Integration Practice How to Make BizTalk Practice More Profitable

Upload: allied-consultants

Post on 14-Apr-2017

203 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Integration Practice: How to make BizTalk Practice more profitable?

I n t eg ra t ion Prac t ice

How to Make BizTalk Practice More Profitable

Page 2: Integration Practice: How to make BizTalk Practice more profitable?

Managing an integration practice is significantly different than managing integration projects

With it comes all the on-going challenges such as hiring, delivery, training, and transitioning between projects

Idea in Brief

Page 3: Integration Practice: How to make BizTalk Practice more profitable?

Challenges

Page 4: Integration Practice: How to make BizTalk Practice more profitable?

{ }1LOW LEVERAGE

Page 5: Integration Practice: How to make BizTalk Practice more profitable?

•If your integration practice looks the following pyramid watch out

•This is essentially the problem of balancing the right number of finders, minders, and grinders (partners, managers, & staff/consultants) per project

Page 6: Integration Practice: How to make BizTalk Practice more profitable?

{ }2PROJECT PIPELINE FRAGMENTATION

Page 7: Integration Practice: How to make BizTalk Practice more profitable?

•BizTalk has become 15 years old & mature product and much hype around SOA (service-oriented architecture) has dwindled

•Thus, the maturity of the platform has resulted in a slow and fragmented pipeline of new projects

Page 8: Integration Practice: How to make BizTalk Practice more profitable?

{ }3HIGH BENCH COST

Page 9: Integration Practice: How to make BizTalk Practice more profitable?
Page 10: Integration Practice: How to make BizTalk Practice more profitable?

Having to maintain BizTalk practice just to keep your foot in the door may result in the following scenarios

•Resources not billed 1500 hrs/ year/ consultant

•Difficulty in achieving 70% realization for each consultant’s maximum available time

Page 11: Integration Practice: How to make BizTalk Practice more profitable?

{ }4SYSTEMATIC UNDER DELEGATION

Page 12: Integration Practice: How to make BizTalk Practice more profitable?

No other habit harms a consulting practice profitability as much as the habit of high-priced

people performing lower-value tasks

It puts you (as a practice) at a competitive disadvantage. You may find it difficult to market

your firm as an efficiently staffed integration services firm

Page 13: Integration Practice: How to make BizTalk Practice more profitable?

Solutions

Page 14: Integration Practice: How to make BizTalk Practice more profitable?

{ }1PROJECT/ENGAGEMENT MANAGEMENT

Page 15: Integration Practice: How to make BizTalk Practice more profitable?

Improving the net income per engagement through

•Properly staffing

•Rightshoring

•Insourcing vs. Outsourcing

Page 16: Integration Practice: How to make BizTalk Practice more profitable?

{ }2CROSS-TRAINING & SKILL DEVELOPMENT

Page 17: Integration Practice: How to make BizTalk Practice more profitable?

•Cross training also helps in achieving an important goal of target billing on average 1,500 hours/year/consultant

•Using experienced offshore partners to acquire BizTalk resources for 200-300 hours per year that will let you maintain a practice

Page 18: Integration Practice: How to make BizTalk Practice more profitable?

{ }3BLENDED PRACTICE MODEL

Page 19: Integration Practice: How to make BizTalk Practice more profitable?

•Establishing and maintaining close relationship with near shore and offshore partners to manage the infrequent workloads

•Local partners that have an established/new practice in BizTalk 

Page 20: Integration Practice: How to make BizTalk Practice more profitable?

{ }4 EFFICIENT SCHEDULING OF PROJECTS

Page 21: Integration Practice: How to make BizTalk Practice more profitable?

•Integration projects are difficult to manage

•You can pad your project’s schedules. This is to say that a 6 weeks project can be negotiated as a 10-12 weeks project

•This allows the practice lead to improving the realization of each resource on the team