integrating large load at grant pud - home | pnucc 2014 gpud integrating large... · integrating...

37
Integrating Large Load at Grant PUD C St d dL L d Case Study andLessons Learned

Upload: dinhdat

Post on 15-Apr-2019

216 views

Category:

Documents


0 download

TRANSCRIPT

Integrating Large Load at Grant PUDC St d d L L dCase Study and Lessons Learned

Grant County at a Glance• Population (in 2012): 91,723• 2 777 square miles (4th largest geographic area in state)2,777 square miles (4th largest geographic area in state)• 2% Avg. annual growth rate exceeded nation and the state

from 1990 to 2010. • Logistical resources: Access to railways, one of largest U.S.

airfields, Interstate 90, fastest broadband network in country• Predominant agricultural economy• Predominant agricultural economy

Grant PUD at a Glance

S k 669 MW ( d i• System peak=669 MWs (summer and winter peaking) 

• 60% of county has access to high‐speed broadband

Attraction of Grant PUD

Available Low‐Cost Renewable Hydropower

Attraction of Grant PUD

14

• Affordable energy rates: – Industrial 2.5 cents‐3.04 cents/kWh 10

12

cents/kWh– Residential Rate: 4.6 cents/kWh  8

10

U.S. Avg

• Renewable energy in demand– BMW/SGL

4

6

gWash.Grant PUD

– Microsoft– YahooI t it

2

4

– Intuit 0Residential 

RateIndustrial

Grant PUD Customers

Customer Class Number  Energy Sales

Residential 35,547 18.8%

Commercial 6,234 11.6%

I i i 4 624 13 6%Irrigation 4,624 13.6%

Streetlights & other 65 .11%

Industrial 12 43.7%Industrial 12 43.7%

Large General 92 6%

Public Authorities 14 .03%

Ag Food Processors 11 5.9%

Total 46,599  3,936,622 MWh

* 2012 data

So what’s going on at Grant?So what s going on at Grant?

• In less than 10 years Grant has transformedIn less than 10 years, Grant has transformed from a stable, slow to moderate growing service territory relative to the region into aservice territory relative to the region into a rapid grower with many new challenges.

• This growth has changed Grant in many ways i ll i h di hifespecially given the extraordinary shift to 

“large individual loads”. 

Where we were just 10 years agoWhere we were just 10 years ago400

300

350

Industrial

150

200

250Ag Food Process

Large General

Irrigation

Commercial

50

100

150Residential

System Losses

0

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

Shift toward larger loads

Grant County PUD 2013 Medium Load Forecast Retail Sales by Rate Class

700

800

Actual Forecasted

Added 140 aMWs of  load since  500

600

2004, ~40% growth

A F d P

Industrial

300

400

aMW

Commercial

Irrigation

Large General

Ag Food Process

200

System Losses

Residential

0

100

1990 1995 2000 2005 2010 2015 2020 2025 2030

A Closer Look …A Closer Look …

• Grant retail load has grown ~40% ‘04 – ’14 (CAGR G a t eta oad as g o 0% 0 (C G3.4% / yr)

• 69% of this growth has been in the industrial gsector.

• It is not just industry where we are growing –meter count is up 19% over the 10 year period BUTI d t i l l t t 0 2% TOTAL (15• Industrial class meter count up 0.2% TOTAL (15 customers) and has resulted in 69% of total load growthgrowth.

A Closer Look …A Closer Look …

• As we said the industrial class meter count upAs we said, the industrial class meter count up 0.2% TOTAL (15 customers) and has resulted in 69% of total load growth69% of total load growth.

• Our 12 largest customers provide 40% of total retail revenuesretail revenues.

• Average use per incremental customer but a h i hhuge variance across these new customers.

• Leads to large planning uncertainties.

Load Forecast Uncertainty ExampleLoad Forecast Uncertainty Example

1,000.0 

1,200.0 

800.0 

,

Total‐Medium

Total‐High Now

400.0 

600.0 g

Total‐High Prev.

200.0 

So What Does this Mean for Planning & Forecasting?

• Forecasting has become quite challenging.g q g g• Standard forecasting techniques are not amenable to what we are facing – small number of high usage 

t ith t l hi h ti l icustomers with extremely high proportional variance.• Large uncertainties around timing and magnitude of sales.sales.

• Factors driving a significant proportion of our sales are not tied to “local / regional” factors.

• International markets, trade / tariff wars and rapidly changing product markets strongly drive our positions.

Challenge: Difficulties in Load forecast

• Load profile shifted from predictable to less consistentLoad profile shifted from predictable to less consistent as large customers arrived.

• What we experienced were things such as:What we experienced were things such as:– Volumes requested were often not used.– What we needed to do:What we needed to do:

• Find incentives for customers to provide more accurate forecast.• Ensure cost shifting minimized and that remedies are non‐discriminatory. 

• Minimize missed market opportunities & increased costs because of capacity “lock ups” by customer(s). p y p y ( )

Solution: Rate Schedule 99?

• Focus on understanding customer market/economic conditions &market/economic conditions & resulting impacts

• Rate Schedule 99: Load Forecast Adjustment– Customers provide annual load forecast for upcoming yearfor upcoming year

• How much energy on avg. customer expects to use each month 

– If forecast includes errors greater than annual gthreshold (3 aMWs) a load forecast adjustment is billed to customer 

• Good experiment but had issues, we’re trying something new.

Who is coming to Grant?Who is coming to Grant?

• The data centers:The data centers: – YahooMicrosoft– Microsoft

– DellI t it

Quincy Area Data Centers– Intuit– VantageI (S b )– Intergate (Sabey)

– Titan Moses Lake Area

Quincy, Wash.

Attributes of data center customers

• Require better than standard power quality.• Redundant service feeds• Redundant service feeds• Large amount of capacity available initially 

then ramp down and slowly grow into load.– Demonstrate that their systems can take it.

• Quick build out often sought.

Data Center Consumption BreakdownData Center Consumption Breakdown

10%

15%15%

Network

Storage

Servers/HVACServers/HVAC75%

Who is coming to Grant?Who is coming to Grant?

• The data centers of course:The data centers, of course:• But not just:

M f t i– Manufacturing• Heavy ‐ SGL Carbon Fibers (SGL – BMW joint venture), REC Silicon ChemiconREC Silicon, Chemicon

• Light ‐ Genie, Takata, MLI, D&L Foundry

– Food Processingood ocess g• Fuji, Pacific Coast Canola, Amway

REC Silicon – “the first”REC Silicon  the first

SGL Carbon FibersSGL Carbon Fibers

More ManufacturingMore Manufacturing

Takata

Genie

MLIMLI

Food ProcessersFood ProcessersAmway

Pacific Coast CanolaPacific Coast Canola

Changing Expectations for ServiceChanging Expectations for Service

• Electricity is a commodity but our customersElectricity is a commodity but our customers are not just seeking and choosing based upon price.

• “System Power” delivered under our standard terms and policies often not adequate.

• We are seeing requests for schedule flexibility, high availability, specific power attributes and power quality as well as opportunities for DSM and EE.

Examples of Changing Expectations for Service

• Expedited facilities construction.Expedited facilities construction.

• Optionality for future expansions• Optionality for future expansions.

E li it GHG d t it t• Explicit GHG and resource type commitments.

• Extremely high availability and “upstream” redundancy.

Challenges: Redundancy

• Customers express need for uninterruptible power supply

Obligation for redundancy?

• Policies state: Required to serve all customers, but not to provide redundancy

• “The District will attempt to provide, but does not pguarantee, a regular and uninterrupted supply of service.”– Customer Service Policy yManual section 2.5

Solution: RFCC

• Redundant Facilities Cost ContributionC t t ib ti i l t f d d t– Customer pays contribution equivalent for redundant capacity to be used

– Underground distribution or extension beyond oneUnderground distribution or extension beyond one mile=customer pays

– Additional system upgrade costs are socializedy pg• Customer pays actual cost of transmission construction

• Can raise upfront cost / financing issues for customer and requires very crisp demarcation definition for “system” vs. “customer” redundancy

Challenge: Requests for immediate large it b t t ilcapacity but not necessarily use

• Large capacity often sought initially but then ramp back, locking up capacitylocking up capacity – Demonstrates potential to grow– Results in missed market opportunities pp

• May require a substantial build out of transmission, distribution and substations or taking on “overbooking” risk

Financial Considerations & ConcernsFinancial Considerations & Concerns

• The growth and especially the type of growth we are experiencing provides opportunities but also entails some new risksentails some new risks.

• We are seeing affects on:• We are seeing affects on:– Financial reserves required.– Rate design.– Credit support.– Perceived risk profile.

Challenges: Investor / Rating Agency Concerns

• 10 customer meters carry 40% of our loadImplications to other rate classes– Implications to other rate classes

Challenge: Stranded Asset risk

• If large customer leaves, general facilities are left unused AND / OR forward resource and transmission commitments could be stranded.

How do we charge?Challenge:Challenge: ggg

• Rate design has become much more important for us.

• Changing customerChanging customer mix results in vast differences betweendifferences between cost to serve classes.

• Explicit definition of• Explicit definition of “policy choices”.

Challenge: Vast Differences within “I” Class

• How similar are a 6 MW and 50+ MWHow similar are a 6 MW and 50+ MW customer?

• Unique attributes and service desires lead to• Unique attributes and service desires lead to questions about mechanism for charging.L ki l d fi i i• Looking at new customer class definitions.

• Considering augmenting current published rate schedules with bespoke retail rate contracts.

Benefits of integrating Large Load

• Consistent revenue producing customerscustomers

• Community developmentC i t t fl t h l l d• Consistent, flat hourly load profiles

Path Forward • Our load forecast continues ll f i f 140to call for increase of ~140 

aMWs over next 10 years.• Customers asking for newCustomers asking for new products & services, it’s not just “system power” anymore.

• Answer to these challenges is not to discourageis not to discourage customer growth –innovate, solve problems & “Deliver Excellence inDeliver Excellence in Service”.

• Large customer salesLarge customer sales benefit all other classes rates.