  • 7/27/2019 Interface Basics

    1/20

    Interface Basics(AP r12 - AR - GL)

    Interfaces in Oracle Application: An Introduction

    What are Interfaces?

    Interfaces are used in Oracle Applications to integrate external systems and Data Conversion.

    The interfaces are mainly used to either transfer data from Oracle Applications to a flat file or data from legacy

    system to Oracle Applications.

    Used extensively at the time of Data Conversion from legacy/ old systems to a fresh implementation of Oracle

    Applications.

    Used also at regular intervals when data transfer is from other live systems if the systems are not defined in Oracle

    Applications implementation.

    Oracle provides flexible and flexible tools in the form of Interface programs to import the master and transactional

    data like Customers, Invoices, and Sales Orders etc from external systems into Oracle Applications.

    Types of Interfaces

    There are two major types of Interfaces:

    Inbound Interface :These interfaces are used to transfer data from external systems to Oracle Applications.

    Outbound Interface :These interfaces are used to transfer data from Oracle Applications to external systems.

    Two other distinctions of Interfaces:

    Open Interface: If the interface logic is provided by Oracle Applications, it is called an Open Interface.

    Custom Interface:If the interface logic needs to be developed by the implementation team, it is called a Custom

    Interface.

    Interface Components

    http://maddy-interface.blogspot.com/2011/07/interface-basicsap-r12-ar-gl.htmlhttp://maddy-interface.blogspot.com/2011/07/interface-basicsap-r12-ar-gl.html
  • 7/27/2019 Interface Basics

    2/20

    Open Interface Logic

    First the data from the source application is loaded into a database table (called Interface table).

    Then the provided validation program logic validates the records whether they are correct or not .

    If the validation fails, the errors are transferred into another table (called Error Table).

    If the validation succeeds, the correct records are transferred through a process into the destination application table.

    Components of an Interface

    a] Source Application:

    You obtain data from a source application to pass on to a destination application for further processing and/or storage.

    b] Source Data Issues:

    Type of file, Size, Frequency of upload, Record Length (Variable or fixed), Delimiter, Datatype for each field, Any unwanted

    data, Naming convention and uniqueness of file, Location of the file, Access on the file.

    c] Destination Application:

    You send data to a destination application so that the application can perform further processing and/or storage.

    d] Interface Table:

    For inbound interfaces, the interface table is the intermediary table where the data from your source application temporarily

    resides until it is validated and processed into the destination application.

    e] Identifier columns:

    Uniquely identify rows in the interface table provide foreign key reference to both the source and destination applications.

    f] Control Columns:

    Control columns track the status of each row in the interface table, as it is inserted, validated, rejected, processed,

    and ultimately deleted.

    WHO columns are also control columns.

    g] Data Columns:

    Stores the data that is being converted.

  • 7/27/2019 Interface Basics

    3/20

    Required columns store the minimum information needed by the destination application to successfully process the

    interface row.

    h] Derived Columns:

    Derived columns are created by the destination application from information in the required columns.

    i] Optional Columns:

    Optional columns are not necessarily required by the destination application, but can be used by the destination application for

    additional value-added functionality beyond the basics.j] Error Table:

    For inbound interfaces, the errors table stores all errors found by the validation and processing functions.

    In some cases, the errors table is a child of the interface table. This allows each row in the interface table to have

    many errors, so that you can easily manage multiple errors at once.

    In other cases, the errors are stored in a column within the interface table, which requires you to fix each error

    independently.

    Developing an Interface

    1] Identification:

    Find out if there exists an Open Interface to carry out the functionality.2] Creation of Pre-Interface table ( staging Table):

    A table in the format of the data file which can be pruned to load as clean a data into the Interface table.

    3] Load data into Pre-Interface table:

    SQL*LOADER can be used to load the flat file into the pre-interface table.

    4] Validate data in the Pre-Interface table:

    Basic validation of the data loaded into the Pre-Interface table can be carried out like:

    For checking NULL values in required columns

    Checking for Foreign Key and Quick Code values.

    Duplication Validation

    Business Rule validation

    5] Mapping the values:Generated fields in Oracle Applications can be mapped in this step to either default values or sequences.

    6] Load data into Interface table:

    Once the data is as clean as you can get it, the data can be inserted into the Interface table.

    At such a time, certain columns, which are necessary in Applications but not found in legacy system, need to be

    populated accordingly like WHO columns.

    7] Run the interface program

    8] Check for Errors

    9] Report on the Interface

    ***************************************************************************************

    ABOUT INTERFACES:

    In Oracle Apps Interfaces are generally tables, which act as a medium to transfer the data from one module to another module

    or to transfer the data from legacy system into Oracle Applications. There are 352 tables provided by the Oracle Package. Each

    module has its own Interface Tables.

    A typical path to transfer the data from Legacy System to Oracle Apps:

  • 7/27/2019 Interface Basics

    4/20

    What is Interfacing?

    It is the process of converting the records from one format to another format. The main components of this interfacing are

    Transfer Program

    Interface Table and

    Import Program

    A] Transfer Program:

    If the source modules data are implemented in Oracle Applications then the Transfer Programs are integrated with the Package.

    If the source modules are implemented in external system (i.e. other than Oracle Applications) then we have to develop our own

    Transfer Programs. Generally these Transfer Programs are developed using PL/SQL, JAVA or SQL Loader.

    What they do?

    It maps the columns of source table with the columns of Interface Tables.

    It performs Row Level and Column Level validations.

    It transfers the data from Source to the Interface Table.

    B] Interface Tables:

    The Interface tables basically have 4 types of columns.

    1. Mandatory Columns.

    2. Conditionally Required Columns.

    3. Optional Columns.

    4. Internal Processing Columns.

    Mandatory Columns:

    These are the main columns which are required in the destination tables (i.e. Oracle Application Module Tables). With the help

    of mandatory columns only the Import Program will converts the records from source to destination.

    Conditionally Required Columns:

    The values for these columns are based on the values of Mandatory columns. For Example:If you are converting foreign

    currency transactions to INR then it as compulsory to provide conditionally required columns like Currency conversion rate,Conversion Time and Conversion Date.

    Optional Columns:

    These are used when a client wanted to transfer some additional information from source to destination. These are based on

    clients requirement.

    Internal Processing Columns:

    Status and Error Message columns are called Internal Processing Columns. These are specific only to Interface Table. These

    columns are going to be used by the Import Program to update the status and error message, if the record fails its validation

    while importing from Interface Table to the Destination Table.

    C] Import Program:

    For all Interface Tables, Oracle Application Package is going to provide Import Programs. These are generally registered with

    destination modules. These Import Programs are designed using PL/SQL, JAVA, C, C++, etc.

    What they do?

    It maps the columns of the Interface Table with one or more columns in the destination table.

  • 7/27/2019 Interface Basics

    5/20

    It performs row level and column level validation.

    It imports the data from Interface Table to the Destination tables, if the records validated successfully.

    It deletes all the successfully validated records from Interface Table.

    If the record fails its validation then the Import Program will update the status and error message columns of Interface

    Table.

    Interface Vs. Application Program Interface (API):

    Interfaces are used to transfer the data from legacy system to Oracle Application system where as API is used to convert the

    data from one form to another form with in the Oracle Application Module.

    *****************************************************************************************************

    Data Migration vs. Data conversion

    When we need to enter data into oracle Apps, following are the few techniques:

    The Data can be entered using the application Screens (for small amount of data, like creating PO, entering sales orders

    using Oracle Apps screens).

    The data can be entered using Oracles Open System Interface (for regular operations e.g. for moving data from one module

    to another).

    The data can be stored in the database table directly (Not recommended by oracle and can be very risky, because on any

    event data is going to be stored in many tables and data should be validated before inserting into tables that may cause data

    integrity and inconsistency problem, sometimes it may corrupt the data completely.).

    Using third party tools like data loader (It is also can be used when data is relatively small (25-200 records) because it

    captures the keystrokes and works like manually entering the data into Oracle form but much faster as process is automated).

    What is the need of Migration/Conversion?

    Migration/Conversion are required when we are upgrading to one version to another (e.g. Oracle Apps 11.5.7 to Oracle 11.5.10)

    or moving data from some legacy system to Oracle Apps. There will be bulk of data (sometimes millions or even more than

    that) that needs to be moved from one system to another and before moving the data it should be validated and only valid

    records should be entered into Oracle Apps.

    If both the systems (Target and source) are not having same structure for data (Tables are not same/Table Structure is not

    same/The data is being stored in database is not same), it needs to be translated (e.g. upgrading from Oracle 11i to R12 where

    table structures are not same) then we say it as conversion (any kind of translation of data on Source data to make it suitable

    for Target system) otherwise migration.

    What is Migration?

    Migration of data means moving the data from one system to another using Interface Programs/APIs where both the systems

    have same structure of data.

    Process of Migrating of data:

    Identify the data to be imported to new system (Business requirement).

    Extract the data into flat file/Staging table

    Load the data into Interface Table(using SQL* Loader/DB Link/Others) after validation(If loading the data using Interface)

    What is Conversion?

    Conversion of data means translating the data to suite target system (data should be formatted according to target system )

    and then move the translated data using Interface Programs/APIs.

    Identify the data to be imported to new system (Business requirement).

    Extract into flat file/Staging table

    Translate/Convert/Format the data

    Load the data into Interface Table(using SQL* Loader/DB Link/Others) after validation(If loading the data using Interface) and

    then launch standard Interface concurrent program to load the data to Oracle Apps Base Tables

    If using API, fetch the data, validate it and then call API to import the data

    How conversion/Migration and interface differ?

  • 7/27/2019 Interface Basics

    6/20

    There are good numbers of parameter on which they can be categorized. Take few of them:

    Frequency

    Conversions/Migration are a one time event

    interfaces are ongoing

    Occurrence in the project timeline

    conversions/Migration executed before production

    interfaces executed during productionManner of execution

    Conversions/Migration are batch

    Interfaces may be batch or real time

    Complexity

    Conversion/Migration does have very complex, its totally depends upon the data mapping activity.

    Coordinating with other systems make interfaces more complex

    Maintenance

    Maintenance of interface is bit cost intensive task.

    ***************************************************************************************

    uring my work on a projects conversion, I came accross this very nice document. This document is very informative and so

    sharing with you all. Happy reading!

    Main Article:

    In this article I will be explaining the general steps involved in any Conversion/Data Migration of Oracle Projects module.At the end of this article, you would have learned:

    Stages in Oracle Projects Conversion.

    How to setup the Oracle Projects module for the conversion/Data Migration.

    Options for the Load (flat file, csv, or direct Loads).

    Oracle Projects AMG APIs needed to perform the Conversion.

    Testing the Conversion Process.

    Verifying the Conversion Process.

    Scenario:

    Company XYZ is using a Project Management and Accounting Software for years long. The Management has decided to

    move from their existing system to Oracle Projects module because of its vast functionality and integration with other financial

    modules.

    How to deal with it?

    Now the question arises:What data to migrate from the legacy system to Oracle Projects?.Well, it depends upon the type

    of projects.

    If the Projects are used for Internal Administration and tracking of costs, you may want to migrate the existing projects, tasks(the

    work break down structure), Cost Budgets, Cost (Timecards, Employee Expenses, Miscellaneous Expenses) etc.

    If the Projects are used for billing the Clients for the work done (Typical Contract Projects), then you may want to Revenue,

    Agreements (Contracts), Revenue budgets and Invoices in addition to the above data.

    Once the decision is made to which data to migrate, then the next step would be setting up the Oracle Projects for the

    conversion purpose, which we will see in detail sooner. Once the System has been setup, the technical elements (programs,

    concurrent processes etc) have to be created in order to migrate the data from Legacy System to Oracle Projects.

    Stages in Oracle Projects Conversion

    1. TheFirst Stageis to obtain the data from the Legacy System which needs to be migrated to Oracle Projects.2. TheSecond Stagewill be most crucial step in the process which is to massage the data according to the Oracle Projects

    Conversion Interface (Programs built using AMG APIs). This Step is indeed time consuming, manual labor intensive to

    massage and rectify the errors etc. But completing this step successfully pays dividends in the consecutive processes / Stages.

    3. TheThird Stageis uploading the data obtained from legacy systems into the Staging Area (Staging Tables created to hold

    the data temporarily till it gets migrated into Oracle Projects). Once the data is uploaded to the Staging tables, the programs

    built for migration (We will see how to build these programs in detail) will validate the Staging Table data to confirm that it is in

    compliance with the Projects Conversion Program (The AMG APIs used in the programs indeed needs data in certain format,

    also the data should be validated against the Oracle Projects Setup. For instance, when migrating the cost or hours from legacy

    to Projects, we might need to validate if the expenditure type is already setup in Oracle Projects, if the expenditure type is not

    setup, the program/APIs will throw an error. So it is always better to capture these kind of scenarios in the Validation Step of the

    Migration.

    The Second Stage and Third Stages are repetitive until you get the valid data from the legacy system which can be migrated

    into Oracle Projects without any errors or issues.TheFourth Stageis the actual migration process which will migrate the data from the Staging Tables to the Oracle Projects

    Base tables. Once this step is done, the projects, tasks and other data are available in Oracle Projects for use.

  • 7/27/2019 Interface Basics

    7/20

    Before going through the stages, we will look at some of the basic setups that need to be done in Oracle Projects.

    Oracle Projects Setup For ConversionProduct Code:

    The Product Code needs to be setup in Oracle Projects in the AMG Gateway Source Products Form in the Oracle Projects

    Implementation Super User Responsibility. This setup is mandatory since this product code needs to be passed when using the

    Oracle Projects AMG APIs

    Project Types and Project Templates:

    The project types and project templates for conversion projects need to be setup up. This is a mandatory setup since while

    migrating projects we need to tell the APIs which project template/type the projects use.

    For Contract Projects, setup the Contract Project Type Template. For administrative or internal projects, setup the Indirect

    Project Type templates.

    If you are migrating Cost and Revenue Budgets, then the Plan Types need to be attached to the templates in order to create the

    budgets for the migrated projects.

    Implementation Option Setup:

    Project Numbering: This implementation option is by default set to Automatic which means when creating projects in Oracle

    Projects, the project number is automatically derived and users are not required to provide any project numbers. This option is

    best suitable when creating projects in Oracle Projects. But when migrating the projects from the third party systems, there is an

    option to migrate the projects with the same project number as in the legacy system. This is not mandatory but is recommended

    since it will be easy to refer back the projects in the source system using the project numbers.

    In order to pass the project number to the Migration program, this implementation option needs to be setup to Manual. Once

    the migration is done, this setup can be reverted back to Automatic.

    Setup Transaction Source:

    The Transaction Source needs to be setup in Oracle Projects in the Transaction Sources form in Oracle Projects

    Implementation Super User Responsibility. This is a mandatory setup for the Costs/hours migration from the legacy system to

    Oracle Projects. We need to tell the migration APIs what the source system is and how the data is handled when it is imported

    to Oracle Projects.

    Setup Expenditure Types:

    Expenditure Types are needed to categorize the cost/hours when it is imported to Oracle Projects. This is a mandatory setup for

    Cost/hours migration. We need to tell the system which expenditure type the cost/hour belongs to.

    Setup Employee Cost Rates:

    Setting up cost rates for employees is not mandatory. But if you need to cost the hours that are migrated in the system, the

    labor cost distribution process in Oracle Projects do need the rates setup in order to calculate the costs.

    But if you are migrating the costs directly from the legacy instead of hours then this step is not needed. But ideally the cost rates

    are required in a general production scenario wherein the employees/contractors enter their timecards.

    You can setup job rate schedule, employee level rate schedule or employee level overrides. Alternatively, the costing client

    extension can be setup to calculate the cost according to the business scenario.

    Refer to the Oracle Projects User Guide for how to setup the employee cost rates.

    First Stage: Obtain Data from Legacy System

    The first stage deals with obtaining the data from the legacy system in the desired format. The data can be obtained in the form

    of flat text file or comma separated file csv, tab delimited file or file with any delimiters. Generally tab delimited files are

    recommended since comma separated files behave strange when there is a comma in the data itself.

    If there is a database link created between the Source Legacy database and the Oracle Projects Database then the data can be

    obtained directly using the select statements against the Source DB from within the Oracle Projects DB. But this method is not

    preferred as it is more performance intensive when it comes to selecting large data over the network.

    For Projects Migration, generally 2 files are obtained. One file for Projects Data and the other file for Tasks Data.

    For Transaction Migration, single file is enough with all the cost/hours data.

    For Cost/Revenue Budget migration, single file is enough with all the Budgets Data.

    Create SQL Loader concurrent program which will upload the obtained data into the Oracle Staging Tables.

    Also it is always the best practice to create a control table in the Staging area, which will control the data migration. For example

    your control table might look like the one below:

    Parameter Type Parameter Parameter Value

    Template Contract Contract_Template

    Template Indirect Indirect_Template

    Expenditure Type Hours Labor

    Expenditure Type Expenses Employee_Expense

    Transaction Transaction Source Legacy1

    Product Code Product code LEGACY1

    Project Publish Workplan Yes

  • 7/27/2019 Interface Basics

    8/20

    Project Baseline Workplan Yes

    Cost Budget Baseline Yes

    Revenue Budget Baseline Yes

    This control table is looked upon by the migration program. So whenever there is a change in the templates, expenditure types

    it is easy to change this control table instead of the code. So the advise is never hard code any values in the code, always

    handle it using the control table.

    Also it will be better to have a form based on this table, so that this table data can be changed from the front end.

    Second Stage & Third Stage: Validate and Format the Data

    I am coupling the second and third stage because both are interdependent. Validating data is very important and it prevents

    some of the time consuming tasks in actual migration such as trouble shooting the errors due to the invalid data.

    Below are some of the key validations that need to be done before doing the actual migration.

    Projects/Tasks Migration:

    Though the projects and tasks are in different staging tables, the migration of projects/tasks is doing using a single program.

    We can always migrate projects and tasks separately, but the issue is with the performance when adding task by task to each

    project. So it always better to create projects and tasks together because of the bulk loading of tasks.

    Project/Task Setup Validations:

    Validate the Product code is setup.

    Validate if the required Project Templates are setup.

    Validate if the Project Numbering is set to Manual for creating projects with the predefined project numbers.

    Project/Task Data Validations:

    Validate if the project name is unique. Project with the same name should not exist in Oracle Projects.

    Validate if the project number is unique. Project with the same number should not exist in Oracle Projects.

    Validate if the project long name is unique. Project with the same long name should not exist in Oracle.

    Validate the project reference(this field is mandatory in the projects file, it can be the projects identifier of the source

    project or project number of the source project, but it has to be unique in the source system as well. This field needs to be

    populated in all the converted projects in order to track back and identify the project in the source system)

    Project name and project number should be 30 chars in length. Project long name should be 240 chars in length.

    Project Description should be 250 chars in length. Project description is not a mandatory field when creating project.

    Check if the project has a project manager and the project manager is active in Oracle HR and has an assignment

    and a Job assigned. Also the project manager has to be active from the project start date, else you cannot create a project with

    that project manager.

    In case of contract projects, check if the customer of the project is a valid customer defined and with a valid Bill To

    site assigned.

    Apart from the above necessary validations, you may have to validate the additional data such as Projects DFF Data you may

    want to populate with your custom field values. For example you may want to populate the Project cost center value in theSegment1 of the Project DFF. In such case you have to validate if the cost center value is a valid value for that Segment1

    (sometimes you may have attached an LOV to that segment1, so in that case, the cost center has to be validated against that

    LOV Values).

    For tasks, values for task types, work type, task manager has to be validated. Task types and work types have to be defined in

    Oracle Projects before the task with those values are migrated, else the task will not be created.

    Cost/hours validationSetup Validations:

    Validate if the Transaction source is setup.

    Validate if the Expenditure type is setup.

    Data Validations:

    Check if the hours value is greater than zero.

  • 7/27/2019 Interface Basics

    9/20

    Check if the employee number is valid in HR and is active on the timecard date.

    If the transaction source is setup as costed, then the cost has provided while migrating the transactions. If the

    transaction source is setup as accounted, then the code combination ids need to be provided when migrating transactions.

    Apart from the above validations, you may want to validate the additional DFF segments that you are going to populate for that

    expenditure item.

    Budgets ValidationSetup Validations:

    Validate the project template has the required financial plan type attached. Financial plans are the project

    management versions of the Budget types in the Forms applications.

    Budget amount has to be greater than zero.

    There is no need to create revenue budgets if the Baseline funding without budget option is checked at the project or

    project type level. Whenever the funding is created for the contract project and is baselined, the revenue budget is automatically

    created and baselined. If that option is not checked, it is necessary that a revenue budget with the same amount as the funding

    amount needs to be created and baselined in order to baseline the funding.

    Data Validations:

    The cost budget for the project can be from the source systems budgeting system. If there is no budgeting in the source

    system, a cost budget with the total cost of the project can be created in Oracle Projects.

    For revenue budgets, it has to be equal to the funding amount of the project. If there is no funding amount in the source system,the sum of the revenue amount can be the funding amount and it is the revenue budget amount as well.

    Agreements and Funding ValidationData Validations:

    Agreement type should be valid.

    Agreement Amount should be greater than zero.

    Hard Limits can be setup according to business rules. If the hard limits are setup for revenue and invoice then the

    revenue and invoice has to be within the funding limits for that project.

    Funding amount has to be within the Agreement amount.

    If the funding at the top task level, then the Customer at top task has to be enabled and the customer should have

    been assigned at the top task.

    Funding amount should be same as the Revenue budget amount which in general will be same as the total revenue

    amount for that project. If there are no hard limits then the revenue or invoice can exceed the funding amounts.

    Records which fail the above validations have to be rectified before doing the actual migration.

    Revenue and Invoice ValidationsData Validations:

    Project / Task should already been converted to Oracle.

    Event amount should be non zero.

    For revenue event revenue amount should be populated.

    For invoice event invoice amount should be populated.

    Generally for a project, the total revenue is obtained from the source system and is created as a revenue event for that project.

    The total invoiced amount is calculated per project and an invoice event is created for each project.

    Once these events are created successfully in the system, the Generate Draft Revenue process and Generate Draft Invoice

    process needs to be run so that the desired revenue and invoices are generated.

    The revenue and invoice automatic approval and release client extensions can be used to automatically release the revenue

    when it is generated and approve/release invoices respectively.

    If the revenue amounts are already interfaced to General Ledger (GL) through a different interface, then uncheck the Interface

    Revenue to GL option in the implementation options and run the Interface Revenue to GL process in Oracle projects. This will

    turn the flags in the revenue records as accepted in GL, though it is not interfaced. Once this is done, revert back the

    implementation option back to its original state.

    If the invoice amounts are already interfaced to Accounts Receivables (AR) by different means, it is not desired to interface the

    projects invoices to AR again since it will double the invoice amount in AR. In this case, we do not have an implementation

    option like we had for Revenue. So a script can be created to update the Invoices flag to Accepted State. Alternatively the

    generated projects invoices can be interfaced to AR, tied back to Oracle and then the invoices can be deleted in AR.

    Stage 4: Actual Migration

    Once the data is validated, the program for conversion is executed to migrate the data into oracle projects base tables. There

    might be still errors due to AMG APIs which has to analyzed and resolved. But the chances of such AMG API issues are just

  • 7/27/2019 Interface Basics

    10/20

    below 10% in any migration (based on my experience in Oracle Projects Conversion).

    Below is a table with Conversion and which AMG APIs are used for that conversion:

    Conversion AMG APIs

    Projects/Tasks Conversion PA_PROJECT_PUB.CREATE_PROJECT

    Budgets Conversion PA_BUDGET_PU B.CREATE_DRAFT_BUDGET,

    PA_BUDGET_PUB.BASELINE_BUDGETAgreements PA_AGREEMENT_PUB.CREATE_AGREEMENT

    Funding PA_AGREEMENT_PUB.ADD_FUNDING

    Revenue/Invoice PA_EVENT_PUB.CREATE_BILLING_EVENT

    User Defined Attributes (UDA) PA_PROJECT_PUB.LOAD_EXTENSIBLE_ATTRIBUTE

    For Transactions (cost/hours) migration, there is no APIs to create the expenditures in Oracle. The pa_transaction_interface_all

    table needs to be populated with the migration data and once it is populated, the PRC: Transaction Import process with the

    Transaction source as parameter needs to be run in Oracle Projects. All invalid records need to be rectified in order to migrate

    all the transactions.

    The rejected records can be found in the same interface table with the transfer_status_code as R.

    Conversion Tips:

    1. Make sure the templates are defined properly and exactly the way it is needed. Once the projects are created using the

    templates and the template was wrongly defined, then it takes ages to rectify the converted projects.

    2. Create the conversion program to operate in two modes: Validate, Run. A concurrent process with a parameter called

    mode accepting Validate/Run can be created. So the same concurrent program can be used to validate as well as run the

    actual migration.

    3. It is a good practice to have source Project id / Project Number as parameter to the projects conversion program. This will

    allow us to test the conversion for a single project and validate the data for that project.

    4. The validation process can write the invalid records to the output file. So once validation process completes, the output will

    have all the invalid records which needs to be rectified.

    5. Create a separate concurrent program to know the status of the already running migration process. If you want to know

    where the migration process is in terms of the number of records migrated, number of records rejected etc. If the volume of the

    migration data is huge, then it is likely possible that the conversion programs may run for hours. So in these scenarios this

    concurrent program can be helpful in finding the status of that migration process.

    6. For Transactions migration, the custom program written to populate the interface table can kick off the PRC: Transaction

    Import process and wait for its completion. Once the transaction import completes, the custom process can print the invalid

    records from the interface table to the output file.

    7. There are APIs to publish and baseline the workplans created as a part of projects migration. But these APIs need to be

    used with care. There are lot of performance issues and bugs when using these APIs.

    ***********************************************************************************************

    Supplier Conversion in R12

    Vendor conversion program will load the Supplier Master, Sites and Contacts data from data files to the staging tables, validate

    the data and then load the data into Interface tables, finally Validated data will import into Oracle Supplier Standard Tables by

    using Oracle Standard Supplier Import Programs.Pre-requisites setups are:Payment terms, Pay Groups, CCID, Supplier classifications, Bank Accounts , Employees (if

    employees have to set up as vendors).

    The Interface Tables are:

    AP_SUPPLIERS_INT

    AP_SUPPLIER_SITES_INT

    AP_SUP_SITE_CONTACT_INT

    AP_SUPPLIERS_INT:

    This is the open interface table for AP Suppliers. It holds Supplier information which is loaded by the user for import. The

    columns in the table map to corresponding columns in the PO_VENDORS table. The Oracle Payables application uses this

    information to create a new Supplier record when the Supplier Open Interface Import program is submitted. Each row in the

    table will be identified by a unique identifier, the VENDOR_INTERFACE_ID.

    Mandatory Columns:

  • 7/27/2019 Interface Basics

    11/20

    VENDOR_INTERFACE_ID (ap_suppliers_int_s.NEXTVAL)- Supplier interface record unique identifier

    VENDOR_NAME Supplier name

    Other important columns:

    SEGMENT1 Supplier Number

    VENDOR_TYPE_LOOKUP_CODE Supplier type

    SHIP_TO_LOCATION_CODE Default ship-to-location name

    BILL_TO_LOCATION_CODE Default bill-to-location name

    TERMS_NAME Payment terms name

    TAX_VERIFICATION_DATE Tax verification date(1099)

    VAT_REGISTRATION_NUM Tax registration number

    ATTRIBUTE1 -15 Descriptive Flexfield Segments

    PAY_GROUP_LOOKUP_CODE Payment group type

    INVOICE_CURRENCY_CODE Default currency unique identifier

    PAYMENT_CURRENCY_CODE Default payment currency unique identifier

    NUM_1099 Tax identification number (1099)

    VAT_CODE Default invoice tax code

    HOLD_FLAG Indicates whether or not the supplier is on purchasing hold

    SUMMARY_FLAG Key flexfield summary flag

    ENABLED_FLAG Key flexfield enable flag

    EMPLOYEE_ID Employee unique identifier if supplier is an employee

    AP_SUPPLIER_SITES_INT:

    This is the open interface table for AP Supplier Sites. It holds Supplier Site information which is loaded by the user for import.

    The columns in the table map to corresponding columns in PO_VENDOR_SITES_ALL table. The Oracle Payables application

    uses this information to create a new Supplier Site record when the Supplier Sites Open Interface Import program is submitted.

    Each row in the table will be joined to the appropriate Supplier using the VENDOR_ID column.

    Mandatory Columns:

    VENDOR_SITE_INTERFACE_ID (ap_supplier_sites_int_s.NEXTVAL) Supplier Site interface record unique

    identifier VENDOR_SITE_CODE Supplier Site name

    Other important columns:

    ADDRESS_LINE1 First line of supplier address

    ADDRESS_LINE2 Second line of supplier address

    ADDRESS_LINE3 Third line of supplier address

    CITY City name

    STATE State name or abbreviation

    ZIP Postal code

    COUNTRY Country name

    PHONE Phone number

    FAX Supplier site facsimile number

    SHIP_TO_LOCATION_CODE Default ship-to-location name

    BILL_TO_LOCATION_CODE Default bill-to-location name

    PAYMENT_METHOD_LOOKUP_CODE Default payment method type

    VAT_CODE Invoice default tax code

    PAY_GROUP_LOOKUP_CODE Payment group type

    TERMS_NAME Payment terms name

    INVOICE_CURRENCY_CODE Default currency unique identifier

    PAYMENT_CURRENCY_CODE Default payment currency unique identifier

    EMAIL_ADDRESS E-mail address of the supplier contact

    PURCHASING_SITE_FLAG Indicates whether purchasing is allowed from this site

    AUTO_TAX_CALC_FLAG Level of automatic tax calculation for supplier

    HOLD_ALL_PAYMENTS_FLAG Indicates if Oracle Payables should place payments for this supplier on hold

  • 7/27/2019 Interface Basics

    12/20

    AP_SUP_SITE_CONTACT_INT:

    This is the open interface table for AP Supplier Site Contacts. It holds Supplier contact data. The columns in the table map to

    corresponding columns in PO_VENDOR_CONTACTS table. The Oracle Payables application uses this information to create a

    new Supplier Contact record when the Supplier Sites Open Interface Import program is submitted. Each row in the table will be

    joined to the appropriate Supplier Site using the VENDOR_SITE_CODE and ORG_ID.

    Mandatory Columns:

    VENDOR_INTERFACE_ID Supplier interface record unique identifier

    VENDOR_CONTACT_INTERFACE_ID (AP_SUP_SITE_CONTACT_INT_S.NEXTVAL) Vendor Contact Interface

    Identifier

    VENDOR_SITE_CODE Supplier Site name

    Other important columns:

    FIRST_NAME Contact First name

    LAST_NAME Contact last name

    AREA_CODE Area code of contact phone number

    PHONE Contact phone number

    FIRST_NAME_ALT Alternate Supplier contact first name

    LAST_NAME_ALT Alternate Supplier contact last name

    EMAIL_ADDRESS Email address for the Supplier Site contact

    FAX Facsimile number for the Supplier Site contact

    VENDOR_ID Supplier unique identifier

    Validations:

    Vendor Number (Check for duplicate records in ap_suppliers table)

    Vendor Name (Check for duplicate records in staging as well as in ap_suppliers table)

    Terms Name (Check for proper record in ap_terms_tl table)

    Pay Group (Check for proper record in fnd_lookup_values_vl table where lookup_type = PAY GROUP)

    Employee Id (Check for proper employee record in per_all_people_f table)

    Vendor Type (Check for proper record in po_lookup_codes table where lookup_type = VENDOR TYPE)

    Vendor Site Code (Check for duplicate records in ap_supplier_sites_all table)

    Country Code ( Check for proper country code in fnd_territories_vl table)

    Payment Method (Check for proper payment method in iby_payment_methods_vl table)

    Interface programs:

    1. Supplier Open Interface Import

    2. Supplier Sites Open Interface Import

    3. Supplier Site Contacts Open Interface Import

    The data inserted via these interfaces are automatically populated into TCA tables.

    Note: AP_SUPPLIER_INT_REJECTIONS table contains suppliers, sites, contacts rejections information.

    *******************************************************************************************

    AP Invoice Interface

    This interface helps us to import vendor invoices into Oracle applications from external systems into Oracle Applications.

    Interface tables:

    1] AP_INVOICES_INTERFACE

    This is the open interface table for importing AP Invoices from external sources and stores header information about invoices.

    Invoice data comes from sources including:

    EDI invoices from suppliers that are loaded through Oracle e-Commerce Gateway

  • 7/27/2019 Interface Basics

    13/20

    Supplier invoices that are transferred through the Oracle XML Gateway

    Invoices that are loaded using Oracle SQL*Loader

    Lease invoices from Oracle Property Manager

    Lease payments from Oracle Assets

    Credit card transaction data that are loaded using the Credit Card Invoice Interface Summary

    Expense Report invoices from Oracle Internet Expenses Payment Requests from Receivables

    Invoices that are entered through the Invoice Gateway.

    There is one row for each invoice you import. Oracle Payables application uses this information to create invoice header

    information when Payables Open Interface program is submitted.

    Data in the AP_INVOICES_INTERFACE table used in conjunction with AP_INVOICE_LINES_INTERFACE table to create

    Payables Invoice, Invoice lines, Distributions and Schedule payments. Data in this table can be viewed and edited using Open

    Interface Invoices window. The Payables Open Interface program validates each record in this interface table selected for

    import, and if the record contains valid data then the program creates a Payables Invoice.

    Important columns:

    INVOICE_ID (Required):Unique identifier for this invoice within this batch. Same value should be populated in invoices lines in

    the AP_INVOICE_LINES_INTERFACE table to identify the data as belonging to the same invoice.

    INVOICE_NUM (Required):Enter the invoice number that needs to be assigned to the invoice created in Payables from this

    record.INVOICE_TYPE_LOOKUP_CODE(Optional) : Type of invoice: Credit or Standard.

    INVOICE DATE(Optional) : Date of the invoice. If you do not enter a value, the system uses the date you submit Payables

    Open Interface Import as the invoice date.

    PO_NUMBER(Optional):Purchase order number from PO_HEADERS.SEGMENT1. This column needs to be populated if

    invoice to be matched with an purchase order.

    VENDOR_ID & VENDOR_SITE_ID (Required):VENDOR_ID isunique identifier for a supplier and VENDOR_SITE_ID

    isInternal supplier site identifier. Supplier of the invoice to be derived by value in one of the following columns in this table:

    VENDOR_ID, VENDOR_NUM, VENDOR_NAME, VENDOR_SITE_ID or PO_NUMBER.

    VENDOR_NUM & VENDOR_NAME(Optional) : Supplier number and name. You must identify the supplier by entering a value

    for one of the following columns in this table: VENDOR_ID, VENDOR_NUM, VENDOR_SITE_ID, VENDOR_SITE CODE, or

    PO_NUMBER.

    INVOICE_AMOUNT(Required):Amount of the invoice.

    INVOICE_CURRENCY_CODE(Optional) : Currency code for the invoice. If you want to create foreign currency invoices, enter

    a currency code that is different from your functional currency.

    EXCHANGE_RATE(Optional) : This column is required if you enter a foreign currency code in the

    INVOICE_CURRENCY_CODE column and you enter User as the EXCHANGE_RATE_TYPE.

    TERMS_ID(Optional) : Internal identifier for the payment terms.

    DESCRIPTION(Optional) : Enter the description that you want to assign to the invoice created from this record.

    SOURCE(Required) : Source of the invoice data. If you import EDI invoices from the Oracle EDI Gateway, the source is EDI

    Gateway. For invoices you import using SQL*Loader, use a QuickCode with the type Source that you have defined in the

    QuickCodes window in Payables.

    2] AP_INVOICE_LINES_INTERFACE

    This is the lines interface table for the AP Invoice Open Interface and it is used in conjunction with AP_INVOICE_INTERFACE

    table. AP_INVOICE_LINES_INTERFACE stores information used to create one or more invoice distributions. Note that one row

    in this table may create, during the import process, more than one invoice distribution.

    Important columns:

    INVOICE_ID(Required) :Enter the INVOICE_ID of the corresponding invoice in the AP_INVOICES_INTERFACE table.

    INVOICE_LINE_ID :This value is not required. You can enter a unique number for each invoice line of an invoice.

    LINE_NUMBER(Optional) :You can enter a unique number to identify the line.

    LINE_TYPE_LOOKUP_CODE(Required) : Enter the lookup code for the type of invoice distribution that you want Payables

    Open Interface Import to create from this record. The code you enter must be ITEM, TAX, MISCELLANEOUS, or FREIGHT.

    These lookup codes are stored in the AP_LOOKUP_CODES table.

    AMOUNT(Required) : The invoice distribution amount. If you are matching to a purchase order, the AMOUNT =

    QUANTITY_INVOICED x UNIT PRICE. If the total amount of all the invoice distributions does not equal the amount of the

    invoice that has the same INVOICE_ID, then Payables Open Interface Import will reject the invoice.

    Concurrent program:

  • 7/27/2019 Interface Basics

    14/20

    Payables Open Interface Import

    Parameters:

    Source:Choose the source of the invoices from the list of values. Use EDI Gateway, Credit Card, or a Source type QuickCode

    you defined in the Payables QuickCodes window.

    Group:To limit the import to invoices with a particular Group ID, enter the Group ID. The Group must exactly match the

    GROUP_ID in the Payables Open Interface tables.

    Batch Name:Payables groups the invoices created from the invoices you import and creates an invoice batch with the batchname you enter. You can enter a batch name only if you have enabled the Use Batch Control Payables option, and if you have

    enabled the Use Batch Control Payables option, you must enter a batch name. If you use a batch name and some invoices are

    rejected during the import process, you can import the corrected invoices into the same batch if you enter the exact batch name

    during the subsequent import.

    Hold Name:If you want to place all invoices on hold at the time of import, enter an Invoice Hold Reason. You can define your

    own hold reasons in the Invoice Approvals window.

    Hold Reason:Payables displays the Invoice Hold Reason Description.

    GL Date:If you want to assign a specific GL Date to all invoices, enter a GL Date. If you do not enter a value here, the system

    will assign a GL Date based on the GL Date Payables option.

    Purge:Enter Yes if you want Payables to delete all successfully imported invoice records that match the Source and Group ID

    of this import. Payables does not delete any invoice data for which it has not yet created invoices. If you want to purge later, you

    can use the Payables Open Interface Purge Program.

    Steps:

    1] Firstly, lets get a unique number to be used as INVOICE_ID to the invoice to be imported. This method ensures that each

    invoice has a unique INVOICE_ID assignment.

    1 selectap_invoices_interface_s.nextval fromdual;

    2 NEXTVAL

    3

    ! 1322""

    2] Then, create records in the Invoice Open Interface tables through SQL queries.

    #1 insertintoA$_%NV&%'E(_%NTE)*A'E +

    #2 invoice_id,

    #3 invoice_num,

    #! vendor_id,

    #- vendor_site_id,

    # invoice_amount,

    #" %NV&%'E_'/))EN'0_'&E,

    # invoice_date,

    # E(')%$T%&N,

    1# $A0_4)&/$_L&&5/$_'&E,

    11 source,

    12 or6_id

    13 7

    1! values+

    1- 1322"",

    1 8%NV1##8,

    1" 8"12!8,

    1 811"28,

  • 7/27/2019 Interface Basics

    15/20

    1 12##.##,

    2# 8/(8,

    21 to_date+8#1312#1#8,8mmdd999987,

    22 8T:is %nvoice is created for test purpose8,

    23 8/*( (/$$L%E)8,

    2! 8 Entry > Open Interface Invoices to check the details of Invoice and Invoice Lines fromthe front end. If required you can do any modifications here. Alternatively you can use these forms to put invoice data in

    AP_INVOICES_INTERFACE and AP_INVOICE_LINES_INTERFACE tables.

    4] Go to the front end and run the concurrent program Payables Open Interface Import to submit a request for Invoice Import.

    Output:

  • 7/27/2019 Interface Basics

    16/20

    output of Payables Open Interface Import

    5] The imported invoice becomes available for review in Invoices Workbench.

    Interface Invoice through Invoice Banch

    ******************************************************************************************

    AR Invoice Interface

    The main three steps for AR Invoice Interface are:

    1] Put the data into your staging tables.

    2] Calls your package to validate the data and load into AR Interface tables (RA_INTERFACE_LINES_ALL &

    RA_INTERFACE_DISTRIBUTIONS_ALL).3] Then submits a concurrent request for AutoInvoice.

    If any errors occur it can be found in ra_interface_errors_all table. The concurrent program has 2 stages. First the Master

    program fires which intern kicks of the Import Program. Once this is completed data is inserted into the following tables.

    1) ra_customer_trx_all (Invoice Header Info)

    2) ra_customer_trx_lines_all (Invoice Line Level Info)

    3) ra_cust_trx_line_gl_dist_all (Accounting Info. One record for each Account Type is inserted into this ex. Receivable

    Revenue Tax Freight etc)

    4) ar_payment_schedules_all (All Payment related info)

    Validations:

    Validation are generally done on the below columns.

    Batch_source_name

    Set_of_books_id

    Orig_sys_batch_name

  • 7/27/2019 Interface Basics

    17/20

    orig_system_bill_customer_ref

    orig_system_bill_address_ref

    Line_Type

    Currency_Code

    Term_name

    Transaction_type Interface_line_attribute1-7

    Account_class

    Accounting Flexfields segments

    1- AR Transaction Type Validation: Check if the Transaction type provided in data file is defined in AR transaction types

    (RA_CUST_TRX_TYPES_ALL)

    2- Transaction Batch Source Validation: Check if the source provided in data file is defined in AR transaction Batch source

    (RA_BATCH_SOURCES_ALL).

    3- Invoice Currency Validation: Check if the currency provided in data file is defined in AR Currency (FND_CURRENCIES).

    4- Customer Validation: Check if the Bill to Customer Number, Ship to Customer Number, Bill to Custom Location, Ship to

    Customer Location provided in the data file is defined in AR Customer (RA_CUSTOMERS).

    5- Primary Sales Representative Validation: Sales representative number to be hardcode to -3 for No Sales Credit.

    6- Term Name: Check if the Term name provided in the data file is defined in Payment terms (RA_TERMS)

    7- Inventory Item Validation: Check if the Item provided in data file is defined in Inventory Items (MTL_SYSTEM_ITEMS).

    8- Unit of Measurement validation: Check if the UOM provided is defined in MTL_UNITS_OF_MEASURE Table

    9- Invoice Tax Code Validation: Check if the Tax Code provided in data file is defined in AR_VAT_TAX_ALL_B Table.

    10- Invoice GL Date Validation: Check if the GL Data of provided invoices is in open period.

    For MOAC:

    You need to add the below columns and need to do validations if your application supports MOAC.

    conversion_type

    conversion_rate

    conversion_date

    Sample Code to run Autoinvoice Master Program:

    view sourceprint?

    #1 E'LA)E

    #2 v_p:ase VA)'?A)2+1##7;

    #3 v_dev_p:ase VA)'?A)2+1##7;

    #! v_status VA)'?A)2+1##7;

    #- v_dev_status VA)'?A)2+1##7;

    # v_messa6e VA)'?A)2+1##7;

    #" v_re@id N/

  • 7/27/2019 Interface Basics

    18/20

    1 ,fr.application_id

    2# fromfnd_concurrent_re@uests fcr

    21 ,fnd_responsi=ilit9 fr

    22 C:erefcr.re@uest_id D 8F!G8

    23 and fcr.responsi=ilit9_id D fr.responsi=ilit9_id;

    2!

    2- '/)(&)c2 %(

    2 selectfa.application_s:ort_name

    2" fromfnd_concurrent_pro6rams fcp, fnd_application fa

    2 C:erefcp.concurrent_pro6ram_name D v_pro6ram_s:ort_name

    2 andfcp.application_id D fa.application_id;

    3#

    31 '/)(&)c_=atc:_id %(

    32 (ELE'T1, =atc:_source_id, name

    33 *)&

  • 7/27/2019 Interface Basics

    19/20

    --

    - *&)v_=atc:_data %Nc_=atc:_id L&&$

    -"

    - fnd_6lo=al.apps_initialiHe+8F*'$_/(E)%G8,v_resp_id,v_resp_appl_id7;

    -

    # v_re@id ID [email protected]=mit_re@uest+8A)8,

    1 8)AX

  • 7/27/2019 Interface Basics

    20/20

    NULL columns with data. In addition, you must supply a valid account combination in the SEGMENT columns appropriate to

    your chart of accounts. Finally, you must supply the budget amounts in the appropriate AMOUNT columns.

    The mandatory (not null) columns of the Interface table are:

    BUDGET_NAME

    BUDGET_ENTITY_NAME (the budget organization)

    CURRENCY_CODE

    FISCAL_YEAR

    UPDATE_LOGIC_TYPE (A for Add, R for Replace)

    Other important columns are:

    SET_OF_BOOKS_ID

    BUDGET_VERSION_ID

    PERIOD1_AMOUNT through PERIOD60_AMOUNT

    SEGMENT1 through SEGMENT30

    Validations:

    Budget Name and Budget Entity Name

    Currency Code

    Account Segments(Code Combination in GL_CODE_COMBINATIONS Table)

    To upload a budget:

    1. Navigate to the Upload Budget window (Budgets > Enter > Upload).

    2. Enter the Budget and Budget Organization.

    3. click Upload.

    General Ledger submits a concurrent process to upload budget information from the GL_BUDGET_INTERFACE table.

    Budget Upload Validation:

    Budget Upload validates all of your budget information for compatibility with General Ledger. Budget Upload also checks to

    make sure that the following conditions are true:

    Your account is assigned to a budget organization

    The budget entry type for your account is Entered Your budget is not Frozen

    Your budget organization is not Frozen

    Your budget fiscal year is open for your budget

    Once updated, General Ledger automatically deletes the rows of budget records in the Budget Interface table.

    Base Tables:

    GL_BUDGETS

    GL_BUDGET_ASSIGNMENTS

    GL_BUDGET_TYPES