Interactive Project Planning. Client-Server-Konzept. Client. Client. . Client. direct function call. Commandline. ERP-System. TCP/IP. Data. ODBC/AdoDB SQL. Server. Select. SQL-DB. ERP Data. ERD. User Usergroups Shift calendar Query. Access rights License model Moduls. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Interactive Project Planning

Interactive Project Planning

Page 2: Interactive Project Planning

.

Client-Server-Konzept

Select

SQL-DB

TCP/IP

direct function call

ERP Data

ODBC/AdoDBSQL

Commandline

Data

Page 3: Interactive Project Planning

ERD

•User

•Usergroups

•Shift calendar

•Query

•Access rights

•License model

•Moduls

Page 4: Interactive Project Planning

Technical Requirements DB

Database:• The system uses only a single Concurrent/Named User of the Database!

• The ContinoPlan Server must be able to connect to the DB via an ODBC/AdoDB-Interface

• The ContinoPlan Server uses an additional userdefined table for the storage of the cnnections and indexes.

Page 5: Interactive Project Planning

Technical Requirements Client

Hardware:Recommended Hardware: Minimum requirement:

Pentium III/500 Mhz Pentium II/166 Mhz256 MB RAM Memory 64 MB RAM Memory16 MB Graphics adapter 2 MB Graphics adapter

Resolution 1024x800 Resolution 800x60032Bit Colorresolution 16Bit Colorresolution100 Mbit Network adapter 10 Mbit Network adapter

Software:Microsoft 32-Bit operating systemMicrosoft Internet Explorer 5.5 Microsoft Mdac 2.7

Network protocol:TCP/IP

Page 6: Interactive Project Planning

Technical Requirements Server

Hardware:Recommended Hardware: Minimum requirement:

Pentium III/500 Mhz Pentium II/333 Mhz256 MB RAM Memory 64 MB RAM Memory16 MB Graphics adapter 2 MB Graphics adapter100 Mbit Network adapter 10 Mbit Network adapter

Software:Microsoft 32-Bit operating systemMicrosoft Internet Explorer 5.5 Microsoft Mdac 2.7ODBC/AdoDB-Interface (e.g. Oracle SQL-Net + ODBC)

Network protocol:TCP/IP

Page 7: Interactive Project Planning

Functions

• Client

• Projectplan• Re-scheduling• Link tasks• Add-on functions

• Server

• User rights• Licensmanagement• Shift calendar• Shiftmodel• DB-Access via ODBC

Page 8: Interactive Project Planning

Operatingsysteme

• MS Windows XP• MS Windows 2000• MS Windows ME• MS Windows NT (SP 4 +)• MS Windows 98• MS Windows 95

Page 9: Interactive Project Planning

Exapmles

• Server: Licencemanagement• Show orders for a certain period• Show tasks for selected orders• Show connecting links• Show task per resources• Show resource load (hidden tasks)• System Settings

Page 10: Interactive Project Planning

Server: Lizenzmanagement

Page 11: Interactive Project Planning

Show orders for a certain period

Page 12: Interactive Project Planning

Show tasks for selected orders

Page 13: Interactive Project Planning

Show connecting links

Page 14: Interactive Project Planning

Show task per resources

Page 15: Interactive Project Planning

Show resource load (hidden tasks)

Page 16: Interactive Project Planning

System Settings

Page 17: Interactive Project Planning

Licensing

• Serverlicense– Basemodul– Only required once € 7.700,--

• Userlicense– per concurrent User € 1.700,--

• Software Maintenance– Annual fee based on list price 15%

Page 18: Interactive Project Planning

Consulting

• On site support and consultant services

– per day (excl. travelexp.) € 1.000,--