intelligent load control for heated wind measurement sensors

22
Intelligent load control for heated wind measurement sensors Winterwind 2012, Skellefteå/SE Intelligent load control for heated wind measurement sensors A. Krenn 1 , H. Winkelmeier 1 , F. Lachinger 1 1 Energiewerkstatt, Friedburg, Austria

Upload: winterwind

Post on 26-May-2015

320 views

Category:

Business


3 download

DESCRIPTION

Presentation by Andreas Krenn, Energiwerkstatt at Winterwind 2012, session 5a. "Intelligent load control for heated wind measurement sensors"

TRANSCRIPT

Page 1: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Intelligent load control for heated wind measurement sensors

A. Krenn1, H. Winkelmeier1, F. Lachinger1

1Energiewerkstatt, Friedburg, Austria

Page 2: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Wind Energy

•  Wind Measurement

•  Project Development

•  Planning & Implementation

•  Training and Education

•  Research & Demonstration

Company Profile

Page 3: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

01 Wind Energy in Austria

02 Test Rig Schareck / Großglockner

03 Wind Measurement Brenner

Page 4: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Wind Energy in Austria State 31.12.2011

•  650 Wind turbines •  1.084 MW installed power •  2,39 TWh electricity generation per year •  3,6 % of Austrian electricity demand

Page 5: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

• 10 •

• 4

• • • •

• 5 • • • • • • • • 3 • • •

• •

• • •

• 7 • •

• • • •

• 4 • 4

• • • •

• • • 7 •

• • •

• • •

• • •

• •

3

• 3

• • • • • •

• 3

• •

4

V med 6,5 – 7,0 m/s

V med 6,0 - 7,5 m/s

V med 5,5 – 6,5 m/s

V med 5,5 - 6,0 m/s

Wind conditions in Austria

Page 6: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Specific wind energy production in Austria Specific wind energy production in different regions of Austria

750 84

3

863

812 90

0

907

798

410 50

1

460 499 60

2

525

47561

4 686 73

5

639 74

5

660

665

910 10

42

990

861 96

1

915 10

10

0

200

400

600

800

1000

1200

2003 2004 2005 2006 2007 2008 2009

[kW

h/m²]

Eastern Region (106 WT) Northern Region (14 WT) Pre-Alpine Region (23 WT) Alps (13 WT)

Page 7: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

01 Wind Energy in Austria

02 Test Rig Schareck / Großglockner

03 Wind Measurement Brenner

Page 8: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Test Rig Schareck

Page 9: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Measurement setup

Producer Type Operating  mode Power  [W]

NRG Ice  Free  3 Heated  cup  anemometer 96  W

Vaisala WAA252 Heated  cup  anemometer 72  W

Thies  A. 2D Heated  2D  Ultrasonic 310  W

Thies  A. 2D  Compact Heated  2D  Ultrasonic  compact 250  W

Thies  A. Classic Unheated  cup  anemometer -­‐-­‐-­‐-­‐-­‐

Thies  A. Classic Wind  vane 25  W

Galltek P63-­‐12 Combined  Thermo-­‐/Hygrosensor -­‐-­‐-­‐-­‐-­‐

Mobotix M12  Dual  Night Webcam  with  infrared  spotlight -­‐-­‐-­‐-­‐-­‐

Page 10: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Data evaluation

Comparison of five different scenarios rsp. icing periods: •  Actual meteorological icing periods based on webcam evaluations

•  Actual instrumental icing periods based on webcam evaluations

•  Estimated icing periods according to synoptic considerations •  Estimated icing periods according to comparison of heated and

unheated anemometers

•  Estimated icing periods according to standard algorithms of heated wind measurement sensors

Page 11: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Page 12: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Page 13: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Resulting Energy Demand

Scenario   Solution  regarding  heating  control   Used  settings   Energy  Consumption  

1   Standard  sensor  algorithm   ≤  2°C   100%  

2   Comparison  heated/unheated  sensor   ∆vmed  >  2  m/s   29%  

3   Relative  humidity  und  temperature   ≥  90%;    ≤ 1°C   55%  

Page 14: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Considerations regarding heating demand

•  Theoretically, heating of wind measurement sensors is only necessary during meteorological icing periods

•  In case of external power supply units –  Which energy consumption do we have? –  How much energy is available? –  Which data availability do I want to achieve?

•  Importance of an advanced load control management

•  Possible approaches: –  Info from webcam, difference betw. heated and unh. sensor not available –  Synoptic considerations (equivalent to meteorological icing)

•  Overestimation of icing periods, but still ~ 50% saving of energy

–  In future - ice detector: current obstacles (350 W heating demand, costs)

Page 15: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

01 Wind Energy in Austria

02 Test Rig Schareck / Großglockner

03 Wind Measurement Brenner

Page 16: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Wind farm Brenner •  2.100 – 2.200m above sea level •  600 W/m2 at hub height (estimated)

•  40 days per year icing (estimated)

•  19 Wind turbines approved (LTW70 – 2.0 MW)

Wind Farm Brenner

Page 17: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Windmessung Steinjoch - 50 m

LIDAR 01 - Steinjoch

LIDAR 02 - Kreuzjoch

LIDAR 03 - Sattelberg

Measurement concept

Page 18: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Wind measurement mast Steinjoch

Energiewerkstatt offered: 50m Mast with heated ultrasonic anemometer

External power supply system; 97% data availability

Page 19: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Power demand Ultrasonic: 250 W (periodically) Power demand LIDAR: 40 W (100 W) (continuously) Technical specification: PV generator: 4 x 180 W Wind generator: 2,40 m diameter / 900 W Fuel cell: 300 W (as backup) Hydrogen store: 6 bottles à 50 litres Battery storage: 600 Ah / c100 Data storage: Ammonit Meteo 32 Dimensions: 1.10 / 2.20 / 1.80 Operat. control: EMS Energy

management system

External power supply system

Page 20: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Controlling of the system •  Load management: Managing the

power demand of the sensors according to the actual conditions

•  Production management: Intelligent interplay of the components

•  Thermal management: Intelligent provision of the required thermal conditions (for battery pack and fuel cell)

•  Provision of a remote control system, which allows permanent control and a remote changing of the settings

Energy management system

Page 21: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Experience from first months

Extreme conditions •  Mean wind speed: 12 m/s in 23 m height •  Wind gusts (10min mean): > 30 m/s •  Ice accretion: Up to 8 cm (all-round)

Evaluation of 1 ½ months • Surplus of ~30% • No demand for FC (only self consumption) • Data availability of ~97%

Page 22: Intelligent load control for heated wind measurement sensors

Intelligent load control for heated wind measurement sensors

Winterwind 2012, Skellefteå/SE

Intelligent load control for heated wind measurement sensors

Thanks for your attention!