integrated management system

43
HEMARUS INDUSTRIES LIMITED IMS FOR BEGINERS By: Vijay Singh Manager -QC

Upload: jennifer-walker

Post on 16-Apr-2017

234 views

Category:

Documents


1 download

TRANSCRIPT

HEMARUS INDUSTRIES LIMITED

IMS FOR BEGINERS

By: Vijay Singh

Manager -QC

INTERNATIONAL ORG FOR

STANDARDISATION (IS0)

World wide federation of National bodies.

ISO tech committees prepare standards.

Draft International standards must be approved by at least 75% of the member bodies casting the vote.

GENERAL

Adoption of QMS sys is a Strategic decision of the Org.

Standards do not imply uniformity in the structure of QMS or documentation.

Design & implementation of QMS is influenced by needs, objectives, products, processes, size & structure of the Org.

NEED FOR ISO

To address the ever changing market

scenario.

To meet the customer requirements.

To create customer focused organization.

To imbibe process approach across the

organization.

To meet all regulatory requirements for our

products.

NEED FOR ISO

To institutionalize “QMS” involving all

employees & stakeholders.

For continual improvement of all

processes.

USE OF STANDARDS

Can be used by internal & external

bodies.

By certification bodies for assessment.

By regulatory bodies.

Organization's own requirement

INTEGRATED MANGAEMENT SYSTEM

STANDARDS

ISO 9001:2008 “QMS”.

ISO 14001:2004 “EMS”.

OHSMS 18001:2007 “Occupational

health & safety management system

Benefits of ISO IMS

ISO Management Systems insure that the company has :

Identify Plans: processes, activities, risks, legal & other requirements,

associated tasks.

• Insure implementation: plans are documented, implemented,

maintained, providing resources, communications, training, emergency

preparedness, and systems to monitor/measure performance,

accident/incidents.

• Improve management system: objectives, targets, programs, data

analysis, monitoring of operations, tracking of non- conformances,

corrective/preventive actions. Internal & third party audits with

management reviews.

= Performance, Productivity and Profits

Why Integrate?

A. Identify your Whole Management System

Formalize your systems

Reduce duplication and improve costs - profits

Reduce risks and impacts - compliance

Focus on business goals-objectives, improve, measure, balance conflicting

objectives

B. Insure that you-

Eliminate conflicting procedures, responsibilities and relationships

Create consistency

Harmonize and optimize practices

Improve communication

Facilitate training and development

• Improve what you do

Financial Returns

Customer Satisfaction

Monitoring what you Measure

PLAN – DO – CHECK – ACT CYCLE

PROCESS APPROACH

PLAN: Establish objectives &

processes.

DO: Implement & operate.

CHECK: Monitor & measure

ACT: Take actions to

continually improve.

Management

Responsibility

Resource

Management

Product

Realization

Continual improvement of “QMS”

Customers

Requirements

Customers

Satisfaction Measurement,

Analysis &

improvement

Product Output Input

MODEL: PROCESS BASED “QMS

PDCA MODEL: ISO 14001: 2004 (E)

OH & S MGMT SYS MODEL

OHSAS 18001:2007

STEP ONE- IDENTITY Commitment - need for Integrated Management System If yes, Are you going to self-

declare or register

Define Scope of Management System

Person(s) responsible for system - IMS Representative (s), Team Leaders

Training:

E-learning, on-site

Standard requirements (Core Training)

Internal or Lead Auditor training, skills training identified

Gap Analysis – (optional)

Preliminary Review: Processes, Site Corporate and ISO Requirements

Risks: Quality, Environment, Health & safety, Financial.

Legal & Other Requirements:

Planning: Policy, Objectives, Targets & Program

Control Plan: Control of operations for customer quality satisfaction, continuous

improvement, prevention of pollution, reduction of accidents/incidents tied to the bottom

line. Change Management

STEP ONE- IDENTITY

STEP TWO- INSURE Implementation and operations of plans

Documentation, Data Control & Analysis Manual (4.4.4)

Procedures Manual (4.2 – 4.6)

Records (4.5.4)

do not duplicate written documentation, make reference to other systems where

applicable. i.e. ISO 90010 – Quality

Resources Roles, Responsibility & Authority defined, documented,

Communications/Consultation – internal, external

Operational Control – Use of Control Plan, Purchasing, Production

Plan for Emergency Response

Competence , Training & Awareness – Orientation, operations – SOP’s, emergency

response, contractor/supplier, internal auditing

STEP TWO- INSURE

Monitoring & Performance Measurement

o Performance (accidents, incidents, pollution prevention)Operations

o Work place inspections – pre-starts

o Objectives & Targets

Evaluation of Compliance

Nonconformity, Corrective/Preventive Action, Accidents, Incidents

Control of Non-conforming Product

STEP THREE- IMPROVE

Internal Audits (4.5.5) to established IMS and Standard

Audit Program – types of audits, schedules

Auditor Selection, training, competence, evaluation

Audit Procedure

Conduct Audits - based on importance of activity concerned and previous audits.

Findings, Reports

Management Review – assess opportunities for improvement and need for changes

(continuing suitability, adequacy, effectiveness)

Inputs & Outputs

IMS Representative(s) report to top management on performance and

recommendations for improvement

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

1 Scope 1 Scope 1 Scope

2 Normative

references

2 Normative

references

2 Normative

references

3 Terms &

definitions

3 Terms &

definitions

3 Terms &

definitions

4 OH&S Mgmt

Sys

elements

EMS

requirements

“Q” sys

requirement

s

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.1 Gen req 4.1 Gen req 4.1 Gen req

5.5

Responsibili

ty, authority

& commn

5.5.1 Responsibili

ty &

authority

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.2 OH&S policy 4.2 Environ

policy

5.1

Management

Commitment

5.3 “Q” policy

8.5.1 Continual

improvement

4.3 Planning 4.3 Planning 5. Planning

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.3.1 Hazard

Iden, risk

Assessment &

determining ctrl

4.3.1 Environmental

aspects

5.2

Customer focus

7.2.1

Determination of

requirements

related to the

product.

7.2.2

Review of

requirements

related to the

product.

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.3.2 Legal &

other

requireme

nts

4.3.

2

Legal &

other

requiremen

ts

- -

4.3.3 Objective

s

&

programm

es

4.3.

3

Objectives,

targets &

programme

s

5.4.1

“Q”objecti

ves.

5.4.2

8.5.1

QMS

Continual

improvem

ent

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.4.1 Resources,

roles,

responsibility

,

accountabilit

y & authority

4.4.1 Resources,

roles,

responsibilit

y & authority

5.1

Mgmt

commitment.

5.5.1

Responsibilit

y & auth.

5.5.2

Mgmt Reps.

6.1

Provision of

resources.

6.3

Infrastructure

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.4.2 Competen

ce

Trg &

awarenes

s

4.4.2 Competen

ce

Trg &

awareness

6.2.1 Human

Resource

s

Compete

nce,

awarene

ss & Trg

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.4.3 Communi

cations,

participati

on &

Consultati

on

4.4.3 Communic

ations

5.5.3

7.2.3

Internal

commu

nication

.

Custom

er

commu

nication

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.4.4 Document

ation

4.4.4

“EMS”

Document

ation

4.2.1 General

Docu

requireme

nts

4.4.5 Control of

document

4.4.5

Control of

document

4.2.3

Control of

document

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.4.6 Operational

control

4.4.6 Operational

control

7.1

Planning &

product

realization.

7.2

Customer

related

processes.

7.2.1

Determination

of

requirements

related to the

product.

7.2.2 Review of

requirements

related to the

product

Cl ISO 9001

7.3.1

7.3.2

7.3.3

7.3.4

7.3.5

7.3.6

7.3.7

7.4.1

7.4.2

7.4.3

7.5

7.5.1

7.5.2

7.5.5

Design & development planning.

Design & development inputs.

Design & development outputs.

Design & development review.

Design & development verification.

Design & development validation.

Control of design & development changes.

Purchasing process.

Purchasing information.

Verification of purchased product.

Production & service provision.

Control of production & service provision.

Validation of processes for production & service provision.

Preservation of product.

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.4.7 ERP 4.4.7 ERP 8.3 Control of

non

conformi

ng

product.

4.5 Checking 4.5 Checking 8 Measure

ment,

analysis

&

improve

ments.

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.5.1 Performance

Measurement

& monitoring

4.5.1 Monitoring

&

measureme

nt

7.6

Control of

monitoring &

measuring

devices.

8.1

General

8.2.3

Monitoring &

measurement

of process.

8.2.4

Monitoring &

measurement

of product.

8.4 Analysis of

data.

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.5.2 Evaluatio

n of

complian

ces

4.5.2 Evaluatio

n of

complian

ces

- -

4.5.3 Incident

investigat

ion, NC,

CAPA

- - - -

4.5.3.1 Incident

investigat

ion

- - - -

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.5.3.2 NC,

CAPA

4.5.3 NC,

CAPA

8.3

Control of

non

conformi

ng

product.

8.4

Analysis

of data.

8.5.2 CA

8.5.3 PA

Comparison of standards

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.5.4 Control of

records

4.5.4 Control of

records

4.2.4 Control of

records

4.5.5 Internal

audit

4.5.5 Internal

audit

8.2.2 Internal

audit

Cl OHSAS

18001

Cl

ISO

14001

Cl

ISO

9001

4.6 Managem

ent review

4.6 Managem

ent

review

5.1

Management

commitment.

5.6

Management

review.

5.6.1

General

5.6.2

Review input.

5.6.3

Review output.

8.5.1 Continual

improvement.

TYPES OF AUDIT

1St Party audit:

- Internal audit

(a) To assess own sys.

(b) Iden sys strengths & weaknesses.

(C) Powerful tool to aid continual

improvement.

2nd Party audit.

Customer auditing a supplier or

potential supplier.

- Aids selection & grading of suppliers.

- Foundation for supplier development.

3rd Party audit

Audit by a external body.

- For registration or certification

purpose.

- Reduces need for 2nd party audit.

- International recognition & market

competitiveness.

In nut shell.

Establish a system.

Plan

Implement.

Document.

Review.

CAPA.

Follow up & review.

IMS

Integrated three standards into one system to suit our needs.

Integrated Management System.

Easy to understand.

Easy to implement.

Saves time.

Avoids repetition of work.

Efficient, non taxing & user friendly.

THANK YOU.