector Strategic Plan 1997,
1999 Rural Electrification Strategy and
Plan 2001
![Page 7: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/7.jpg)
The Energy Policy for Uganda GOAL:
To meet the energy needs of Uganda’s population for social and economic development in an environmentally sustainable manner
OBJECTIVES: To establish the availability, potential and demand of
the various energy resources in the country To increase access to modern affordable and reliable
energy services as a contribution to poverty eradication (Pillar 1, 2 ,5 of the PEAP)
To improve energy governance and administration To stimulate economic development To manage energy-related environmental impacts
![Page 8: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/8.jpg)
Poverty Eradication Action Plan
Five Pillars in the PEAP Economic management Production, competitiveness and
incomes Security, conflict-resolution and disaster-
management Governance Human Development
![Page 9: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/9.jpg)
Power Sector Strategic Plan (1997,1999)
It spelt-out a new policy direction in the power sector and emphasized:
Need to make power sector financially viable.
Involvement private sector in electricity.
Increase of access to electricity.
![Page 10: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/10.jpg)
Electricity Act, 1999 Broke the monopoly of power utility-UEB Created a Regulator (ERA). made RE an obligation Establishment of Rural Electrification
Fund (REF) Minister had to develop strategy & plan Special incentives for investments in RE
![Page 11: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/11.jpg)
The Rural Electrification Strategy and Plan
It spelt out the mechanism of Rural Electrification and the targets:
Institutional framework for the Rural Electrification Fund.
Increase of rural electrification from 1% to 10% by 2012.
Combination of delivery modes : grid extension, off-grid systems, solar PVs and renewable energy projects.
![Page 12: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/12.jpg)
The Rural Electrification Fund
Channel for extending “smart subsidies”. Main sources of funding
Government budget 5% levy from transmission bulk purchases from
generation companies Grants from bilateral and multilateral donors
Criteria for access based on: Financial and economic soundness of project Sound environmental impact statement Positive social return Equitable electricity distribution
![Page 13: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/13.jpg)
ENERGY FOR RURAL TRANSFORMATION PROGRAMME (ERT)
It is a ten year programme developed by GOU with support from World Bank/GEF.
It is private sector led. Projects benefit from subsidies to buy
down capital costs. The overall goal is to increase electricity
access in rural areas from 1% to 10% by 2012.
![Page 14: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/14.jpg)
It addresses several delivery mechanisms: Grid extension where feasible; Decentralized mini grids; Solar PVs; and Development of other renewable energy
resources.
![Page 15: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/15.jpg)
OPERATIONAL FRAMEWORK OF ERT
ERT has strong linkage with key production and human resource sectors: Agriculture, Health, Telecommunication, Water and Education.
Target areas are: District Headquarters, Trading Centers, Agro Processing areas, Schools, Health Centers and Rural Water supply units.
Service delivery mechanism and Project Developers: Private Sector, NGO’s, Local Communities and local governments.
![Page 16: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/16.jpg)
Lessons Learnt on ERT
Private sector is reluctant to invest in RE projects. It perceive it as a high risk business- the thinking is have public leading is required
Time it takes for private sector from project initiation to implementation is long
Need to have subsides such as GEF financing to buy down capital cost which lowers the tariff.
Unlike GEF, PCF does not considerably lower the tariff.
Programmes being developed should address the problem of affordability and the high upfront costs.
![Page 17: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/17.jpg)
Lessons Learnt on ERT Cont’d
Linkages with other social and economic sectors in developing RETs is a big stimuli of development
Need to employ a mix of service delivery methods: Grid extension where feasible; Decentralized mini grids; Solar PVs; and Development of other renewable energy resources.
![Page 18: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/18.jpg)
SELECTED CASE STUDIES OF ENERGY INTERGRATION IN RURAL
DEV
Igloo fish processing plant in Majanji - Busia District.
SME’s on Njeru – Kayunga – Bbale Rural Electrification Scheme
Fish Processing Plant at Bukakata (Using a diesel generator)
Ssembabule Rural Electrification Scheme
Kaweri Coffee Plantation Limited in Mubende District
![Page 19: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/19.jpg)
FISH PROCESSING PLANT IGLOO FOOD INDUSTRIES
This is a fish factory situated near Majanji Landing Site on lake Victoria in Busia District.
Provision of electricity to the site involved construction of a 10 km 33 kV line (three phase)
Production Capacity: 40 tonnes of fish/day
Number of people employed: 400
![Page 20: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/20.jpg)
Majanji landing Site
Fresh fish for the factory is received at this landing site
Beneficiaries include about 74 fishermen
![Page 21: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/21.jpg)
Ice Plant at Igloo Food Industries
The company uses electricity to produce ice, to chill the fish and for refrigeration of the cold rooms.
Ice Production: 60 tonnes/day.
The ice produced is used by fishermen to preserve the fish immediately it is caught.
![Page 22: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/22.jpg)
Loading Fish for Export
Fish exports brings in foreign currency into the economy.
![Page 23: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/23.jpg)
SME’S ON NJERU – KAYUNGA - BBALE – RURAL ELECTRIFICATION
PROJECT
The project completed in July 2000 included construction of a 92 km 33 kV line from Njeru to Bbale and provision of distribution transformers
Major load centers on the project include, A stone quarry belonging to Nile Mining Company. 13 maize mills Five coffee factories Two milk cooling plants Three secondary schools and six primary schools A health unit
![Page 24: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/24.jpg)
Coffee Processing Unit A small coffee
processing unit connected to the grid.
There are four other coffee mills connected to the grid.
![Page 25: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/25.jpg)
Maize Mill Kayunga – Bugerere Road
There are 13 such maize mills on the line
![Page 26: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/26.jpg)
Bugerere Balunzi Diary Cooling Plant
It belongs to a Cooperative society located in Baale.
Capacity is 5000 litres a day. Serves about 120 farmers. Before the cooling plant was
installed, the milk was taken to Kayunga town 44KM away.
This greatly improved the milk quality reducing loses.
![Page 27: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/27.jpg)
Bugerere modern farm cooling plant
Situated between Kayunga-Bbale.
It serves 20 farmers
It handles 1800 litres of milk per day
![Page 28: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/28.jpg)
Bbale Health Centre
Main energy source used before electrification was kerosene and charcoal
The hospital is connected to the grid now
Electricity is used for: Lighting Sterilisation of hospital
equipment & medical supplies
Refrigeration of vaccines Powering equipment for
limited operation
![Page 29: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/29.jpg)
Kanjuki S.S.S This is one of the
secondary schools connected to the grid.
Electricity is used for: lighting the class rooms which has made reading at night possible.
Lighting in dometries - which has improved quality of life of the students
School in take has increased to 800 students half of them reside at the school.
![Page 30: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/30.jpg)
FISH PROCESSING PLANT AT BUKAKATA, MASAKA
It belongs to Fresh water fish exporters Ltd
The factory currently uses a 265 kV diesel generator.
It employs 250 people Factory capacity is 50
tonnes/day, however due to limited power, current production is 10 tonnes/day.
![Page 31: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/31.jpg)
Bukakata landing site
The site is on Lake Victoria in Masaka District
Fresh fish is harvested here
It serves 20 fishermen.
![Page 32: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/32.jpg)
Ice making plant-Bukakata Cont’d
The ice produced is used by fishermen to preserve the fish immediately it is caught
![Page 33: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/33.jpg)
Company Fuel Service Station-Bukakata Cont’d
Fuel consumption by the plant is about 600 litres per day.
![Page 34: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/34.jpg)
Proposed Scheme for Extending Grid Power to
Bukakata Proposed scheme will involve
construction of a 35 km 33 kV line from Masaka to Bukakata
Project cost has been estimated at Ug. Shs 1.5 billion.
From Bukakata the line would be extended to Kalangala Island (If funds are available)
![Page 35: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/35.jpg)
RURAL ELECTRIFICATION
SCHEME IN SEMBABULE This involved
construction of a 17 km power line from Matete to Ssembabule town and provision of distribution transformers.
Electricity is used for: communication, car battery charging and in small enterprises in the town
![Page 36: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/36.jpg)
Coffee Processing Plant in Ssemabule
Processes 150 bags per day
It serves about 100 farmers
![Page 37: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/37.jpg)
Maize mill in Ssemabule One maize mill is
in operation in the town.
Previously the maize was grinded at a mill 10km away from Ssemabule
![Page 38: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/38.jpg)
KAWERI COFFEE PLANTATION LIMITED
Government is providing 23 km of 33 kV line to the plantation.
18 km has so far been constructed and commissioned
Total project cost is US $ 10M.
When completed, the company will employ about 6000 people.
![Page 39: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/39.jpg)
Wet Coffee Processing Plant – Kaweri Plantations
Ltd
The wet processing plant has a capacity of 500 kg/hour. This is for carrying out trials.
![Page 40: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/40.jpg)
100 kVA Transformer A 100 kVA transformer
serving the wet processing plant, the residential quarters
3 transformers have been installed and powered.
The remaining 2 transformers and 5 km of the line will be provided in the near future.
![Page 41: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/41.jpg)
Coffee Plantation Peak production
capacity of the plantations is expected to be 4000 tonnes of coffee per year.
![Page 42: INTERGRATION OF ENERGY ACCESS IN RURAL DEVELOPMENT IN UGANDA Benon Bena and James Baanabe Ministry of Energy and Mineral Development Uganda EU Energy Initiative](https://reader035.vdocuments.us/reader035/viewer/2022062304/56649c935503460f9494fd8b/html5/thumbnails/42.jpg)
CONCLUSION
Good policy frame addressing energy is key in increasing energy access.
Rural energy used in enterprises has added value to agricultural products, thus improving the farmers’ incomes.
Rural enterprises resulting from energy access have provided employment, hence reducing poverty levels.
People’s lives have improved through provision of energy for social services (health, education and water)
Private –public partnership with the public leading