integrated modular avionics platforms & modules etso · pdf fileintegrated modular...

20
Integrated Modular Avionics Platforms & Modules ETSO-2C153 Anne Sénéchal PCM Parts & Appliances & Senior Expert Airborne Electronic Hardware 21 st April 2016

Upload: lynguyet

Post on 13-Feb-2018

345 views

Category:

Documents


31 download

TRANSCRIPT

Page 1: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

Integrated Modular Avionics

Platforms & Modules

ETSO-2C153

Anne SénéchalPCM Parts & Appliances& Senior Expert Airborne Electronic Hardware21st April 2016

Page 2: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

What is an ETSO authorization?

European Technical Standard Order

2

European Technical Standard Order

Authorization

IMA ETSO-2C153 - Avionics WorkshopApril 2016

Page 3: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

What is an ETSO authorization?

An ETSOA shows that a part or appliance

complies with a minimum performance standard

3

•748/2012 Article 1 N° 2 (g)

IMA ETSO-2C153 - Avionics WorkshopApril 2016

The ETSOA is optional, installation approval is

anyway required

Page 4: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

Introduction on IMA - History

IMA stands for Integrated Modular Avionics

Modular & incremental development of the aircraft function

FAA released TSO-C153 in June 2002

ED-124/DO-297 was released in November 2005

Containing letter of acceptance (FAA system)

Breakdown of tasks/split in incremental steps

Requirements on the modularity (incl. Partitioning)

During number of yearsEU industry expressed the need of an IMA ETSO

2012 : EASA starts to work on ETSO-2C153, consideringthe EASA system …and the IMA experience of 15 years

April 2016 IMA ETSO-2C153 - Avionics Workshop 4

Page 5: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

The 2C153 Concept – in EASA system

ETSO approval independent from the aircraft installation

there is no requirement that an installation process is concurrent to the ETSO process

The clear EASA intent to keep the two processes interoperable but independent

No approval letter concept at EASA approval of equipment (ETSOA) or product (TC, STC)

As a conclusion : EASA intended to have

defined perimeter of the IMA platform/modules,

+ MPS on modular aspects/functions

this is a step forward to FAA TSO-C153 (not incompatible),

with Minimum Performance StandardApril 2016 IMA ETSO-2C153 - Avionics Workshop 5

Page 6: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

IMA - incremental process

ED-124/DO-297

Task 1: Module acceptance

Task 2: Application acceptance

Task 3: System level acceptance

…6April 2016 IMA ETSO-2C153 - Avionics Workshop

Page 7: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

ETSO-2C153 – EASA intent

ED-124/DO-297 Task1 –Module acceptance

Covering ALL components of a module

Hardware + Core Software

Tools

Applicability

Module/Platform offering a SHARING function

Process requirements

Performance requirements

Staying generic… but detailed enough

7April 2016 IMA ETSO-2C153 - Avionics Workshop

Page 8: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

IMA Sharing functions = Classes

April 2016 IMA ETSO-2C153 - Avionics Workshop 8

• Rack HousingClass RH

• ProcessingClass PR

• Graphical ProcessingClass GP

• Data StorageClass DS

• InterfaceClass IF

• Power SupplyClass PS

• Display HeadClass DH

Page 9: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

ETSO-2C153: How does it work?

Characterization

Functional

DO-160 ED-14

9April 2016 IMA ETSO-2C153 - Avionics Workshop

Page 10: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

ETSO 2C153 Appendices

1. General

2. MPS

3. Data

4. EnvironmentalQualification

10

• Common2.1

• Rack Housing2.2 RH

• Processing2.3 PR

• Graphical Processing2.4 GP

• Data Storage2.5 DS

• Interface2.6 IF

• Power Supply2.7 PS

• Display Head2.8 DH

MPS = Performance + CharacterizationApril 2016 IMA ETSO-2C153 - Avionics Workshop

Page 11: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

2C153: General requirements

Compliance to

Common requirements

Specific requirements on certification basis:

At least, one class

All classes applicable to the article

Class DH (Display Head):

Concurrent ETSO-C113 required

Incomplete ETSO is possible

11April 2016 IMA ETSO-2C153 - Avionics Workshop

Page 12: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

Emphasis on Data Requirements

Clear boundary

Clear covered/not covered aspects

Transfer of ‘safety’ aspects for furthersafety analysis

User Guide concept

Installation Manual

April 2016 IMA ETSO-2C153 - Avionics Workshop 12

Page 13: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

Environmental qualification

Standalone Platform (LRU)

Classic ED-14/DO-160

Modules intended for Cabinet installation

Partial Qualification required

Anticipate a minimum set of conditions

Environmental usage domain characterized

Complete cabinet qualification data accepted

13April 2016 IMA ETSO-2C153 - Avionics Workshop

Page 14: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

Rulemaking Procedure

April 2016 14

Analyse issueand

developDraft RIA

DraftRule

Public

Consult

(3 months)

Analysis of comments

and finalreview

Taskinitiation

RIA NPA(RIA)

Decisionwith CRD

ETSO

4-year Rule

making Programme

ToRGC

ConsultRAG/

TAG/

SSCC

IMA ETSO-2C153 - Avionics Workshop

Publication is imminent !

Page 15: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

ETSO-2C153, different from FAA TSO-C153

14 years later, developed from this experience

ETSO-2C153 is different from FAA TSO-C153 :

Defines classes and Minimum Performances for eachclass

Include Health Monitoring

Requires to characterise the platform/modules to the user & verify

Use of Ed-124/DO-297, task 1

Environmental qualification adapted for modules

User Data (User Guide) to identify/document the requirements/constraints to be respected by User

April 2016 IMA ETSO-2C153 - Avionics Workshop 15

Page 16: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

ETSO Validation aspects

ETSO-2C153 is different from FAA TSO-C153

But not incompatible with FAA TSO-C153

FAA TSO-C153 is not included in the ReciprocalAcceptance from TIP of Bilateral agreement EU-US

Additional Activities & Data Package for demonstrationof compliance to ETSO-2C153 MPS will be needed(requirements in each Appendix)

April 2016 IMA ETSO-2C153 - Avionics Workshop 16

Page 17: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

IMA ETSO-2C153

in the IMA integration and

certification process

Page 18: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

Conclusion on IMA certification process

April 2016 IMA ETSO-2C153 - Avionics Workshop 18

RMT.0456 ETSO-2C153 IMA

Platform & Modules

RMT.0622 AMC 20-170

Incremental certification of IMA (from platform & modules up to aircraft)

RMT.0621

Subpart A

CS-ETSO

CS-23, CS-25, CS-27, CS-29…

Page 19: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

On-going drafting of AMC 20-170

On going rulemaking task to develop AMC on IMA

Will cover requirements from Platform to the full integration in the aircraft

Will recognize ED-124/DO-297 tasks and associated objectives

Will cover the use of ETSO IMA based platforms

AMC 20-170 will replace the Draft Certification Memorandum published and used through CRI

April 2016 IMA ETSO-2C153 - Avionics Workshop 19

Page 20: Integrated Modular Avionics Platforms & Modules ETSO · PDF fileIntegrated Modular Avionics Platforms & Modules ETSO-2C153 ... ETSO-2C153 –EASA intent ED-124/DO-297 Task1 – Module

Thank you for your attention