integrating multiple external models using iso 42010€¦ · title: integrating multiple external...

11
Bruce McNaughton Independent Consultant [email protected] Teamwork 06/01/2012 Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected] 1

Upload: others

Post on 20-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton

Independent Consultant [email protected]

Teamwork

06/01/2012

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected] 1

Page 2: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

The Tower of Models

MBO

NOTE: All of the trademarks Identified in the Tower are owned By the respective Trademark owner (OGC, SEI, PMI, ISO, OpenGroup, OMG, etc)

42 Model Types: • Assessment • Best Practice • Product

06/01/2012

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected] 2

Page 3: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

System of Interest

Architecture Approved in November.. Replaces IEEE 1471

http://www.iso-architecture.org/42010/cm/

06/01/2012 3

Page 4: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

Environment

System-of-

Interest Architecture

exhibits

Architecture

Description Stakeholder

Architecture

Rationale

Correspondence

Correspondence

Rule Concern

Architecture

Viewpoint

Model Kind

Has interests in

has

frames

governs

governs

Architecture

View

Architecture

Model

expresses identifies

identifies

identifies

06/01/2012 4

Page 5: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

System Supplier Customers Capabilities

06/01/2012 5

Page 6: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

People Skills, Knowledge,

Experience,

Capacity

Structure (Relationships, FIT,

Purpose)

Activities /

Decisions (Management, Core,

Support, Unique)

Tools

/ Facilities (IT Systems, Tools,

Work space)

Measurement

/ Reward (Job Design, Team,

Individual)

Team Management Plan Purpose / Mission

Objectives / Strategies / Plan / Budget

Vision / Values

(To Deliver and Improve

the planned contribution)

Adapted from:

Jay Galbraith

Star Model

(A.K.A. FIT Model)

Activities of a

Manager Planning

Organizing

Resourcing

Integrating

Measuring

Developing People

06/01/2012 6

Page 7: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

PeopleSkills, Knowledge,

Experience,

Capacity

Structure(Relationships, FIT,

Purpose)

Activities /

Decisions(Management, Core,

Support, Unique)

Tools

/ Facilities(IT Systems, Tools,

Work space)

Measurement

/ Reward(Job Design, Team,

Individual)

Team Management PlanPurpose / Mission

Objectives / Strategies / Plan / Budget

Vision / Values

(To Deliver and Improve

the planned contribution)

Adapted from:

Jay Galbraith

Star Model

(A.K.A. FIT Model)

Business Architecture

Jobs, Roles, Skills, Person (Training, Coaching, Development)

Processes (Related Activities,

Roles, RASCI, Work Products,

Completion Criteria)

IT Applications /

Infrastructure (Information, Access,

Automation, Flow, Timing)

Structure (Org Charts, Assignments, Allocations)

Motivation (Feedback,

Achievement, Performance)

Plans (Capacity, Capability, Contribution, Timing)

External

Standards and

Best Practice

06/01/2012 7

Page 8: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

Architecture Description

For an Organization

G

A

P

G

A

P

G

A

P

Teams Customers

Training &

Coaching

Process

Automation

ICT Products

& Services

Assessment

Models

Best Practice

Models

Process

Assets

Process Audits /

Assessments

Customer

Requirements

Product and / or

Service Solutions

Mapping

Desk

Check

What you should do What you say you do What you actually do

External

Requirements

Product /

Compliance

06/01/2012 8

Page 9: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

Summary

Models (Assessment / Best Practice) ◦ Models need to be integrated into the architecture

◦ Terminology is a challenge … many are identical but different

words.

Business Architecture ◦ Teams can be used to normalize a Business Architecture

◦ Managers are key to strategic planning and implementation

◦ Plans should be a key source of information

ISO 42010 ◦ Simple definitions for:

System

Architecture Description

Architecture Framework

06/01/2012 9

Page 10: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected]

Ackoff, Russell, ‘Re-Creating the Corporation’. Adams, Douglas, ‘The Hitchhiker’s Guide to the Galaxy’. Collins, Jim, ‘Built to Last’. Collins, Jim, ‘Good to Great’. Covey, Stephen R., ‘The Seven Habits of Highly Effective People’, 1989. Drucker, Peter, ‘Management: Tasks, Responsibilities, and Practice, 1974.

(I recommend the 1974 version (ISBN 0 7506 4389 7) as this is an abridged version). Galbraith, Jay, ‘Organization Design’, 1977. Galbraith, Jay, Downey, Diane, Kates, Amy, ‘Designing Dynamic Organizations’, 2002. Gilb, Tom, ‘Competitive Engineering’. Goldratt, Eliyahu M., and Cox, Jeff, ‘The Goal’. Hock, Dee, ‘One from Many’. Hopper, Kenneth and Hopper, William, ‘The Puritan Gift’. Larman, Craig and Vodde, Bas, ‘Scaling Lean and Agile Development, Thinking and

Organizational Tools for Large-Scale Scrum’. Lee, Thomas H., Shiba, Shoji, and Wood, Robert Chapman, ‘Integrated Management

Systems’. Manz, Charles C., Sims, Henry, P. Jr, ‘Business without Bosses’ Potts, Chris, ‘fruITion’. Senge, Peter M., ‘The Fifth Discipline’ Senge, Peter M., ‘The Dance of Change’. Sterman, John D., ‘Business Dynamics’. Womack, James P., and Jones, Daniel T., ‘Lean Thinking’.

06/01/2012 10

Page 11: Integrating Multiple External Models using ISO 42010€¦ · Title: Integrating Multiple External Models using ISO 42010 Author: Bruce McNaughton Created Date: 5/24/2012 4:24:23 PM

Bruce McNaughton, Independent Consultant, Copyright 2012 [email protected] 06/01/2012 11