Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
TABLE OF CONTENTS
1 INTRODUCTION 3
1.1 General 3 1.2 Scope of study 3 1.3 Noise Immission limits 4 1.3.1 World Bank 4 1.3.2 World Health Organisation 5 1.3.3 Greek national noise limits 5 1.3.4 Project Specification 6 1.3.5 Summary 6
2 DOCUMENTATION USED 7
3 STANDARDS AND GUIDELINES USED 7
4 SITE DESCRIPTION 8
4.1 Local Situation, Sensitive Receptor Points 8 4.2 Proposed Gas Compressor Station 9
5 NOISE MODELLING 11
5.1 Methodology 11 5.2 Meteorological conditions considered 11
6 NOISE CONTROL SPECIFICATIONS AND ASSOCITATED NOISE CONTROL MEASURES (NCM) 12
7 PREDICTED NOISE LEVELS 18
8 CONCLUSION 20
GLOSSARY OF TERMS 21
ATTACHMENTS 22
Page 3 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
1 INTRODUCTION
1.1 General
The TAP AG proposes to develop the Trans Adriatic Pipeline to transport natural gas from the
Middle East Area via Greece, Albania and across the Adriatic Sea to southern Italy.
The pipeline transport capacity will be initially approx. 10 billion cubic meters / year. In order to
provide this gas capacity a gas compressor facility in north-eastern Greece near the Greek-
Turkish-Border is needed among other stations. It is planned to develop the initial transport
capacity at a later stage up to an ultimate transport capacity of 20 billion cubic meters / year.
Genest und Partner Ingenieurgesellschaft mbH was commissioned by E.ON New Build & Tech-
nology GmbH to undertake a noise modelling study of the proposed gas compressor station
GCS00 at the regional unit Evros, Greek, near the border to Turkey. The study will form part of
an Environmental Impact Assessment for the site and is therefore based on the first development
phase of 10 BCM/Y and the future enhancement phase to the ultimate gas transport capacity of
20 BCM/Y.
In this report, all necessary noise control measures for the proposed gas compressor station
GCS00 will be specified to comply with various noise limits, which are discussed later in this
report under section 1.3.
1.2 Scope of study
The task of this study is to identify noise mitigation options in plant selection and design in order
to achieve compliance with the governmental noise level requirements. As a first step a
preliminary estimate for the noise emission and the necessary mitigation measures should be
prepared.
The following list outlines the major activities undertaken during the course of the noise impact
assessment.
Page 4 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Review of documentation provided by E.ON New Build & Technology GmbH including
Data Site & Utility Data, site plans and topographical data.
Estimation of noise emission levels (sound power levels) for equipment associated with
the proposed operation.
Development of an acoustic model for the proposed compressor station and the
surrounding area for each construction phase.
Calculation of noise levels at sensitive receptors using the noise prediction method
described in ISO 9613 ‘Acoustics – Attenuation of sound during propagation outdoors –
Part 2: General method of calculation’ for the meteorological conditions provided by ENT.
The acoustic model shall only consider continuous and discontinuous noise sources during
normal operation of the plant.
The following noise sources are to be excluded from the modelling and determination of the
predicted sound pressure level:
Construction, pre-commissioning and commissioning noise emissions
Maintenance activity like vehicle road noise, crane movements etc.
1.3 Noise Immission limits
Currently there are no statutory regulations governing environmental noise immissions in the
surrounding area of the proposed compressor station. Several criteria are therefore discussed
below to provide information of international standards.
1.3.1 World Bank
In the ‘Pollution Prevention and Abatement Handbook’ issued by the World Bank Group in April
1999 (Permanent URL: http://go.worldbank.org/E6G093QFZ1), noise limits for new installations
financed by the World Bank are set out, which are summarized below in Table 1.
Additionally, it is stated in the handbook that an increase of up to 3 dB above the existing
background noise levels at receptors outside the property boundary is considered acceptable.
Page 5 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Table 1: World Bank noise limits, maximum LAeq in dB(A)
Receptor Day
(07:00 – 22:00) Night
(22:00 – 07:00)
Residential, institutional, educational 55 45
Industrial, commercial 70 70
1.3.2 World Health Organisation
In the WHO document „Guidelines for Community Noise‘, guideline limit values for community
noise in various specific environments are provided. Noise levels below the limits are considered
necessary to minimize any temporary or long term deterioration in physical, psychological or
social functioning associated with noise exposure. The values form the basis of many
international environmental noise policy limits and are summarized in Table 2 below.
Table 2: WHO Guideline values
Specific Environment Critical Health Effects LAeq
dB(A)
LAmax
dB(A)
Outdoor living area Serious annoyance, daytime and evening
Moderate annoyance, daytime and evening
55
50
Inside bedrooms Sleep disturbance, night-time 30 45
Outside bedrooms Sleep disturbance, window open (outdoor values) 45 60
School, playground outdoor Annoyance (external source) 55
Industrial, commercial, shopping and traffic
areas, indoors and Outdoors Hearing impairment 70 110
1.3.3 Greek national noise limits
The main legal framework is provided under art. 14 of the Environmental Protection Act 1985,
Presidential Decree 1180/1981. The herein mentioned noise limits apply at the borderline of a
plot area, according to its land use (urban, semi-urban, industrial, mixed). The part of the
borderline oriented to the emission source is relevant. The noise limits in this instruction are listed
in the table below and correspond with the noise limits set out by the WHO:
Page 6 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Table 3: Immission noise limits according to Greek legislation (Presidential Decree 1180/1981, Table 1)
Line Description Noise limits LAeq in dB(A)
1 Established industrial areas 70
2 Areas with predominantly industrial
characteristics 65
3 Areas with equivalent industrial and urban
characteristics 55
4 Areas with predominantly urban
characteristics 50
In cases where the noise emitting site borders are on a home property, the noise limit is 45
dB(A), measured in front of an open door or window.
1.3.4 Project Specification
Until further notice, the noise limits within this project will be set to LAeq ≤ 65 dB(A) at the station
fence measured as hourly averaged noise level.
1.3.5 Summary
The ‘3 dB(A) Criterion’ demanded by the World Bank Group is the most strict requirement
concerning noise, (please see also Section 1.3.1). Consequently the maximum noise impacts
emitted from the proposed compressor station should not increase the background noise level of
3 dB(A) at the nearest receptor location off-site. As the further development from 10 to 20 BCM/y
transport capacity will be done at a later stage, the ‘3 dB(A) Criterion’ is applied to each of the 2
construction phases respectively.
Page 7 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
2 DOCUMENTATION USED
Specification Noise Survey
Document No.: CAL00-ENT-000-A-TSA-0001, Rev.: 01
Project Manual – Part 12 – Document Control
Document No.: CAL00 – ENT-000-B-TPA-0012, Rev.: 0D
Project Manual – Part 16 – Engineering Manual
Document No.: CAL00-ENT-000-B-TPA-0016, Rev.: 0C
Station Layout GCS00 – Gas Compressor Station Kipoi
GCS00-ENT-000-Q-DQA-0007 Rev. 0G
3 STANDARDS AND GUIDELINES USED
DIN EN 12354-4 „Building acoustics – Estimation of acoustic performance of
buildings from the performance of products
Part 4: Transmission of indoor sound to the outside“,
Issue date: 2001-04
VDI 3733 „Noise at pipes“
Issue date: 1996-07
VDI 3734 Part 1
„Characteristic noise emission values of technical sound
sources; air coolers“
Issue date: 1981-02
DIN ISO 9613 Part 2
Acoustics - „Attenuation of sound during propagation
outdoors,
Part 2: General method of calculation“
Issue date: 1999-10
Page 8 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
4 SITE DESCRIPTION
4.1 Local Situation, Sensitive Receptor Points
The Gas Compressor Station is proposed for a site within the district Evros, Greece. The local
situation can be seen from the aerial image below.
The area is a primarily rural area. The closest residences to the site are the settlements in the
north-east of Peplos.
The shortest distance between the proposed compressor station and community areas is to
‘Peplos’, with a distance of approx. 1650 m to the geometrical center of the station.
Picture 1: Aerial image of the proposed compressor station GCS00 and nearby communities
Page 9 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Table 4: Noise sensitive receptors
Sensitive receptor point Distance / Direction
1 Thymaria
nearest outskirt of village
approx. 2650 m
west-north-west
2 Tavri
nearest outskirt of village
approx. 2900 m
west
3 Peplos
nearest outskirt of village approx. 1650 m
south-south-west
4 Kipoi
nearest outskirt of village approx. 2250 m
south-sputh-east
5 Station fence
West of the station approx. 200 m
north-west
6 Station fence
South of the station approx. 200 m
south-west
7 Station fence
East of the station approx. 200 m
south-east
4.2 Proposed Gas Compressor Station
For the ultimate transport capacity of 20 billion cubic meters / year six gas turbines, each with a
power of 15 MW, will be installed of which five units will be in operation simultaneously at full
load. One compressor unit is reserved for standby. Each gas compressor unit comprises one
natural gas compressor with a gas turbine driver and will be located within its own compressor
building.
The compressor buildings will be a solid construction (concrete walls or brick walls) with sound
proof doors and air ventilation systems. The combustion air intake filter equipment and the
exhaust ducts and stacks will be located outside, adjacent to the compressor building. It is
assumed that the gas turbine driver will be equipped with an additional enclosure.
Two gas coolers, each equipped with 10 low noise fans and one recycle cooler with four fans will
be located to the north of the compressor buildings. The area between the compressor buildings
and the gas coolers is reserved for the pipe work. Piping, which is located above ground, must be
equipped with a sound proof cladding.
Page 10 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
As the pipeline transport capacity will be initially approx. 10 billion cubic meters / year the first
construction phase comprises only part of the above mentioned processing units for the 20
BCM/y case. Namely these are three gas compressor units, one gas cooler, one fuel gas skid
and one power generator. Furthermore there will be three metering sections and three filter units.
Also the piping above ground and diverse operation and administration building have to be
considered. Due to the 2+1 sparing philosophy, 2 gas compressor units have to be taken into
account during normal operation.
To guarantee the final transport capacity of approx. 20 billion cubic meters / year an extension of
the existent gas compressor station will be necessary. Thus the implementation of three
additional gas compressor units plus piping is intended in a second construction phase.
Page 11 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
5 NOISE MODELLING
5.1 Methodology
In order to determine the extent of noise emission from the proposed site a 3D computer noise
model has been developed. The model was developed using the prediction software
‚SoundPLAN, Version 7.1,‘ in conjunction with topographic information supplied in digital form.
The significant noise sources were built in the model at the locations obtained from the provided
plot plans.
The noise predictions have been performed according to ISO 9613-2. The method incorporates
the influence of geometrical divergence, ground absorption, atmospheric absorption (in
accordance with ISO 9613-1), shielding (barrier) attenuation and meteorological conditions.
For the noise assessment of the planned compressor station, sound power data from Section 6
were used, assuming the scenario of normal operation mode for each development phase
separately.
According to ISO 9613-2, Table 5, the accuracy of the model is within a range of ±3 dB.
5.2 Meteorological conditions considered
The noise model has been based on the following meteorological conditions which need to be
verified during detail engineering phase:
Table 5: Meteorological conditions considered in the noise model
Temperature (°C) Relative
Humidity (%)
Barometric
Pressure (hPa)
Wind Speed and Direction
15 70 1015 ≈ 3 m/s North-East
Cmet was generally set to zero. No vegetation was considered within the noise model. The ground
beneath the noise sources were modelled as fully reflective (ground absorption zero). Outside of
the proposed compressor station the ground was considered as agriculturally used area with a
ground absorption factor 0,85.
Page 12 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
6 NOISE CONTROL SPECIFICATIONS AND ASSOCITATED NOISE CONTROL MEASURES (NCM)
The following outlines the source sound power levels to be associated with the major noise
emitting equipment at the proposed site:
Table 6: Noise Specifications
Exhaust stack opening per unit, including stack surface LWA ≤ 86 dB(A)
NCM:
Exhaust silencer with staggered splitters
Exhaust duct outside compressor building, per unit LWA ≤ 85 dB(A)
NCM:
Sound proof cladding
Filter house, combustion air intake, per unit LWA ≤ 78 dB(A)
NCM:
Air intake silencer with staggered splitters
Air intake duct outside compressor building, per unit LWA ≤ 78 dB(A)
NCM:
Sound proof cladding
Turbine enclosure ventilation inlet, per unit LWA ≤ 76 dB(A)
NCM:
Inlet silencer
Turbine enclosure ventilation outlet, per unit LWA ≤ 76 dB(A)
NCM:
Outlet silencer
Oil cooler outside compressor building, per unit LWA ≤ 90 dB(A)
NCM:
To be guaranteed by the supplier
Oil mist separator outlet, per unit LWA ≤ 78 dB(A)
NCM:
To be guaranteed by the supplier
Gas compressor unit inside compressor building
for one unit LWA ≤ 110 dB(A)
NCM:
To be guaranteed by the supplier
(enclosed gas turbine package).
100 mm sound proof cladding of gas pipes inside
the compressor building.
Resulting sound pressure level inside the building,
averaged: LpA approx. 94 dB(A)
Page 13 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Compressor building
Walls R’w ≥ 48 dB
NCM:
Concrete or brickwork, m ≥ 280 kg/m²
Roof R’w ≥ 45 dB
NCM:
Concrete, m ≥ 210 kg/m², plus thermal insulation
Explosion relief panel, approx. 200 m²,
as part of the roof of each compressor building R’w ≥ 26 dB
NCM:
To be guaranteed by the supplier
Doors, in situ R’w ≥ 30 dB
NCM:
To be guaranteed by the supplier
Building ventilation inlet, per opening
(four per building assumed) LWA ≤ 67 dB(A)
NCM:
Air inlet silencers with staggered splitters
Building ventilation outlet on roof, per unit
(four per building assumed) LWA ≤ 84 dB(A)
NCM:
To be guaranteed by the supplier
Gas cooler with 10 fans, per cooler
(two coolers considered) LWA ≤ 91 dB(A)
NCM:
To be guaranteed by the supplier
One Start-up cooler with 4 fans LWA ≤ 87 dB(A)
NCM:
To be guaranteed by the supplier
Gas flow noise within gas coolers, per cooler
(identical for the two gas cooler and the start-up cooler) LWA ≤ 91 dB(A)
NCM:
To be reviewed during detail engineering.
Page 14 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Gas cooler, vertical pipework, upstream LWA ≤ 77 dB(A) / m
NCM:
To be reviewed during detail engineering,
probably 100 mm sound proof cladding.
Gas cooler header, discharge side, above ground LWA ≤ 76 dB(A) / m
NCM:
To be reviewed during detail engineering,
probably 150 mm sound proof cladding.
Gas cooler, vertical pipework, downstream LWA ≤ 74 dB(A) / m
NCM:
To be reviewed during detail engineering,
probably 100 mm sound proof cladding.
Station inlet filter, per unit
(in total four filter assumed) LWA ≤ 75 dB(A)
NCM:
To be reviewed during detail engineering,
normally no action needed.
Meter run, per unit LWA ≤ 87 dB(A)
NCM:
To be reviewed during detail engineering,
probably 100 mm sound proof cladding.
Compressor piping outdoors, suction side of
compressor, per unit LWA ≤ 78 dB(A) / m
NCM:
To be reviewed during detail engineering,
probably 200 mm sound proof cladding.
Compressor piping outdoors, discharge side of
compressor, per unit LWA ≤ 80 dB(A) / m
NCM:
To be reviewed during detail engineering,
probably 200 mm sound proof cladding.
Recycle valve, per unit LWA ≤ 85 dB(A)
NCM:
To be reviewed during detail engineering,
probably enclosed.
Header, suction side LWA ≤ 66 dB(A) / m
NCM:
To be reviewed during detail engineering.
Page 15 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Header, discharge side, above ground LWA ≤ 68 dB(A) / m
NCM:
To be reviewed during detail engineering,
probably 200 mm sound proof cladding.
Air compressor, per unit
Air intake
Room ventilation outlet
LWA ≤ 65 dB(A)
LWA ≤ 66 dB(A)
NCM:
Within Utility Building.
Silencers at intake and outlet
Boiler room (Heating)
Stack
Room ventilation, air intake
Room ventilation, outlet
LWA ≤ 76 dB(A)
LWA ≤ 70 dB(A)
LWA ≤ 70 dB(A)
NCM:
Within Utility Building.
probably silencers at intake and outlet
Fuel gas skid I and II
Building surface (walls, roof, door)
Room ventilation, intake
Room ventilation, outlet
LWA ≤ 64 dB(A)
LWA ≤ 66 dB(A)
LWA ≤ 66 dB(A)
NCM:
Solid or lightweight construction,
walls and roof R’w ≥ 37 dB
Door R’w ≥ 30 dB
Power generation I and II (Gas)
Building surface (walls, roof, door)
Stack opening
Room ventilation, intake
Room ventilation, outlet
LWA ≤ 74 dB(A)
LWA ≤ 88 dB(A)
LWA ≤ 74 dB(A)
LWA ≤ 74 dB(A)
NCM:
Solid or lightweight construction,
walls and roof R’w ≥ 37 dB
Door R’w ≥ 30 dB
Main Power generation I and II (Diesel)
Package surface (walls, roof, door)
Mean sound level at 1 m distance all package surfaces
Stack opening
LWA ≤ 85 dB(A)
LWA ≤ 88 dB(A)
NCM:
Sound pressure level to be guaranteed by the supplier,
Generator has to be installed into an insulating container
Page 16 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Emergency Power generation I and II (Diesel)
Building surface (walls, roof, door)
Stack opening
Room ventilation, intake
Room ventilation, outlet
Cooling Air inlet
LWA ≤ 78 dB(A)
LWA ≤ 88 dB(A)
LWA ≤ 80 dB(A)
LWA ≤ 70 dB(A)
LWA ≤ 81 dB(A)
NCM:
Solid or lightweight construction,
walls and roof R’w ≥ 36 dB
Door R’w ≥ 30 dB
Administration Building, Electrical Building,
Workshop / Stores Building
It is assumed, that sound pressure levels inside these
buildings are usually not higher than
LpA = 85 dB(A)
NCM:
Solid or lightweight Building construction,
walls and roof R’w ≥ 37 dB
Doors R’w ≥ 30 dB
Ventilation openings (if necessary) LwA ≤ 75 dB(A)
Air condition units outdoors (6 assumed) LwA ≤ 85 dB(A)
Optional
(instead of one turbine driven gas compressor):
Combined Cycle - Steam Turbine with gas compressor,
installed within a solid building
Average sound pressure inside turbine hall
Four heat recovery steam generator
One condensate Cooler
LpA 96 dB(A)
LWA 94 dB(A) / unit
LWA 93 dB(A)
NCM:
Solid or lightweight Building construction,
walls and roof R’w ≥ 48 dB
Large Door R’w ≥ 30 dB
Small Doors R’w ≥ 25 dB
Ventilation openings, air intake LwA ≤ 75 dB(A)
Ventilation openings, air outlet LwA ≤ 84 dB(A)
Additional remarks:
All specified sound power levels must be free of a tonal noise characteristic. A tonal characteristic
may exist if the sound pressure levels of two adjacent 1/3 octave bands differ by 5 dB or more.
Page 17 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Noise with a tonal characteristic may be produced by the gas compressors due to their blade
passing frequency. This subject should be reviewed during detail engineering phase for further
decisions.
Tonal noise characteristics are especially not acceptable at the Non Return Valves (NRV) or the
filter screens.
Impulsive noise is likely not to be considered under normal operation. However, the fuel gas vent
system will be activated after shut down of a compressor unit, thus the sound power level of this
system should not exceed LWA = 100 dB(A).
Due to the highest priority of environmental and safety aspects noise emissions during
emergency cases are likely not to be considered within an environmental impact study.
Nevertheless for the reason of engineering criticality assessment noise emissions of emergency
power generators are also considered in the present study. According to routinely necessary test
runs of Diesel Power Generators are regarded.
Page 18 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
7 PREDICTED NOISE LEVELS
Noise levels in the area surrounding the site have been predicted using SoundPlan 7.1 as
described in Section 5.1 above. The prediction software is well recognized and accepted for its
accuracy and validity.
The predicted noise levels at each receptor, based on the modelled data outlined in Section 6 are
summarized in Table 7 and
Table 8 below.
Table 7: Plant operation noise at sensitive receptors (construction phase I)
Point No.
Sensitive receptor
Initial noise level
at night time
in dB(A)
Additional noise level
at night time
in dB(A)
Total noise level
at night time
in dB(A)
Increase of background
noise in dB(A)
1 Thymaria 29,4 20,6 29,9 0,5
2 Tavri 29,4 21,4 30,0 0,6
3 Peplos 29,4 25,7 30,9 1,5
4 Kipoi 29,4 18,7 29,8 0,4
5 Station fence, west 59,2
6 Station fence, south 54,8
7 Station fence, east 50,8
Table 8: Plant operation noise at sensitive receptors (construction phase II)
Point No.
Sensitive receptor
Initial noise level
at night time
in dB(A)
Additional noise level
at night time
in dB(A)
Total noise level
at night time
in dB(A)
Increase of background
noise in dB(A)
1 Thymaria 29,9 19,3 30,3 0,4
2 Tavri 30,0 20,1 30,5 0,4
3 Peplos 30,9 25,6 32,1 1,1
4 Kipoi 29,8 19,9 30,2 0,4
5 Station fence, west 59,2 53,1 60,2
6 Station fence, south 54,8 54,4 57,6
7 Station fence, east 50,8 53,4 55,3
From the table above, it can be seen that noise levels will be about 13 dB(A) below the
45 dB(A) criterion suggested by the World Bank, the WHO and the Greek legislation for outdoor
noise levels in residential areas during night time.
Page 19 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
Further, the predicted noise levels at the station fence comply with the project specification
outlined in Section 1.3.4.
The contribution of each individual noise source to the additional total sound pressure level at the
sensitive receptors for each development phase can be drawn from the numerical charts in
Attachment 3. The noise contour plots for the scenarios modelled are shown in Attachment 4.
For the calculation of the resulting total noise level for each development phase at the nearest
receptor point, baseline measurements have been performed by Genest & Partner in November
30th 2012. As shown in the tables above, the additional predicted noise levels at each receptor
point, is less than the initial noise level. From that it can be derived that the predicted noise-
increase of the proposed site lies within a range of 3 dB(A) for each development phase. The
method of approach takes into account that the operation of the compressor station during the
initial development stage will contribute to the background noise considered for construction
phase II.
Page 20 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
8 CONCLUSION
It is proposed to develop a gas compressor station in the district Evros, Greece, near the Turkish
border. The final compressor station will be developed in two construction phases as referred to
in chapter 4.2. The first comprises of 2+1 gas compressor units, the second of three units, each
along with the necessary auxiliary equipment.
To predict the noise impact in the surrounding area a 3D noise model was developed. The
prediction results in this report indicates that noise received at the closest residences at the
villages Thymaria, Tavri, Peplos and Kipoi from the full capacity operation of each construction
phase of the proposed gas compressor site GCS00 shall be deemed to be complied with the
guidelines of the World Bank and the WHO at all times.
This will be achieved by noise control treatment to plant equipment as specified in Section 6.
This Study comprises 22 pages and 4 Attachments.
Genest und Partner
Ingenieurgesellschaft mbH
Ludwigshafen/Rhein, February 23th 2013
Scherer/ Dr. Hunsmann
Page 21 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
GLOSSARY OF TERMS
Lp / LpA unweighted / A-weighted sound pressure level in dB / dB(A)
Lpi Sound pressure level inside of rooms or enclosures in dB / dB(A)
Leq / LAeq unweighted / A-weighted energy averaged noise from a source, equivalent
continuous sound pressure level over a given period in dB / dB(A)
LW / LWA unweighted / A-weighted sound power level in dB / dB(A)
L‘W Sound power level per unit (m or m²)
R‘w Sound transmission loss in dB
De Insertion loss in dB
S Area in m²
s Distance in m
K0 Solid angle index in dB
Adiv Attenuation by geometric divergence
Aatm Attenuation by atmospheric absorption
Agr Attenuation by ground effect
Abar Attenuation by barrier or screening
Amisc Attenuation by miscellaneous effects
Cmet Meteorological correction
dLrefl Increase of noise by reflection
Page 22 of 22 Area Code
Comp. Code
System Code
Disc. Code
Doc.- Type
Ser. No.
Project Title: Trans Adriatic Pipeline – TAP GCS00-WGP-000-S-TRS-0001Rev.: 00 Document Title: Noise Control Study GCS00
ATTACHMENTS
Attachment 1: Topographical overview
Attachment 2: Station layout
Attachment 3: Detailed noise prediction results
Attachment 4: Noise contour plot
2 Tavri
1 Thymaria
4 Kipoi
7 Station Fence East
3 Peplos
6 Station Fence South
5 Station Fence West
34942000
34942000
34942500
34942500
34943000
34943000
34943500
34943500
34944000
34944000
34944500
34944500
34945000
34945000
34945500
34945500
34946000
34946000
34946500
34946500
34947000
34947000
34947500
34947500
4547000
4547000
4547500
4547500
4548000
4548000
4548500
4548500
4549000
4549000
4549500
4549500
4550000
4550000
4550500
4550500
4551000
4551000
4551500
4551500
4552000
4552000
Attachment 1
GCS00-WGP
127D5 G1, Rev. 00
Trans Adriatic Pipeline AG
Proposed Gas Compression Station
GCS00 at district Evros, Greece
Topographical Overview
Map Source:
Google Earth
-----------------------------------------------------------
Legend
Receptor
Industry building
noise source (point)
noise source (line)
noise source (area)
Noise Level
LAeq
= 25 dB(A)
= 30 dB(A)
= 35 dB(A)
= 40 dB(A)
= 45 dB(A)
= 50 dB(A)
= 55 dB(A)
= 60 dB(A)
= 65 dB(A)
= 70 dB(A)
= 75 dB(A)
Scale (on paper size A3) 1:20000
00 100 200 400 600 800 1000m
Vent
Oil CoolerOil Cooler
Unit 1Unit 1
+17,10m
Compressor Building
Unit 2Unit 2
Oil Cooler
Stack
Stack
Stack
Unit 3
Transportation Gas Cooler
Start Up Gas CoolerTransportation Gas Cooler
+17,10m
+17,10m
+1,50m
+1,50m
%%P 0,00m
%%P 0,00m
%%P 0,00m
+1,50m
- 1,50m
- 1,50m
%%P 0,00m
%%P 0,00m
%%P 0,00m
- 1,50m
%%P 0,00m
- 1,50m
%%P 0,00m
Extinguishing Water Supply(Small Sewage Works)
(Small Sewage Works)
Waste Water Treatment Plant
Unit 4
Unit 5Unit 6
Workshop Building
+9,00m
Administration Building
+4,50m
+9,00m
Stores Building
Main Power Generation (Diesel)Electrical Building
+4,50m
Diesel Fuel Tank
Sunshade Parking Area
Emergency Power Generation (Diesel)
Emergency Exit
Second Access for Fire Brigade and Emergency Exit
Emergency Exit
Emergency Exit
m²
6,3KW
5KW
m²
Compressor Building
Compressor Building
Compressor Building
Compressor Building
Compressor Building
Parking Area
+4,50m+9,00m
Utility Building
Chromatograph
Condensate\PTank
Scraper Receiving Station
Scraper Launching Station
Metering
Filter Separator 1-5
+4,50m
Fuel Gas Skid
Fuel Gas Filter
+4,50m
Power Generation (Gas)
+70,00mDN 1200
34944900
34944900
34945000
34945000
34945100
34945100
34945200
34945200
34945300
34945300
4549300
4549300
4549400
4549400
4549500
4549500
4549600
4549600
4549700
4549700
Attachment 2.1
GCS00-WGP127D5 G1, Rev. 00
Trans Adriatic Pipeline AG
Proposed Gas Compression Station
GCS00 at district Evros, Greece
Station Layout
Construction phase I
Map Source:1) Drawing file GCS00-ENT-000-Q-DQA-0007_PL.dxf
-----------------------------------------------------------
Legend
Receptor
Industry building
noise source (point)
noise source (line)
noise source (area)
Elevation point
Elevation line
Punkt
Noise LevelLAeq
= 25 dB(A)= 30 dB(A)= 35 dB(A)= 40 dB(A)= 45 dB(A)= 50 dB(A)= 55 dB(A)= 60 dB(A)= 65 dB(A)= 70 dB(A)= 75 dB(A)
Scale (on paper size A3) 1:200000 10 20 40 60 80 100
m
Vent
Oil CoolerOil Cooler
Unit 1Unit 1
+17,10m
Compressor Building
Unit 2Unit 2
Oil Cooler
Stack
Stack
Stack
Unit 3
Transportation Gas Cooler
Start Up Gas CoolerTransportation Gas Cooler
+17,10m
+17,10m
+1,50m
+1,50m
%%P 0,00m
%%P 0,00m
%%P 0,00m
+1,50m
- 1,50m
- 1,50m
%%P 0,00m
%%P 0,00m
%%P 0,00m
- 1,50m
%%P 0,00m
- 1,50m
%%P 0,00m
Extinguishing Water Supply(Small Sewage Works)
(Small Sewage Works)
Waste Water Treatment Plant
Unit 4
Unit 5Unit 6
Workshop Building
+9,00m
Administration Building
+4,50m
+9,00m
Stores Building
Main Power Generation (Diesel)Electrical Building
+4,50m
Diesel Fuel Tank
Sunshade Parking Area
Emergency Power Generation (Diesel)
Emergency Exit
Second Access for Fire Brigade and Emergency Exit
Emergency Exit
Emergency Exit
m²
6,3KW
5KW
m²
Compressor Building
Compressor Building
Compressor Building
Compressor Building
Compressor Building
Parking Area
+4,50m+9,00m
Utility Building
Chromatograph
Condensate\PTank
Scraper Receiving Station
Scraper Launching Station
Metering
Filter Separator 1-5
+4,50m
Fuel Gas Skid
Fuel Gas Filter
+4,50m
Power Generation (Gas)
+70,00mDN 1200
34944900
34944900
34945000
34945000
34945100
34945100
34945200
34945200
34945300
34945300
4549300
4549300
4549400
4549400
4549500
4549500
4549600
4549600
4549700
4549700
Attachment 2.2
GCS00-WGP127D5 G1, Rev. 00
Trans Adriatic Pipeline AG
Proposed Gas Compression Station
GCS00 at district Evros, Greece
Station Layout
Construction phase II
Map Source:1) Drawing file GCS00-ENT-000-Q-DQA-0007_PL.dxf
-----------------------------------------------------------
Legend
Receptor
Industry building
noise source (point)
noise source (line)
noise source (area)
Elevation point
Elevation line
Punkt
Noise LevelLAeq
= 25 dB(A)= 30 dB(A)= 35 dB(A)= 40 dB(A)= 45 dB(A)= 50 dB(A)= 55 dB(A)= 60 dB(A)= 65 dB(A)= 70 dB(A)= 75 dB(A)
Scale (on paper size A3) 1:200000 10 20 40 60 80 100
m
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Legende Source No. Number of sourceSource Source nameGroup Group nameLi dB(A) Indoor sound pressure levelR'w dB Transmission lossLw' dB(A) Sound power level per m,m²l or S m,m² Size of source (length or area)Lw dB(A) Sound power level per unitKo dB Correction for non spherical emissions m Distance source - receptor pointAdiv dB Attenuation due to divergenceAgr dB Attenuation due to ground effectsAbar dB Attenuation due to barrierAatm dB Attenuation due to atmospheric absorptiondLrefl dB Increase of noise due to reflectionsCmet Meteorological correctionLr,i dB(A) Assessed sound pressure at receiver
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.1 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 1 Thymaria Ld = 20,6 dB(A) Ln = 20,6 dB(A)
203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 2456,13 -78,80 -0,60 -0,07 -6,03 2,66 0,00 4,17
204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 2450,21 -78,78 -0,68 -0,07 -6,03 2,53 0,00 3,98
205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 2442,24 -78,75 -0,81 -0,07 -6,02 2,54 0,00 3,90
206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 2441,11 -78,74 -0,81 -0,07 -6,02 2,54 0,00 3,90
10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2557,34 -79,15 0,90 -4,18 -3,80 0,00 0,00 -0,23
11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2555,37 -79,14 0,90 -4,18 -3,80 0,00 0,00 -0,22
12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2568,81 -79,19 0,92 -4,19 -3,82 0,00 0,00 -0,28
13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2566,58 -79,18 0,92 -4,19 -3,82 0,00 0,00 -0,27
5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 2557,02 -79,15 0,42 -2,67 -2,93 0,00 0,00 -1,33
4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2550,78 -79,13 1,97 -4,32 -2,96 0,00 0,00 -12,36
3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 2562,07 -79,16 1,60 -4,64 -8,68 0,00 0,00 -16,22
6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 2557,01 -79,15 3,95 -4,05 -1,49 0,00 0,00 0,27
22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2566,49 -79,18 1,98 - -0,73 0,00 0,00 -22,75
21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2573,83 -79,20 1,64 - -4,19 0,00 0,00 -33,82
7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2565,06 -79,17 1,64 -4,64 -8,70 0,00 0,00 -19,85
18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2550,70 -79,13 1,97 -4,31 -2,97 0,00 0,00 -12,36
19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2555,63 -79,14 1,97 -4,31 -2,97 0,00 0,00 -12,38
15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2549,53 -79,12 1,62 -4,60 -8,70 0,00 0,00 -19,78
16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2557,02 -79,15 1,62 -4,60 -8,72 0,00 0,00 -19,82
17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 2553,67 -79,14 3,90 -3,59 -1,80 0,00 0,00 0,37
2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 2556,85 -79,15 -0,10 -1,81 -4,73 0,00 0,00 -16,27
20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 2565,73 -79,18 -0,03 - -1,44 0,00 0,00 -25,49
14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 2553,13 -79,13 -0,09 -0,79 -4,87 0,00 0,00 -14,31
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.2 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 2562,26 -79,16 -1,08 -3,09 -3,77 0,00 0,00 -16,96
29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2555,61 -79,14 0,08 -3,57 -2,18 0,00 0,00 -4,81
27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2551,87 -79,13 0,11 0,00 -9,11 2,54 0,00 -5,60
9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 2562,07 -79,16 -0,72 -3,57 -5,41 0,00 0,00 7,28
40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2626,18 -79,38 1,06 -4,23 -3,92 0,00 0,00 -0,47
41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2624,27 -79,37 1,06 -4,23 -3,92 0,00 0,00 -0,46
42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2637,71 -79,42 1,08 -4,25 -3,95 0,00 0,00 -0,53
43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2635,54 -79,41 1,08 -4,23 -3,93 0,00 0,00 -0,49
35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 2626,04 -79,38 0,47 -3,82 -2,28 0,00 0,00 -2,01
34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2619,77 -79,36 2,02 -4,35 -2,97 0,00 0,00 -12,59
33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 2631,12 -79,39 1,67 -4,64 -8,85 0,00 0,00 -16,55
36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 2626,03 -79,38 3,96 -4,56 -0,99 0,00 0,00 0,04
52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2635,27 -79,41 2,03 - -0,95 0,00 0,00 -25,38
51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2642,65 -79,43 1,71 - -5,18 0,00 0,00 -35,69
37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2634,12 -79,40 1,71 -4,64 -8,86 0,00 0,00 -20,18
48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2619,63 -79,36 2,02 -4,35 -2,97 0,00 0,00 -12,59
49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2624,43 -79,37 2,02 - -0,71 0,00 0,00 -21,31
45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2618,49 -79,35 1,70 -4,64 -8,83 0,00 0,00 -20,11
46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2625,78 -79,38 1,70 - -5,04 0,00 0,00 -23,43
47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 2622,52 -79,37 3,92 -4,56 -0,99 0,00 0,00 0,01
32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 2625,88 -79,38 0,14 -3,46 -4,31 0,00 0,00 -17,49
50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 2634,51 -79,41 0,18 - -1,63 0,00 0,00 -27,28
44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 2622,00 -79,36 0,14 -3,65 -4,22 0,00 0,00 -16,53
38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 2631,16 -79,40 -0,90 -3,22 -3,87 0,00 0,00 -17,25
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.3 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2624,92 -79,37 0,39 -3,79 -2,27 0,00 0,00 -5,05
56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2620,76 -79,36 0,36 -0,53 - 2,51 0,00 -7,14
39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 2630,97 -79,39 -0,51 -3,69 -5,57 0,00 0,00 6,96
196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 2604,66 -79,31 1,73 - -8,67 0,00 0,00 -43,04
197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 2587,70 -79,25 1,70 -1,41 - 0,00 0,00 -27,66
198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 2574,28 -79,21 1,54 - -8,19 0,00 0,00 -51,26
199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 2567,85 -79,18 1,58 -1,17 - 0,00 0,00 -30,66
200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 2561,89 -79,16 1,60 -1,21 - 0,00 0,00 -44,19
201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 2554,98 -79,14 1,61 -1,24 - 0,00 0,00 -30,02
190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 2563,26 -79,17 1,80 - -8,36 0,00 0,00 -47,54
192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 2570,61 -79,19 1,80 - -8,33 0,00 0,00 -57,95
193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 2575,36 -79,21 1,80 - -8,32 0,00 0,00 -48,10
194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 2580,59 -79,23 1,80 - -9,54 0,00 0,00 -50,45
195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 2594,48 -79,27 1,80 - -8,83 0,00 0,00 -40,96
202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 2551,85 -79,13 1,78 - -8,33 0,00 0,00 -40,38
191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 2577,87 -79,22 1,34 -4,73 - 0,00 0,00 -23,23
59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 2654,22 -79,47 0,96 -4,28 -6,61 0,00 0,00 -12,40
60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 2646,15 -79,44 0,95 -4,27 -6,59 0,00 0,00 -12,36
61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 2638,00 -79,42 0,94 -4,27 -6,58 0,00 0,00 -12,33
65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 2563,43 -79,17 0,29 -3,21 -7,19 0,00 0,00 -19,94
66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 2560,73 -79,16 1,51 - -5,08 0,00 0,00 -36,00
63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 2563,10 -79,17 0,26 -3,46 -7,15 0,00 0,00 -23,32
64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 2563,17 -79,17 0,77 - -4,66 0,00 0,00 -44,77
68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 2556,01 -79,14 0,14 -0,01 -7,30 0,00 0,00 -16,82
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.4 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 2559,62 -79,16 0,15 -4,34 -6,73 0,00 0,00 -23,83
67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2562,15 -79,16 -4,56 - -6,04 0,00 0,00 -27,60
69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2558,34 -79,15 -4,56 0,00 -6,03 0,00 0,00 -15,73
162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 2600,80 -79,29 1,94 -4,29 - 0,00 0,00 -5,27
163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 2598,10 -79,29 1,94 -4,16 - 0,00 0,00 -5,19
164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 2595,40 -79,28 1,94 -4,01 - 0,00 0,00 -5,11
74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 2601,23 -79,30 1,33 -4,56 -8,93 0,00 0,00 9,90
75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 2605,55 -79,31 1,33 -4,72 -8,79 0,00 0,00 7,04
165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 2503,83 -78,96 0,10 - -2,99 0,00 0,00 -18,36
167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 2496,23 -78,94 0,03 -2,68 -5,61 0,00 0,00 -8,05
170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 2499,70 -78,95 0,01 - -3,25 0,00 0,00 -16,12
171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 2498,28 -78,94 0,91 - -1,93 0,00 0,00 -22,40
168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 2491,97 -78,92 -0,21 -2,06 -5,75 0,00 0,00 -9,88
173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 2504,62 -78,97 -0,15 -4,09 -1,99 0,00 0,00 4,80
166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 2497,92 -78,94 -0,47 -3,95 -4,94 0,00 0,00 -9,64
169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2492,37 -78,92 -4,55 0,00 -5,88 0,00 0,00 -7,34
172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2501,57 -78,96 -4,55 - -5,90 0,00 0,00 -21,16
90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2597,53 -79,28 1,90 -0,52 - 0,00 0,00 -19,96
77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2588,32 -79,25 1,84 -0,39 - 0,00 0,00 -15,94
91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2598,39 -79,29 1,90 -0,53 - 0,00 0,00 -19,96
79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2589,20 -79,26 1,84 -0,39 - 0,00 0,00 -15,94
92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2599,25 -79,29 1,91 -0,53 - 0,00 0,00 -19,97
80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2590,08 -79,26 1,84 -0,39 - 0,00 0,00 -15,95
93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2600,30 -79,29 1,91 -0,53 - 0,00 0,00 -19,97
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.5 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2591,10 -79,26 1,85 -0,40 - 0,00 0,00 -15,95
94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2601,16 -79,30 1,92 -0,54 - 0,00 0,00 -19,98
82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2591,98 -79,26 1,85 -0,40 - 0,00 0,00 -15,96
95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2602,02 -79,30 1,92 -0,54 - 0,00 0,00 -19,98
83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2592,85 -79,27 1,86 -0,40 - 0,00 0,00 -15,96
96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2603,08 -79,30 1,93 -0,54 - 0,00 0,00 -19,99
84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2593,88 -79,27 1,86 -0,40 - 0,00 0,00 -15,96
97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2603,94 -79,30 1,93 -0,54 - 0,00 0,00 -19,99
85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2594,76 -79,27 1,87 -0,40 - 0,00 0,00 -15,97
98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2604,80 -79,31 1,93 -0,54 - 0,00 0,00 -20,01
86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2595,64 -79,28 1,87 -0,40 - 0,00 0,00 -15,97
99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2605,86 -79,31 1,94 -0,55 - 0,00 0,00 -20,02
87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2596,68 -79,28 1,88 -0,40 - 0,00 0,00 -15,98
100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2606,72 -79,31 1,94 -0,55 - 0,00 0,00 -20,03
88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2597,56 -79,28 1,88 -0,41 - 0,00 0,00 -15,98
101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2607,58 -79,32 1,95 -0,55 - 0,00 0,00 -20,04
89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2598,43 -79,29 1,89 -0,41 - 0,00 0,00 -15,99
160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 2598,56 -79,29 1,32 -4,23 -9,07 0,00 0,00 10,90
71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 2598,26 -79,29 0,68 -0,13 -9,18 0,00 0,00 1,07
73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 2598,26 -79,29 0,68 -0,13 -9,18 0,00 0,00 5,07
78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2608,03 -79,32 2,00 -0,66 - 0,00 0,00 -20,93
131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2608,90 -79,32 2,01 -0,66 - 0,00 0,00 -20,94
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2609,76 -79,32 2,01 -0,67 - 0,00 0,00 -20,95
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2610,83 -79,33 2,01 -0,67 - 0,00 0,00 -20,96
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.6 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2611,69 -79,33 2,02 -0,68 - 0,00 0,00 -20,97
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2612,55 -79,33 2,02 -0,68 - 0,00 0,00 -20,97
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2613,59 -79,34 2,03 -0,69 - 0,00 0,00 -20,99
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2614,45 -79,34 2,03 -0,69 - 0,00 0,00 -20,99
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2615,31 -79,34 2,03 -0,70 - 0,00 0,00 -21,00
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2616,38 -79,35 2,04 -0,70 - 0,00 0,00 -21,01
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2617,25 -79,35 2,04 -0,70 - 0,00 0,00 -21,02
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2618,11 -79,35 2,04 -0,71 - 0,00 0,00 -21,03
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2619,17 -79,36 2,05 -0,71 - 0,00 0,00 -21,04
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2620,04 -79,36 2,05 -0,71 - 0,00 0,00 -21,05
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2620,90 -79,36 2,05 -0,72 - 0,00 0,00 -21,06
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2621,97 -79,36 2,06 -0,72 - 0,00 0,00 -21,07
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2622,83 -79,37 2,06 -0,72 - 0,00 0,00 -21,08
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2623,70 -79,37 2,06 -0,73 - 0,00 0,00 -21,09
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2624,74 -79,37 2,07 -0,73 - 0,00 0,00 -21,10
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2625,60 -79,38 2,07 -0,73 - 0,00 0,00 -21,11
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2626,46 -79,38 2,07 -0,73 - 0,00 0,00 -21,12
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2627,53 -79,38 2,08 -0,74 - 0,00 0,00 -21,13
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2628,39 -79,39 2,08 -0,74 - 0,00 0,00 -21,14
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2629,26 -79,39 2,08 -0,74 - 0,00 0,00 -21,15
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2630,30 -79,39 2,09 -0,74 - 0,00 0,00 -21,16
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2631,17 -79,40 2,09 -0,74 - 0,00 0,00 -21,16
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2632,03 -79,40 2,09 -0,75 - 0,00 0,00 -21,18
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2633,10 -79,40 2,10 -0,75 - 0,00 0,00 -21,19
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.7 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2633,96 -79,40 2,10 -0,75 - 0,00 0,00 -21,20
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2634,83 -79,41 2,10 -0,75 - 0,00 0,00 -21,21
70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2617,88 -79,35 0,80 -0,14 -9,29 0,00 0,00 5,02
76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2600,52 -79,29 1,98 -0,59 - 0,00 0,00 -17,68
102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2601,39 -79,30 1,99 -0,60 - 0,00 0,00 -17,69
103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2602,26 -79,30 1,99 -0,60 - 0,00 0,00 -17,70
104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2603,31 -79,30 2,00 -0,61 - 0,00 0,00 -17,71
105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2604,18 -79,31 2,00 -0,62 - 0,00 0,00 -17,72
106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2605,05 -79,31 2,00 -0,63 - 0,00 0,00 -17,72
107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2606,09 -79,31 2,01 -0,64 - 0,00 0,00 -17,73
108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2606,96 -79,31 2,01 -0,64 - 0,00 0,00 -17,74
109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2607,83 -79,32 2,01 -0,65 - 0,00 0,00 -17,75
110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2608,89 -79,32 2,02 -0,66 - 0,00 0,00 -17,77
111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2609,76 -79,32 2,02 -0,66 - 0,00 0,00 -17,78
112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2610,63 -79,33 2,02 -0,67 - 0,00 0,00 -17,79
113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2611,67 -79,33 2,03 -0,67 - 0,00 0,00 -17,80
114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2612,54 -79,33 2,03 -0,68 - 0,00 0,00 -17,81
115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2613,41 -79,34 2,04 -0,68 - 0,00 0,00 -17,82
116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2614,47 -79,34 2,04 -0,69 - 0,00 0,00 -17,83
117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2615,33 -79,34 2,04 -0,69 - 0,00 0,00 -17,84
118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2616,21 -79,35 2,05 -0,69 - 0,00 0,00 -17,85
119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2617,28 -79,35 2,05 -0,70 - 0,00 0,00 -17,86
120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2618,15 -79,35 2,05 -0,70 - 0,00 0,00 -17,87
121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2619,01 -79,35 2,06 -0,70 - 0,00 0,00 -17,87
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.8 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,05 -79,36 2,06 -0,71 - 0,00 0,00 -17,88
123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,92 -79,36 2,06 -0,71 - 0,00 0,00 -17,89
124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2621,79 -79,36 2,07 -0,71 - 0,00 0,00 -17,90
125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2622,85 -79,37 2,07 -0,72 - 0,00 0,00 -17,91
126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2623,72 -79,37 2,07 -0,72 - 0,00 0,00 -17,92
127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2624,59 -79,37 2,08 -0,72 - 0,00 0,00 -17,93
128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2625,63 -79,38 2,08 -0,72 - 0,00 0,00 -17,94
129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2626,49 -79,38 2,08 -0,73 - 0,00 0,00 -17,95
130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2627,36 -79,38 2,09 -0,73 - 0,00 0,00 -17,96
72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2617,88 -79,35 0,80 -0,14 -9,29 0,00 0,00 5,02
161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 2590,02 -79,26 1,31 -3,83 -9,30 0,00 0,00 6,48
28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 2568,06 -79,18 -4,57 0,00 - 0,00 0,00 -4,22
23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 2547,88 -79,12 1,34 -4,32 -3,35 0,00 0,00 4,77
24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 2551,24 -79,13 2,92 -3,53 -5,02 2,53 0,00 5,00
1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 2544,75 -79,11 1,06 -0,81 -7,78 2,12 0,00 7,48
25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 2567,35 -79,18 1,30 -3,78 -9,28 0,00 0,00 2,42
26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 2580,98 -79,23 1,31 -4,00 -9,15 0,00 0,00 3,73
58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 2637,06 -79,41 -4,58 -4,03 - 0,00 0,00 -8,77
31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 2616,94 -79,35 1,46 -4,35 -3,45 0,00 0,00 4,53
53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 2620,32 -79,36 2,97 -8,08 -0,95 2,71 0,00 4,52
30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 2613,96 -79,34 1,14 -4,42 -6,00 2,32 0,00 5,70
54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 2636,22 -79,41 1,37 -9,56 -6,96 0,00 0,00 -1,19
55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 2649,86 -79,46 1,39 -6,43 -7,99 0,00 0,00 2,32
186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2511,70 -78,99 -4,55 - -5,92 0,00 0,00 -33,50
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.9 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2513,56 -79,00 -4,55 - -5,93 0,00 0,00 -34,41
188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2515,42 -79,00 -4,55 - -5,93 0,00 0,00 -34,94
176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 2506,58 -78,97 -4,50 -0,27 -5,91 0,00 0,00 -18,65
210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 2504,46 -78,97 -0,12 -4,23 -5,35 2,53 0,00 0,87
209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 2504,05 -78,96 -0,15 -4,21 -5,34 2,53 0,00 0,87
189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 2548,93 -79,12 -4,56 - -6,01 0,00 0,00 -30,97
182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 2508,85 -78,98 -4,54 0,00 -5,92 0,00 0,00 -11,43
177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 2547,53 -79,11 -4,51 -0,26 -6,01 0,00 0,00 -8,88
179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 2545,34 -79,11 -4,51 -0,26 -6,00 0,00 0,00 -8,87
178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 2546,43 -79,11 -4,51 -0,26 -6,01 0,00 0,00 -8,88
174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 2548,45 -79,12 1,47 - -8,31 0,00 0,00 -46,04
180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 2524,80 -79,04 1,44 -0,52 - 0,00 0,00 -22,97
181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2522,76 -79,03 2,17 -3,78 - 0,00 0,00 -32,67
184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 2528,95 -79,05 1,52 - -8,41 0,00 0,00 -40,43
185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2531,20 -79,06 2,21 - - 0,00 0,00 -51,20
183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 2505,68 -78,97 1,43 -2,06 - 0,00 0,00 -29,48
175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 2526,80 -79,04 0,92 -4,67 - 0,00 0,00 -28,09
207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2487,18 -78,91 -0,46 - -3,26 0,00 0,00 -10,51
208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2490,12 -78,92 -0,42 - -3,09 0,00 0,00 -11,19
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.10 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 2 Tavri Ld = 21,4 dB(A) Ln = 21,4 dB(A)
203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 2820,80 -80,00 -0,62 -2,97 -5,73 0,00 0,00 -2,31
204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 2814,49 -79,98 -0,70 -2,59 -5,77 0,00 0,00 -2,03
205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 2803,32 -79,95 -0,82 0,00 -6,56 2,54 0,00 2,21
206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 2804,01 -79,95 -0,82 0,00 -6,57 2,54 0,00 2,20
10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2867,31 -80,14 0,91 -4,19 -3,89 0,00 0,00 -1,31
11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2868,19 -80,14 0,91 -4,19 -3,89 0,00 0,00 -1,31
12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2879,63 -80,18 0,93 -4,19 -3,91 0,00 0,00 -1,35
13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2880,49 -80,18 0,93 -4,19 -3,91 0,00 0,00 -1,35
5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 2875,51 -80,17 0,42 -7,54 -1,09 0,00 0,00 -5,38
4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2868,89 -80,15 1,97 -7,07 -1,03 0,00 0,00 -14,21
3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 2880,93 -80,18 1,59 - -4,83 0,00 0,00 -22,66
6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 2875,52 -80,17 3,96 -6,14 -0,40 0,00 0,00 -1,75
22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2871,76 -80,16 1,97 0,00 -3,18 0,00 0,00 -9,30
21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2879,65 -80,18 1,62 0,00 -9,68 0,00 0,00 -17,22
7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2884,14 -80,19 1,62 - -4,74 0,00 0,00 -26,62
18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2865,52 -80,14 1,97 -1,73 -1,98 0,00 0,00 -9,81
19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2863,31 -80,13 1,97 0,00 -3,18 0,00 0,00 -9,27
15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2866,05 -80,14 1,61 -3,04 -8,13 0,00 0,00 -18,68
16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2862,70 -80,13 1,61 0,00 -9,65 0,00 0,00 -17,15
17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 2864,17 -80,13 3,92 -1,98 -0,60 0,00 0,00 2,21
2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 2875,29 -80,17 -0,12 -6,61 -2,80 0,00 0,00 -20,18
20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 2870,86 -80,15 -0,08 0,00 -4,47 0,00 0,00 -14,86
14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 2864,41 -80,13 -0,11 -0,35 -4,51 0,00 0,00 -14,54
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.11 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 2873,85 -80,16 -1,08 -3,09 -4,08 0,00 0,00 -18,27
29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2877,07 -80,17 0,05 0,00 -2,37 0,00 0,00 -2,49
27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2863,56 -80,13 0,10 0,00 -9,73 2,54 0,00 -7,22
9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 2873,87 -80,16 -0,73 -0,27 -6,03 0,00 0,00 8,94
40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2941,22 -80,36 1,06 -4,23 -4,00 0,00 0,00 -1,54
41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2942,08 -80,37 1,06 -0,66 -3,46 0,00 0,00 2,58
42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2953,54 -80,40 1,08 -4,23 -4,03 0,00 0,00 -1,58
43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2954,38 -80,40 1,08 -4,23 -4,03 0,00 0,00 -1,58
35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 2949,36 -80,39 0,47 - -0,92 0,00 0,00 -9,00
34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2942,74 -80,37 2,01 - -0,70 0,00 0,00 -17,84
33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 2954,79 -80,40 1,65 - -4,74 0,00 0,00 -25,86
36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 2949,37 -80,39 3,97 -9,56 -0,39 0,00 0,00 -5,36
52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2945,71 -80,38 2,01 0,00 -3,22 0,00 0,00 -9,52
51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2953,60 -80,40 1,69 0,00 -9,83 0,00 0,00 -17,53
37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2958,00 -80,41 1,69 - -4,79 0,00 0,00 -29,58
48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2939,38 -80,36 2,01 -5,23 -1,17 0,00 0,00 -12,68
49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2937,23 -80,35 2,01 0,00 -3,22 0,00 0,00 -9,49
45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2939,90 -80,36 1,67 -7,83 -6,66 0,00 0,00 -22,16
46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2936,64 -80,35 1,67 0,00 -9,80 0,00 0,00 -17,46
47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 2938,07 -80,35 3,94 -5,73 -0,38 0,00 0,00 -1,53
32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 2949,14 -80,39 0,16 - -1,93 0,00 0,00 -23,92
50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 2944,81 -80,37 0,15 0,00 -4,58 0,00 0,00 -14,97
44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 2938,30 -80,35 0,15 -2,29 -4,02 0,00 0,00 -15,95
38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 2947,75 -80,38 -0,91 -3,22 -4,19 0,00 0,00 -18,55
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.12 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2950,87 -80,39 0,40 -2,51 -2,03 0,00 0,00 -4,53
56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2937,49 -80,35 0,33 -4,06 -8,46 2,29 0,00 -10,26
39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 2947,77 -80,38 -0,53 -0,33 -6,16 0,00 0,00 8,73
196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 2971,60 -80,45 1,88 - -9,64 0,00 0,00 -44,95
197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 2959,80 -80,42 1,87 - -9,41 0,00 0,00 -42,65
198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 2946,26 -80,38 1,86 - -9,26 0,00 0,00 -55,40
199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 2940,06 -80,36 1,85 - -9,43 0,00 0,00 -44,18
200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 2933,64 -80,34 1,85 - - 0,00 0,00 -54,29
201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 2926,27 -80,32 1,84 - -9,57 0,00 0,00 -41,82
190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 2922,37 -80,31 1,84 -4,64 - 0,00 0,00 -33,93
192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 2930,43 -80,33 1,85 - -9,44 0,00 0,00 -56,63
193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 2935,79 -80,35 1,85 -7,31 - 0,00 0,00 -37,87
194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 2940,91 -80,36 1,86 -4,59 - 0,00 0,00 -44,47
195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 2955,11 -80,40 1,87 -4,49 - 0,00 0,00 -31,27
202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 2916,68 -80,29 1,84 - -9,50 0,00 0,00 -41,08
191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 2943,70 -80,37 1,79 -4,99 - 0,00 0,00 -25,27
59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 2882,14 -80,19 0,93 0,00 -7,84 0,00 0,00 -10,10
60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 2873,24 -80,16 0,92 0,00 -7,83 0,00 0,00 -10,06
61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 2864,27 -80,13 0,92 0,00 -7,82 0,00 0,00 -10,03
65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 2803,86 -79,95 0,27 -3,75 -7,61 0,00 0,00 -21,71
66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 2804,60 -79,95 1,50 - -6,56 0,00 0,00 -34,23
63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 2798,93 -79,93 0,23 0,00 -7,82 0,00 0,00 -21,33
64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 2799,08 -79,93 0,77 0,00 -7,77 0,00 0,00 -30,15
68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 2795,90 -79,92 0,08 0,00 -7,85 0,00 0,00 -18,20
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.13 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 2799,99 -79,94 0,09 -4,30 -7,25 0,00 0,00 -25,15
67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2804,21 -79,95 -4,49 -7,97 -6,61 0,00 0,00 -25,01
69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2795,28 -79,92 -4,49 0,00 -6,59 0,00 0,00 -16,99
162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 2835,62 -80,05 1,93 -0,42 - 0,00 0,00 -2,75
163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 2832,65 -80,04 1,93 -0,46 - 0,00 0,00 -2,77
164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 2829,66 -80,03 1,93 -0,50 - 0,00 0,00 -2,80
74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 2888,95 -80,21 1,31 0,00 - 0,00 0,00 12,15
75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 2908,43 -80,27 1,33 0,00 - 0,00 0,00 9,21
165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 2809,46 -79,96 0,06 - -3,86 0,00 0,00 -17,01
167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 2803,77 -79,95 0,01 -5,89 -4,78 0,00 0,00 -11,46
170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 2802,54 -79,94 0,11 0,00 -5,92 0,00 0,00 -6,99
171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 2801,02 -79,94 0,93 0,00 -6,64 0,00 0,00 -11,79
168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 2796,67 -79,92 -0,33 0,00 -5,94 0,00 0,00 -9,13
173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 2810,28 -79,97 -0,20 -3,12 -2,20 0,00 0,00 4,52
166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 2803,05 -79,94 -0,50 -3,92 -5,43 0,00 0,00 -11,13
169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2796,50 -79,92 -4,48 0,00 -6,60 0,00 0,00 -8,99
172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2804,55 -79,95 -4,48 0,00 -6,61 0,00 0,00 -9,03
90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2859,79 -80,12 1,86 0,00 - 0,00 0,00 -20,80
77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2863,09 -80,13 1,79 0,00 - 0,00 0,00 -17,04
91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2860,72 -80,12 1,86 0,00 - 0,00 0,00 -20,80
79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2864,04 -80,13 1,80 0,00 - 0,00 0,00 -17,04
92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2861,66 -80,12 1,86 0,00 - 0,00 0,00 -20,81
80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2865,01 -80,13 1,80 0,00 - 0,00 0,00 -17,04
93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2862,82 -80,13 1,87 0,00 - 0,00 0,00 -20,81
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.14 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2866,08 -80,14 1,81 0,00 - 0,00 0,00 -17,04
94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2863,76 -80,13 1,87 0,00 - 0,00 0,00 -20,81
82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2867,02 -80,14 1,81 0,00 - 0,00 0,00 -17,05
95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2864,69 -80,13 1,88 0,00 - 0,00 0,00 -20,81
83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2868,00 -80,14 1,81 0,00 - 0,00 0,00 -17,05
96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2865,84 -80,14 1,88 0,00 - 0,00 0,00 -20,82
84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2869,12 -80,15 1,82 0,00 - 0,00 0,00 -17,05
97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2866,78 -80,14 1,89 0,00 - 0,00 0,00 -20,82
85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2870,07 -80,15 1,82 0,00 - 0,00 0,00 -17,05
98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2867,72 -80,14 1,89 0,00 - 0,00 0,00 -20,82
86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2871,04 -80,15 1,83 0,00 - 0,00 0,00 -17,06
99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2868,87 -80,15 1,89 0,00 - 0,00 0,00 -20,82
87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2872,16 -80,16 1,83 0,00 - 0,00 0,00 -17,06
100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2869,81 -80,15 1,90 0,00 - 0,00 0,00 -20,83
88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2873,11 -80,16 1,84 0,00 - 0,00 0,00 -17,06
101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2870,75 -80,15 1,90 0,00 - 0,00 0,00 -20,83
89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2874,08 -80,16 1,84 0,00 - 0,00 0,00 -17,06
160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 2884,92 -80,19 1,31 0,00 - 0,00 0,00 12,96
71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 2866,65 -80,14 0,63 0,00 -8,65 0,00 0,00 0,84
73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 2866,65 -80,14 0,63 0,00 -8,65 0,00 0,00 4,84
78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2872,05 -80,16 1,96 0,00 - 0,00 0,00 -21,50
131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2872,99 -80,16 1,96 0,00 - 0,00 0,00 -21,50
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2873,93 -80,16 1,97 0,00 - 0,00 0,00 -21,50
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2875,08 -80,17 1,97 0,00 - 0,00 0,00 -21,51
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.15 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2876,02 -80,17 1,98 0,00 - 0,00 0,00 -21,51
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2876,96 -80,17 1,98 0,00 - 0,00 0,00 -21,51
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2878,11 -80,17 1,98 0,00 - 0,00 0,00 -21,52
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2879,05 -80,18 1,99 0,00 - 0,00 0,00 -21,52
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2879,98 -80,18 1,99 0,00 - 0,00 0,00 -21,52
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2881,14 -80,18 1,99 0,00 - 0,00 0,00 -21,53
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2882,08 -80,19 2,00 0,00 - 0,00 0,00 -21,53
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2883,02 -80,19 2,00 0,00 - 0,00 0,00 -21,53
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2884,16 -80,19 2,00 0,00 - 0,00 0,00 -21,54
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2885,10 -80,20 2,01 0,00 - 0,00 0,00 -21,54
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2886,04 -80,20 2,01 0,00 - 0,00 0,00 -21,54
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2887,20 -80,20 2,02 0,00 - 0,00 0,00 -21,54
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2888,14 -80,20 2,02 0,00 - 0,00 0,00 -21,55
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2889,07 -80,21 2,02 0,00 - 0,00 0,00 -21,55
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2890,22 -80,21 2,03 0,00 - 0,00 0,00 -21,55
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2891,16 -80,21 2,03 0,00 - 0,00 0,00 -21,56
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2892,10 -80,22 2,03 0,00 - 0,00 0,00 -21,56
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2893,26 -80,22 2,04 0,00 - 0,00 0,00 -21,56
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2894,20 -80,22 2,04 0,00 - 0,00 0,00 -21,57
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2895,13 -80,23 2,04 0,00 - 0,00 0,00 -21,57
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2896,29 -80,23 2,04 0,00 - 0,00 0,00 -21,58
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2897,23 -80,23 2,05 0,00 - 0,00 0,00 -21,58
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2898,17 -80,23 2,05 0,00 - 0,00 0,00 -21,58
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2899,32 -80,24 2,05 0,00 - 0,00 0,00 -21,59
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.16 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2900,26 -80,24 2,06 0,00 - 0,00 0,00 -21,59
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2901,20 -80,24 2,06 0,00 - 0,00 0,00 -21,59
70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2887,93 -80,20 0,74 0,00 -8,70 0,00 0,00 4,84
76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2874,74 -80,16 1,94 0,00 - 0,00 0,00 -18,38
102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2875,68 -80,17 1,95 0,00 - 0,00 0,00 -18,39
103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2876,62 -80,17 1,95 0,00 - 0,00 0,00 -18,39
104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2877,77 -80,17 1,95 0,00 - 0,00 0,00 -18,39
105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2878,71 -80,18 1,96 0,00 - 0,00 0,00 -18,39
106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2879,66 -80,18 1,96 0,00 - 0,00 0,00 -18,40
107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2880,79 -80,18 1,97 0,00 - 0,00 0,00 -18,40
108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2881,73 -80,19 1,97 0,00 - 0,00 0,00 -18,40
109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2882,68 -80,19 1,97 0,00 - 0,00 0,00 -18,40
110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2883,82 -80,19 1,98 0,00 - 0,00 0,00 -18,41
111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2884,76 -80,19 1,98 0,00 - 0,00 0,00 -18,41
112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2885,70 -80,20 1,98 0,00 - 0,00 0,00 -18,41
113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2886,85 -80,20 1,99 0,00 - 0,00 0,00 -18,42
114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2887,79 -80,20 1,99 0,00 - 0,00 0,00 -18,42
115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2888,73 -80,21 1,99 0,00 - 0,00 0,00 -18,42
116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2889,88 -80,21 2,00 0,00 - 0,00 0,00 -18,43
117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2890,82 -80,21 2,00 0,00 - 0,00 0,00 -18,43
118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2891,77 -80,22 2,00 0,00 - 0,00 0,00 -18,43
119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2892,91 -80,22 2,01 0,00 - 0,00 0,00 -18,44
120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2893,84 -80,22 2,01 0,00 - 0,00 0,00 -18,44
121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2894,79 -80,22 2,01 0,00 - 0,00 0,00 -18,44
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.17 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2895,92 -80,23 2,02 0,00 - 0,00 0,00 -18,44
123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2896,86 -80,23 2,02 0,00 - 0,00 0,00 -18,45
124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2897,80 -80,23 2,02 0,00 - 0,00 0,00 -18,45
125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2898,95 -80,24 2,03 0,00 - 0,00 0,00 -18,45
126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2899,89 -80,24 2,03 0,00 - 0,00 0,00 -18,46
127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2900,83 -80,24 2,04 0,00 - 0,00 0,00 -18,46
128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2901,97 -80,25 2,04 0,00 - 0,00 0,00 -18,46
129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2902,91 -80,25 2,04 0,00 - 0,00 0,00 -18,47
130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2903,85 -80,25 2,04 0,00 - 0,00 0,00 -18,47
72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2887,92 -80,20 0,74 0,00 -8,70 0,00 0,00 4,84
161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 2863,62 -80,13 1,29 0,00 - 0,00 0,00 8,47
28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 2869,99 -80,15 -4,50 0,00 - 0,00 0,00 -6,34
23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 2857,08 -80,11 1,37 -4,35 -3,48 0,00 0,00 3,65
24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 2860,96 -80,12 2,92 -3,34 -2,46 3,41 0,00 7,64
1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 2858,99 -80,12 0,98 -2,64 -5,30 1,54 0,00 6,46
25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 2864,39 -80,13 1,28 0,00 - 0,07 0,00 4,33
26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 2878,73 -80,18 1,30 0,00 - 0,20 0,00 5,83
58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 2943,98 -80,37 -4,51 0,00 - 0,00 0,00 -6,88
31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 2930,95 -80,33 1,48 -4,38 -3,57 0,00 0,00 3,42
53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 2934,83 -80,34 2,96 -7,20 -0,92 2,23 0,00 3,95
30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 2932,87 -80,34 1,13 -6,24 -4,60 2,45 0,00 4,40
54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 2938,36 -80,35 1,35 0,00 - 0,00 0,00 3,91
55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 2952,70 -80,40 1,36 0,00 - 0,07 0,00 5,36
186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2868,07 -80,14 -4,49 -0,25 -6,76 0,00 0,00 -18,64
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.18 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2870,03 -80,15 -4,49 -0,25 -6,77 0,00 0,00 -18,64
188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2871,99 -80,16 -4,49 -0,24 -6,77 0,00 0,00 -18,65
176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 2866,48 -80,14 -4,44 -0,33 -6,76 0,00 0,00 -20,66
210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 2865,33 -80,14 -0,03 -2,72 -5,91 1,89 0,00 0,09
209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 2865,57 -80,14 -0,03 -2,20 -6,03 1,75 0,00 0,36
189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 2907,31 -80,26 -4,49 -0,21 -6,86 0,00 0,00 -13,81
182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 2872,70 -80,16 -4,48 - -6,78 0,00 0,00 -26,34
177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 2908,08 -80,26 -4,45 -0,31 -6,86 0,00 0,00 -10,87
179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 2909,28 -80,27 -4,45 -0,30 -6,86 0,00 0,00 -10,87
178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 2908,68 -80,27 -4,45 -0,30 -6,86 0,00 0,00 -10,87
174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 2910,58 -80,27 1,64 - -9,93 0,00 0,00 -43,99
180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 2889,56 -80,21 1,61 - -9,88 0,00 0,00 -35,74
181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2887,40 -80,20 2,20 - - 0,00 0,00 -42,68
184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 2886,29 -80,20 1,55 -4,67 - 0,00 0,00 -28,68
185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2888,64 -80,21 2,21 -4,75 - 0,00 0,00 -35,32
183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 2865,51 -80,14 1,46 -4,23 - 0,00 0,00 -33,24
175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 2887,98 -80,20 1,05 -4,65 - 0,00 0,00 -30,32
207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2818,27 -79,99 -0,50 0,00 -6,56 1,87 0,00 1,82
208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2821,39 -80,00 -0,46 0,00 -6,56 1,87 0,00 1,85
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.19 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 3 Peplos Ld = 25,7 dB(A) Ln = 25,7 dB(A)
203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 1818,07 -76,18 0,41 -8,05 -3,41 0,00 0,00 -0,24
204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 1816,75 -76,18 0,37 -8,77 -3,29 0,00 0,00 -0,88
205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 1810,36 -76,15 0,29 -2,92 -4,63 2,35 0,00 5,95
206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 1813,42 -76,16 0,30 -2,92 -4,64 2,35 0,00 5,92
10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1733,37 -75,77 1,05 -4,24 -3,70 0,00 0,00 3,34
11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1738,23 -75,79 1,06 -4,23 -3,70 0,00 0,00 3,33
12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1736,38 -75,78 1,05 -4,24 -3,70 0,00 0,00 3,33
13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 1741,65 -75,81 1,06 -4,24 -3,70 0,00 0,00 3,31
5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 1748,24 -75,84 0,52 - -0,58 0,00 0,00 -10,85
4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1746,66 -75,84 2,12 - -0,72 0,00 0,00 -20,58
3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 1749,53 -75,85 1,82 - -4,13 0,00 0,00 -27,05
6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 1748,23 -75,84 3,94 - -0,27 0,00 0,00 -7,48
22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1725,61 -75,73 2,10 -4,38 -2,78 0,00 0,00 -8,72
21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1727,53 -75,74 1,85 -4,65 -6,84 0,00 0,00 -14,37
7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1750,30 -75,85 1,88 - -4,32 0,00 0,00 -31,06
18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1740,72 -75,81 2,11 -4,36 -2,77 0,00 0,00 -8,77
19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 1728,56 -75,75 2,10 -4,36 -2,77 0,00 0,00 -8,71
15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1743,64 -75,82 1,88 -4,65 -6,88 0,00 0,00 -14,45
16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 1725,16 -75,73 1,85 -4,65 -6,82 0,00 0,00 -14,33
17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 1733,44 -75,77 3,88 -4,61 -0,87 0,00 0,00 3,62
2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 1748,23 -75,84 0,27 - -1,08 0,00 0,00 -23,55
20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 1725,45 -75,73 0,22 -2,72 -3,60 0,00 0,00 -11,99
14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 1734,84 -75,78 0,32 -2,95 -3,59 0,00 0,00 -11,44
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.20 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 1737,04 -75,79 -0,87 -3,26 -2,88 0,00 0,00 -12,65
29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 1753,45 -75,87 0,41 - -0,51 0,00 0,00 -10,64
27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 1735,69 -75,78 0,51 -0,30 -7,66 2,48 0,00 -0,75
9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 1737,27 -75,79 -0,43 -3,74 -4,15 0,00 0,00 12,02
40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1752,85 -75,87 1,06 -4,24 -3,71 0,00 0,00 3,23
41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1757,66 -75,89 1,07 -4,24 -3,72 0,00 0,00 3,22
42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1756,36 -75,88 1,06 -4,24 -3,72 0,00 0,00 3,21
43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 1761,56 -75,91 1,07 -4,25 -3,72 0,00 0,00 3,20
35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 1767,80 -75,94 0,53 - -0,59 0,00 0,00 -11,01
34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1765,94 -75,93 2,12 - -0,72 0,00 0,00 -20,54
33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 1769,31 -75,95 1,82 - -4,17 0,00 0,00 -27,22
36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 1767,79 -75,94 3,94 - -0,27 0,00 0,00 -7,65
52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1745,43 -75,83 2,10 -4,39 -2,79 0,00 0,00 -8,84
51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1747,67 -75,84 1,85 -4,65 -6,89 0,00 0,00 -14,52
37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1770,21 -75,95 1,88 - -4,35 0,00 0,00 -31,19
48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1759,97 -75,90 2,11 -4,39 -2,80 0,00 0,00 -8,91
49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 1747,94 -75,84 2,10 -4,39 -2,79 0,00 0,00 -8,85
45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1762,86 -75,92 1,88 -4,65 -6,94 0,00 0,00 -14,62
46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 1744,57 -75,83 1,85 -4,65 -6,89 0,00 0,00 -14,50
47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 1752,76 -75,87 3,88 -4,59 -0,87 0,00 0,00 3,55
32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 1767,78 -75,94 0,27 - -1,09 0,00 0,00 -23,70
50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 1745,24 -75,83 0,22 -3,68 -3,21 0,00 0,00 -12,67
44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 1754,16 -75,87 0,32 -3,85 -3,18 0,00 0,00 -12,01
38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 1756,75 -75,89 -0,86 -3,27 -2,90 0,00 0,00 -12,78
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.21 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 1772,53 -75,96 0,42 - -0,51 0,00 0,00 -10,97
56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 1754,98 -75,88 0,52 -1,03 -8,64 2,52 0,00 -2,50
39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 1756,96 -75,89 -0,42 -3,75 -4,19 0,00 0,00 11,89
196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 1845,03 -76,31 2,16 - -6,80 0,00 0,00 -38,20
197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 1851,32 -76,34 2,17 - -6,76 0,00 0,00 -37,42
198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 1848,62 -76,33 2,18 - -6,85 0,00 0,00 -52,91
199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 1847,88 -76,33 2,18 - -6,91 0,00 0,00 -44,62
200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 1845,97 -76,32 2,18 - -6,79 0,00 0,00 -57,57
201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 1843,89 -76,31 2,18 - -6,89 0,00 0,00 -43,93
190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 1822,93 -76,21 2,15 -8,13 -7,23 0,00 0,00 -28,54
192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 1825,51 -76,22 2,15 - -6,91 0,00 0,00 -54,96
193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 1827,46 -76,23 2,15 -7,91 -7,28 0,00 0,00 -30,16
194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 1828,19 -76,23 2,15 -5,89 -7,66 0,00 0,00 -37,28
195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 1831,27 -76,25 2,15 -4,76 -8,13 0,00 0,00 -23,51
202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 1831,48 -76,25 2,16 -6,79 -7,52 0,00 0,00 -26,23
191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 1838,30 -76,28 2,05 -5,11 -8,02 0,00 0,00 -17,35
59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 1596,80 -75,06 0,96 -4,28 -5,12 0,00 0,00 -6,49
60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 1594,36 -75,04 0,96 -4,28 -5,11 0,00 0,00 -6,47
61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 1591,97 -75,03 0,96 -4,28 -5,11 0,00 0,00 -6,46
65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 1610,54 -75,13 0,63 -5,39 -4,94 0,00 0,00 -15,51
66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 1616,28 -75,16 1,65 - -4,36 0,00 0,00 -33,03
63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 1602,59 -75,09 0,65 -3,67 -4,84 0,00 0,00 -16,75
64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 1602,59 -75,09 0,90 -4,58 -4,57 0,00 0,00 -26,55
68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 1609,09 -75,12 0,73 -3,59 -4,87 0,00 0,00 -13,36
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.22 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 1611,12 -75,13 0,72 -4,57 -4,58 0,00 0,00 -17,31
67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 1613,28 -75,15 -4,72 - -3,80 0,00 0,00 -22,66
69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 1604,12 -75,10 -4,72 0,00 -3,78 0,00 0,00 -9,59
162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 1603,42 -75,09 1,98 -4,76 -8,18 0,00 0,00 2,60
163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 1602,70 -75,09 1,98 -4,76 -8,18 0,00 0,00 2,61
164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 1601,95 -75,09 1,98 -4,76 -8,18 0,00 0,00 2,62
74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 1704,16 -75,62 1,47 -4,56 -6,57 1,03 0,00 17,12
75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 1705,33 -75,63 1,47 -4,56 -6,58 1,13 0,00 14,36
165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 1719,50 -75,70 0,58 - -2,56 0,00 0,00 -13,75
167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 1722,16 -75,71 0,59 - -2,28 0,00 0,00 -12,79
170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 1714,28 -75,67 0,58 -4,34 -3,76 0,00 0,00 -4,42
171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 1713,96 -75,67 1,21 -4,53 -4,69 0,00 0,00 -9,83
168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 1716,89 -75,69 0,57 -4,38 -3,75 0,00 0,00 -6,17
173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 1719,67 -75,70 0,73 -3,49 -2,57 0,00 0,00 8,97
166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 1718,22 -75,69 0,47 -4,47 -3,71 0,00 0,00 -4,74
169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 1715,92 -75,68 -4,72 0,00 -4,05 0,00 0,00 -2,44
172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 1714,69 -75,68 -4,72 0,00 -4,04 0,00 0,00 -2,43
90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1652,27 -75,35 2,05 -2,00 - 0,00 0,00 -14,68
77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1673,65 -75,47 2,07 -1,51 - 0,00 0,00 -11,25
91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1652,51 -75,35 2,05 -2,03 - 0,00 0,00 -14,70
79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1673,88 -75,47 2,07 -1,53 - 0,00 0,00 -11,28
92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1652,74 -75,36 2,05 -2,06 - 0,00 0,00 -14,73
80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,15 -75,47 2,07 -1,55 - 0,00 0,00 -11,30
93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,05 -75,36 2,05 -2,09 - 0,00 0,00 -14,76
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.23 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,36 -75,47 2,07 -1,57 - 0,00 0,00 -11,33
94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,29 -75,36 2,05 -2,11 - 0,00 0,00 -14,78
82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,58 -75,47 2,07 -1,59 - 0,00 0,00 -11,35
95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,53 -75,36 2,05 -2,13 - 0,00 0,00 -14,80
83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1674,86 -75,47 2,08 -1,61 - 0,00 0,00 -11,38
96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1653,80 -75,36 2,05 -2,16 - 0,00 0,00 -14,83
84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,16 -75,47 2,08 -1,63 - 0,00 0,00 -11,40
97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,04 -75,36 2,05 -2,17 - 0,00 0,00 -14,85
85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,38 -75,47 2,08 -1,65 - 0,00 0,00 -11,42
98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,28 -75,36 2,05 -2,19 - 0,00 0,00 -14,87
86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,66 -75,48 2,08 -1,66 - 0,00 0,00 -11,45
99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,58 -75,37 2,05 -2,21 - 0,00 0,00 -14,89
87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1675,93 -75,48 2,08 -1,68 - 0,00 0,00 -11,47
100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1654,83 -75,37 2,05 -2,23 - 0,00 0,00 -14,91
88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1676,16 -75,48 2,08 -1,69 - 0,00 0,00 -11,49
101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 1655,06 -75,37 2,05 -2,26 - 0,00 0,00 -14,93
89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 1676,44 -75,48 2,08 -1,70 - 0,00 0,00 -11,51
160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 1695,54 -75,58 1,46 -4,56 -6,55 0,79 0,00 17,73
71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 1663,46 -75,41 0,88 -1,24 -8,92 0,00 0,00 4,32
73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 1663,45 -75,41 0,88 -1,24 -8,92 0,00 0,00 8,32
78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1656,63 -75,38 2,11 -2,81 - 0,00 0,00 -15,76
131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1656,87 -75,38 2,11 -2,84 - 0,00 0,00 -15,77
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,12 -75,38 2,11 -2,88 - 0,00 0,00 -15,79
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,40 -75,38 2,11 -2,92 - 0,00 0,00 -15,80
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.24 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,64 -75,38 2,11 -2,95 - 0,00 0,00 -15,82
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1657,89 -75,38 2,11 -2,98 - 0,00 0,00 -15,83
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,21 -75,38 2,11 -3,09 - 0,00 0,00 -15,85
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,46 -75,39 2,11 -3,17 - 0,00 0,00 -15,86
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,70 -75,39 2,11 -3,25 - 0,00 0,00 -15,87
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1658,99 -75,39 2,11 -3,34 - 0,00 0,00 -15,89
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1659,24 -75,39 2,11 -3,40 - 0,00 0,00 -15,90
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1659,49 -75,39 2,11 -3,46 - 0,00 0,00 -15,91
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1659,77 -75,39 2,11 -3,53 - 0,00 0,00 -15,93
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,02 -75,39 2,11 -3,59 - 0,00 0,00 -15,94
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,27 -75,40 2,11 -3,64 - 0,00 0,00 -15,95
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,56 -75,40 2,11 -3,70 - 0,00 0,00 -15,96
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1660,81 -75,40 2,11 -3,75 - 0,00 0,00 -15,97
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,07 -75,40 2,11 -3,80 - 0,00 0,00 -15,98
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,39 -75,40 2,11 -3,85 - 0,00 0,00 -15,99
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,64 -75,40 2,11 -3,89 - 0,00 0,00 -16,00
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1661,90 -75,40 2,11 -3,92 - 0,00 0,00 -16,01
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1662,20 -75,41 2,11 -3,97 - 0,00 0,00 -16,03
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1662,45 -75,41 2,11 -4,00 - 0,00 0,00 -16,03
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1662,70 -75,41 2,11 -4,04 - 0,00 0,00 -16,04
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,05 -75,41 2,11 -4,08 - 0,00 0,00 -16,05
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,30 -75,41 2,11 -4,11 - 0,00 0,00 -16,06
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,56 -75,41 2,11 -4,14 - 0,00 0,00 -16,07
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1663,86 -75,41 2,11 -4,17 - 0,00 0,00 -16,08
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.25 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1664,12 -75,42 2,11 -4,20 - 0,00 0,00 -16,09
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1664,37 -75,42 2,11 -4,24 - 0,00 0,00 -16,10
70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 1668,98 -75,44 0,88 -2,09 -8,25 0,00 0,00 8,10
76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,10 -75,47 2,14 -2,54 - 0,00 0,00 -13,06
102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,35 -75,47 2,14 -2,57 - 0,00 0,00 -13,07
103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,59 -75,47 2,14 -2,61 - 0,00 0,00 -13,08
104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1674,89 -75,47 2,14 -2,64 - 0,00 0,00 -13,10
105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,13 -75,47 2,14 -2,66 - 0,00 0,00 -13,11
106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,37 -75,47 2,14 -2,69 - 0,00 0,00 -13,13
107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,67 -75,48 2,14 -2,72 - 0,00 0,00 -13,14
108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1675,92 -75,48 2,14 -2,77 - 0,00 0,00 -13,15
109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,17 -75,48 2,14 -2,87 - 0,00 0,00 -13,17
110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,44 -75,48 2,14 -2,98 - 0,00 0,00 -13,18
111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,69 -75,48 2,14 -3,06 - 0,00 0,00 -13,19
112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1676,94 -75,48 2,14 -3,14 - 0,00 0,00 -13,21
113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1677,26 -75,48 2,15 -3,23 - 0,00 0,00 -13,22
114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1677,51 -75,49 2,15 -3,30 - 0,00 0,00 -13,23
115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1677,76 -75,49 2,15 -3,37 - 0,00 0,00 -13,24
116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,06 -75,49 2,15 -3,44 - 0,00 0,00 -13,25
117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,31 -75,49 2,15 -3,50 - 0,00 0,00 -13,26
118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,56 -75,49 2,15 -3,55 - 0,00 0,00 -13,27
119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1678,82 -75,49 2,15 -3,62 - 0,00 0,00 -13,29
120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,07 -75,49 2,15 -3,66 - 0,00 0,00 -13,30
121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,33 -75,49 2,15 -3,71 - 0,00 0,00 -13,31
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.26 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,64 -75,50 2,15 -3,76 - 0,00 0,00 -13,32
123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1679,89 -75,50 2,15 -3,81 - 0,00 0,00 -13,33
124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,14 -75,50 2,15 -3,85 - 0,00 0,00 -13,33
125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,45 -75,50 2,15 -3,89 - 0,00 0,00 -13,34
126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,70 -75,50 2,15 -3,93 - 0,00 0,00 -13,35
127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1680,96 -75,50 2,15 -3,97 - 0,00 0,00 -13,36
128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1681,27 -75,50 2,15 -4,00 - 0,00 0,00 -13,37
129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1681,53 -75,51 2,15 -4,04 - 0,00 0,00 -13,38
130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1681,79 -75,51 2,15 -4,07 - 0,00 0,00 -13,39
72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 1668,98 -75,44 0,88 -2,09 -8,25 0,00 0,00 8,10
161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 1675,78 -75,48 1,44 -4,55 -6,49 0,00 0,00 12,49
28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 1719,83 -75,70 -4,76 -0,01 -7,02 2,49 0,00 5,02
23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 1730,97 -75,76 1,37 -4,22 -2,99 0,00 0,00 8,62
24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 1731,70 -75,76 3,04 -4,64 -3,75 0,18 0,00 6,29
1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 1739,06 -75,80 1,26 -4,37 -4,77 0,00 0,00 8,32
25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 1708,57 -75,64 1,49 -4,56 -6,59 2,46 0,00 10,52
26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 1715,70 -75,68 1,49 -4,56 -6,61 2,47 0,00 11,92
58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 1739,23 -75,80 -4,79 0,00 -7,10 2,49 0,00 4,82
31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 1749,54 -75,85 1,38 -4,30 -3,07 0,00 0,00 8,38
53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 1750,43 -75,86 3,04 -4,67 -3,80 0,20 0,00 6,14
30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 1757,56 -75,89 1,26 -4,45 -4,75 0,11 0,00 8,28
54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 1728,00 -75,74 1,49 -4,56 -6,64 2,44 0,00 10,35
55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 1735,54 -75,78 1,50 -4,56 -6,66 2,46 0,00 11,76
186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 1810,13 -76,15 -4,75 -0,02 -4,27 0,00 0,00 -12,17
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.27 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 1810,56 -76,15 -4,75 -0,02 -4,27 0,00 0,00 -12,18
188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 1811,00 -76,15 -4,75 -0,02 -4,27 0,00 0,00 -12,18
176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 1815,97 -76,17 -4,68 -0,09 -4,28 0,00 0,00 -14,22
210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 1817,26 -76,18 0,51 -4,28 -4,22 1,80 0,00 4,62
209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 1818,38 -76,19 0,51 -4,28 -4,22 1,80 0,00 4,62
189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 1819,26 -76,19 -4,76 -1,92 -4,29 0,00 0,00 -9,15
182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 1823,19 -76,21 -4,73 - -4,30 0,00 0,00 -25,98
177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 1823,21 -76,21 -4,70 -0,08 -4,30 0,00 0,00 -4,28
179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 1829,03 -76,24 -4,70 -0,08 -4,31 0,00 0,00 -4,32
178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 1826,12 -76,22 -4,70 -0,08 -4,31 0,00 0,00 -4,30
174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 1826,09 -76,22 2,05 - -7,01 0,00 0,00 -43,61
180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 1827,33 -76,23 2,05 - -6,68 0,00 0,00 -36,02
181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 1826,56 -76,22 2,58 - - 0,00 0,00 -45,81
184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 1814,58 -76,17 2,03 -5,51 -7,87 0,00 0,00 -21,30
185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 1814,81 -76,17 2,56 -4,77 - 0,00 0,00 -26,37
183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 1815,56 -76,17 2,04 -4,10 -8,44 0,00 0,00 -25,75
175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 1820,86 -76,20 1,82 -4,91 -8,00 0,00 0,00 -22,26
207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 1762,47 -75,91 0,44 -4,38 -4,05 2,53 0,00 5,62
208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 1763,11 -75,92 0,44 -4,39 -4,05 2,53 0,00 5,61
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.28 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 4 Kipoi Ld = 18,7 dB(A) Ln = 18,7 dB(A)
203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 2838,99 -80,06 0,56 - -4,27 0,00 0,00 -19,38
204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 2843,84 -80,07 0,56 - -4,32 0,00 0,00 -19,72
205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 2848,92 -80,09 0,57 - -4,36 0,00 0,00 -19,97
206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 2850,88 -80,09 0,57 - -4,36 0,00 0,00 -19,99
10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2722,48 -79,69 1,46 -4,74 -3,85 0,00 0,00 -0,83
11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2725,64 -79,70 1,47 -4,74 -3,87 0,00 0,00 -0,84
12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2712,83 -79,66 1,45 -4,76 -3,83 0,00 0,00 -0,80
13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 2716,36 -79,67 1,47 -4,76 -3,85 0,00 0,00 -0,81
5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 2726,93 -79,71 0,60 - -1,40 0,00 0,00 -19,27
4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2732,16 -79,72 2,15 - -1,82 0,00 0,00 -29,89
3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 2722,69 -79,69 1,86 - -7,41 0,00 0,00 -35,12
6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 2726,94 -79,71 4,01 - -0,57 0,00 0,00 -16,22
22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2711,89 -79,66 2,13 -5,03 -2,50 0,00 0,00 -12,99
21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2705,68 -79,64 1,87 -5,37 -8,60 0,00 0,00 -20,72
7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2720,19 -79,68 1,89 - -7,51 0,00 0,00 -38,86
18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2730,54 -79,72 2,14 - -1,82 0,00 0,00 -29,89
19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 2722,65 -79,69 2,13 - -1,81 0,00 0,00 -29,88
15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2732,44 -79,72 1,89 - -7,53 0,00 0,00 -38,90
16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 2720,44 -79,68 1,87 - -7,51 0,00 0,00 -38,87
17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 2725,79 -79,70 3,97 - -0,55 0,00 0,00 -16,01
2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 2727,03 -79,71 0,47 - -2,21 0,00 0,00 -33,81
20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 2712,49 -79,66 0,45 -4,29 -4,08 0,00 0,00 -17,74
14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 2726,71 -79,70 0,47 - -2,25 0,00 0,00 -32,92
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.29 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 2719,04 -79,68 -0,45 -3,64 -4,02 0,00 0,00 -17,65
29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2729,73 -79,71 0,53 - -1,01 0,00 0,00 -19,10
27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 2728,10 -79,71 1,00 - -6,38 0,00 0,00 -28,76
9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 2719,27 -79,68 0,00 -4,12 -5,81 0,00 0,00 6,53
40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2665,10 -79,51 1,33 -4,83 -3,63 0,00 0,00 -0,64
41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2668,33 -79,52 1,33 -4,82 -3,64 0,00 0,00 -0,65
42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2655,60 -79,48 1,30 -4,85 -3,58 0,00 0,00 -0,61
43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 2659,21 -79,49 1,30 -4,83 -3,60 0,00 0,00 -0,62
35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 2669,81 -79,52 0,55 - -1,38 0,00 0,00 -19,13
34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2674,96 -79,54 2,10 - -1,80 0,00 0,00 -29,76
33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 2665,64 -79,51 1,78 - -7,32 0,00 0,00 -34,93
36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 2669,82 -79,52 3,99 - -0,56 0,00 0,00 -16,10
52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2654,45 -79,47 2,10 -5,21 -2,30 0,00 0,00 -12,81
51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2648,34 -79,45 1,81 -5,65 -8,30 0,00 0,00 -20,56
37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2663,18 -79,50 1,81 - -7,42 0,00 0,00 -38,66
48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2673,24 -79,53 2,11 - -1,81 0,00 0,00 -29,76
49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 2665,17 -79,51 2,11 - -1,81 0,00 0,00 -29,75
45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2675,18 -79,54 1,83 - -7,45 0,00 0,00 -38,71
46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 2662,92 -79,50 1,83 - -7,43 0,00 0,00 -38,65
47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 2668,39 -79,52 3,96 - -0,54 0,00 0,00 -15,89
32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 2669,93 -79,52 0,37 - -2,17 0,00 0,00 -33,65
50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 2655,05 -79,47 0,38 -4,34 -3,96 0,00 0,00 -17,56
44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 2669,01 -79,52 0,39 - -2,20 0,00 0,00 -32,70
38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 2661,96 -79,50 -0,62 -3,55 -3,91 0,00 0,00 -17,43
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.30 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2672,34 -79,53 0,47 - -1,01 0,00 0,00 -19,22
56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 2670,71 -79,52 0,81 - -6,26 0,00 0,00 -28,62
39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 2663,08 -79,50 -0,19 -4,06 -5,63 0,00 0,00 6,76
196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 2715,44 -79,67 2,01 -5,32 - 0,00 0,00 -31,93
197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 2732,88 -79,72 2,03 - - 0,00 0,00 -49,99
198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 2744,01 -79,76 2,05 - - 0,00 0,00 -61,70
199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 2749,48 -79,78 2,05 - - 0,00 0,00 -53,45
200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 2754,15 -79,79 2,06 - - 0,00 0,00 -66,99
201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 2759,56 -79,81 2,07 - - 0,00 0,00 -52,86
190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 2744,83 -79,76 2,07 -5,23 - 0,00 0,00 -33,08
192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 2739,14 -79,74 2,06 -5,25 - 0,00 0,00 -44,13
193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 2735,53 -79,73 2,05 -5,26 - 0,00 0,00 -34,82
194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 2731,10 -79,72 2,05 - - 0,00 0,00 -62,95
195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 2719,58 -79,68 2,03 -5,31 - 0,00 0,00 -30,39
202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 2758,03 -79,80 2,08 - - 0,00 0,00 -51,26
191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 2737,18 -79,74 1,97 -5,17 - 0,00 0,00 -23,96
59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 2599,67 -79,29 0,97 -5,97 -5,32 0,00 0,00 -12,61
60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 2606,83 -79,31 0,97 -5,92 -5,35 0,00 0,00 -12,62
61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 2614,09 -79,34 0,97 -5,87 -5,39 0,00 0,00 -12,64
65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 2687,98 -79,58 0,83 -5,06 -7,01 0,00 0,00 -21,50
66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 2691,60 -79,59 1,67 -5,86 -9,41 0,00 0,00 -25,78
63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 2686,80 -79,58 0,82 -5,08 -7,00 0,00 0,00 -24,64
64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 2686,74 -79,58 0,92 -5,20 -6,99 0,00 0,00 -34,04
68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 2694,69 -79,60 0,83 -8,01 -7,03 0,00 0,00 -24,32
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.31 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 2691,50 -79,59 0,82 -5,05 -7,02 0,00 0,00 -24,59
67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2689,69 -79,59 -4,80 -0,33 -6,34 0,00 0,00 -17,05
69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 2691,56 -79,59 -4,80 - -6,35 0,00 0,00 -36,91
162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 2651,51 -79,46 2,04 -6,08 - 0,00 0,00 -6,50
163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 2653,92 -79,47 2,04 -6,06 - 0,00 0,00 -6,51
164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 2656,32 -79,48 2,04 -6,05 - 0,00 0,00 -6,52
74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 2673,17 -79,53 1,51 -5,43 -8,56 0,94 0,00 10,28
75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 2669,20 -79,52 1,51 -5,45 -8,54 0,48 0,00 6,99
165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 2767,60 -79,83 0,63 -4,69 -5,52 0,00 0,00 -12,33
167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 2775,18 -79,86 0,63 - -3,73 0,00 0,00 -27,12
170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 2770,01 -79,84 0,62 -4,69 -5,52 0,00 0,00 -10,66
171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 2771,25 -79,85 1,24 -4,93 -6,06 0,00 0,00 -15,74
168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 2777,76 -79,87 0,63 - -3,73 0,00 0,00 -29,22
173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 2766,91 -79,83 0,81 -4,25 -2,75 2,47 0,00 6,45
166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 2772,61 -79,85 0,55 -4,64 -5,53 0,00 0,00 -10,80
169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2777,14 -79,86 -4,80 - -6,55 0,00 0,00 -29,38
172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 2768,42 -79,84 -4,80 -0,14 -6,53 0,00 0,00 -9,30
90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2664,76 -79,51 2,25 -6,88 - 0,00 0,00 -24,08
77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2678,35 -79,55 2,26 -6,61 - 0,00 0,00 -20,22
91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2664,01 -79,50 2,25 -6,89 - 0,00 0,00 -24,08
79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2677,58 -79,55 2,26 -6,61 - 0,00 0,00 -20,22
92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2663,26 -79,50 2,25 -6,90 - 0,00 0,00 -24,08
80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2676,84 -79,54 2,26 -6,62 - 0,00 0,00 -20,22
93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2662,35 -79,50 2,25 -6,91 - 0,00 0,00 -24,08
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.32 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2675,94 -79,54 2,26 -6,63 - 0,00 0,00 -20,21
94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2661,60 -79,49 2,25 -6,91 - 0,00 0,00 -24,07
82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2675,18 -79,54 2,26 -6,64 - 0,00 0,00 -20,21
95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2660,85 -79,49 2,25 -6,92 - 0,00 0,00 -24,07
83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2674,44 -79,54 2,26 -6,65 - 0,00 0,00 -20,21
96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2659,93 -79,49 2,25 -6,93 - 0,00 0,00 -24,07
84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2673,55 -79,53 2,26 -6,65 - 0,00 0,00 -20,20
97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2659,18 -79,49 2,25 -6,94 - 0,00 0,00 -24,06
85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2672,79 -79,53 2,26 -6,66 - 0,00 0,00 -20,20
98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2658,43 -79,48 2,25 -6,95 - 0,00 0,00 -24,06
86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2672,04 -79,53 2,26 -6,67 - 0,00 0,00 -20,20
99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2657,51 -79,48 2,25 -6,96 - 0,00 0,00 -24,06
87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2671,14 -79,53 2,26 -6,68 - 0,00 0,00 -20,19
100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2656,77 -79,48 2,25 -6,96 - 0,00 0,00 -24,05
88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2670,38 -79,52 2,26 -6,69 - 0,00 0,00 -20,19
101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 2656,02 -79,48 2,25 -6,97 - 0,00 0,00 -24,05
89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 2669,63 -79,52 2,26 -6,69 - 0,00 0,00 -20,19
160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 2674,25 -79,54 1,50 -5,44 -8,56 0,34 0,00 10,47
71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 2666,73 -79,51 1,23 -5,47 -6,72 0,00 0,00 -1,48
73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 2666,74 -79,51 1,23 -5,47 -6,72 0,00 0,00 2,52
78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2655,96 -79,48 2,27 -7,02 - 0,00 0,00 -24,77
131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2655,21 -79,47 2,27 -7,03 - 0,00 0,00 -24,77
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2654,46 -79,47 2,27 -7,04 - 0,00 0,00 -24,77
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2653,53 -79,47 2,27 -7,05 - 0,00 0,00 -24,77
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.33 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2652,78 -79,47 2,27 -7,06 - 0,00 0,00 -24,76
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2652,03 -79,46 2,27 -7,07 - 0,00 0,00 -24,76
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2651,14 -79,46 2,27 -7,08 - 0,00 0,00 -24,76
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2650,39 -79,46 2,27 -7,09 - 0,00 0,00 -24,76
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2649,65 -79,46 2,27 -7,10 - 0,00 0,00 -24,75
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2648,72 -79,45 2,27 -7,11 - 0,00 0,00 -24,75
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2647,97 -79,45 2,27 -7,12 - 0,00 0,00 -24,75
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2647,22 -79,45 2,27 -7,13 - 0,00 0,00 -24,75
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2646,30 -79,44 2,27 -7,14 - 0,00 0,00 -24,74
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2645,55 -79,44 2,27 -7,15 - 0,00 0,00 -24,74
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2644,81 -79,44 2,27 -7,16 - 0,00 0,00 -24,74
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2643,88 -79,44 2,27 -7,17 - 0,00 0,00 -24,74
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2643,13 -79,43 2,27 -7,18 - 0,00 0,00 -24,73
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2642,39 -79,43 2,27 -7,19 - 0,00 0,00 -24,73
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2641,49 -79,43 2,27 -7,20 - 0,00 0,00 -24,73
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2640,75 -79,43 2,26 -7,21 - 0,00 0,00 -24,73
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2640,01 -79,42 2,26 -7,22 - 0,00 0,00 -24,72
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2639,08 -79,42 2,26 -7,23 - 0,00 0,00 -24,72
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2638,33 -79,42 2,26 -7,24 - 0,00 0,00 -24,72
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2637,59 -79,42 2,26 -7,25 - 0,00 0,00 -24,72
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2636,70 -79,41 2,26 -7,26 - 0,00 0,00 -24,72
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2635,95 -79,41 2,26 -7,27 - 0,00 0,00 -24,71
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2635,20 -79,41 2,26 -7,28 - 0,00 0,00 -24,71
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2634,28 -79,41 2,26 -7,29 - 0,00 0,00 -24,71
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.34 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2633,53 -79,40 2,26 -7,30 - 0,00 0,00 -24,71
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2632,79 -79,40 2,26 -7,31 - 0,00 0,00 -24,70
70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2649,63 -79,46 1,22 -5,56 -6,62 0,00 0,00 2,58
76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2667,11 -79,51 2,29 -6,83 - 0,00 0,00 -21,61
102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2666,37 -79,51 2,29 -6,84 - 0,00 0,00 -21,60
103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2665,63 -79,51 2,29 -6,85 - 0,00 0,00 -21,60
104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2664,71 -79,51 2,29 -6,86 - 0,00 0,00 -21,60
105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2663,97 -79,50 2,29 -6,86 - 0,00 0,00 -21,60
106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2663,23 -79,50 2,29 -6,87 - 0,00 0,00 -21,59
107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2662,32 -79,50 2,29 -6,88 - 0,00 0,00 -21,59
108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2661,58 -79,49 2,29 -6,89 - 0,00 0,00 -21,59
109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2660,84 -79,49 2,29 -6,90 - 0,00 0,00 -21,59
110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2659,91 -79,49 2,29 -6,91 - 0,00 0,00 -21,58
111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2659,17 -79,49 2,29 -6,92 - 0,00 0,00 -21,58
112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2658,43 -79,48 2,29 -6,93 - 0,00 0,00 -21,58
113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2657,53 -79,48 2,29 -6,94 - 0,00 0,00 -21,57
114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2656,79 -79,48 2,29 -6,95 - 0,00 0,00 -21,57
115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2656,05 -79,48 2,29 -6,95 - 0,00 0,00 -21,57
116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2655,13 -79,47 2,29 -6,97 - 0,00 0,00 -21,57
117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2654,39 -79,47 2,29 -6,97 - 0,00 0,00 -21,56
118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2653,65 -79,47 2,29 -6,98 - 0,00 0,00 -21,56
119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2652,71 -79,47 2,29 -6,99 - 0,00 0,00 -21,56
120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2651,97 -79,46 2,29 -7,00 - 0,00 0,00 -21,56
121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2651,23 -79,46 2,29 -7,01 - 0,00 0,00 -21,55
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.35 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2650,33 -79,46 2,29 -7,02 - 0,00 0,00 -21,55
123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2649,59 -79,46 2,29 -7,03 - 0,00 0,00 -21,55
124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2648,85 -79,45 2,29 -7,04 - 0,00 0,00 -21,55
125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2647,94 -79,45 2,29 -7,05 - 0,00 0,00 -21,54
126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2647,20 -79,45 2,29 -7,06 - 0,00 0,00 -21,54
127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2646,45 -79,45 2,29 -7,07 - 0,00 0,00 -21,54
128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2645,56 -79,44 2,29 -7,08 - 0,00 0,00 -21,54
129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2644,83 -79,44 2,29 -7,09 - 0,00 0,00 -21,53
130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2644,08 -79,44 2,29 -7,10 - 0,00 0,00 -21,53
72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 2649,62 -79,46 1,22 -5,56 -6,62 0,00 0,00 2,58
161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 2676,70 -79,54 1,48 -5,44 -8,56 0,00 0,00 5,50
28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 2708,88 -79,65 -4,80 -0,49 - 2,53 0,00 -3,45
23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 2730,50 -79,72 1,76 -4,55 -3,62 0,00 0,00 4,09
24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 2727,52 -79,71 3,09 - -1,24 0,00 0,00 -11,34
1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 2735,51 -79,73 1,33 - -3,52 0,00 0,00 -12,86
25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 2708,02 -79,65 1,53 -5,26 -8,74 2,17 0,00 3,41
26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 2694,88 -79,60 1,53 -5,31 -8,68 1,76 0,00 4,49
58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 2650,96 -79,46 -4,80 -0,72 - 2,54 0,00 -3,25
31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 2672,62 -79,53 1,68 -4,58 -3,51 0,00 0,00 4,28
53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 2669,69 -79,52 3,06 - -1,24 0,00 0,00 -11,22
30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 2677,49 -79,55 1,28 - -3,49 0,00 0,00 -12,71
54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 2650,07 -79,46 1,50 -5,52 -8,46 1,05 0,00 2,47
55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 2636,96 -79,41 1,49 -5,60 -8,39 0,33 0,00 3,23
186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2786,85 -79,89 -4,80 -9,81 -6,57 0,00 0,00 -28,06
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.36 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2785,32 -79,89 -4,80 -9,96 -6,57 0,00 0,00 -28,21
188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 2783,80 -79,88 -4,80 - -6,57 0,00 0,00 -28,36
176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 2793,34 -79,91 -4,80 -8,12 -6,59 0,00 0,00 -28,41
210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 2795,65 -79,92 0,51 - -4,80 0,00 0,00 -21,05
209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 2796,38 -79,92 0,51 - -4,79 0,00 0,00 -21,05
189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 2756,48 -79,80 -4,80 -0,13 -6,50 0,00 0,00 -13,22
182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 2793,68 -79,92 -4,80 - -6,59 0,00 0,00 -33,48
177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 2759,09 -79,81 -4,80 -0,06 -6,51 0,00 0,00 -10,16
179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 2763,04 -79,82 -4,80 -0,06 -6,52 0,00 0,00 -10,18
178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 2761,06 -79,81 -4,80 -0,06 -6,51 0,00 0,00 -10,17
174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 2759,23 -79,81 2,01 -8,10 - 0,00 0,00 -36,04
180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 2780,53 -79,87 2,03 - - 0,00 0,00 -47,51
181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2782,37 -79,88 2,50 - - 0,00 0,00 -54,23
184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 2772,28 -79,85 2,04 - - 0,00 0,00 -33,02
185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 2770,90 -79,84 2,50 - - 0,00 0,00 -45,94
183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 2794,01 -79,92 2,06 - - 0,00 0,00 -52,85
175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 2775,68 -79,86 1,89 -5,01 - 0,00 0,00 -29,18
207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2794,38 -79,92 0,52 - -4,18 2,54 0,00 -10,16
208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 2791,91 -79,91 0,52 - -4,16 2,54 0,00 -10,47
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.37 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 5 Station Fence West Ld = 59,2 dB(A) Ln = 59,2 dB(A)
203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 157,11 -54,92 3,00 - -0,29 0,00 0,00 23,61
204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 154,95 -54,80 3,00 - -0,28 1,99 0,00 25,34
205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 147,71 -54,38 3,00 0,00 -0,38 2,60 0,00 37,84
206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 150,73 -54,56 3,00 0,00 -0,39 2,59 0,00 37,65
10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 129,61 -53,25 3,00 -6,16 -1,01 0,00 0,00 28,59
11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 131,51 -53,37 3,00 - -0,16 0,00 0,00 22,58
12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 141,28 -53,99 3,00 -7,34 -0,53 0,00 0,00 27,13
13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 143,09 -54,10 3,00 -7,60 -0,58 0,00 0,00 26,72
5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 139,74 -53,90 3,00 - -0,11 0,00 0,00 20,85
4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 133,70 -53,51 3,91 -8,65 -0,18 0,00 0,00 13,64
3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 144,69 -54,20 3,34 - -0,47 0,00 0,00 6,26
6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 139,73 -53,90 3,17 -9,15 -0,05 0,00 0,00 21,06
22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 131,58 -53,38 3,88 0,00 -0,96 0,00 0,00 21,61
21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 139,27 -53,87 3,99 0,00 -0,79 0,00 0,00 20,35
7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 147,67 -54,38 4,10 - -0,49 0,00 0,00 2,66
18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 129,08 -53,21 3,84 0,00 -0,94 0,00 0,00 21,75
19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 124,23 -52,88 3,75 0,00 -0,92 0,00 0,00 22,03
15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 130,40 -53,30 3,85 0,00 -0,74 0,00 0,00 20,83
16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 123,07 -52,79 3,72 0,00 -0,71 0,00 0,00 21,24
17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 126,05 -53,00 3,00 0,00 -0,34 0,00 0,00 30,66
2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 139,85 -53,91 3,08 - -0,19 0,00 0,00 7,47
20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 131,55 -53,37 3,07 0,00 -0,30 0,00 0,00 19,23
14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 126,77 -53,05 3,07 -0,18 -0,29 0,00 0,00 20,11
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.38 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 135,87 -53,65 3,00 -5,36 -0,26 0,00 0,00 13,87
29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 142,71 -54,08 3,00 0,00 -0,22 0,00 0,00 28,70
27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 126,64 -53,04 3,00 0,00 -0,83 0,04 0,00 29,16
9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 136,23 -53,68 3,00 -6,31 -0,34 0,00 0,00 38,81
40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 201,13 -57,06 3,00 -7,32 -0,75 0,00 0,00 23,87
41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 202,37 -57,11 3,00 -7,88 -0,59 0,00 0,00 23,42
42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 213,28 -57,57 3,00 -5,76 -1,40 0,00 0,00 24,27
43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 214,46 -57,62 3,00 - -0,19 0,00 0,00 19,67
35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 209,90 -57,43 3,53 - -0,17 3,22 0,00 12,80
34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 203,45 -57,16 4,63 - -0,28 0,00 0,00 2,49
33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 215,15 -57,65 4,21 - -0,88 0,00 0,00 -2,43
36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 209,89 -57,43 4,11 - -0,10 1,75 0,00 12,69
52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 204,62 -57,21 4,64 0,00 -1,31 0,00 0,00 18,18
51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 212,49 -57,54 4,68 0,00 -1,16 0,00 0,00 17,00
37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 218,28 -57,77 4,72 - -0,89 0,00 0,00 -5,63
48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 199,53 -56,99 4,60 - -0,17 0,00 0,00 9,02
49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 196,39 -56,85 4,58 0,00 -1,28 0,00 0,00 18,52
45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 200,39 -57,03 4,60 - -0,60 0,00 0,00 1,44
46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 195,65 -56,82 4,57 0,00 -1,08 0,00 0,00 17,69
47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 197,56 -56,91 3,49 -5,88 -0,10 1,00 0,00 22,60
32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 209,48 -57,42 3,20 - -0,26 0,00 0,00 -4,28
50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 203,55 -57,17 3,11 0,00 -0,46 0,00 0,00 15,32
44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 198,08 -56,93 3,24 -3,02 -0,42 0,00 0,00 13,43
38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 207,35 -57,33 3,00 -5,63 -0,39 0,00 0,00 9,80
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.39 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 212,03 -57,52 3,00 - -0,15 2,63 0,00 17,21
56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 197,61 -56,91 3,00 -9,33 -0,59 1,14 0,00 17,31
39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 207,76 -57,34 3,00 -6,41 -0,54 0,00 0,00 34,85
196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 250,81 -58,98 4,50 - -1,08 0,00 0,00 -13,15
197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 244,59 -58,76 4,46 - -1,12 0,00 0,00 -13,52
198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 234,96 -58,41 4,40 - -1,09 0,00 0,00 -25,17
199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 230,57 -58,25 4,37 - -1,12 0,00 0,00 -17,58
200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 225,53 -58,06 4,33 - -1,11 0,00 0,00 -31,41
201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 219,85 -57,83 4,29 - -1,15 0,00 0,00 -17,74
190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 205,65 -57,25 4,17 -6,01 -0,97 0,00 0,00 0,82
192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 212,68 -57,55 4,24 - -0,90 0,00 0,00 -21,29
193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 217,20 -57,73 4,27 -4,90 -1,04 0,00 0,00 -0,29
194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 221,24 -57,89 4,30 -3,94 -1,08 0,00 0,00 -8,25
195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 232,46 -58,32 4,37 -1,09 -1,35 0,00 0,00 7,10
202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 206,56 -57,29 4,18 - -0,95 0,00 0,00 -6,96
191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 227,32 -58,12 3,42 -5,87 -1,34 0,00 0,00 8,08
59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 188,90 -56,52 5,05 0,00 -1,14 0,00 0,00 24,39
60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 181,47 -56,17 5,01 0,00 -1,11 0,00 0,00 24,73
61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 174,11 -55,81 4,97 0,00 -1,07 0,00 0,00 25,09
65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 100,44 -51,03 3,09 -3,74 -0,31 0,00 0,00 17,34
66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 96,76 -50,71 3,28 - -0,40 0,00 0,00 4,32
63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 103,12 -51,26 3,08 -3,39 -0,31 0,00 0,00 14,32
64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 103,17 -51,26 3,39 - -0,24 0,00 0,00 -6,73
68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 94,53 -50,50 3,00 0,00 -0,29 0,00 0,00 21,70
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.40 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 97,48 -50,77 3,00 -4,72 -0,29 0,00 0,00 13,47
67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,00 98,83 -50,89 -3,78 - -0,23 0,00 0,00 5,44
69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,00 98,52 -50,86 -3,77 0,00 -0,23 0,00 0,00 19,14
162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 136,49 -53,69 3,07 -1,49 -0,92 0,01 0,00 35,65
163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 134,09 -53,54 3,05 -1,82 -0,90 0,01 0,00 35,47
164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 131,71 -53,38 3,03 -2,21 -0,87 0,01 0,00 35,24
74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 140,46 -53,94 3,41 0,00 -0,83 0,63 0,00 50,63
75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 149,72 -54,50 3,53 0,00 -0,88 0,53 0,00 47,19
165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 76,62 -48,68 3,04 - -0,13 0,00 0,00 18,03
167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 74,05 -48,38 3,03 - -0,13 0,00 0,00 21,08
170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 68,74 -47,74 3,00 0,00 -0,16 0,00 0,00 33,88
171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 67,89 -47,63 3,00 0,00 -0,38 0,00 0,00 28,85
168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 66,56 -47,46 3,00 0,00 -0,16 0,00 0,00 32,45
173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 77,31 -48,76 3,00 -6,05 -0,06 0,01 0,00 38,15
166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 71,37 -48,06 3,00 -4,73 -0,17 0,00 0,00 28,70
169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,00 65,96 -47,38 -3,49 0,00 -0,16 0,00 0,00 30,98
172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,00 70,78 -47,99 -3,52 0,00 -0,17 0,00 0,00 30,32
90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 131,86 -53,39 3,12 0,00 -3,62 0,00 0,00 32,42
77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 127,28 -53,09 3,09 0,00 -3,53 2,09 0,00 38,80
91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 132,77 -53,45 3,13 0,00 -3,64 0,00 0,00 32,35
79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 128,23 -53,15 3,09 0,00 -3,56 1,88 0,00 38,51
92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 133,68 -53,51 3,13 0,00 -3,67 0,00 0,00 32,27
80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 129,20 -53,22 3,09 0,00 -3,58 1,90 0,00 38,43
93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 134,79 -53,59 3,13 0,00 -3,69 0,00 0,00 32,17
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.41 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 130,29 -53,29 3,09 0,00 -3,61 1,91 0,00 38,35
94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 135,70 -53,64 3,14 0,00 -3,72 0,00 0,00 32,09
82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 131,24 -53,35 3,10 0,00 -3,64 1,92 0,00 38,28
95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 136,61 -53,70 3,14 0,00 -3,74 0,00 0,00 32,01
83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 132,21 -53,42 3,10 0,00 -3,66 1,93 0,00 38,20
96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 137,73 -53,77 3,15 0,00 -3,77 0,00 0,00 31,92
84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 133,34 -53,49 3,10 0,00 -3,69 1,95 0,00 38,12
97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 138,65 -53,83 3,15 0,00 -3,79 0,00 0,00 31,84
85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 134,29 -53,55 3,10 0,00 -3,72 1,96 0,00 38,04
98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 139,55 -53,89 3,15 0,00 -3,82 0,04 0,00 31,80
86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 135,26 -53,62 3,11 0,00 -3,74 1,97 0,00 37,97
99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 140,67 -53,96 3,16 0,00 -3,84 0,13 0,00 31,80
87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 136,39 -53,69 3,11 0,00 -3,77 1,99 0,00 37,89
100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 141,59 -54,01 3,16 0,00 -3,87 0,13 0,00 31,72
88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 137,34 -53,75 3,11 0,00 -3,79 2,00 0,00 37,82
101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 142,50 -54,07 3,16 0,00 -3,89 0,13 0,00 31,65
89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 138,31 -53,81 3,12 0,00 -3,82 2,01 0,00 37,74
160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 136,54 -53,70 3,34 0,00 -0,81 0,59 0,00 51,59
71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 134,77 -53,58 3,00 0,00 -1,69 0,60 0,00 37,33
73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 134,77 -53,58 3,00 0,00 -1,69 0,60 0,00 41,33
78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 143,22 -54,11 3,19 0,00 -3,91 0,07 0,00 30,83
131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 144,14 -54,17 3,20 0,00 -3,93 0,21 0,00 30,90
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 145,05 -54,22 3,20 0,00 -3,96 1,10 0,00 31,72
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 146,19 -54,29 3,21 0,00 -3,98 1,49 0,00 32,01
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.42 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 147,11 -54,34 3,21 0,00 -4,01 1,50 0,00 31,95
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 148,03 -54,40 3,22 0,00 -4,03 1,50 0,00 31,88
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 149,14 -54,46 3,22 0,00 -4,06 1,51 0,00 31,80
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 150,06 -54,52 3,22 0,00 -4,08 1,52 0,00 31,74
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 150,98 -54,57 3,23 0,00 -4,11 1,53 0,00 31,67
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 152,12 -54,64 3,23 0,00 -4,13 1,54 0,00 31,59
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 153,04 -54,69 3,24 0,00 -4,16 1,54 0,00 31,53
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 153,96 -54,74 3,24 0,00 -4,18 1,55 0,00 31,46
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 155,09 -54,80 3,25 0,00 -4,21 1,56 0,00 31,38
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 156,01 -54,86 3,25 0,00 -4,23 1,56 0,00 31,32
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 156,94 -54,91 3,26 0,00 -4,26 1,57 0,00 31,26
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 158,08 -54,97 3,26 0,00 -4,28 1,58 0,00 31,18
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 159,00 -55,02 3,27 0,00 -4,31 1,59 0,00 31,12
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 159,92 -55,07 3,27 0,00 -4,33 1,59 0,00 31,05
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 161,04 -55,13 3,28 0,00 -4,36 1,60 0,00 30,98
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 161,97 -55,18 3,28 0,00 -4,38 1,61 0,00 30,92
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 162,89 -55,23 3,29 0,00 -4,41 1,61 0,00 30,85
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 164,03 -55,29 3,29 0,00 -4,43 1,62 0,00 30,78
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 164,96 -55,34 3,30 0,00 -4,46 1,63 0,00 30,72
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 165,88 -55,39 3,30 0,00 -4,48 1,63 0,00 30,65
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 167,01 -55,45 3,30 0,00 -4,51 1,64 0,00 30,58
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 167,94 -55,49 3,31 0,00 -4,53 1,65 0,00 30,52
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 168,86 -55,54 3,31 0,00 -4,56 1,65 0,00 30,46
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 170,01 -55,60 3,32 0,00 -4,58 1,66 0,00 30,38
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.43 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 170,93 -55,65 3,32 0,00 -4,61 1,67 0,00 30,32
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 171,86 -55,70 3,33 0,00 -4,63 1,67 0,00 30,27
70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 155,10 -54,80 3,00 0,00 -1,84 0,79 0,00 40,15
76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 139,69 -53,90 3,17 0,00 -3,86 2,01 0,00 36,26
102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 140,63 -53,95 3,17 0,00 -3,88 2,02 0,00 36,19
103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 141,57 -54,01 3,18 0,00 -3,90 2,03 0,00 36,12
104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 142,73 -54,08 3,18 0,00 -3,93 2,05 0,00 36,04
105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 143,67 -54,14 3,19 0,00 -3,96 2,06 0,00 35,97
106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 144,61 -54,20 3,19 0,00 -3,98 2,07 0,00 35,91
107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 145,75 -54,26 3,20 0,00 -4,01 2,08 0,00 35,83
108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 146,69 -54,32 3,20 0,00 -4,04 2,09 0,00 35,76
109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 147,64 -54,38 3,20 0,00 -4,06 2,10 0,00 35,70
110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 148,79 -54,44 3,21 0,00 -4,09 2,12 0,00 35,62
111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 149,73 -54,50 3,21 0,00 -4,12 2,13 0,00 35,55
112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 150,68 -54,55 3,22 0,00 -4,14 2,14 0,00 35,49
113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 151,82 -54,62 3,22 0,00 -4,17 1,04 0,00 34,31
114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 152,77 -54,67 3,22 0,00 -4,19 0,95 0,00 34,14
115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 153,71 -54,73 3,23 0,00 -4,22 0,86 0,00 33,98
116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 154,87 -54,79 3,23 0,00 -4,25 0,75 0,00 33,78
117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 155,81 -54,84 3,24 0,00 -4,27 0,76 0,00 33,71
118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 156,76 -54,90 3,24 0,00 -4,30 0,77 0,00 33,64
119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 157,92 -54,96 3,25 0,00 -4,33 0,77 0,00 33,56
120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 158,86 -55,01 3,25 0,00 -4,35 0,78 0,00 33,50
121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 159,80 -55,06 3,26 0,00 -4,37 0,08 0,00 32,73
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.44 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 160,94 -55,13 3,26 0,00 -4,40 0,00 0,00 32,56
123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 161,88 -55,18 3,27 0,00 -4,43 0,00 0,00 32,49
124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 162,83 -55,23 3,27 0,00 -4,45 0,00 0,00 32,42
125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 163,99 -55,29 3,28 0,00 -4,48 0,00 0,00 32,33
126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 164,93 -55,34 3,28 0,00 -4,51 0,00 0,00 32,26
127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 165,88 -55,39 3,28 0,00 -4,53 0,00 0,00 32,19
128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 167,01 -55,45 3,29 0,00 -4,56 0,00 0,00 32,11
129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 167,96 -55,50 3,29 0,00 -4,58 0,00 0,00 32,04
130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 168,90 -55,54 3,30 0,00 -4,61 0,00 0,00 31,97
72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 155,10 -54,80 3,00 0,00 -1,84 0,79 0,00 40,15
161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 124,43 -52,89 3,20 0,00 -0,75 0,60 0,00 47,72
28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 129,28 -53,22 -4,20 0,00 -0,53 0,00 0,00 32,06
23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 120,57 -52,62 3,00 -3,88 -0,43 0,00 0,00 36,29
24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 122,72 -52,77 3,07 0,00 -1,18 2,41 0,00 38,75
1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 123,02 -52,79 3,00 0,00 -0,50 2,18 0,00 43,88
25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 126,16 -53,01 3,15 0,00 -0,77 0,93 0,00 43,66
26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 135,92 -53,66 3,35 0,00 -0,82 0,50 0,00 44,18
58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 202,87 -57,14 -4,44 0,00 -0,83 0,00 0,00 27,61
31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 191,34 -56,63 3,00 -4,42 -0,80 0,00 0,00 31,36
53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 194,20 -56,76 4,15 -6,03 -0,95 7,57 0,00 35,20
30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 193,14 -56,71 3,20 - -0,34 9,46 0,00 33,42
54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 200,27 -57,02 4,20 0,00 -1,14 1,03 0,00 40,44
55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 210,07 -57,44 4,29 0,00 -1,18 0,46 0,00 40,93
186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 166,43 -55,42 -4,35 0,00 -0,39 0,00 0,00 12,85
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.45 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 167,70 -55,48 -4,35 0,00 -0,40 0,00 0,00 12,78
188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 168,99 -55,55 -4,36 0,00 -0,40 0,00 0,00 12,71
176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,00 169,95 -55,60 -3,59 -1,89 -0,40 0,00 0,00 9,53
210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 170,25 -55,61 3,00 -8,04 -0,33 1,14 0,00 27,16
209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 171,18 -55,66 3,00 -8,40 -0,33 1,20 0,00 26,80
189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 194,23 -56,76 -4,42 -1,00 -0,46 0,00 0,00 15,38
182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 177,87 -55,99 -4,22 - -0,42 0,00 0,00 -2,98
177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 197,05 -56,88 -3,77 -1,09 -0,46 0,00 0,00 18,80
179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 201,15 -57,06 -3,79 -0,99 -0,47 0,00 0,00 18,69
178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 199,09 -56,97 -3,78 -1,14 -0,47 0,00 0,00 18,64
174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 199,96 -57,01 3,58 - -0,97 0,00 0,00 -15,12
180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 188,76 -56,51 3,46 - -0,93 0,00 0,00 -9,70
181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 187,33 -56,44 4,46 - -3,62 0,00 0,00 -11,18
184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 178,41 -56,02 3,31 -1,35 -1,06 0,00 0,00 11,10
185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 180,43 -56,12 4,41 -3,37 -3,61 0,00 0,00 9,69
183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 168,90 -55,54 3,43 -9,07 -0,73 0,00 0,00 -1,00
175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 183,40 -56,26 3,00 -4,82 -1,12 0,00 0,00 5,82
207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 108,99 -51,74 3,00 0,00 -0,28 2,49 0,00 40,47
208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 110,83 -51,89 3,00 0,00 -0,29 2,49 0,00 40,32
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.46 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 6 Station Fence South Ld = 54,8 dB(A) Ln = 54,8 dB(A)
203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 405,33 -63,15 4,66 - -0,71 0,00 0,00 11,16
204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 408,16 -63,21 4,67 - -0,72 0,00 0,00 11,14
205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 409,11 -63,23 4,67 - -0,73 0,00 0,00 13,88
206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 411,80 -63,29 4,68 - -0,74 0,00 0,00 13,52
10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 285,23 -60,10 2,99 -4,90 -2,38 0,00 0,00 21,62
11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 289,80 -60,23 2,99 -4,95 -2,33 0,00 0,00 21,49
12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 280,42 -59,95 2,99 -4,90 -2,37 0,00 0,00 21,77
13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 285,52 -60,10 2,99 -5,02 -2,31 0,00 0,00 21,56
5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 295,55 -60,40 4,24 - -0,21 0,00 0,00 10,18
4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 298,14 -60,48 5,06 - -0,31 0,00 0,00 0,06
3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 293,53 -60,35 4,68 - -1,18 0,00 0,00 -5,53
6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 295,55 -60,40 4,66 - -0,10 0,00 0,00 11,49
22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 273,88 -59,74 4,98 0,00 -1,57 0,00 0,00 15,73
21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 270,77 -59,64 4,96 0,00 -1,44 0,00 0,00 14,89
7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 292,39 -60,31 5,04 - -1,18 0,00 0,00 -8,79
18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 294,05 -60,36 5,05 - -0,25 0,00 0,00 3,69
19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 282,67 -60,02 5,01 -9,87 -0,27 0,00 0,00 6,92
15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 296,79 -60,44 5,05 - -0,92 0,00 0,00 -3,01
16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 279,51 -59,92 4,99 - -0,98 0,00 0,00 4,74
17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 287,22 -60,16 4,27 -9,08 -0,09 0,00 0,00 15,94
2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 295,66 -60,41 3,48 - -0,33 0,00 0,00 -4,94
20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 274,24 -59,75 3,48 0,00 -0,61 0,00 0,00 12,95
14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 288,37 -60,19 3,50 - -0,39 0,00 0,00 1,93
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.47 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 284,49 -60,07 2,99 -4,77 -0,59 0,00 0,00 7,70
29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 300,16 -60,54 3,59 - -0,19 0,00 0,00 5,78
27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 290,12 -60,24 2,99 - -0,76 0,00 0,00 8,59
9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 284,75 -60,08 2,99 -4,80 -0,83 0,00 0,00 33,43
40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 264,22 -59,43 2,99 -4,90 -2,19 0,00 0,00 22,47
41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 269,15 -59,59 2,99 -4,94 -2,10 0,00 0,00 22,36
42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 262,61 -59,38 2,99 -4,94 -2,20 0,00 0,00 22,48
43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 268,03 -59,56 2,99 -5,01 -2,11 0,00 0,00 22,32
35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 276,91 -59,84 4,12 - -0,19 0,00 0,00 10,17
34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 277,85 -59,87 4,99 - -0,26 0,00 0,00 1,36
33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 276,25 -59,82 4,60 - -0,91 0,00 0,00 -1,42
36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 276,91 -59,84 4,57 - -0,09 0,00 0,00 11,61
52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 253,71 -59,08 4,90 0,00 -1,50 0,00 0,00 16,38
51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 252,73 -59,05 4,89 0,00 -1,36 0,00 0,00 15,50
37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 275,92 -59,81 4,98 - -0,85 0,00 0,00 -1,36
48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 272,78 -59,71 4,97 -8,63 -0,31 0,00 0,00 8,40
49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 260,46 -59,31 4,92 -7,08 -0,48 0,00 0,00 10,13
45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 275,75 -59,80 4,98 - -0,91 0,00 0,00 3,33
46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 257,02 -59,19 4,90 -6,52 -1,14 0,00 0,00 9,07
47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 265,39 -59,47 4,13 -6,28 -0,15 0,00 0,00 19,24
32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 277,08 -59,84 3,38 - -0,32 0,00 0,00 -3,10
50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 253,91 -59,09 3,38 0,00 -0,57 0,00 0,00 13,57
44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 266,56 -59,51 3,39 -7,59 -0,43 0,00 0,00 6,42
38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 265,55 -59,47 2,99 -4,72 -0,54 0,00 0,00 8,40
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.48 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 281,52 -59,98 3,43 - -0,18 0,00 0,00 8,47
56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 268,27 -59,56 2,99 -7,07 -0,94 0,00 0,00 15,42
39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 265,68 -59,48 2,99 -4,83 -0,77 0,00 0,00 34,05
196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 353,54 -61,96 4,91 0,00 -1,98 0,00 0,00 2,91
197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 365,52 -62,25 4,96 - -1,62 0,00 0,00 -17,07
198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 368,28 -62,32 4,97 - -1,73 0,00 0,00 -30,86
199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 370,20 -62,36 4,97 - -1,82 0,00 0,00 -23,16
200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 371,06 -62,38 4,98 - -1,58 0,00 0,00 -31,69
201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 372,23 -62,41 4,98 - -1,58 0,00 0,00 -19,15
190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 350,85 -61,89 4,91 0,00 -1,97 0,00 0,00 1,92
192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 349,83 -61,87 4,91 -2,26 -1,82 0,00 0,00 -11,23
193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 349,44 -61,86 4,90 0,00 -1,96 0,00 0,00 0,19
194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 347,91 -61,82 4,91 - -1,46 0,00 0,00 -19,14
195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 345,10 -61,75 4,90 -5,91 -1,86 0,00 0,00 -1,14
202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 363,05 -62,19 4,95 - -1,47 0,00 0,00 -8,83
191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 358,08 -62,07 4,36 -8,26 -1,96 0,00 0,00 2,08
59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 134,46 -53,56 4,65 0,00 -0,88 0,00 0,00 27,21
60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 139,91 -53,91 4,71 0,00 -0,90 0,00 0,00 26,89
61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 145,77 -54,27 4,76 0,00 -0,93 0,00 0,00 26,56
65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 217,40 -57,74 3,62 0,00 -0,65 0,00 0,00 14,56
66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 221,52 -57,90 4,69 0,00 -1,67 0,00 0,00 12,53
63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 215,66 -57,67 3,47 0,00 -0,64 0,00 0,00 11,36
64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 215,62 -57,67 4,68 0,00 -0,64 0,00 0,00 3,16
68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 223,78 -57,99 3,76 -4,36 -0,67 0,00 0,00 10,23
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.49 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 222,06 -57,92 3,36 -4,73 -0,66 0,00 0,00 6,29
67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 219,39 -57,82 -4,38 0,00 -0,52 0,00 0,00 11,30
69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 220,43 -57,86 -4,38 - -0,52 0,00 0,00 0,10
162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 181,68 -56,18 3,76 0,00 -1,25 0,00 0,00 35,00
163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 183,85 -56,28 3,79 0,00 -1,26 0,00 0,00 34,91
164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 186,03 -56,38 3,81 0,00 -1,27 0,00 0,00 34,82
74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 240,12 -58,60 4,49 0,00 -1,32 1,19 0,00 47,12
75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 236,74 -58,48 4,47 0,00 -1,30 1,07 0,00 44,27
165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 312,55 -60,89 4,77 0,00 -0,73 0,00 0,00 20,24
167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 319,51 -61,08 4,81 - -0,52 0,00 0,00 7,93
170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 312,79 -60,90 4,78 0,00 -0,73 0,00 0,00 21,93
171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 313,73 -60,92 5,07 0,00 -1,25 0,00 0,00 16,76
168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 319,96 -61,09 4,81 - -0,56 0,00 0,00 8,87
173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 312,09 -60,88 4,26 0,00 -0,55 2,51 0,00 35,35
166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 316,20 -60,99 4,14 -4,69 -0,73 0,00 0,00 16,40
169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 319,18 -61,07 -4,58 - -0,75 0,00 0,00 4,60
172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 311,65 -60,87 -4,56 0,00 -0,74 0,00 0,00 15,85
90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 206,87 -57,31 3,43 0,00 -5,50 0,00 0,00 26,94
77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 225,84 -58,07 3,42 0,00 -6,05 0,00 0,00 29,55
91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 206,36 -57,28 3,42 0,00 -5,49 0,00 0,00 26,97
79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 225,36 -58,05 3,42 0,00 -6,04 0,00 0,00 29,58
92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 205,86 -57,26 3,42 0,00 -5,47 0,00 0,00 27,00
80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 224,92 -58,03 3,42 0,00 -6,03 0,00 0,00 29,60
93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 205,27 -57,24 3,42 0,00 -5,46 0,00 0,00 27,04
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.50 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 224,34 -58,01 3,41 0,00 -6,01 0,00 0,00 29,64
94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 204,77 -57,22 3,42 0,00 -5,45 0,00 0,00 27,07
82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 223,87 -57,99 3,41 0,00 -6,00 0,00 0,00 29,67
95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 204,28 -57,20 3,42 0,00 -5,43 0,00 0,00 27,10
83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 223,45 -57,98 3,41 0,00 -5,99 0,00 0,00 29,69
96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 203,67 -57,17 3,41 0,00 -5,42 0,00 0,00 27,14
84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 222,92 -57,96 3,41 0,00 -5,98 0,00 0,00 29,72
97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 203,19 -57,15 3,41 0,00 -5,41 0,00 0,00 27,17
85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 222,46 -57,94 3,41 0,00 -5,96 0,00 0,00 29,75
98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 202,71 -57,13 3,41 0,00 -5,40 0,00 0,00 27,20
86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 222,05 -57,92 3,41 0,00 -5,95 0,00 0,00 29,78
99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 202,13 -57,10 3,41 0,00 -5,38 0,00 0,00 27,23
87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 221,51 -57,90 3,40 0,00 -5,94 0,00 0,00 29,81
100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 201,66 -57,08 3,41 0,00 -5,37 0,00 0,00 27,26
88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 221,06 -57,88 3,40 0,00 -5,93 0,00 0,00 29,84
101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 201,19 -57,06 3,40 0,00 -5,36 0,00 0,00 27,29
89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 220,66 -57,87 3,40 0,00 -5,92 0,00 0,00 29,86
160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 235,06 -58,42 4,46 0,00 -1,30 0,92 0,00 47,83
71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 212,86 -57,55 2,99 0,00 -2,22 0,00 0,00 32,22
73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 212,83 -57,55 2,99 0,00 -2,22 0,00 0,00 36,22
78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 201,80 -57,09 3,48 0,00 -5,37 0,00 0,00 26,60
131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 201,34 -57,07 3,47 0,00 -5,36 0,00 0,00 26,63
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,89 -57,05 3,47 0,00 -5,35 0,00 0,00 26,66
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,32 -57,03 3,47 0,00 -5,34 0,00 0,00 26,70
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.51 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 199,87 -57,01 3,47 0,00 -5,33 0,00 0,00 26,72
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 199,43 -56,99 3,46 0,00 -5,32 0,00 0,00 26,75
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,91 -56,97 3,46 0,00 -5,30 0,00 0,00 26,79
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,47 -56,95 3,46 0,00 -5,29 0,00 0,00 26,81
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,04 -56,93 3,46 0,00 -5,28 0,00 0,00 26,84
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,50 -56,90 3,45 0,00 -5,27 0,00 0,00 26,88
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,08 -56,88 3,45 0,00 -5,26 0,00 0,00 26,90
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 196,66 -56,87 3,45 0,00 -5,25 0,00 0,00 26,93
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 196,13 -56,84 3,45 0,00 -5,23 0,00 0,00 26,96
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 195,71 -56,82 3,45 0,00 -5,22 0,00 0,00 26,99
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 195,31 -56,81 3,44 0,00 -5,21 0,00 0,00 27,02
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,79 -56,78 3,44 0,00 -5,20 0,00 0,00 27,05
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,39 -56,77 3,44 0,00 -5,19 0,00 0,00 27,07
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,00 -56,75 3,44 0,00 -5,18 0,00 0,00 27,10
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 193,54 -56,73 3,43 0,00 -5,17 0,00 0,00 27,13
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 193,15 -56,71 3,43 0,00 -5,16 0,00 0,00 27,15
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 192,77 -56,69 3,43 0,00 -5,15 0,00 0,00 27,18
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 192,29 -56,67 3,43 0,00 -5,14 0,00 0,00 27,21
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,91 -56,65 3,43 0,00 -5,13 0,00 0,00 27,23
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,54 -56,64 3,42 0,00 -5,12 0,00 0,00 27,26
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,12 -56,62 3,42 0,00 -5,11 0,00 0,00 27,29
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 190,76 -56,60 3,42 0,00 -5,10 0,00 0,00 27,31
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 190,40 -56,59 3,42 0,00 -5,09 0,00 0,00 27,33
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,95 -56,56 3,42 0,00 -5,08 0,00 0,00 27,36
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.52 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,60 -56,55 3,41 0,00 -5,07 0,00 0,00 27,38
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,26 -56,53 3,41 0,00 -5,06 0,00 0,00 27,41
70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 203,03 -57,14 2,99 0,00 -2,16 0,00 0,00 36,69
76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 217,77 -57,75 3,53 0,00 -5,85 0,00 0,00 28,76
102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 217,35 -57,74 3,53 0,00 -5,83 0,00 0,00 28,79
103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 216,93 -57,72 3,53 0,00 -5,82 0,00 0,00 28,81
104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 216,42 -57,70 3,52 0,00 -5,81 0,00 0,00 28,84
105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 216,00 -57,68 3,52 0,00 -5,80 0,00 0,00 28,87
106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 215,59 -57,66 3,52 0,00 -5,79 0,00 0,00 28,89
107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 215,10 -57,65 3,52 0,00 -5,78 0,00 0,00 28,92
108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 214,70 -57,63 3,52 0,00 -5,77 0,00 0,00 28,95
109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 214,30 -57,61 3,51 0,00 -5,76 0,00 0,00 28,97
110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,80 -57,59 3,51 0,00 -5,75 0,00 0,00 29,00
111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,41 -57,58 3,51 0,00 -5,74 0,00 0,00 29,03
112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,02 -57,56 3,51 0,00 -5,73 0,00 0,00 29,05
113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 212,57 -57,54 3,51 0,00 -5,71 0,00 0,00 29,08
114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 212,19 -57,53 3,50 0,00 -5,71 0,00 0,00 29,10
115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 211,81 -57,51 3,50 0,00 -5,70 0,00 0,00 29,12
116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 211,35 -57,49 3,50 0,00 -5,68 0,00 0,00 29,15
117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,99 -57,48 3,50 0,00 -5,67 0,00 0,00 29,17
118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,62 -57,46 3,49 0,00 -5,67 0,00 0,00 29,20
119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,14 -57,44 3,49 0,00 -5,65 0,00 0,00 29,22
120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,78 -57,43 3,49 0,00 -5,64 0,00 0,00 29,25
121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,43 -57,41 3,49 0,00 -5,64 0,00 0,00 29,27
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.53 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,02 -57,40 3,49 0,00 -5,63 0,00 0,00 29,29
123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 208,67 -57,38 3,49 0,00 -5,62 0,00 0,00 29,32
124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 208,33 -57,37 3,48 0,00 -5,61 0,00 0,00 29,34
125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,91 -57,35 3,48 0,00 -5,60 0,00 0,00 29,36
126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,58 -57,34 3,48 0,00 -5,59 0,00 0,00 29,38
127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,25 -57,32 3,48 0,00 -5,58 0,00 0,00 29,40
128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,87 -57,31 3,48 0,00 -5,57 0,00 0,00 29,43
129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,55 -57,29 3,48 0,00 -5,56 0,00 0,00 29,45
130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,23 -57,28 3,47 0,00 -5,56 0,00 0,00 29,47
72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 203,03 -57,14 2,99 0,00 -2,16 0,00 0,00 36,69
161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 225,15 -58,04 4,39 0,00 -1,25 0,46 0,00 43,12
28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 268,95 -59,59 -4,53 0,00 -1,10 0,00 0,00 24,80
23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 289,78 -60,23 2,99 -3,61 -1,01 0,00 0,00 28,35
24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 287,55 -60,17 4,74 -7,96 -0,87 0,00 0,00 22,98
1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 296,59 -60,44 4,17 -7,16 -0,75 0,00 0,00 27,82
25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 261,04 -59,33 4,61 0,00 -1,41 1,74 0,00 38,98
26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 257,86 -59,22 4,60 0,00 -1,40 2,18 0,00 40,97
58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 247,62 -58,87 -4,51 0,00 -1,01 2,33 0,00 27,95
31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 265,68 -59,48 2,99 -3,64 -0,95 0,00 0,00 29,15
53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 264,37 -59,44 4,64 0,00 -2,06 0,00 0,00 30,37
30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 273,22 -59,72 4,02 0,00 -1,02 0,00 0,00 35,28
54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 238,68 -58,55 4,48 0,00 -1,31 1,67 0,00 39,66
55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 235,81 -58,44 4,47 0,00 -1,30 1,16 0,00 40,69
186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 366,83 -62,28 -4,61 - -0,87 0,00 0,00 -7,13
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.54 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 366,12 -62,26 -4,61 - -0,86 0,00 0,00 -7,13
188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 365,43 -62,25 -4,60 - -0,86 0,00 0,00 -7,11
176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 374,11 -62,45 -4,28 -7,99 -0,88 0,00 0,00 -4,60
210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 376,19 -62,50 4,56 - -0,71 0,00 0,00 7,95
209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 377,26 -62,52 4,56 - -0,71 0,00 0,00 7,89
189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 354,56 -61,99 -4,60 0,00 -0,84 0,00 0,00 10,59
182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 378,24 -62,55 -4,54 - -0,89 0,00 0,00 -9,37
177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 358,52 -62,08 -4,25 -0,51 -0,85 0,00 0,00 13,32
179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 364,33 -62,22 -4,26 -0,48 -0,86 0,00 0,00 13,19
178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 361,42 -62,15 -4,26 -0,50 -0,85 0,00 0,00 13,25
174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 360,31 -62,13 4,37 0,00 -2,01 0,00 0,00 1,22
180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 372,65 -62,42 4,45 - -1,75 0,00 0,00 -16,31
181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 373,45 -62,44 5,23 - -6,01 0,00 0,00 -19,30
184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 360,54 -62,13 4,36 -5,69 -1,83 0,00 0,00 0,93
185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 359,88 -62,12 5,20 - -4,17 0,00 0,00 -10,12
183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 374,20 -62,45 4,47 - -1,74 0,00 0,00 -21,29
175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 366,80 -62,28 3,30 -7,31 -1,97 0,00 0,00 -3,23
207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 349,30 -61,86 4,45 0,00 -0,86 0,00 0,00 28,73
208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 347,73 -61,82 4,44 0,00 -0,86 0,00 0,00 28,77
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.55 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 7 Station Fence East Ld = 50,8 dB(A) Ln = 50,8 dB(A)
203 Air condition unit I Administration Building 0,00 0,00 87,00 87,00 0,00 477,44 -64,57 4,85 - -0,84 0,00 0,00 9,96
204 Air condition unit II Administration Building 0,00 0,00 87,00 87,00 0,00 482,88 -64,67 4,86 - -0,85 0,00 0,00 9,65
205 Air condition unit III Administration Building 0,00 0,00 87,00 87,00 0,00 489,59 -64,79 4,88 - -0,87 0,00 0,00 7,89
206 Air condition unit IV Administration Building 0,00 0,00 87,00 87,00 0,00 491,10 -64,82 4,88 - -0,87 0,00 0,00 8,23
10 Building vent., exhaust 1 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 371,21 -62,38 2,99 -4,81 -2,74 0,00 0,00 19,05
11 Building vent., exhaust 2 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 373,20 -62,43 2,99 -4,84 -2,72 0,00 0,00 18,99
12 Building vent., exhaust 3 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 359,77 -62,11 2,99 -4,77 -2,66 0,00 0,00 19,45
13 Building vent., exhaust 4 on roof Compressor Building Unit 1 0,00 0,00 86,00 86,00 0,00 362,10 -62,17 2,99 -4,76 -2,64 0,00 0,00 19,42
5 Facade N, GT air intake Compressor Building Unit 1 0,00 0,00 74,26 3,75 80,00 3,00 371,46 -62,39 4,59 - -0,22 0,00 0,00 8,48
4 Facade N, build. vent. air intlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 377,57 -62,53 5,25 - -0,35 0,00 0,00 -2,11
3 Facade N, large door Compressor Building Unit 1 94,00 30,00 59,73 15,57 71,66 3,00 366,50 -62,27 4,94 - -1,15 0,00 0,00 -4,89
6 Facade N, package ventilation, air inlet Compressor Building Unit 1 0,00 0,00 74,02 2,50 78,00 3,00 371,46 -62,39 4,93 - -0,10 0,00 0,00 10,27
22 Facade S, build. vent. air inlet Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 361,73 -62,16 5,22 0,00 -1,83 0,00 0,00 13,30
21 Facade S, door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 354,33 -61,98 5,20 0,00 -1,82 0,00 0,00 12,42
7 Facade S, small door Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 363,58 -62,20 5,22 - -1,13 0,00 0,00 -7,92
18 Facade W, build. vent. air inlet I Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 377,49 -62,53 5,25 - -0,44 0,00 0,00 -3,37
19 Facade W, build. vent. air inlet II Compressor Building Unit 1 94,00 38,00 63,05 4,00 69,07 3,00 372,56 -62,42 5,24 - -0,32 0,00 0,00 -0,19
15 Facade W, door 1 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 378,72 -62,56 5,25 - -1,31 0,00 0,00 -9,28
16 Facade W, door 2 Compressor Building Unit 1 94,00 25,00 64,73 2,13 68,02 3,00 371,25 -62,39 5,23 - -1,11 0,00 0,00 -3,42
17 Facade W, package ventilation outlet Compressor Building Unit 1 0,00 0,00 78,00 1,00 78,00 3,00 374,49 -62,46 4,67 - -0,12 0,00 0,00 9,18
2 Facade north Compressor Building Unit 1 94,00 48,00 42,00 282,61 66,51 3,00 371,47 -62,39 3,79 - -0,38 0,00 0,00 -6,65
20 Facade south Compressor Building Unit 1 94,00 48,00 42,00 304,43 66,84 3,00 362,35 -62,17 3,78 0,00 -0,79 0,00 0,00 10,65
14 Facade west Compressor Building Unit 1 94,00 48,00 42,00 359,86 67,56 3,00 375,18 -62,48 3,89 - -0,45 0,00 0,00 -4,73
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.56 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
8 Roof Compressor Building Unit 1 94,00 45,00 45,41 297,84 70,15 0,00 366,13 -62,26 2,98 -4,73 -0,75 0,00 0,00 5,38
29 air intake duct Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 373,17 -62,43 4,05 - -0,26 0,00 0,00 10,45
27 oil demister Compressor Building Unit 1 0,00 0,00 80,00 80,00 0,00 376,58 -62,51 2,99 - -1,01 0,00 0,00 0,80
9 roof, explosion panel Compressor Building Unit 1 94,00 16,00 74,24 154,80 96,14 0,00 366,88 -62,28 2,98 -4,75 -1,05 0,00 0,00 31,04
40 Building vent., exhaust 1 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 303,99 -60,65 2,99 -4,98 -2,45 0,00 0,00 20,92
41 Building vent., exhaust 2 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 306,42 -60,72 2,99 -4,97 -2,46 0,00 0,00 20,84
42 Building vent., exhaust 3 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 293,13 -60,33 2,99 -4,74 -2,48 0,00 0,00 21,43
43 Building vent., exhaust 4 on roof Compressor Building Unit 3 0,00 0,00 86,00 86,00 0,00 295,97 -60,42 2,99 -4,71 -2,47 0,00 0,00 21,40
35 Facade N, GT air intake Compressor Building Unit 3 0,00 0,00 74,26 3,75 80,00 3,00 305,74 -60,70 4,29 - -0,22 0,00 0,00 13,90
34 Facade N, build. vent. air intlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 311,51 -60,86 5,09 - -0,27 0,00 0,00 2,06
33 Facade N, large door Compressor Building Unit 3 94,00 30,00 59,73 15,57 71,66 3,00 301,06 -60,57 4,71 - -0,93 0,00 0,00 3,10
36 Facade N, package ventilation, air inlet Compressor Building Unit 3 0,00 0,00 74,02 2,50 78,00 3,00 305,73 -60,70 4,70 - -0,10 0,00 0,00 14,70
52 Facade S, build. vent. air inlet Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 293,88 -60,36 5,04 0,00 -1,64 0,00 0,00 15,12
51 Facade S, door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 286,82 -60,14 5,01 0,00 -1,52 0,00 0,00 14,37
37 Facade S, small door Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 298,32 -60,49 5,05 - -1,00 0,00 0,00 3,40
48 Facade W, build. vent. air inlet I Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 310,81 -60,84 5,09 - -0,34 0,00 0,00 -0,89
49 Facade W, build. vent. air inlet II Compressor Building Unit 3 94,00 38,00 63,05 4,00 69,07 3,00 304,79 -60,67 5,08 - -0,28 0,00 0,00 1,84
45 Facade W, door 1 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 312,32 -60,88 5,09 - -1,05 0,00 0,00 -7,03
46 Facade W, door 2 Compressor Building Unit 3 94,00 25,00 64,73 2,13 68,02 3,00 303,18 -60,63 5,06 - -0,93 0,00 0,00 -1,19
47 Facade W, package ventilation outlet Compressor Building Unit 3 0,00 0,00 78,00 1,00 78,00 3,00 307,16 -60,74 4,38 - -0,10 0,00 0,00 11,20
32 Facade north Compressor Building Unit 3 94,00 48,00 42,00 282,61 66,51 3,00 305,86 -60,70 3,52 - -0,40 0,00 0,00 -0,48
50 Facade south Compressor Building Unit 3 94,00 48,00 42,00 304,43 66,84 3,00 294,42 -60,37 3,56 0,00 -0,65 0,00 0,00 12,37
44 Facade west Compressor Building Unit 3 94,00 48,00 42,00 359,86 67,56 3,00 307,89 -60,76 3,58 - -0,36 0,00 0,00 -2,38
38 Roof Compressor Building Unit 3 94,00 45,00 45,41 297,84 70,15 0,00 299,27 -60,51 2,98 -4,70 -0,62 0,00 0,00 7,29
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.57 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
57 air intake duct Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 307,66 -60,75 3,64 -5,67 -0,34 0,00 0,00 16,88
56 oil demister Compressor Building Unit 3 0,00 0,00 80,00 80,00 0,00 309,43 -60,80 2,99 - -0,84 0,00 0,00 2,91
39 roof, explosion panel Compressor Building Unit 3 94,00 16,00 74,24 154,80 96,14 0,00 299,80 -60,53 2,98 -4,74 -0,87 0,00 0,00 32,98
196 Facade E Electrical Building 87,43 37,00 39,28 92,30 58,93 3,00 347,10 -61,80 4,89 0,00 -1,95 0,00 0,00 3,07
197 Facade E, sec. 1 Electrical Building 87,43 37,00 39,28 127,16 60,33 3,00 364,56 -62,23 4,95 - -1,50 0,00 0,00 -14,42
198 Facade E, sec. 2 Electrical Building 87,43 37,00 39,28 8,11 48,37 3,00 375,75 -62,49 4,98 - -1,74 0,00 0,00 -22,73
199 Facade E, sec. 3 Electrical Building 87,43 37,00 39,28 58,38 56,94 3,00 381,21 -62,62 5,00 - -1,62 0,00 0,00 -20,00
200 Facade E, sec. 4 Electrical Building 87,43 37,00 39,28 2,59 43,42 3,00 385,96 -62,72 5,01 - -1,64 0,00 0,00 -33,60
201 Facade E, sec. 5 Electrical Building 87,43 37,00 39,28 67,56 57,58 3,00 391,47 -62,85 5,02 - -1,66 0,00 0,00 -19,47
190 Facade S, sec. 1 Electrical Building 87,43 37,00 39,28 72,39 57,88 3,00 377,52 -62,53 4,98 0,00 -2,09 0,00 0,00 1,23
192 Facade S, sec. 2 Electrical Building 87,43 37,00 39,28 5,65 46,80 3,00 371,53 -62,39 4,96 0,00 -2,06 0,00 0,00 -9,69
193 Facade S, sec. 3 Electrical Building 87,43 37,00 39,28 48,15 56,11 3,00 367,70 -62,30 4,95 0,00 -2,05 0,00 0,00 -0,29
194 Facade S, sec. 4 Electrical Building 87,43 37,00 39,28 6,42 47,36 3,00 363,16 -62,19 4,95 - -1,46 0,00 0,00 -19,71
195 Facade S, sec. 5 Electrical Building 87,43 37,00 39,28 131,91 60,48 3,00 351,23 -61,90 4,90 0,00 -1,97 0,00 0,00 4,51
202 Facade W Electrical Building 87,43 37,00 39,28 97,41 59,17 3,00 390,38 -62,82 5,02 - -1,59 0,00 0,00 -16,37
191 Roof Electrical Building 87,43 37,00 39,28 1181,57 70,01 0,00 368,72 -62,33 4,40 -4,75 -2,05 0,00 0,00 5,29
59 Filter I Filter 0,00 0,00 69,83 5,21 77,00 0,00 303,65 -60,64 5,39 0,00 -1,61 0,00 0,00 20,15
60 Filter II Filter 0,00 0,00 69,82 5,22 77,00 0,00 312,61 -60,89 5,41 0,00 -1,64 0,00 0,00 19,88
61 Filter III Filter 0,00 0,00 69,88 5,15 77,00 0,00 321,66 -61,14 5,43 0,00 -1,67 0,00 0,00 19,62
65 Fuel Gas Skid, facade E Fuel Gas Skid I 87,00 37,00 45,32 126,06 66,33 3,00 388,41 -62,78 4,54 0,00 -1,13 0,00 0,00 9,96
66 Fuel Gas Skid, facade E, door Fuel Gas Skid I 87,00 30,00 57,56 4,84 64,41 3,00 388,99 -62,79 5,25 0,00 -2,54 0,00 0,00 7,32
63 Fuel Gas Skid, facade S Fuel Gas Skid I 87,00 37,00 45,32 61,38 63,20 3,00 391,74 -62,85 4,57 0,00 -1,14 0,00 0,00 6,78
64 Fuel Gas Skid, facade S, door Fuel Gas Skid I 87,00 37,00 45,32 7,04 53,80 3,00 391,71 -62,85 5,26 0,00 -1,14 0,00 0,00 -1,93
68 Fuel Gas Skid, facade W Fuel Gas Skid I 87,00 37,00 45,32 130,90 66,49 3,00 396,49 -62,96 4,60 -4,26 -1,16 0,00 0,00 5,71
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.58 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Fuel Gas Skid, roof Fuel Gas Skid I 87,00 37,00 45,32 123,97 66,25 0,00 392,48 -62,87 4,50 -4,72 -1,14 0,00 0,00 2,02
67 Ventilation, intake Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 388,66 -62,78 -4,57 0,00 -0,92 0,00 0,00 5,74
69 Ventilation, outlet Fuel Gas Skid I 0,00 0,00 68,00 68,00 6,01 396,03 -62,95 -4,57 - -0,93 0,00 0,00 -7,65
162 Meter Run I Metering 0,00 0,00 72,70 39,44 88,66 0,00 353,43 -61,96 4,85 0,00 -2,23 0,00 0,00 29,32
163 Meter Run II Metering 0,00 0,00 72,70 39,45 88,66 0,00 356,42 -62,03 4,86 0,00 -2,25 0,00 0,00 29,24
164 Meter Run III Metering 0,00 0,00 72,69 39,54 88,66 0,00 359,43 -62,10 4,87 0,00 -2,27 0,00 0,00 29,16
74 Header discharge side Piping 0,00 0,00 80,00 136,95 101,37 0,00 325,45 -61,24 4,87 0,00 -1,68 0,12 0,00 43,44
75 Header suction side Piping 0,00 0,00 78,00 112,70 98,52 0,00 317,93 -61,04 4,85 0,00 -1,65 0,00 0,00 40,68
165 Facade E Power Generation Gas I 97,00 37,00 58,49 36,27 74,09 3,00 425,18 -63,56 5,09 0,00 -0,98 0,00 0,00 17,63
167 Facade N Power Generation Gas I 97,00 37,00 58,49 58,24 76,15 3,00 432,56 -63,71 5,11 -9,89 -0,78 0,00 0,00 9,86
170 Facade S Power Generation Gas I 97,00 37,00 58,49 53,44 75,77 3,00 429,68 -63,65 5,10 0,00 -0,99 0,00 0,00 19,23
171 Facade S, door Power Generation Gas I 97,00 30,00 64,01 4,84 70,86 3,00 431,23 -63,69 5,32 0,00 -1,59 0,00 0,00 13,90
168 Facade W Power Generation Gas I 97,00 37,00 58,49 36,05 74,06 3,00 437,40 -63,81 5,12 - -0,71 0,00 0,00 3,45
173 Power Generation Gas I, Exhaust Stack Power Generation Gas I 0,00 0,00 90,00 90,00 0,00 424,38 -63,55 4,71 0,00 -0,72 2,53 0,00 32,97
166 Roof Power Generation Gas I 97,00 37,00 58,49 104,04 78,67 0,00 431,34 -63,69 4,63 -4,71 -0,99 0,00 0,00 13,91
169 Room ventilation, intake Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 437,07 -63,80 -4,64 - -1,03 0,00 0,00 -1,81
172 Room ventilation, outlet Power Generation Gas I 0,00 0,00 76,00 76,00 6,01 427,83 -63,62 -4,62 0,00 -1,01 0,00 0,00 12,76
90 Distrib. pipe 1 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 340,49 -61,63 4,09 0,00 -8,68 0,00 0,00 20,10
77 Distrib. pipe 1 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 345,11 -61,75 3,98 0,00 -8,95 0,00 0,00 23,53
91 Distrib. pipe 2 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 339,56 -61,61 4,09 0,00 -8,65 0,00 0,00 20,14
79 Distrib. pipe 2 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 344,17 -61,73 3,97 0,00 -8,93 0,00 0,00 23,57
92 Distrib. pipe 3 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 338,63 -61,59 4,08 0,00 -8,63 0,00 0,00 20,18
80 Distrib. pipe 3 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 343,23 -61,70 3,97 0,00 -8,91 0,00 0,00 23,61
93 Distrib. pipe 4 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 337,48 -61,56 4,08 0,00 -8,61 0,00 0,00 20,23
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.59 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
81 Distrib. pipe 4 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 342,15 -61,68 3,96 0,00 -8,88 0,00 0,00 23,65
94 Distrib. pipe 5 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 336,55 -61,53 4,07 0,00 -8,58 0,00 0,00 20,27
82 Distrib. pipe 5 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 341,22 -61,65 3,96 0,00 -8,86 0,00 0,00 23,69
95 Distrib. pipe 6 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 335,62 -61,51 4,07 0,00 -8,56 0,00 0,00 20,31
83 Distrib. pipe 6 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 340,28 -61,63 3,95 0,00 -8,84 0,00 0,00 23,73
96 Distrib. pipe 7 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 334,47 -61,48 4,06 0,00 -8,54 0,00 0,00 20,36
84 Distrib. pipe 7 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 339,18 -61,60 3,95 0,00 -8,81 0,00 0,00 23,78
97 Distrib. pipe 8 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 333,53 -61,45 4,06 0,00 -8,52 0,00 0,00 20,40
85 Distrib. pipe 8 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 338,25 -61,58 3,94 0,00 -8,79 0,00 0,00 23,82
98 Distrib. pipe 9 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 332,61 -61,43 4,05 0,00 -8,49 0,00 0,00 20,44
86 Distrib. pipe 9 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 337,31 -61,55 3,93 0,00 -8,77 0,00 0,00 23,86
99 Distrib. pipe 10 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 331,46 -61,40 4,04 0,00 -8,47 0,00 0,00 20,49
87 Distrib. pipe 10 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 336,20 -61,52 3,93 0,00 -8,74 0,00 0,00 23,91
100 Distrib. pipe 11 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 330,53 -61,38 4,04 0,00 -8,45 0,00 0,00 20,53
88 Distrib. pipe 11 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 335,27 -61,50 3,92 0,00 -8,72 0,00 0,00 23,95
101 Distrib. pipe 12 downstream Start Up Cooler 0,00 0,00 76,00 10,75 86,31 0,00 329,60 -61,35 4,03 0,00 -8,43 0,00 0,00 20,57
89 Distrib. pipe 12 upstream Start Up Cooler 0,00 0,00 79,00 13,33 90,25 0,00 334,33 -61,48 3,92 0,00 -8,69 0,00 0,00 23,99
160 Header discharge side, Start Up Cooler Start Up Cooler 0,00 0,00 80,00 164,56 102,16 0,00 328,10 -61,31 4,88 0,00 -1,69 0,00 0,00 44,04
71 Start Up Cooler Start Up Cooler 0,00 0,00 66,17 191,91 89,00 0,00 337,20 -61,55 3,32 0,00 -2,84 0,00 0,00 27,93
73 Start Up Cooler, gas flow noise Start Up Cooler 0,00 0,00 70,16 192,32 93,00 0,00 337,20 -61,55 3,32 0,00 -2,84 0,00 0,00 31,93
78 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 328,74 -61,33 4,15 0,00 -8,41 0,00 0,00 20,01
131 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 327,81 -61,30 4,15 0,00 -8,38 0,00 0,00 20,05
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 326,87 -61,28 4,14 0,00 -8,36 0,00 0,00 20,09
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 325,72 -61,25 4,14 0,00 -8,34 0,00 0,00 20,14
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.60 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 324,79 -61,22 4,13 0,00 -8,31 0,00 0,00 20,19
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 323,86 -61,20 4,13 0,00 -8,29 0,00 0,00 20,23
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 322,73 -61,17 4,12 0,00 -8,27 0,00 0,00 20,28
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 321,80 -61,14 4,12 0,00 -8,25 0,00 0,00 20,32
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 320,87 -61,12 4,11 0,00 -8,22 0,00 0,00 20,36
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 319,72 -61,09 4,10 0,00 -8,20 0,00 0,00 20,41
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 318,78 -61,06 4,10 0,00 -8,18 0,00 0,00 20,45
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 317,85 -61,04 4,09 0,00 -8,15 0,00 0,00 20,49
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 316,71 -61,01 4,09 0,00 -8,13 0,00 0,00 20,55
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 315,78 -60,98 4,08 0,00 -8,11 0,00 0,00 20,59
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 314,85 -60,95 4,07 0,00 -8,08 0,00 0,00 20,63
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 313,70 -60,92 4,07 0,00 -8,06 0,00 0,00 20,68
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 312,77 -60,90 4,06 0,00 -8,04 0,00 0,00 20,72
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 311,84 -60,87 4,06 0,00 -8,01 0,00 0,00 20,76
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 310,71 -60,84 4,05 0,00 -7,99 0,00 0,00 20,82
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 309,78 -60,81 4,04 0,00 -7,97 0,00 0,00 20,86
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 308,85 -60,79 4,04 0,00 -7,94 0,00 0,00 20,90
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 307,70 -60,75 4,03 0,00 -7,92 0,00 0,00 20,95
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 306,77 -60,73 4,03 0,00 -7,90 0,00 0,00 20,99
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 305,84 -60,70 4,02 0,00 -7,87 0,00 0,00 21,04
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 304,71 -60,67 4,01 0,00 -7,85 0,00 0,00 21,09
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 303,78 -60,64 4,01 0,00 -7,83 0,00 0,00 21,13
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 302,85 -60,62 4,00 0,00 -7,80 0,00 0,00 21,17
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 301,70 -60,58 3,99 0,00 -7,78 0,00 0,00 21,22
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.61 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 300,78 -60,56 3,99 0,00 -7,76 0,00 0,00 21,27
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 299,85 -60,53 3,98 0,00 -7,73 0,00 0,00 21,31
70 Gas Cooler 1/2 Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 316,02 -60,99 3,14 0,00 -2,75 0,00 0,00 32,41
76 Gas Cooler 1/2, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 332,61 -61,43 4,13 0,00 -8,65 0,00 0,00 22,88
102 Gas Cooler 1/2, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 331,69 -61,41 4,13 0,00 -8,63 0,00 0,00 22,92
103 Gas Cooler 1/2, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 330,76 -61,38 4,12 0,00 -8,61 0,00 0,00 22,96
104 Gas Cooler 1/2, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 329,63 -61,35 4,11 0,00 -8,58 0,00 0,00 23,01
105 Gas Cooler 1/2, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 328,71 -61,33 4,11 0,00 -8,56 0,00 0,00 23,05
106 Gas Cooler 1/2, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 327,79 -61,30 4,10 0,00 -8,54 0,00 0,00 23,09
107 Gas Cooler 1/2, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 326,68 -61,27 4,10 0,00 -8,51 0,00 0,00 23,14
108 Gas Cooler 1/2, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 325,76 -61,25 4,09 0,00 -8,49 0,00 0,00 23,18
109 Gas Cooler 1/2, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 324,83 -61,23 4,09 0,00 -8,47 0,00 0,00 23,22
110 Gas Cooler 1/2, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 323,70 -61,19 4,08 0,00 -8,44 0,00 0,00 23,27
111 Gas Cooler 1/2, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 322,78 -61,17 4,08 0,00 -8,42 0,00 0,00 23,31
112 Gas Cooler 1/2, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 321,86 -61,15 4,07 0,00 -8,40 0,00 0,00 23,36
113 Gas Cooler 1/2, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 320,74 -61,12 4,06 0,00 -8,37 0,00 0,00 23,41
114 Gas Cooler 1/2, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 319,82 -61,09 4,06 0,00 -8,35 0,00 0,00 23,45
115 Gas Cooler 1/2, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 318,90 -61,07 4,05 0,00 -8,33 0,00 0,00 23,49
116 Gas Cooler 1/2, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 317,77 -61,03 4,05 0,00 -8,30 0,00 0,00 23,54
117 Gas Cooler 1/2, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 316,85 -61,01 4,04 0,00 -8,28 0,00 0,00 23,58
118 Gas Cooler 1/2, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 315,93 -60,98 4,03 0,00 -8,25 0,00 0,00 23,62
119 Gas Cooler 1/2, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 314,80 -60,95 4,03 0,00 -8,23 0,00 0,00 23,68
120 Gas Cooler 1/2, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 313,88 -60,93 4,02 0,00 -8,20 0,00 0,00 23,72
121 Gas Cooler 1/2, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 312,96 -60,90 4,02 0,00 -8,18 0,00 0,00 23,76
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.62 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
122 Gas Cooler 1/2, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 311,85 -60,87 4,01 0,00 -8,16 0,00 0,00 23,81
123 Gas Cooler 1/2, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 310,94 -60,85 4,00 0,00 -8,13 0,00 0,00 23,85
124 Gas Cooler 1/2, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 310,02 -60,82 4,00 0,00 -8,11 0,00 0,00 23,89
125 Gas Cooler 1/2, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 308,89 -60,79 3,99 0,00 -8,08 0,00 0,00 23,95
126 Gas Cooler 1/2, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 307,97 -60,76 3,99 0,00 -8,06 0,00 0,00 23,99
127 Gas Cooler 1/2, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 307,05 -60,74 3,98 0,00 -8,04 0,00 0,00 24,03
128 Gas Cooler 1/2, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 305,95 -60,71 3,97 0,00 -8,01 0,00 0,00 24,08
129 Gas Cooler 1/2, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 305,03 -60,68 3,97 0,00 -7,99 0,00 0,00 24,12
130 Gas Cooler 1/2, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 304,12 -60,65 3,96 0,00 -7,97 0,00 0,00 24,17
72 Gas Cooler 1/2, gas flow noise Transportation Gas Cooler 0,00 0,00 66,05 495,71 93,00 0,00 316,02 -60,99 3,14 0,00 -2,75 0,00 0,00 32,41
161 Header Discharge side Transportation Gas Cooler 0,00 0,00 78,00 90,45 97,56 0,00 341,55 -61,66 4,93 0,00 -1,75 0,00 0,00 39,08
28 Control valve (enclosed) Unit 1 0,00 0,00 87,00 87,00 3,01 360,34 -62,13 -4,60 0,00 -1,47 2,48 0,00 24,30
23 Exhaust Stack Opening Unit 1 0,00 0,00 87,18 2,01 90,21 0,00 380,94 -62,61 2,99 -3,53 -1,23 0,00 0,00 25,84
24 Exhaust duct outsde compressor Unit 1 0,00 0,00 76,40 12,10 87,23 0,00 376,90 -62,52 5,04 - -0,33 0,00 0,00 14,96
1 Oil Cooler Unit 1 0,00 0,00 78,11 24,50 92,00 0,00 383,45 -62,67 4,58 - -0,69 0,00 0,00 14,52
25 Piping suction side Unit 1 0,00 0,00 78,00 34,38 93,36 0,00 361,47 -62,15 4,99 0,00 -1,83 1,12 0,00 35,49
26 Piping, discharge side Unit 1 0,00 0,00 80,00 30,25 94,81 0,00 347,74 -61,82 4,95 0,00 -1,78 0,85 0,00 37,02
58 Control valve (eingehaust) Unit 3 0,00 0,00 87,00 87,00 3,01 291,65 -60,29 -4,55 0,00 -1,19 0,00 0,00 23,98
31 Exhaust Stack Opening Unit 3 0,00 0,00 87,18 2,01 90,21 0,00 312,99 -60,90 2,99 -3,59 -1,07 0,00 0,00 27,63
53 Exhaust duct outsde compressor Unit 3 0,00 0,00 79,40 6,06 87,23 0,00 309,03 -60,79 4,83 - -0,29 0,00 0,00 17,09
30 Oil Cooler Unit 3 0,00 0,00 78,11 24,50 92,00 0,00 316,28 -60,99 4,28 - -0,55 15,79 0,00 32,77
54 Piping suction side Unit 3 0,00 0,00 78,00 34,38 93,36 0,00 292,15 -60,30 4,76 0,00 -1,55 0,66 0,00 36,92
55 Piping, discharge side Unit 3 0,00 0,00 80,00 30,25 94,81 0,00 278,62 -59,89 4,70 0,00 -1,49 0,00 0,00 38,12
186 Air compressor I, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 423,05 -63,52 -4,63 -2,27 -1,00 0,00 0,00 1,59
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.63 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase Icalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
187 Air compressor II, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 421,37 -63,49 -4,63 0,00 -0,99 0,00 0,00 3,90
188 Air compressor III, air intake Utility Building 0,00 0,00 67,00 67,00 6,01 419,69 -63,45 -4,63 0,00 -0,99 0,00 0,00 3,94
176 Air compressor room, ventilation Utility Building 0,00 0,00 68,00 68,00 3,01 429,17 -63,64 -4,35 -0,39 -1,01 0,00 0,00 1,62
210 Air condition unit I Utility Building 0,00 0,00 87,00 87,00 0,00 431,35 -63,69 4,73 - -0,77 4,03 0,00 13,86
209 Air condition unit II Utility Building 0,00 0,00 87,00 87,00 0,00 431,97 -63,70 4,73 - -0,77 4,29 0,00 13,71
189 Boiler room, ventilation intake Utility Building 0,00 0,00 72,00 72,00 6,01 389,97 -62,81 -4,62 0,00 -0,92 0,00 0,00 9,66
182 Boiler room, ventilation outlet Utility Building 0,00 0,00 72,00 72,00 6,01 428,48 -63,63 -4,57 - -1,01 0,00 0,00 -9,68
177 Boiler, stack opening I Utility Building 0,00 0,00 78,00 78,00 3,01 392,40 -62,87 -4,30 -0,45 -0,93 0,00 0,00 12,46
179 Boiler, stack opening III Utility Building 0,00 0,00 78,00 78,00 3,01 395,99 -62,95 -4,31 -0,42 -0,93 0,00 0,00 12,40
178 Boiler, stack opening Ii Utility Building 0,00 0,00 78,00 78,00 3,01 394,18 -62,91 -4,30 -0,45 -0,93 0,00 0,00 12,42
174 Facade E Utility Building 87,43 37,00 37,28 117,45 57,98 3,00 392,16 -62,86 4,54 -2,83 -2,09 0,00 0,00 -2,27
180 Facade N Utility Building 87,43 37,00 37,28 390,90 63,20 3,00 413,91 -63,33 4,59 - -1,78 0,00 0,00 -15,25
181 Facade N, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 416,20 -63,38 5,30 - -5,89 0,00 0,00 -19,06
184 Facade S Utility Building 87,43 37,00 37,28 392,52 63,22 3,00 406,96 -63,18 4,64 0,00 -2,23 0,00 0,00 5,45
185 Facade S, doors Utility Building 87,43 30,00 51,96 22,00 65,38 3,00 405,53 -63,15 5,28 0,00 -6,75 0,00 0,00 3,76
183 Facade W Utility Building 87,43 37,00 37,28 115,70 57,92 3,00 429,81 -63,66 4,66 - -1,77 0,00 0,00 -19,35
175 Roof Utility Building 87,43 37,00 37,28 595,39 65,03 0,00 410,64 -63,26 3,58 -4,76 -2,24 0,00 0,00 -1,66
207 Air condition unit I Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 441,31 -63,89 4,76 - -0,79 0,00 0,00 15,07
208 Air condition unit II Workshop/Stores Building 0,00 0,00 87,00 87,00 0,00 438,44 -63,83 4,75 - -0,79 1,30 0,00 16,58
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.1.64 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Legende Source No. Number of sourceSource Source nameGroup Group nameLi dB(A) Indoor sound pressure levelR'w dB Transmission lossLw' dB(A) Sound power level per m,m²l or S m,m² Size of source (length or area)Lw dB(A) Sound power level per unitKo dB Correction for non spherical emissions m Distance source - receptor pointAdiv dB Attenuation due to divergenceAgr dB Attenuation due to ground effectsAbar dB Attenuation due to barrierAatm dB Attenuation due to atmospheric absorptiondLrefl dB Increase of noise due to reflectionsCmet Meteorological correctionLr,i dB(A) Assessed sound pressure at receiver
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.1 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 1 Thymaria Ld = 19,3 dB(A) Ln = 19,3 dB(A)
11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2644,58 -79,44 1,10 -4,24 -3,95 0,00 0,00 -0,53
69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2714,09 -79,66 1,26 -4,29 -4,07 0,00 0,00 -0,77
40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2695,61 -79,61 1,22 -4,28 -4,04 0,00 0,00 -0,71
41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2693,74 -79,60 1,22 -4,28 -4,04 0,00 0,00 -0,70
12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2642,68 -79,43 1,10 -4,24 -3,95 0,00 0,00 -0,53
70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2712,23 -79,66 1,26 -4,29 -4,07 0,00 0,00 -0,77
13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2656,33 -79,48 1,13 -4,26 -3,98 0,00 0,00 -0,59
42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2707,19 -79,64 1,24 -4,30 -4,07 0,00 0,00 -0,76
71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2725,88 -79,70 1,29 -4,31 -4,10 0,00 0,00 -0,83
72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2723,65 -79,70 1,28 -4,30 -4,09 0,00 0,00 -0,79
14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2654,05 -79,47 1,13 -4,25 -3,96 0,00 0,00 -0,55
43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2705,07 -79,64 1,24 -4,28 -4,05 0,00 0,00 -0,73
29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 2654,90 -79,47 -4,58 - - 0,00 0,00 -22,52
58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 2706,31 -79,64 -4,59 -7,85 - 0,00 0,00 -13,11
87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 2724,28 -79,70 -4,59 - - 0,00 0,00 -22,25
160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2649,82 -79,46 2,15 -0,84 - 0,00 0,00 -21,39
161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2650,68 -79,46 2,15 -0,85 - 0,00 0,00 -21,40
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2651,56 -79,46 2,15 -0,85 - 0,00 0,00 -21,41
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2652,64 -79,47 2,15 -0,86 - 0,00 0,00 -21,42
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2653,50 -79,47 2,16 -0,86 - 0,00 0,00 -21,43
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2654,37 -79,47 2,16 -0,87 - 0,00 0,00 -21,44
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2655,41 -79,47 2,16 -0,87 - 0,00 0,00 -21,45
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2656,27 -79,48 2,16 -0,88 - 0,00 0,00 -21,46
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.2 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2657,14 -79,48 2,17 -0,88 - 0,00 0,00 -21,47
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2658,21 -79,48 2,17 -0,89 - 0,00 0,00 -21,48
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2659,08 -79,49 2,17 -0,89 - 0,00 0,00 -21,49
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2659,94 -79,49 2,17 -0,89 - 0,00 0,00 -21,50
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2661,01 -79,49 2,17 -0,90 - 0,00 0,00 -21,51
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2661,88 -79,50 2,18 -0,90 - 0,00 0,00 -21,52
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2662,74 -79,50 2,18 -0,90 - 0,00 0,00 -21,53
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2663,82 -79,50 2,18 -0,91 - 0,00 0,00 -21,55
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2664,68 -79,51 2,18 -0,91 - 0,00 0,00 -21,56
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2665,55 -79,51 2,19 -0,91 - 0,00 0,00 -21,58
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2666,59 -79,51 2,19 -0,92 - 0,00 0,00 -21,59
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2667,45 -79,51 2,19 -0,92 - 0,00 0,00 -21,60
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2668,32 -79,52 2,19 -0,92 - 0,00 0,00 -21,62
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2669,39 -79,52 2,19 -0,93 - 0,00 0,00 -21,63
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2670,26 -79,52 2,20 -0,93 - 0,00 0,00 -21,64
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2671,13 -79,53 2,20 -0,93 - 0,00 0,00 -21,65
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2672,17 -79,53 2,20 -0,93 - 0,00 0,00 -21,67
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2673,04 -79,53 2,20 -0,94 - 0,00 0,00 -21,68
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2673,91 -79,54 2,20 -0,94 - 0,00 0,00 -21,69
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2674,98 -79,54 2,21 -0,94 - 0,00 0,00 -21,70
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2675,85 -79,54 2,21 -0,94 - 0,00 0,00 -21,71
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2676,72 -79,54 2,21 -0,95 - 0,00 0,00 -21,72
2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 2665,92 -79,51 1,54 -4,37 -3,51 0,00 0,00 4,36
60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 2735,49 -79,73 1,66 -4,40 -3,61 0,00 0,00 4,13
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.3 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 2686,30 -79,58 1,57 -4,38 -3,54 0,00 0,00 4,29
53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 2689,75 -79,59 3,01 -8,20 -0,85 0,00 0,00 1,60
82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 2731,75 -79,72 3,04 - -0,45 0,00 0,00 -5,52
24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 2662,24 -79,50 3,00 - -0,43 1,54 0,00 -3,51
169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 2495,81 -78,94 0,09 - -2,98 0,00 0,00 -18,34
22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2660,71 -79,49 2,04 - -0,91 0,00 0,00 -25,15
80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2730,25 -79,72 2,09 - -0,91 0,00 0,00 -25,25
81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2725,63 -79,70 2,08 - -0,77 0,00 0,00 -23,55
23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2655,97 -79,48 2,04 - -0,76 0,00 0,00 -23,40
78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2731,37 -79,72 1,80 - -4,91 0,00 0,00 -35,44
20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2661,86 -79,50 1,73 - -4,89 0,00 0,00 -35,29
19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2654,65 -79,47 1,73 - -3,97 0,00 0,00 -33,48
77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2724,34 -79,70 1,78 - -3,99 0,00 0,00 -33,64
21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 2657,88 -79,48 3,94 - -0,34 0,00 0,00 -9,73
79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 2727,49 -79,71 3,95 - -0,35 0,00 0,00 -9,92
170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 2488,07 -78,91 0,13 -2,36 -5,54 0,00 0,00 -7,92
6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 2645,39 -79,44 0,48 -3,83 -2,29 0,00 0,00 -2,08
35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 2695,63 -79,61 0,52 -3,85 -2,33 0,00 0,00 -2,27
64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 2715,06 -79,67 0,52 -3,85 -2,34 0,00 0,00 -2,34
5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2651,16 -79,46 2,04 -4,36 -2,99 0,00 0,00 -12,70
63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2720,85 -79,69 2,07 -4,38 -3,04 0,00 0,00 -12,96
34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2689,34 -79,58 2,07 -4,38 -3,02 0,00 0,00 -12,85
171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 2489,50 -78,91 0,93 -3,72 -6,46 0,00 0,00 -14,30
33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 2700,73 -79,62 1,74 -4,65 -9,01 0,00 0,00 -16,88
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.4 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 2709,10 -79,65 1,74 -4,65 -9,02 0,00 0,00 -16,92
4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 2639,45 -79,42 1,68 -4,64 -8,87 0,00 0,00 -16,59
65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 2715,05 -79,67 3,99 -4,56 -1,01 0,00 0,00 -0,26
7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 2645,38 -79,44 3,97 -4,56 -1,00 0,00 0,00 -0,03
36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 2695,62 -79,61 3,98 -4,57 -1,01 0,00 0,00 -0,20
8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2636,99 -79,41 1,72 -4,64 -8,87 0,00 0,00 -20,19
66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2706,63 -79,64 1,78 -4,65 -9,04 0,00 0,00 -20,53
168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 2491,47 -78,92 0,04 - -3,11 0,00 0,00 -10,88
52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2704,63 -79,63 2,07 - -1,00 0,00 0,00 -25,86
17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2653,66 -79,47 2,04 - -0,85 0,00 0,00 -24,61
75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2723,10 -79,69 2,08 - -0,85 0,00 0,00 -24,71
51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2712,04 -79,66 1,78 - -5,26 0,00 0,00 -35,93
16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2646,74 -79,45 1,72 - -4,42 0,00 0,00 -34,51
74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2716,15 -79,67 1,79 - -5,26 0,00 0,00 -35,94
37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2703,75 -79,63 1,78 -4,65 -9,03 0,00 0,00 -20,51
165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 2483,94 -78,89 -0,22 -2,05 -5,74 0,00 0,00 -9,82
48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2689,13 -79,58 2,07 -4,38 -3,02 0,00 0,00 -12,85
49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2693,80 -79,60 2,07 - -0,71 0,00 0,00 -21,28
45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2688,02 -79,58 1,77 -4,65 -8,99 0,00 0,00 -20,44
46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2695,12 -79,60 1,77 - -5,27 0,00 0,00 -23,69
47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 2691,94 -79,59 3,94 -4,56 -1,01 0,00 0,00 -0,22
18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 2658,48 -79,48 0,26 - -1,46 0,00 0,00 -25,95
76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 2728,07 -79,71 0,36 - -1,49 0,00 0,00 -26,14
32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 2695,47 -79,60 0,29 -3,70 -4,32 0,00 0,00 -17,82
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.5 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 2715,57 -79,67 0,30 -3,83 -4,26 0,00 0,00 -17,94
3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 2645,89 -79,44 0,19 -3,64 -4,24 0,00 0,00 -17,62
73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 2723,89 -79,70 0,35 - -1,51 0,00 0,00 -27,01
50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 2703,87 -79,63 0,32 - -1,68 0,00 0,00 -27,49
15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 2654,44 -79,47 0,23 - -1,46 0,00 0,00 -26,80
44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 2691,43 -79,59 0,30 -4,07 -4,12 0,00 0,00 -16,91
88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 2629,94 -79,39 0,93 -4,27 -6,57 0,00 0,00 -12,30
89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 2621,81 -79,36 0,92 -4,27 -6,55 0,00 0,00 -12,26
91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 2556,04 -79,14 0,31 -4,20 -7,07 0,00 0,00 -20,77
92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2558,28 -79,15 0,78 - -4,59 0,00 0,00 -47,40
94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 2549,16 -79,12 0,34 -0,88 -7,46 0,00 0,00 -20,77
95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2549,06 -79,12 0,77 -4,36 -6,91 0,00 0,00 -34,46
96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 2549,02 -79,12 0,14 -0,01 -7,29 0,00 0,00 -16,79
90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 2552,63 -79,13 0,14 -4,34 -6,72 0,00 0,00 -23,79
98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 2659,80 -79,49 1,05 -0,16 -9,53 0,00 0,00 4,87
102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2642,44 -79,43 2,13 -2,64 - 0,00 0,00 -19,50
103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2643,31 -79,44 2,14 -2,64 - 0,00 0,00 -19,51
104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2644,18 -79,44 2,14 -2,66 - 0,00 0,00 -20,61
105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2645,24 -79,44 2,14 -2,66 - 0,00 0,00 -20,63
106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2646,11 -79,44 2,14 -2,66 - 0,00 0,00 -20,64
107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2646,98 -79,45 2,15 -2,67 - 0,00 0,00 -20,66
108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2648,03 -79,45 2,15 -2,67 - 0,00 0,00 -20,67
109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2648,90 -79,45 2,15 -2,67 - 0,00 0,00 -20,69
110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2649,77 -79,46 2,15 -2,68 - 0,00 0,00 -20,70
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.6 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2650,84 -79,46 2,16 -2,70 - 0,00 0,00 -20,71
112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2651,71 -79,46 2,16 -2,71 - 0,00 0,00 -20,73
113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2652,58 -79,47 2,16 -2,73 - 0,00 0,00 -20,74
114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2653,63 -79,47 2,16 -2,74 - 0,00 0,00 -20,75
115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2654,49 -79,47 2,17 -2,75 - 0,00 0,00 -20,76
116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2655,37 -79,47 2,17 -2,77 - 0,00 0,00 -20,77
117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2656,43 -79,48 2,17 -2,78 - 0,00 0,00 -20,79
118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2657,30 -79,48 2,17 -2,79 - 0,00 0,00 -20,80
119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2658,17 -79,48 2,18 -2,80 - 0,00 0,00 -20,81
120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2659,25 -79,49 2,18 -2,81 - 0,00 0,00 -20,82
121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2660,12 -79,49 2,18 -2,81 - 0,00 0,00 -20,83
122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2660,99 -79,49 2,18 -2,81 - 0,00 0,00 -20,84
123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2662,04 -79,50 2,19 -2,81 - 0,00 0,00 -20,85
124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2662,90 -79,50 2,19 -2,81 - 0,00 0,00 -20,85
125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2663,77 -79,50 2,19 -2,81 - 0,00 0,00 -20,85
126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2664,84 -79,51 2,19 -2,81 - 0,00 0,00 -20,86
127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2665,71 -79,51 2,19 -2,80 - 0,00 0,00 -20,86
128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2666,58 -79,51 2,20 -2,80 - 0,00 0,00 -20,87
129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2667,63 -79,51 2,20 -2,80 - 0,00 0,00 -20,87
130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2668,49 -79,52 2,20 -2,80 - 0,00 0,00 -20,88
131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2669,37 -79,52 2,20 -2,80 - 0,00 0,00 -20,88
99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 2659,80 -79,49 1,05 -0,16 -9,53 0,00 0,00 4,87
100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 2697,87 -79,61 1,43 -5,28 -8,71 0,00 0,00 8,17
162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 2698,08 -79,61 1,43 -4,80 -8,94 0,00 0,00 8,62
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.7 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 2697,30 -79,61 1,43 -5,00 -8,84 0,00 0,00 6,49
163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 2592,70 -79,27 1,93 -3,85 - 0,00 0,00 -5,03
164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 2590,00 -79,26 1,93 -3,67 - 0,00 0,00 -4,93
59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 2731,95 -79,72 1,24 - -1,66 0,00 0,00 -5,70
30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 2683,37 -79,57 1,21 -4,43 -6,12 2,31 0,00 5,40
1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 2662,17 -79,50 1,19 - -1,63 0,00 0,00 -5,65
25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 2654,05 -79,47 1,39 -8,28 -7,05 0,00 0,00 -0,04
54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 2705,45 -79,64 1,45 -9,31 -7,18 0,00 0,00 -1,32
83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 2723,33 -79,69 -4,59 -0,65 -6,42 0,00 0,00 3,65
55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 2719,11 -79,68 1,46 -6,28 -8,24 0,00 0,00 2,07
26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 2667,70 -79,51 1,41 - -6,79 3,14 0,00 2,22
84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 2736,91 -79,74 1,48 - -7,00 0,00 0,00 -0,96
173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 2496,79 -78,94 -0,16 -4,11 -1,97 0,00 0,00 4,82
167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 2489,89 -78,92 -0,47 -3,95 -4,93 0,00 0,00 -9,59
38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 2700,63 -79,62 -0,72 -3,36 -3,98 0,00 0,00 -17,54
67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 2719,12 -79,68 -0,68 -3,39 -4,01 0,00 0,00 -17,61
9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 2649,56 -79,46 -0,85 -3,26 -3,90 0,00 0,00 -17,33
166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2484,33 -78,90 -4,55 0,00 -5,86 0,00 0,00 -7,29
172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2486,21 -78,90 -4,55 0,00 -5,86 0,00 0,00 -7,30
93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2553,91 -79,14 -4,56 - -6,02 0,00 0,00 -26,75
97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2551,32 -79,13 -4,56 0,00 -6,02 0,00 0,00 -15,69
28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2643,01 -79,43 0,40 -3,80 -2,29 0,91 0,00 -4,20
57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2694,54 -79,60 0,44 -3,82 -2,33 0,00 0,00 -5,31
86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2712,68 -79,66 0,44 -3,81 -2,34 0,90 0,00 -4,47
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.8 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2728,14 -79,71 0,73 - -4,74 0,00 0,00 -19,95
27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2658,76 -79,49 0,49 - -4,60 0,00 0,00 -19,84
56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2690,03 -79,59 0,60 -1,14 - 2,54 0,00 -8,59
39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 2700,44 -79,62 -0,31 -3,81 -5,74 0,00 0,00 6,65
10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 2649,37 -79,45 -0,46 -3,72 -5,62 0,33 0,00 7,21
68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 2718,93 -79,68 -0,25 -3,85 -5,79 0,00 0,00 6,57
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.9 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 2 Tavri Ld = 20,1 dB(A) Ln = 20,1 dB(A)
11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2960,87 -80,42 1,10 -4,25 -4,04 0,00 0,00 -1,60
69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3034,75 -80,63 1,25 -4,29 -4,15 0,00 0,00 -1,83
40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3015,08 -80,58 1,21 -4,28 -4,12 0,00 0,00 -1,77
41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3015,92 -80,58 1,21 -0,69 -3,56 0,00 0,00 2,38
12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2961,72 -80,42 1,10 -0,62 -3,54 0,00 0,00 2,51
70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3035,58 -80,64 1,25 -0,66 -3,63 0,00 0,00 2,32
13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2973,11 -80,46 1,12 -4,25 -4,06 0,00 0,00 -1,64
42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3027,42 -80,61 1,23 -4,28 -4,15 0,00 0,00 -1,81
71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3047,00 -80,67 1,27 -4,30 -4,18 0,00 0,00 -1,87
72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 3047,99 -80,67 1,28 -4,30 -4,18 0,00 0,00 -1,87
14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2974,12 -80,46 1,12 -4,25 -4,06 0,00 0,00 -1,65
43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 3028,23 -80,62 1,23 -4,28 -4,15 0,00 0,00 -1,81
29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 2963,07 -80,43 -4,51 0,00 - 0,00 0,00 -7,02
58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 3017,94 -80,59 -4,52 0,00 - 0,00 0,00 -7,41
87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 3037,07 -80,64 -4,52 0,00 - 0,00 0,00 -7,54
160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2917,54 -80,29 2,11 -1,68 - 0,00 0,00 -23,67
161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2918,48 -80,30 2,11 -1,67 - 0,00 0,00 -23,67
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2919,43 -80,30 2,11 -1,67 - 0,00 0,00 -23,67
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2920,59 -80,30 2,11 -1,67 - 0,00 0,00 -23,67
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2921,53 -80,30 2,12 -1,66 - 0,00 0,00 -23,67
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2922,47 -80,31 2,12 -1,66 - 0,00 0,00 -23,67
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2923,61 -80,31 2,12 -1,66 - 0,00 0,00 -23,67
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2924,55 -80,31 2,12 -1,65 - 0,00 0,00 -23,66
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.10 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2925,49 -80,32 2,13 -1,65 - 0,00 0,00 -23,66
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2926,65 -80,32 2,13 -1,64 - 0,00 0,00 -23,66
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2927,59 -80,32 2,13 -1,64 - 0,00 0,00 -23,66
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2928,53 -80,33 2,13 -1,64 - 0,00 0,00 -23,65
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2929,67 -80,33 2,14 -1,63 - 0,00 0,00 -23,65
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2930,61 -80,33 2,14 -1,63 - 0,00 0,00 -23,65
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2931,55 -80,33 2,14 -1,62 - 0,00 0,00 -23,64
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2932,71 -80,34 2,14 -1,63 - 0,00 0,00 -23,72
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2933,65 -80,34 2,15 -1,63 - 0,00 0,00 -23,72
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2934,58 -80,34 2,15 -1,62 - 0,00 0,00 -23,72
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2935,73 -80,35 2,15 -1,62 - 0,00 0,00 -23,72
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2936,67 -80,35 2,15 -1,61 - 0,00 0,00 -23,72
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2937,61 -80,35 2,15 -1,60 - 0,00 0,00 -23,71
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2938,77 -80,36 2,16 -1,59 - 0,00 0,00 -23,71
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2939,71 -80,36 2,16 -1,59 - 0,00 0,00 -23,71
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2940,65 -80,36 2,16 -1,58 - 0,00 0,00 -23,70
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2941,80 -80,36 2,16 -1,57 - 0,00 0,00 -23,70
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2942,74 -80,37 2,17 -1,56 - 0,00 0,00 -23,70
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2943,68 -80,37 2,17 -1,55 - 0,00 0,00 -23,69
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2944,84 -80,37 2,17 -1,54 - 0,00 0,00 -23,69
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2945,78 -80,38 2,17 -1,53 - 0,00 0,00 -23,68
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2946,71 -80,38 2,17 -1,52 - 0,00 0,00 -23,68
2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 2983,18 -80,49 1,56 -4,40 -3,63 0,00 0,00 3,25
60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 3057,14 -80,70 1,67 -4,43 -3,73 0,00 0,00 3,03
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.11 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 3004,89 -80,55 1,59 -4,41 -3,66 0,00 0,00 3,19
53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 3008,80 -80,56 3,00 -6,94 -1,01 0,00 0,00 1,71
82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 3053,42 -80,69 3,02 - -0,59 0,00 0,00 -2,13
24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 2979,52 -80,48 2,98 - -0,58 0,89 0,00 -1,04
169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 2813,09 -79,98 0,06 - -3,87 0,00 0,00 -17,00
22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2976,10 -80,47 2,03 - -0,91 0,00 0,00 -19,80
80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3050,00 -80,68 2,07 - -0,93 0,00 0,00 -19,98
81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3052,06 -80,68 2,07 - -1,03 0,00 0,00 -21,27
23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2978,20 -80,47 2,03 - -1,02 0,00 0,00 -21,11
78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3049,52 -80,68 1,76 - -4,98 0,00 0,00 -29,03
20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2975,60 -80,46 1,70 - -4,92 0,00 0,00 -28,81
19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2978,80 -80,47 1,70 - -5,34 0,00 0,00 -31,01
77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3052,64 -80,69 1,76 - -5,39 0,00 0,00 -31,21
21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 2977,34 -80,47 3,95 - -0,42 0,00 0,00 -7,19
79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 3051,21 -80,68 3,96 - -0,43 0,00 0,00 -7,35
170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 2807,27 -79,96 -0,05 -5,77 -4,82 0,00 0,00 -11,83
6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 2969,97 -80,45 0,48 - -0,93 0,00 0,00 -9,42
35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 3023,17 -80,60 0,51 - -0,97 0,00 0,00 -10,12
64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 3043,79 -80,66 0,52 - -0,90 0,00 0,00 -9,20
5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2976,14 -80,47 2,03 - -0,87 0,00 0,00 -19,51
63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3049,97 -80,68 2,06 - -0,83 0,00 0,00 -19,25
34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3016,54 -80,58 2,05 - -0,71 0,00 0,00 -22,10
171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 2808,82 -79,96 0,93 -7,86 -4,06 0,00 0,00 -17,09
33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 3028,60 -80,62 1,71 - -5,06 0,00 0,00 -26,95
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.12 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 3037,49 -80,64 1,72 - -5,15 0,00 0,00 -27,17
4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 2963,68 -80,43 1,66 - -4,83 0,00 0,00 -26,14
65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 3043,80 -80,66 3,99 -9,44 -0,39 0,00 0,00 -5,50
7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 2969,98 -80,45 3,98 -9,94 -0,39 0,00 0,00 -5,81
36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 3023,18 -80,60 3,99 - -0,41 0,00 0,00 -6,57
8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2961,08 -80,42 1,69 - -4,88 0,00 0,00 -29,81
66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3034,89 -80,63 1,75 - -5,23 0,00 0,00 -30,90
168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 2805,96 -79,95 -0,10 0,00 -5,94 0,00 0,00 -1,87
52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3019,62 -80,59 2,05 0,00 -3,26 0,00 0,00 -9,73
17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2965,39 -80,43 2,02 0,00 -3,23 0,00 0,00 -9,57
75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 3039,31 -80,65 2,06 0,00 -3,27 0,00 0,00 -9,79
51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3027,51 -80,61 1,74 0,00 -9,98 0,00 0,00 -17,83
16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2957,99 -80,41 1,69 0,00 -9,84 0,00 0,00 -17,55
74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 3031,91 -80,63 1,75 0,00 -9,99 0,00 0,00 -17,85
37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3031,81 -80,63 1,75 - -5,11 0,00 0,00 -30,65
165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 2800,35 -79,94 -0,33 0,00 -5,95 0,00 0,00 -9,13
48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3013,20 -80,57 2,05 -5,17 -1,22 0,00 0,00 -12,85
49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 3011,11 -80,57 2,05 0,00 -3,25 0,00 0,00 -9,71
45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3013,71 -80,57 1,73 -7,72 -6,99 0,00 0,00 -22,54
46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 3010,53 -80,56 1,73 0,00 -9,95 0,00 0,00 -17,76
47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 3011,92 -80,57 3,95 -5,52 -0,39 0,00 0,00 -1,52
18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 2977,07 -80,47 0,25 - -2,03 0,00 0,00 -23,72
76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 3050,95 -80,68 0,34 - -2,08 0,00 0,00 -23,91
32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 3022,95 -80,60 0,28 - -2,07 0,00 0,00 -24,88
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.13 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 3044,28 -80,66 0,31 - -1,96 0,00 0,00 -24,04
3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 2970,45 -80,45 0,21 - -1,98 0,00 0,00 -24,06
73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 3040,07 -80,65 0,40 0,00 -4,75 0,00 0,00 -15,16
50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 3018,72 -80,59 0,28 0,00 -4,69 0,00 0,00 -15,17
15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 2966,14 -80,44 0,25 0,00 -4,63 0,00 0,00 -14,99
44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 3012,15 -80,57 0,28 -2,34 -4,11 0,00 0,00 -16,18
88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 2855,32 -80,11 0,91 0,00 -7,80 0,00 0,00 -10,00
89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 2846,39 -80,08 0,90 0,00 -7,79 0,00 0,00 -9,97
91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 2805,88 -79,95 0,27 -3,80 -7,65 0,00 0,00 -21,81
92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2805,28 -79,95 0,77 - -5,83 0,00 0,00 -44,35
94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 2802,84 -79,94 0,23 -2,28 -7,67 0,00 0,00 -23,32
95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2802,76 -79,94 0,76 -5,86 -7,18 0,00 0,00 -37,05
96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 2797,82 -79,93 0,08 0,00 -7,85 0,00 0,00 -18,21
90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 2801,82 -79,94 0,08 -4,30 -7,25 0,00 0,00 -25,16
98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 2933,42 -80,34 0,98 -0,18 -9,98 0,00 0,00 3,48
102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2920,21 -80,30 2,09 0,00 - 0,00 0,00 -18,53
103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2921,15 -80,30 2,10 0,00 - 0,00 0,00 -18,53
104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2922,09 -80,31 2,10 0,00 - 0,00 0,00 -18,53
105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2923,24 -80,31 2,10 0,00 - 0,00 0,00 -18,54
106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2924,18 -80,31 2,10 0,00 - 0,00 0,00 -18,54
107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2925,12 -80,31 2,11 0,00 - 0,00 0,00 -18,55
108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2926,26 -80,32 2,11 0,00 - 0,00 0,00 -18,55
109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2927,20 -80,32 2,11 0,00 - 0,00 0,00 -18,55
110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2928,14 -80,32 2,11 0,00 - 0,00 0,00 -18,56
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.14 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2929,28 -80,33 2,12 0,00 - 0,00 0,00 -18,56
112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2930,23 -80,33 2,12 0,00 - 0,00 0,00 -18,57
113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2931,17 -80,33 2,12 0,00 - 0,00 0,00 -18,57
114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2932,32 -80,34 2,12 0,00 - 0,00 0,00 -18,57
115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2933,26 -80,34 2,13 0,00 - 0,00 0,00 -18,58
116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2934,20 -80,34 2,13 0,00 - 0,00 0,00 -18,58
117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2935,35 -80,35 2,13 0,00 - 0,00 0,00 -18,59
118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2936,29 -80,35 2,13 0,00 - 0,00 0,00 -18,59
119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2937,24 -80,35 2,14 0,00 - 0,00 0,00 -18,59
120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2938,38 -80,35 2,14 0,00 - 0,00 0,00 -18,60
121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2939,32 -80,36 2,14 0,00 - 0,00 0,00 -18,60
122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2940,26 -80,36 2,14 0,00 - 0,00 0,00 -18,61
123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2941,39 -80,36 2,15 0,00 - 0,00 0,00 -18,61
124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2942,33 -80,37 2,15 0,00 - 0,00 0,00 -18,61
125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2943,27 -80,37 2,15 0,00 - 0,00 0,00 -18,62
126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2944,42 -80,37 2,15 0,00 - 0,00 0,00 -18,62
127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2945,36 -80,37 2,16 0,00 - 0,00 0,00 -18,63
128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2946,31 -80,38 2,16 0,00 - 0,00 0,00 -18,63
129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2947,44 -80,38 2,16 0,00 - 0,00 0,00 -18,63
130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2948,38 -80,38 2,16 0,00 - 0,00 0,00 -18,64
131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2949,32 -80,39 2,16 0,00 - 0,00 0,00 -18,64
99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 2933,42 -80,34 0,98 -0,18 -9,98 0,00 0,00 3,48
100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 2995,73 -80,52 1,40 0,00 - 0,00 0,00 10,63
162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 2991,50 -80,51 1,40 0,00 - 0,00 0,00 10,85
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.15 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 2993,38 -80,52 1,40 0,00 - 0,00 0,00 8,80
163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 2826,69 -80,02 1,93 -0,54 - 0,00 0,00 -2,82
164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 2823,71 -80,01 1,92 -0,57 - 0,00 0,00 -2,84
59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 3058,22 -80,70 1,23 - -2,09 0,00 0,00 -6,37
30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 3006,72 -80,55 1,19 -6,12 -4,76 2,43 0,00 4,18
1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 2984,19 -80,49 1,17 - -2,05 6,34 0,00 0,05
25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 2957,56 -80,41 1,37 0,00 - 0,10 0,00 3,92
54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 3012,50 -80,57 1,41 0,00 - 0,03 0,00 3,60
83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 3031,50 -80,63 -4,52 0,00 -7,15 0,00 0,00 2,71
55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 3026,71 -80,61 1,42 0,00 - 0,07 0,00 5,02
26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 2971,78 -80,45 1,38 0,00 - 0,06 0,00 5,26
84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 3045,78 -80,67 1,44 0,00 - 0,08 0,00 5,00
173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 2813,82 -79,98 -0,20 -3,09 -2,20 0,00 0,00 4,54
167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 2806,70 -79,96 -0,50 -3,92 -5,43 0,00 0,00 -11,14
38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 3021,61 -80,60 -0,74 -3,34 -4,30 0,00 0,00 -18,83
67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 3041,27 -80,65 -0,69 -3,38 -4,33 0,00 0,00 -18,91
9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 2967,40 -80,44 -0,86 -3,25 -4,22 0,00 0,00 -18,63
166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2800,17 -79,94 -4,48 0,00 -6,60 0,00 0,00 -9,01
172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2805,27 -79,95 -4,48 -5,13 -6,62 0,00 0,00 -14,17
93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2806,50 -79,96 -4,49 -7,92 -6,62 0,00 0,00 -24,97
97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2797,17 -79,93 -4,49 0,00 -6,60 0,00 0,00 -17,00
28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2970,06 -80,45 0,41 -4,04 -1,60 1,23 0,00 -4,45
57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 3024,73 -80,61 0,44 -3,04 -2,12 0,00 0,00 -5,32
86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 3043,92 -80,66 0,45 -4,23 -1,79 0,00 0,00 -6,22
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.16 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 3052,16 -80,68 0,69 - -5,99 0,00 0,00 -18,00
27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2978,16 -80,47 0,46 - -5,80 0,00 0,00 -17,82
56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 3011,56 -80,57 0,56 -4,16 -8,70 2,28 0,00 -10,59
39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 3021,62 -80,60 -0,34 -0,38 -6,31 0,00 0,00 8,51
10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 2967,36 -80,44 -0,48 -2,79 -6,18 0,00 0,00 6,24
68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 3041,28 -80,65 -0,28 -3,83 -6,24 0,00 0,00 5,13
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.17 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 3 Peplos Ld = 25,6 dB(A) Ln = 25,6 dB(A)
11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1758,45 -75,89 1,06 -4,24 -3,72 0,00 0,00 3,21
69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1781,05 -76,01 1,07 -4,25 -3,74 0,00 0,00 3,08
40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1774,67 -75,97 1,07 -4,25 -3,73 0,00 0,00 3,11
41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1779,42 -76,00 1,08 -4,26 -3,74 0,00 0,00 3,09
12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1763,25 -75,92 1,07 -4,25 -3,73 0,00 0,00 3,18
70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1785,78 -76,03 1,08 -4,26 -3,74 0,37 0,00 3,42
13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1761,58 -75,91 1,06 -4,25 -3,72 0,00 0,00 3,18
42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1778,66 -75,99 1,07 -4,25 -3,73 0,00 0,00 3,09
71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1784,66 -76,02 1,07 -4,26 -3,74 0,00 0,00 3,06
72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 1790,33 -76,05 1,09 -4,26 -3,75 0,00 0,00 3,03
14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 1767,32 -75,94 1,07 -4,25 -3,73 0,00 0,00 3,16
43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 1783,80 -76,02 1,08 -4,26 -3,74 0,00 0,00 3,06
29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 1744,74 -75,83 -4,80 0,00 -7,12 2,49 0,00 4,76
58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 1761,59 -75,91 -4,80 0,00 -7,19 2,49 0,00 4,61
87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 1767,81 -75,94 -4,80 0,00 -7,21 2,49 0,00 4,55
160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,01 -75,44 2,11 -4,58 - 0,00 0,00 -16,21
161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,28 -75,44 2,11 -4,59 - 0,00 0,00 -16,21
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,55 -75,44 2,11 -4,61 - 0,00 0,00 -16,22
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1669,86 -75,45 2,11 -4,62 - 0,00 0,00 -16,22
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1670,13 -75,45 2,11 -4,63 - 0,00 0,00 -16,23
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1670,40 -75,45 2,11 -4,64 - 0,00 0,00 -16,23
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1670,75 -75,45 2,11 -4,65 - 0,00 0,00 -16,24
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,02 -75,45 2,11 -4,66 - 0,00 0,00 -16,24
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.18 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,29 -75,45 2,11 -4,67 - 0,00 0,00 -16,25
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,61 -75,45 2,11 -4,68 - 0,00 0,00 -16,25
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1671,88 -75,46 2,11 -4,68 - 0,00 0,00 -16,26
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1672,15 -75,46 2,11 -4,69 - 0,00 0,00 -16,26
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1672,46 -75,46 2,11 -4,70 - 0,00 0,00 -16,27
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1672,74 -75,46 2,11 -4,70 - 0,00 0,00 -16,27
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,01 -75,46 2,11 -4,71 - 0,00 0,00 -16,28
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,33 -75,46 2,11 -4,72 - 0,00 0,00 -16,28
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,61 -75,47 2,11 -4,72 - 0,00 0,00 -16,29
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1673,88 -75,47 2,11 -4,73 - 0,00 0,00 -16,29
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1674,24 -75,47 2,11 -4,73 - 0,00 0,00 -16,29
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1674,52 -75,47 2,11 -4,74 - 0,00 0,00 -16,30
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1674,79 -75,47 2,11 -4,74 - 0,00 0,00 -16,30
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1675,12 -75,47 2,11 -4,74 - 0,00 0,00 -16,31
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1675,40 -75,47 2,11 -4,75 - 0,00 0,00 -16,31
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1675,68 -75,48 2,11 -4,75 - 0,00 0,00 -16,31
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,05 -75,48 2,11 -4,75 - 0,00 0,00 -16,32
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,33 -75,48 2,11 -4,76 - 0,00 0,00 -16,32
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,61 -75,48 2,11 -4,76 - 0,00 0,00 -16,32
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1676,94 -75,48 2,11 -4,76 - 0,00 0,00 -16,33
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1677,22 -75,48 2,11 -4,76 - 0,00 0,00 -16,33
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 1677,50 -75,49 2,11 -4,76 - 0,00 0,00 -16,33
2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 1764,49 -75,92 1,39 -4,33 -3,10 0,00 0,00 8,25
60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 1788,11 -76,04 1,40 -2,62 -4,62 0,00 0,00 8,33
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.19 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 1771,16 -75,96 1,39 -4,34 -3,11 0,00 0,00 8,20
53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 1772,16 -75,96 3,04 -4,68 -3,82 0,72 0,00 6,53
82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 1786,66 -76,03 3,04 - -0,34 0,00 0,00 -0,12
24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 1763,21 -75,92 3,04 -4,68 -3,81 0,00 0,00 5,86
169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 1739,10 -75,80 0,61 - -2,52 0,55 0,00 -14,72
22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1759,32 -75,90 2,10 - -0,70 0,00 0,00 -20,29
80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1782,57 -76,01 2,10 - -0,71 0,00 0,00 -20,39
81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1794,37 -76,07 2,11 - -0,77 0,00 0,00 -21,43
23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1771,27 -75,96 2,11 - -0,77 0,00 0,00 -21,32
78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1779,75 -76,00 1,85 - -3,83 0,00 0,00 -30,17
20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1756,45 -75,88 1,85 - -3,82 0,00 0,00 -30,05
19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1774,62 -75,97 1,88 - -4,30 0,00 0,00 -31,13
77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1797,67 -76,09 1,88 - -4,32 0,00 0,00 -31,27
21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 1766,50 -75,93 3,88 - -0,26 0,00 0,00 -6,68
79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 1789,66 -76,05 3,89 - -0,26 0,00 0,00 -6,82
170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 1741,76 -75,81 0,60 - -2,39 0,00 0,00 -13,75
6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 1773,71 -75,97 0,53 - -0,59 0,00 0,00 -11,05
35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 1789,68 -76,05 0,53 - -0,59 0,00 0,00 -11,19
64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 1796,39 -76,08 0,53 - -0,59 0,00 0,00 -11,23
5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1775,50 -75,98 2,12 - -0,82 0,00 0,00 -21,75
63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1798,42 -76,09 2,12 - -0,82 0,00 0,00 -21,86
34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1787,57 -76,04 2,12 - -0,71 0,00 0,00 -20,55
171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 1742,06 -75,81 1,25 - -1,64 0,01 0,00 -21,34
33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 1791,40 -76,06 1,82 - -4,21 0,00 0,00 -27,42
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.20 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 1794,32 -76,07 1,82 - -4,21 0,00 0,00 -27,45
4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 1771,88 -75,96 1,82 - -4,17 0,00 0,00 -27,25
65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 1796,38 -76,08 3,95 - -0,28 0,00 0,00 -7,88
7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 1773,70 -75,97 3,94 - -0,27 0,00 0,00 -7,69
36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 1789,67 -76,05 3,94 - -0,27 0,00 0,00 -7,83
8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1771,13 -75,96 1,88 - -4,35 0,00 0,00 -31,19
66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1793,46 -76,07 1,88 - -4,37 0,00 0,00 -31,33
168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 1733,85 -75,77 0,60 -5,27 -3,60 0,14 0,00 0,24
52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1767,60 -75,94 2,10 -4,39 -2,80 0,00 0,00 -8,96
17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 1751,14 -75,86 2,10 -4,39 -2,79 0,00 0,00 -8,87
75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 1774,09 -75,97 2,10 -4,39 -2,80 0,00 0,00 -9,00
51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1770,16 -75,95 1,85 -4,65 -6,96 0,00 0,00 -14,69
16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 1748,98 -75,85 1,85 -4,65 -6,90 0,00 0,00 -14,53
74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 1771,64 -75,96 1,85 -4,65 -6,96 0,00 0,00 -14,70
37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1792,42 -76,06 1,88 - -4,37 0,00 0,00 -31,32
165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 1736,53 -75,79 0,57 -4,38 -3,78 0,00 0,00 -6,29
48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1781,56 -76,01 2,11 -4,40 -2,81 0,00 0,00 -9,03
49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 1769,68 -75,95 2,10 -4,39 -2,80 0,00 0,00 -8,97
45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1784,42 -76,02 1,88 -4,66 -7,00 0,00 0,00 -14,78
46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 1766,36 -75,93 1,85 -4,65 -6,95 0,00 0,00 -14,66
47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 1774,44 -75,97 3,88 -4,60 -0,88 0,00 0,00 3,44
18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 1765,06 -75,93 0,29 - -1,12 0,00 0,00 -22,29
76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 1788,24 -76,04 0,29 - -1,13 0,00 0,00 -22,43
32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 1789,66 -76,05 0,28 - -1,10 0,00 0,00 -23,87
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.21 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 1796,60 -76,08 0,28 - -1,11 0,00 0,00 -24,00
3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 1773,90 -75,97 0,27 - -1,10 0,00 0,00 -23,82
73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 1774,40 -75,97 0,26 -4,02 -3,08 0,00 0,00 -12,98
50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 1767,38 -75,94 0,23 -3,99 -3,08 0,00 0,00 -12,94
15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 1751,42 -75,86 0,25 -3,83 -3,15 0,00 0,00 -12,75
44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 1775,83 -75,98 0,29 -3,99 -3,11 0,00 0,00 -12,23
88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 1589,55 -75,02 0,96 -4,28 -5,11 0,00 0,00 -6,44
89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 1587,29 -75,01 0,96 -4,28 -5,10 0,00 0,00 -6,42
91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 1626,45 -75,22 0,70 -5,98 -4,90 0,00 0,00 -16,07
92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 1621,57 -75,19 0,92 - -3,33 0,00 0,00 -44,00
94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 1632,58 -75,25 0,71 -4,67 -5,01 0,00 0,00 -17,86
95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 1632,57 -75,25 0,94 - -3,32 0,00 0,00 -43,95
96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 1624,11 -75,20 0,76 -3,61 -4,91 0,00 0,00 -13,47
90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 1623,99 -75,20 0,74 -4,57 -4,61 0,00 0,00 -17,39
98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 1681,66 -75,51 0,89 -4,16 -6,40 0,00 0,00 7,83
102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1686,36 -75,53 2,15 -4,51 - 0,00 0,00 -13,50
103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1686,62 -75,53 2,15 -4,52 - 0,00 0,00 -13,50
104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1686,89 -75,53 2,15 -4,54 - 0,00 0,00 -13,51
105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1687,22 -75,54 2,15 -4,56 - 0,00 0,00 -13,52
106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1687,48 -75,54 2,15 -4,57 - 0,00 0,00 -13,52
107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1687,75 -75,54 2,15 -4,58 - 0,00 0,00 -13,53
108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,08 -75,54 2,15 -4,60 - 0,00 0,00 -13,53
109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,35 -75,54 2,15 -4,61 - 0,00 0,00 -13,54
110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,62 -75,54 2,15 -4,62 - 0,00 0,00 -13,54
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.22 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1688,93 -75,54 2,15 -4,63 - 0,00 0,00 -13,55
112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1689,20 -75,55 2,15 -4,64 - 0,00 0,00 -13,55
113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1689,47 -75,55 2,15 -4,65 - 0,00 0,00 -13,56
114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1689,82 -75,55 2,15 -4,66 - 0,00 0,00 -13,56
115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,09 -75,55 2,15 -4,67 - 0,00 0,00 -13,57
116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,36 -75,55 2,15 -4,68 - 0,00 0,00 -13,57
117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,70 -75,55 2,15 -4,69 - 0,00 0,00 -13,57
118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1690,97 -75,55 2,15 -4,69 - 0,00 0,00 -13,58
119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1691,24 -75,56 2,15 -4,70 - 0,00 0,00 -13,58
120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1691,54 -75,56 2,15 -4,71 - 0,00 0,00 -13,59
121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1691,81 -75,56 2,15 -4,71 - 0,00 0,00 -13,59
122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,09 -75,56 2,15 -4,72 - 0,00 0,00 -13,59
123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,43 -75,56 2,15 -4,73 - 0,00 0,00 -13,60
124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,71 -75,56 2,15 -4,73 - 0,00 0,00 -13,60
125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1692,98 -75,57 2,15 -4,73 - 0,00 0,00 -13,61
126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1693,32 -75,57 2,15 -4,74 - 0,00 0,00 -13,61
127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1693,60 -75,57 2,15 -4,74 - 0,00 0,00 -13,61
128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1693,88 -75,57 2,15 -4,75 - 0,00 0,00 -13,62
129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1694,22 -75,57 2,15 -4,75 - 0,00 0,00 -13,62
130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1694,50 -75,57 2,15 -4,75 - 0,00 0,00 -13,62
131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 1694,78 -75,57 2,15 -4,76 - 0,00 0,00 -13,63
99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 1681,66 -75,51 0,89 -4,16 -6,40 0,00 0,00 7,83
100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 1735,71 -75,78 1,48 -4,56 -6,66 1,46 0,00 16,28
162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 1731,78 -75,76 1,47 -4,56 -6,65 1,47 0,00 16,51
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.23 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 1733,14 -75,77 1,47 -4,56 -6,65 1,49 0,00 14,49
163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 1601,24 -75,08 1,98 -4,76 -8,18 0,00 0,00 2,62
164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 1600,52 -75,08 1,98 -4,76 -8,17 0,00 0,00 2,63
59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 1795,67 -76,08 1,27 -4,45 -4,82 0,00 0,00 7,92
30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 1779,03 -76,00 1,26 -4,45 -4,79 0,53 0,00 8,56
1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 1772,17 -75,96 1,26 -4,45 -4,78 0,00 0,00 8,07
25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 1733,50 -75,77 1,49 -4,56 -6,66 2,28 0,00 10,14
54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 1750,38 -75,85 1,49 -4,56 -6,70 2,26 0,00 9,99
83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 1756,65 -75,89 -4,80 0,00 -4,14 2,31 0,00 12,49
55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 1758,32 -75,89 1,50 -4,56 -6,73 2,47 0,00 11,59
26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 1741,15 -75,81 1,50 -4,56 -6,68 2,46 0,00 11,72
84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 1764,68 -75,93 1,50 -4,56 -6,75 2,47 0,00 11,60
173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 1738,81 -75,80 0,75 -4,07 -2,20 0,80 0,00 9,49
167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 1737,84 -75,79 0,49 -4,47 -3,75 0,00 0,00 -4,85
38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 1778,80 -75,99 -0,85 -3,29 -2,94 0,00 0,00 -12,92
67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 1785,23 -76,03 -0,85 -3,29 -2,94 0,00 0,00 -12,96
9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 1762,42 -75,91 -0,86 -3,28 -2,91 0,00 0,00 -12,82
166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 1735,58 -75,78 -4,72 0,00 -4,09 0,00 0,00 -2,59
172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 1741,35 -75,81 -4,72 - -4,11 0,00 0,00 -18,23
93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 1631,05 -75,24 -4,72 - -3,85 0,00 0,00 -23,43
97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 1619,14 -75,18 -4,72 0,00 -3,82 0,00 0,00 -9,71
28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 1777,95 -75,99 0,42 - -0,51 0,00 0,00 -11,04
57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 1794,54 -76,07 0,42 - -0,52 0,00 0,00 -10,99
86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 1800,72 -76,10 0,42 - -0,52 0,00 0,00 -11,02
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.24 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 1790,73 -76,05 0,55 - -3,66 0,00 0,00 -12,16
27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 1766,89 -75,94 0,53 - -3,68 0,00 0,00 -11,46
56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 1777,31 -75,99 0,54 -3,56 -7,24 2,52 0,00 -3,73
39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 1779,00 -76,00 -0,41 -3,76 -4,24 0,00 0,00 11,74
10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 1762,63 -75,92 -0,42 -3,75 -4,20 0,00 0,00 11,85
68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 1785,44 -76,03 -0,40 -3,76 -4,25 0,01 0,00 11,71
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.25 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 4 Kipoi Ld = 19,9 dB(A) Ln = 19,9 dB(A)
11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2649,93 -79,46 1,28 -4,86 -3,56 0,00 0,00 -0,59
69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2593,26 -79,27 1,09 -4,97 -3,26 0,00 0,00 -0,41
40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2608,18 -79,32 1,14 -4,94 -3,34 0,00 0,00 -0,46
41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2611,48 -79,33 1,14 -4,92 -3,36 0,00 0,00 -0,47
12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2653,19 -79,47 1,28 -4,84 -3,57 0,00 0,00 -0,60
70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2596,58 -79,28 1,09 -4,95 -3,28 0,00 0,00 -0,42
13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2640,12 -79,42 1,25 -4,88 -3,51 0,00 0,00 -0,56
42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2598,83 -79,29 1,11 -4,96 -3,29 0,00 0,00 -0,43
71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2583,59 -79,24 1,06 -4,99 -3,21 0,00 0,00 -0,38
72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 2587,60 -79,25 1,06 -4,97 -3,23 0,00 0,00 -0,39
14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 2644,04 -79,44 1,25 -4,86 -3,53 0,00 0,00 -0,57
43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 2602,52 -79,30 1,11 -4,94 -3,31 0,00 0,00 -0,44
29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 2636,17 -79,41 -4,80 -0,79 - 2,54 0,00 -3,21
58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 2593,97 -79,27 -4,80 -1,04 - 2,55 0,00 -3,14
87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 2579,36 -79,22 -4,80 -1,15 - 2,55 0,00 -3,13
160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2619,93 -79,36 2,26 -7,49 - 0,00 0,00 -24,67
161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2619,19 -79,36 2,26 -7,50 - 0,00 0,00 -24,67
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2618,44 -79,35 2,26 -7,51 - 0,00 0,00 -24,67
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2617,51 -79,35 2,26 -7,52 - 0,00 0,00 -24,67
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2616,77 -79,35 2,26 -7,53 - 0,00 0,00 -24,67
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2616,03 -79,34 2,26 -7,54 - 0,00 0,00 -24,66
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2615,14 -79,34 2,26 -7,55 - 0,00 0,00 -24,66
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2614,40 -79,34 2,26 -7,56 - 0,00 0,00 -24,66
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.26 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2613,66 -79,34 2,26 -7,57 - 0,00 0,00 -24,66
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2612,74 -79,33 2,26 -7,59 - 0,00 0,00 -24,66
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2612,00 -79,33 2,26 -7,60 - 0,00 0,00 -24,65
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2611,26 -79,33 2,26 -7,61 - 0,00 0,00 -24,65
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2610,34 -79,33 2,26 -7,62 - 0,00 0,00 -24,65
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2609,60 -79,32 2,26 -7,63 - 0,00 0,00 -24,65
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2608,86 -79,32 2,26 -7,64 - 0,00 0,00 -24,65
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2607,94 -79,32 2,26 -7,66 - 0,00 0,00 -24,65
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2607,20 -79,32 2,26 -7,67 - 0,00 0,00 -24,64
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2606,46 -79,31 2,26 -7,68 - 0,00 0,00 -24,64
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2605,58 -79,31 2,26 -7,69 - 0,00 0,00 -24,64
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2604,84 -79,31 2,26 -7,70 - 0,00 0,00 -24,64
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2604,10 -79,31 2,26 -7,71 - 0,00 0,00 -24,64
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2603,18 -79,30 2,26 -7,73 - 0,00 0,00 -24,64
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2602,44 -79,30 2,26 -7,74 - 0,00 0,00 -24,64
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2601,70 -79,30 2,26 -7,75 - 0,00 0,00 -24,63
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2600,82 -79,29 2,26 -7,76 - 0,00 0,00 -24,63
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2600,08 -79,29 2,26 -7,77 - 0,00 0,00 -24,63
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2599,35 -79,29 2,26 -7,78 - 0,00 0,00 -24,63
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2598,42 -79,29 2,26 -7,80 - 0,00 0,00 -24,63
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2597,69 -79,28 2,26 -7,81 - 0,00 0,00 -24,63
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 2596,95 -79,28 2,26 -7,82 - 0,00 0,00 -24,63
2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 2632,26 -79,40 1,59 -4,59 -3,41 0,00 0,00 4,41
60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 2575,92 -79,21 1,45 -4,62 -3,25 0,00 0,00 4,59
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.27 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 2615,64 -79,34 1,55 -4,60 -3,36 0,00 0,00 4,46
53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 2612,71 -79,33 3,00 - -1,23 0,00 0,00 -11,08
82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 2578,80 -79,22 2,97 -5,96 -2,77 0,00 0,00 2,25
24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 2635,14 -79,41 3,03 -5,67 -3,09 2,54 0,00 4,62
169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 2780,08 -79,87 0,65 -4,67 -5,55 0,00 0,00 -12,34
22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2635,32 -79,41 2,08 -5,27 -2,22 0,00 0,00 -12,76
80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2578,79 -79,22 2,02 -5,49 -1,98 0,00 0,00 -12,60
81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2587,14 -79,25 2,02 -5,44 -2,03 0,00 0,00 -12,62
23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2643,49 -79,44 2,08 -5,22 -2,27 0,00 0,00 -12,78
78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2576,79 -79,21 1,70 -6,13 -7,84 0,00 0,00 -20,46
20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2633,37 -79,40 1,79 -5,73 -8,21 0,00 0,00 -20,53
19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2645,79 -79,44 1,79 -5,62 -8,30 0,00 0,00 -20,56
77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2589,48 -79,26 1,70 -5,98 -7,95 0,00 0,00 -20,46
21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 2640,21 -79,42 3,95 -4,84 -0,84 0,00 0,00 -0,16
79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 2583,78 -79,24 3,92 -4,90 -0,77 0,00 0,00 0,01
170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 2787,80 -79,90 0,65 - -3,73 0,00 0,00 -27,51
6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 2653,98 -79,47 0,53 - -1,38 0,00 0,00 -19,13
35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 2613,16 -79,34 0,49 - -1,36 0,00 0,00 -18,96
64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 2597,59 -79,28 0,47 - -1,36 0,00 0,00 -18,95
5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2649,27 -79,45 2,08 - -1,79 0,00 0,00 -29,68
63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2592,96 -79,27 2,02 - -1,76 0,00 0,00 -29,50
34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2618,23 -79,35 2,05 - -1,78 0,00 0,00 -29,60
171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 2786,60 -79,89 1,27 - -3,81 0,00 0,00 -31,83
33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 2609,05 -79,32 1,69 - -7,22 0,00 0,00 -34,72
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.28 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 2602,36 -79,30 1,68 - -7,20 0,00 0,00 -34,69
4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 2658,83 -79,49 1,77 - -7,31 0,00 0,00 -34,90
65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 2597,59 -79,28 3,96 - -0,55 0,00 0,00 -15,93
7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 2653,99 -79,47 3,99 - -0,56 0,00 0,00 -16,11
36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 2613,17 -79,34 3,97 - -0,55 0,00 0,00 -15,94
8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2660,84 -79,49 1,81 - -7,42 0,00 0,00 -38,65
66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2604,34 -79,31 1,72 - -7,31 0,00 0,00 -38,43
168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 2782,57 -79,88 0,64 -4,67 -5,56 0,00 0,00 -5,33
52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2597,48 -79,28 2,04 -5,42 -2,06 0,00 0,00 -12,65
17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 2639,27 -79,42 2,08 -5,26 -2,24 0,00 0,00 -12,77
75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 2582,54 -79,23 2,03 -5,48 -1,99 0,00 0,00 -12,61
51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2591,46 -79,26 1,73 -6,02 -7,94 0,00 0,00 -20,47
16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 2644,98 -79,44 1,81 -5,66 -8,28 0,00 0,00 -20,56
74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 2588,15 -79,25 1,72 -6,04 -7,92 0,00 0,00 -20,47
37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2606,64 -79,31 1,73 - -7,32 0,00 0,00 -38,45
165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 2790,17 -79,90 0,65 - -3,74 0,00 0,00 -29,21
48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2616,40 -79,35 2,05 - -1,78 0,00 0,00 -29,59
49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 2608,16 -79,32 2,05 - -1,78 0,00 0,00 -29,58
45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2618,38 -79,35 1,75 - -7,35 0,00 0,00 -38,50
46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 2605,86 -79,31 1,75 - -7,34 0,00 0,00 -38,45
47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 2611,44 -79,33 3,94 - -0,53 0,00 0,00 -15,72
18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 2639,23 -79,42 0,39 -4,38 -3,92 0,00 0,00 -16,77
76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 2582,76 -79,23 0,21 -4,42 -3,75 0,00 0,00 -16,62
32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 2613,20 -79,34 0,23 - -2,11 0,00 0,00 -33,45
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.29 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 2597,17 -79,28 0,19 - -2,12 0,00 0,00 -33,49
3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 2653,54 -79,47 0,33 - -2,17 0,00 0,00 -33,67
73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 2581,87 -79,23 0,20 -4,41 -3,75 0,00 0,00 -17,35
50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 2598,06 -79,29 0,22 -4,37 -3,80 0,00 0,00 -17,40
15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 2638,59 -79,42 0,35 -4,37 -3,91 0,00 0,00 -17,51
44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 2612,40 -79,33 0,28 - -2,17 0,00 0,00 -32,58
88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 2621,27 -79,36 0,97 -5,83 -5,43 0,00 0,00 -12,65
89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 2628,55 -79,39 0,97 -5,78 -5,47 0,00 0,00 -12,67
91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 2698,01 -79,61 0,85 -5,02 -7,05 0,00 0,00 -21,51
92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2694,94 -79,60 0,95 -5,14 -7,03 0,00 0,00 -35,66
94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 2705,67 -79,64 0,86 -7,37 -7,08 0,00 0,00 -26,87
95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 2705,75 -79,64 0,97 - -6,57 0,00 0,00 -54,60
96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 2704,13 -79,63 0,85 -7,97 -7,07 0,00 0,00 -24,33
90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 2700,95 -79,62 0,84 -5,01 -7,06 0,00 0,00 -24,59
98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 2613,74 -79,34 1,22 -5,79 -6,40 0,00 0,00 2,69
102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2631,23 -79,40 2,28 -7,26 - 0,00 0,00 -21,50
103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2630,49 -79,39 2,28 -7,27 - 0,00 0,00 -21,49
104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2629,75 -79,39 2,28 -7,28 - 0,00 0,00 -21,49
105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2628,85 -79,39 2,28 -7,29 - 0,00 0,00 -21,49
106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2628,11 -79,38 2,28 -7,30 - 0,00 0,00 -21,49
107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2627,37 -79,38 2,28 -7,31 - 0,00 0,00 -21,49
108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2626,48 -79,38 2,28 -7,32 - 0,00 0,00 -21,48
109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2625,75 -79,38 2,28 -7,33 - 0,00 0,00 -21,48
110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2625,01 -79,37 2,28 -7,34 - 0,00 0,00 -21,48
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.30 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2624,09 -79,37 2,28 -7,35 - 0,00 0,00 -21,48
112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2623,35 -79,37 2,28 -7,36 - 0,00 0,00 -21,48
113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2622,62 -79,37 2,28 -7,37 - 0,00 0,00 -21,47
114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2621,73 -79,36 2,28 -7,39 - 0,00 0,00 -21,47
115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,99 -79,36 2,28 -7,40 - 0,00 0,00 -21,47
116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2620,26 -79,36 2,28 -7,41 - 0,00 0,00 -21,47
117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2619,35 -79,36 2,28 -7,42 - 0,00 0,00 -21,47
118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2618,61 -79,35 2,28 -7,43 - 0,00 0,00 -21,46
119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2617,88 -79,35 2,28 -7,44 - 0,00 0,00 -21,46
120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2616,95 -79,35 2,28 -7,45 - 0,00 0,00 -21,46
121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2616,21 -79,35 2,28 -7,46 - 0,00 0,00 -21,46
122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2615,48 -79,34 2,28 -7,47 - 0,00 0,00 -21,46
123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2614,59 -79,34 2,28 -7,48 - 0,00 0,00 -21,45
124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2613,86 -79,34 2,28 -7,49 - 0,00 0,00 -21,45
125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2613,13 -79,34 2,28 -7,50 - 0,00 0,00 -21,45
126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2612,22 -79,33 2,28 -7,52 - 0,00 0,00 -21,45
127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2611,48 -79,33 2,28 -7,53 - 0,00 0,00 -21,45
128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2610,75 -79,33 2,28 -7,54 - 0,00 0,00 -21,44
129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2609,87 -79,32 2,28 -7,55 - 0,00 0,00 -21,44
130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2609,13 -79,32 2,28 -7,56 - 0,00 0,00 -21,44
131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 2608,40 -79,32 2,28 -7,57 - 0,00 0,00 -21,44
99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 2613,73 -79,34 1,22 -5,79 -6,40 0,00 0,00 2,69
100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 2597,44 -79,28 1,43 -5,86 -8,15 1,18 0,00 9,67
162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 2596,56 -79,28 1,44 -5,87 -8,15 0,52 0,00 9,20
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.31 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 2597,42 -79,28 1,44 -5,86 -8,15 0,57 0,00 7,22
163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 2658,72 -79,49 2,04 -6,03 - 0,00 0,00 -6,52
164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 2661,13 -79,49 2,04 -6,02 - 0,00 0,00 -6,53
59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 2581,75 -79,23 1,14 -5,29 -5,43 2,53 0,00 5,73
30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 2620,87 -79,36 1,20 - -3,42 0,00 0,00 -12,50
1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 2638,09 -79,42 1,23 -5,07 -5,68 2,53 0,00 5,59
25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 2635,26 -79,41 1,48 -5,60 -8,38 1,10 0,00 2,55
54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 2592,95 -79,27 1,42 -5,87 -8,13 2,25 0,00 3,76
83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 2578,40 -79,22 -4,80 -0,61 -6,08 1,15 0,00 5,45
55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 2579,85 -79,22 1,40 -5,97 -8,05 1,83 0,00 4,79
26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 2622,15 -79,37 1,46 -5,68 -8,30 0,38 0,00 3,30
84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 2565,48 -79,18 1,37 -6,08 -7,96 0,45 0,00 3,48
173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 2779,10 -79,87 0,83 -4,25 -2,78 2,47 0,00 6,41
167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 2785,05 -79,89 0,58 -4,63 -5,56 0,00 0,00 -10,83
38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 2604,64 -79,31 -0,84 -3,44 -3,78 0,00 0,00 -17,22
67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 2590,25 -79,26 -0,89 -3,92 -3,72 0,00 0,00 -17,65
9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 2646,63 -79,45 -0,68 -4,02 -3,85 0,00 0,00 -17,85
166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2789,56 -79,90 -4,80 - -6,58 0,00 0,00 -29,45
172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 2789,40 -79,90 -4,80 - -6,58 0,00 0,00 -29,45
93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2700,92 -79,62 -4,80 -0,29 -6,37 0,00 0,00 -17,07
97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 2700,98 -79,62 -4,80 - -6,37 0,00 0,00 -36,97
28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2657,53 -79,48 0,46 - -1,01 0,00 0,00 -19,24
57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2615,83 -79,34 0,41 - -0,99 0,00 0,00 -19,05
86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2601,29 -79,30 0,40 - -0,99 0,00 0,00 -19,04
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.32 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 2583,59 -79,24 0,36 - -5,84 15,54 0,00 -12,44
27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 2639,56 -79,42 0,65 - -6,05 15,60 0,00 -12,65
56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 2614,19 -79,34 0,52 - -6,12 0,00 0,00 -28,50
39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 2606,30 -79,31 -0,43 -3,99 -5,43 0,00 0,00 6,97
10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 2647,97 -79,45 -0,25 -4,04 -5,58 0,00 0,00 6,81
68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 2591,41 -79,26 -0,50 -3,97 -5,38 0,00 0,00 7,03
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.33 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 5 Station Fence West Ld = 53,1 dB(A) Ln = 53,1 dB(A)
11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 220,52 -57,86 3,00 -6,17 -1,34 0,00 0,00 23,64
69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 294,04 -60,36 3,00 -5,09 -2,27 0,00 0,00 21,28
40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 274,39 -59,76 3,00 -6,03 -1,55 0,00 0,00 21,66
41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 275,30 -59,79 3,00 - -0,33 0,00 0,00 18,87
12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 221,65 -57,91 3,00 -7,55 -0,71 0,00 0,00 22,84
70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 294,88 -60,38 3,00 - -0,26 0,00 0,00 18,24
13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 232,62 -58,33 3,00 -6,28 -1,19 1,37 0,00 24,58
42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 286,71 -60,14 3,00 -5,76 -1,66 0,00 0,00 21,44
71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 306,29 -60,71 3,00 -5,07 -2,17 0,00 0,00 21,05
72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 307,26 -60,74 3,00 -6,06 -1,55 0,00 0,00 20,65
14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 233,90 -58,37 3,00 -6,06 -1,15 0,00 0,00 23,42
43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 287,56 -60,17 3,00 -6,37 -1,32 0,00 0,00 21,15
29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 222,00 -57,92 -4,47 0,00 -0,91 0,00 0,00 26,72
58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 277,17 -59,85 -4,54 0,00 -1,13 0,00 0,00 24,49
87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 296,43 -60,43 -4,56 0,00 -1,21 0,00 0,00 23,81
160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 188,00 -56,48 3,41 0,00 -5,03 0,00 0,00 27,49
161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 188,93 -56,52 3,41 0,00 -5,06 0,00 0,00 27,43
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 189,87 -56,56 3,42 0,00 -5,08 0,00 0,00 27,37
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,02 -56,61 3,43 0,00 -5,11 0,00 0,00 27,30
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 191,95 -56,66 3,43 0,00 -5,13 0,00 0,00 27,23
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 192,88 -56,70 3,43 0,00 -5,15 0,00 0,00 27,17
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,01 -56,75 3,44 0,00 -5,18 0,00 0,00 27,10
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 194,94 -56,79 3,45 0,00 -5,21 0,00 0,00 27,04
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.34 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 195,88 -56,83 3,45 0,00 -5,23 0,00 0,00 26,98
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,03 -56,88 3,46 0,00 -5,26 0,00 0,00 26,91
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 197,96 -56,92 3,46 0,00 -5,28 0,00 0,00 26,85
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 198,89 -56,96 3,47 0,00 -5,30 0,00 0,00 26,79
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,04 -57,01 3,47 0,00 -5,33 0,00 0,00 26,72
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 200,97 -57,05 3,48 0,00 -5,35 0,00 0,00 26,66
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 201,91 -57,10 3,48 0,00 -5,38 0,00 0,00 26,60
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 203,06 -57,14 3,49 0,00 -5,41 0,00 0,00 26,53
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 203,99 -57,18 3,49 0,00 -5,43 0,00 0,00 26,47
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 204,93 -57,22 3,50 0,00 -5,45 0,00 0,00 26,41
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 206,06 -57,27 3,50 0,00 -5,48 0,00 0,00 26,34
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 206,99 -57,31 3,51 0,00 -5,50 0,00 0,00 26,28
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 207,93 -57,35 3,51 0,00 -5,53 0,00 0,00 26,23
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 209,08 -57,40 3,52 0,00 -5,55 0,00 0,00 26,16
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 210,01 -57,44 3,52 0,00 -5,58 0,00 0,00 26,10
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 210,95 -57,48 3,53 0,00 -5,60 0,00 0,00 26,04
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 212,09 -57,52 3,53 0,00 -5,63 0,00 0,00 25,98
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 213,02 -57,56 3,54 0,00 -5,65 0,00 0,00 25,92
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 213,96 -57,60 3,54 0,00 -5,67 0,00 0,00 25,86
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 215,11 -57,65 3,55 0,00 -5,70 0,00 0,00 25,79
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 216,05 -57,68 3,55 0,00 -5,73 0,00 0,00 25,74
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 216,98 -57,72 3,56 0,00 -5,75 0,00 0,00 25,68
2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 242,89 -58,70 3,00 -3,64 -0,88 0,00 0,00 29,99
60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 316,68 -61,00 3,00 -3,52 -1,07 0,00 0,00 27,62
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.35 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 264,48 -59,44 3,00 -3,63 -0,94 0,00 0,00 29,20
53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 267,66 -59,54 4,66 -8,69 -0,62 0,11 0,00 23,14
82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 312,32 -60,88 4,85 - -0,33 0,00 0,00 15,35
24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 238,48 -58,54 4,49 - -0,28 8,44 0,00 25,94
169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 89,87 -50,06 3,11 - -0,16 0,00 0,00 17,80
22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 235,02 -58,41 4,81 - -0,27 0,00 0,00 2,31
80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 308,97 -60,79 5,10 - -0,33 0,00 0,00 0,00
81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 310,96 -60,85 5,10 - -0,45 0,00 0,00 -2,67
23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 237,64 -58,51 4,83 - -0,40 0,00 0,00 -0,70
78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 308,57 -60,78 5,09 - -0,96 0,00 0,00 -3,81
20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 234,48 -58,39 4,80 - -0,75 0,00 0,00 -1,37
19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 238,49 -58,54 4,82 - -0,93 0,00 0,00 -5,76
77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 311,61 -60,86 5,10 - -1,16 0,00 0,00 -7,86
21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 236,52 -58,47 3,91 - -0,09 0,00 0,00 11,31
79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 310,11 -60,82 4,40 - -0,13 0,00 0,00 8,75
170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 88,84 -49,96 3,10 - -0,15 0,00 0,00 18,38
6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 230,00 -58,23 3,75 - -0,18 3,24 0,00 11,95
35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 282,41 -60,01 4,17 - -0,19 0,00 0,00 9,79
64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 302,88 -60,62 4,29 - -0,21 0,00 0,00 8,88
5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 236,03 -58,45 4,82 - -0,37 0,00 0,00 -0,39
63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 309,00 -60,79 5,10 - -0,36 0,00 0,00 -1,37
34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 275,82 -59,80 4,99 - -0,32 0,00 0,00 -0,01
171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 89,74 -50,05 3,18 - -0,19 0,00 0,00 10,20
33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 287,77 -60,17 4,66 - -1,01 0,00 0,00 -3,41
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.36 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 296,60 -60,44 4,70 - -1,06 0,00 0,00 -3,91
4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 223,83 -57,99 4,28 - -0,93 0,00 0,00 -2,96
65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 302,87 -60,62 4,69 - -0,10 0,00 0,00 10,43
7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 230,00 -58,23 4,28 - -0,11 0,00 0,00 10,01
36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 282,40 -60,01 4,60 - -0,09 0,00 0,00 11,38
8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 221,29 -57,89 4,73 - -0,92 0,00 0,00 -6,05
66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 294,02 -60,36 5,05 - -1,05 0,00 0,00 -7,11
168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 82,61 -49,33 3,01 -0,22 -0,20 0,74 0,00 38,14
52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 278,61 -59,89 5,00 0,00 -1,59 0,00 0,00 15,59
17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 224,26 -58,01 4,76 0,00 -1,39 0,00 0,00 17,42
75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 298,40 -60,49 5,06 0,00 -1,65 0,00 0,00 14,99
51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 286,54 -60,14 5,02 0,00 -1,51 0,00 0,00 14,39
16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 216,88 -57,72 4,71 0,00 -1,18 0,00 0,00 16,83
74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 290,96 -60,27 5,04 0,00 -1,53 0,00 0,00 14,25
37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 290,96 -60,27 5,04 - -1,01 0,00 0,00 -6,76
165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 81,54 -49,22 3,00 0,00 -0,19 0,00 0,00 30,67
48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 272,27 -59,69 4,98 - -0,20 0,00 0,00 5,82
49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 269,99 -59,62 4,97 0,00 -1,56 0,00 0,00 15,86
45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 272,90 -59,71 4,98 - -0,78 0,00 0,00 -1,75
46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 269,45 -59,60 4,96 0,00 -1,43 0,00 0,00 14,94
47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 270,84 -59,65 4,17 -7,17 -0,09 0,00 0,00 18,27
18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 236,34 -58,46 3,25 - -0,29 0,00 0,00 -2,01
76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 309,99 -60,82 3,62 - -0,38 0,00 0,00 -4,10
32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 282,05 -60,00 3,40 - -0,32 0,00 0,00 -5,18
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.37 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 303,23 -60,63 3,52 - -0,35 0,00 0,00 -6,06
3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 230,30 -58,24 3,24 - -0,29 0,00 0,00 -5,17
73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 299,00 -60,51 3,47 0,00 -0,66 0,00 0,00 12,14
50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 277,60 -59,86 3,46 0,00 -0,62 0,00 0,00 12,82
15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 224,83 -58,03 3,23 0,00 -0,51 0,00 0,00 14,53
44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 271,24 -59,66 3,47 -4,76 -0,53 0,00 0,00 9,08
88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 166,97 -55,45 4,92 -6,84 -0,35 0,00 0,00 19,29
89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 159,97 -55,07 4,87 -8,64 -0,32 0,00 0,00 17,84
91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 90,33 -50,11 3,06 -3,79 -0,27 0,00 0,00 18,21
92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 93,25 -50,39 3,26 - -0,21 0,00 0,00 -10,86
94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 82,61 -49,33 3,01 0,00 -0,25 0,00 0,00 19,78
95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 82,63 -49,33 3,00 0,00 -0,25 0,00 0,00 8,58
96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 83,96 -49,47 3,00 0,00 -0,25 0,00 0,00 22,76
90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 86,99 -49,78 3,00 -4,71 -0,26 0,00 0,00 14,50
98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 200,88 -57,05 3,00 0,00 -2,15 0,00 0,00 36,80
102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 185,34 -56,35 3,38 0,00 -5,03 0,00 0,00 30,83
103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 186,28 -56,40 3,38 0,00 -5,05 0,00 0,00 30,76
104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 187,23 -56,44 3,39 0,00 -5,07 0,00 0,00 30,70
105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 188,39 -56,49 3,39 0,00 -5,10 0,00 0,00 30,62
106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 189,33 -56,54 3,39 0,00 -5,13 0,00 0,00 30,56
107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 190,28 -56,58 3,40 0,00 -5,15 0,00 0,00 30,50
108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 191,43 -56,63 3,40 0,00 -5,18 0,00 0,00 30,42
109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 192,37 -56,67 3,41 0,00 -5,20 0,00 0,00 30,36
110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 193,32 -56,72 3,41 0,00 -5,23 0,00 0,00 30,30
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.38 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 194,48 -56,77 3,42 0,00 -5,26 0,00 0,00 30,22
112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 195,42 -56,81 3,42 0,00 -5,28 0,00 0,00 30,16
113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,37 -56,85 3,43 0,00 -5,31 0,00 0,00 30,10
114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,52 -56,90 3,44 0,00 -5,33 0,00 0,00 30,02
115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,47 -56,95 3,44 0,00 -5,36 0,00 0,00 29,96
116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,41 -56,99 3,44 0,00 -5,38 0,00 0,00 29,90
117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,58 -57,04 3,45 0,00 -5,41 0,00 0,00 29,83
118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 201,52 -57,08 3,45 0,00 -5,44 0,00 0,00 29,77
119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 202,47 -57,12 3,46 0,00 -5,46 0,00 0,00 29,71
120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 203,63 -57,17 3,47 0,00 -5,49 0,00 0,00 29,64
121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 204,58 -57,21 3,47 0,00 -5,51 0,00 0,00 29,58
122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 205,52 -57,25 3,47 0,00 -5,54 0,00 0,00 29,52
123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 206,67 -57,30 3,48 0,00 -5,57 0,00 0,00 29,44
124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 207,61 -57,34 3,48 0,00 -5,59 0,00 0,00 29,39
125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 208,56 -57,38 3,49 0,00 -5,61 0,00 0,00 29,33
126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 209,72 -57,42 3,49 0,00 -5,64 0,00 0,00 29,25
127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 210,67 -57,46 3,50 0,00 -5,67 0,00 0,00 29,20
128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 211,61 -57,50 3,50 0,00 -5,69 0,00 0,00 29,14
129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 212,75 -57,55 3,51 0,00 -5,72 0,00 0,00 29,07
130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 213,70 -57,59 3,51 0,00 -5,74 0,00 0,00 29,01
131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 214,65 -57,63 3,52 0,00 -5,77 0,00 0,00 28,95
99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 200,88 -57,05 3,00 0,00 -2,15 0,00 0,00 36,80
100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 251,43 -59,00 4,55 0,00 -1,37 0,31 0,00 44,84
162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 248,74 -58,91 4,53 0,00 -1,35 0,41 0,00 45,23
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.39 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 248,95 -58,91 4,53 0,00 -1,35 0,40 0,00 43,17
163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 129,35 -53,23 3,02 -9,93 -0,66 0,02 0,00 27,89
164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 127,08 -53,07 3,01 - -0,64 0,02 0,00 27,69
59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 317,14 -61,02 4,30 - -0,63 0,00 0,00 15,01
30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 265,85 -59,48 3,97 - -0,44 1,08 0,00 22,15
1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 243,52 -58,72 3,78 - -0,47 2,39 0,00 19,78
25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 219,72 -57,83 4,36 0,00 -1,23 0,60 0,00 39,27
54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 272,21 -59,69 4,68 0,00 -1,46 0,02 0,00 36,91
83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 291,49 -60,28 -4,55 0,00 -0,69 0,00 0,00 29,49
55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 286,50 -60,13 4,74 0,00 -1,52 0,12 0,00 38,01
26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 229,30 -58,20 4,43 0,00 -1,27 0,41 0,00 40,17
84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 305,75 -60,70 4,82 0,00 -1,60 0,13 0,00 37,52
173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 90,27 -50,10 3,00 -5,15 -0,08 0,02 0,00 37,69
167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 85,80 -49,66 3,00 -4,72 -0,20 0,60 0,00 27,69
38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 280,64 -59,96 3,00 -5,13 -0,55 0,00 0,00 7,52
67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 300,27 -60,54 3,00 -4,97 -0,60 0,00 0,00 7,04
9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 226,74 -58,10 3,00 -5,24 -0,44 0,00 0,00 9,37
166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 80,93 -49,15 -3,78 0,00 -0,19 0,01 0,00 28,89
172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 87,51 -49,83 -3,83 - -0,21 0,28 0,00 13,95
93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,00 87,50 -49,83 -3,62 - -0,21 0,00 0,00 8,00
97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,00 87,47 -49,83 -3,62 0,00 -0,21 0,00 0,00 20,35
28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 230,63 -58,25 3,00 - -0,16 2,70 0,00 12,69
57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 284,25 -60,07 3,47 -9,92 -0,19 0,00 0,00 13,28
86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 303,24 -60,63 3,63 - -0,21 0,00 0,00 10,29
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.40 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 311,34 -60,86 3,00 - -0,93 0,00 0,00 1,48
27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 237,68 -58,51 3,00 - -0,73 0,00 0,00 4,17
56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 270,84 -59,65 3,00 - -0,73 2,29 0,00 13,38
39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 280,95 -59,96 3,00 -5,15 -0,77 0,00 0,00 33,25
10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 227,16 -58,12 3,00 -6,46 -0,59 0,86 0,00 34,83
68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 300,54 -60,55 3,00 -5,16 -0,82 0,00 0,00 32,61
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.41 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 6 Station Fence South Ld = 54,4 dB(A) Ln = 54,4 dB(A)
11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 261,90 -59,35 2,99 -4,93 -2,19 0,00 0,00 22,53
69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 266,34 -59,50 2,99 -4,93 -2,23 0,00 0,00 22,34
40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 263,00 -59,39 2,99 -4,94 -2,21 0,00 0,00 22,46
41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 267,95 -59,55 2,99 -5,00 -2,12 0,00 0,00 22,32
12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 266,87 -59,52 2,99 -4,99 -2,10 0,00 0,00 22,39
70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 271,23 -59,66 2,99 -4,99 -2,15 0,00 0,00 22,19
13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 260,69 -59,31 2,99 -4,92 -2,20 0,00 0,00 22,56
42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 264,94 -59,45 2,99 -4,89 -2,20 0,00 0,00 22,46
71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 268,67 -59,58 2,99 -4,84 -2,22 0,00 0,00 22,36
72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 274,48 -59,76 2,99 -4,86 -2,10 0,00 0,00 22,27
14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 266,68 -59,51 2,99 -5,00 -2,09 0,00 0,00 22,39
43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 270,28 -59,63 2,99 -4,93 -2,09 0,00 0,00 22,34
29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 245,57 -58,80 -4,50 0,00 -1,00 2,32 0,00 28,03
58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 248,10 -58,88 -4,51 0,00 -1,01 2,33 0,00 27,94
87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 251,85 -59,01 -4,51 0,00 -1,03 2,34 0,00 27,79
160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 184,02 -56,29 3,39 0,00 -4,93 0,00 0,00 27,75
161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 183,75 -56,28 3,38 0,00 -4,93 0,00 0,00 27,77
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 183,48 -56,26 3,38 0,00 -4,92 0,00 0,00 27,79
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 183,15 -56,25 3,38 0,00 -4,91 0,00 0,00 27,81
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,90 -56,24 3,38 0,00 -4,91 0,00 0,00 27,83
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,65 -56,22 3,38 0,00 -4,90 0,00 0,00 27,85
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,38 -56,21 3,38 0,00 -4,89 0,00 0,00 27,86
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 182,15 -56,20 3,38 0,00 -4,89 0,00 0,00 27,88
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.42 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,92 -56,19 3,38 0,00 -4,88 0,00 0,00 27,90
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,62 -56,18 3,37 0,00 -4,87 0,00 0,00 27,92
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,40 -56,16 3,37 0,00 -4,87 0,00 0,00 27,93
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 181,19 -56,15 3,37 0,00 -4,86 0,00 0,00 27,95
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,91 -56,14 3,37 0,00 -4,86 0,00 0,00 27,97
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,70 -56,13 3,37 0,00 -4,85 0,00 0,00 27,98
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,50 -56,12 3,37 0,00 -4,85 0,00 0,00 27,99
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,24 -56,11 3,37 0,00 -4,84 0,00 0,00 28,01
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 180,05 -56,10 3,37 0,00 -4,84 0,00 0,00 28,02
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,87 -56,09 3,37 0,00 -4,83 0,00 0,00 28,04
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,67 -56,08 3,36 0,00 -4,83 0,00 0,00 28,05
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,50 -56,07 3,36 0,00 -4,82 0,00 0,00 28,06
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,33 -56,07 3,36 0,00 -4,82 0,00 0,00 28,07
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 179,11 -56,05 3,36 0,00 -4,81 0,00 0,00 28,09
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,95 -56,05 3,36 0,00 -4,81 0,00 0,00 28,10
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,80 -56,04 3,36 0,00 -4,80 0,00 0,00 28,11
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,65 -56,03 3,36 0,00 -4,80 0,00 0,00 28,12
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,51 -56,03 3,36 0,00 -4,80 0,00 0,00 28,13
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,37 -56,02 3,36 0,00 -4,79 0,00 0,00 28,14
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,19 -56,01 3,36 0,00 -4,79 0,00 0,00 28,15
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 178,06 -56,00 3,36 0,00 -4,79 0,00 0,00 28,16
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 177,94 -56,00 3,36 0,00 -4,78 0,00 0,00 28,17
2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 260,67 -59,31 2,99 -3,56 -0,92 0,00 0,00 29,41
60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 271,63 -59,67 2,99 -3,56 -0,95 0,00 0,00 29,03
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.43 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 261,74 -59,35 2,99 -3,57 -0,93 0,00 0,00 29,36
53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 261,45 -59,34 4,62 0,00 -2,04 0,00 0,00 30,46
82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 269,95 -59,62 4,66 -1,89 -1,94 0,00 0,00 28,44
24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 260,02 -59,29 4,61 0,00 -2,04 0,00 0,00 30,51
169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 329,33 -61,34 4,83 0,00 -0,76 0,00 0,00 19,83
22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 256,91 -59,19 4,91 0,00 -1,51 0,00 0,00 16,28
80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 265,99 -59,49 4,95 -8,18 -0,33 0,00 0,00 9,01
81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 278,07 -59,88 4,99 - -0,25 0,00 0,00 6,59
23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 269,40 -59,60 4,96 0,00 -1,56 0,00 0,00 15,87
78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 263,10 -59,39 4,93 -8,73 -1,00 0,00 0,00 6,83
20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 253,91 -59,09 4,89 0,00 -1,36 0,00 0,00 15,46
19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 272,91 -59,71 4,97 0,00 -1,45 0,00 0,00 14,82
77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 281,46 -59,98 5,00 - -0,87 0,00 0,00 0,41
21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 264,41 -59,44 4,13 0,00 -0,57 0,00 0,00 25,12
79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 273,24 -59,72 4,19 -7,65 -0,10 0,00 0,00 17,71
170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 336,33 -61,53 4,85 - -0,56 0,00 0,00 7,89
6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 275,07 -59,78 4,11 - -0,19 0,00 0,00 10,25
35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 277,30 -59,85 4,13 - -0,19 0,00 0,00 10,32
64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 281,10 -59,97 4,15 - -0,20 0,00 0,00 10,19
5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 274,82 -59,77 4,98 - -0,26 0,00 0,00 2,61
63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 282,51 -60,01 5,01 - -0,29 0,00 0,00 0,59
34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 276,41 -59,82 4,99 - -0,25 0,00 0,00 3,44
171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 335,51 -61,51 5,14 - -0,60 0,00 0,00 0,95
33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 278,13 -59,88 4,61 - -0,96 0,00 0,00 -2,88
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.44 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 279,78 -59,93 4,62 - -1,10 0,00 0,00 -4,49
4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 275,47 -59,79 4,60 - -0,92 0,00 0,00 -2,52
65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 281,09 -59,97 4,59 - -0,10 0,00 0,00 11,59
7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 275,07 -59,78 4,56 - -0,09 0,00 0,00 11,69
36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 277,29 -59,85 4,57 - -0,09 0,00 0,00 11,72
8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 275,69 -59,80 4,98 - -0,82 0,00 0,00 -3,60
66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 279,28 -59,91 4,99 - -1,10 0,00 0,00 -7,69
168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 329,40 -61,35 4,83 0,00 -0,76 0,00 0,00 26,85
52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 254,25 -59,10 4,90 0,00 -1,50 0,00 0,00 16,36
17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 251,78 -59,01 4,89 0,00 -1,50 0,00 0,00 16,45
75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 258,18 -59,23 4,92 0,00 -1,52 0,00 0,00 16,23
51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 255,62 -59,14 4,90 0,00 -1,37 0,00 0,00 15,40
16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 252,34 -59,03 4,88 0,00 -1,35 0,00 0,00 15,52
74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 256,54 -59,18 4,90 0,00 -1,37 0,00 0,00 15,37
37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 278,67 -59,89 4,99 - -0,87 0,00 0,00 -4,76
165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 336,35 -61,53 4,87 - -0,54 0,00 0,00 3,62
48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 270,65 -59,64 4,96 0,00 -1,56 0,00 0,00 15,83
49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 258,23 -59,23 4,92 0,00 -1,52 0,00 0,00 16,23
45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 273,63 -59,74 4,97 0,00 -1,45 0,00 0,00 14,80
46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 254,76 -59,11 4,89 0,00 -1,37 0,00 0,00 15,43
47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 263,20 -59,40 4,12 0,00 -0,57 0,00 0,00 25,15
18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 262,57 -59,38 3,36 0,00 -0,59 0,00 0,00 13,96
76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 271,47 -59,67 3,41 -9,13 -0,41 0,00 0,00 4,77
32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 277,41 -59,85 3,38 - -0,32 0,00 0,00 -3,36
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.45 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 281,36 -59,98 3,40 - -0,31 0,00 0,00 -4,51
3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 275,16 -59,78 3,37 - -0,32 0,00 0,00 -3,34
73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 258,50 -59,24 3,33 0,00 -0,58 0,00 0,00 13,35
50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 254,26 -59,10 3,38 0,00 -0,57 0,00 0,00 13,55
15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 251,84 -59,01 3,37 0,00 -0,56 0,00 0,00 13,63
44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 264,29 -59,43 3,37 0,00 -0,59 0,00 0,00 13,91
88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 151,87 -54,62 4,81 0,00 -0,96 0,00 0,00 26,22
89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 158,33 -54,98 4,85 0,00 -1,00 0,00 0,00 25,87
91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 228,91 -58,19 3,68 0,00 -0,68 0,00 0,00 14,14
92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 225,33 -58,05 4,73 0,00 -0,67 0,00 0,00 1,18
94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 236,93 -58,48 3,77 -4,04 -0,70 0,00 0,00 6,90
95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 237,01 -58,49 4,78 - -0,54 0,00 0,00 -14,15
96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 234,33 -58,39 3,81 -4,63 -0,70 0,00 0,00 9,58
90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 231,64 -58,29 3,47 -4,72 -0,68 0,00 0,00 6,02
98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 189,07 -56,52 2,99 0,00 -2,08 0,00 0,00 37,39
102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 201,40 -57,07 3,45 0,00 -5,43 0,00 0,00 29,77
103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 201,16 -57,06 3,45 0,00 -5,43 0,00 0,00 29,79
104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,92 -57,05 3,45 0,00 -5,42 0,00 0,00 29,80
105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,64 -57,04 3,45 0,00 -5,41 0,00 0,00 29,82
106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,41 -57,03 3,45 0,00 -5,41 0,00 0,00 29,84
107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 200,19 -57,02 3,45 0,00 -5,40 0,00 0,00 29,85
108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,92 -57,01 3,44 0,00 -5,40 0,00 0,00 29,87
109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,71 -57,00 3,44 0,00 -5,39 0,00 0,00 29,88
110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,50 -56,99 3,44 0,00 -5,39 0,00 0,00 29,89
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.46 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,23 -56,98 3,44 0,00 -5,38 0,00 0,00 29,91
112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 199,03 -56,97 3,44 0,00 -5,37 0,00 0,00 29,92
113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,83 -56,96 3,44 0,00 -5,37 0,00 0,00 29,94
114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,62 -56,95 3,44 0,00 -5,36 0,00 0,00 29,95
115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,43 -56,94 3,44 0,00 -5,36 0,00 0,00 29,96
116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,25 -56,94 3,44 0,00 -5,35 0,00 0,00 29,97
117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 198,03 -56,93 3,43 0,00 -5,35 0,00 0,00 29,99
118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,86 -56,92 3,43 0,00 -5,34 0,00 0,00 30,00
119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,69 -56,91 3,43 0,00 -5,34 0,00 0,00 30,01
120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,45 -56,90 3,43 0,00 -5,33 0,00 0,00 30,02
121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,29 -56,89 3,43 0,00 -5,33 0,00 0,00 30,03
122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 197,14 -56,89 3,43 0,00 -5,33 0,00 0,00 30,04
123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,97 -56,88 3,43 0,00 -5,32 0,00 0,00 30,06
124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,83 -56,87 3,43 0,00 -5,32 0,00 0,00 30,06
125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,68 -56,87 3,43 0,00 -5,31 0,00 0,00 30,07
126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,51 -56,86 3,43 0,00 -5,31 0,00 0,00 30,08
127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,39 -56,85 3,43 0,00 -5,31 0,00 0,00 30,09
128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,26 -56,85 3,43 0,00 -5,30 0,00 0,00 30,10
129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,13 -56,84 3,43 0,00 -5,30 0,00 0,00 30,11
130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 196,01 -56,84 3,42 0,00 -5,30 0,00 0,00 30,12
131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 195,90 -56,83 3,42 0,00 -5,29 0,00 0,00 30,12
99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 189,07 -56,52 2,99 0,00 -2,08 0,00 0,00 37,39
100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 227,03 -58,11 4,41 0,00 -1,26 1,04 0,00 46,42
162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 223,27 -57,97 4,38 0,00 -1,24 0,98 0,00 46,69
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.47 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 225,15 -58,04 4,40 0,00 -1,25 1,01 0,00 44,62
163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 188,36 -56,49 3,84 0,00 -1,29 0,00 0,00 34,72
164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 190,59 -56,59 3,87 0,00 -1,30 0,00 0,00 34,63
59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 278,60 -59,89 4,06 -0,20 -1,03 0,00 0,00 34,93
30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 269,45 -59,60 3,99 -3,50 -0,79 0,00 0,00 32,10
1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 268,37 -59,57 3,98 -3,41 -0,82 0,00 0,00 32,18
25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 234,46 -58,39 4,46 0,00 -1,30 1,63 0,00 39,76
54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 237,14 -58,49 4,48 0,00 -1,31 1,68 0,00 39,72
83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 241,48 -58,65 -4,50 0,00 -0,57 1,22 0,00 32,51
55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 239,82 -58,59 4,49 0,00 -1,32 2,15 0,00 41,54
26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 236,29 -58,46 4,47 0,00 -1,30 2,15 0,00 41,66
84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 247,13 -58,85 4,54 0,00 -1,35 2,19 0,00 41,39
173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 328,50 -61,32 4,35 0,00 -0,58 2,52 0,00 34,96
167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 332,83 -61,44 4,23 -4,69 -0,77 0,00 0,00 16,02
38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 265,97 -59,49 2,99 -4,73 -0,55 0,00 0,00 8,37
67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 269,53 -59,60 2,99 -4,72 -0,55 0,00 0,00 8,26
9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 263,53 -59,41 2,99 -4,72 -0,54 0,00 0,00 8,46
166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 335,57 -61,51 -4,59 - -0,79 0,00 0,00 -1,97
172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 337,44 -61,56 -4,58 - -0,80 0,00 0,00 -0,32
93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 232,32 -58,31 -4,40 0,00 -0,55 0,00 0,00 10,75
97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 230,75 -58,26 -4,40 - -0,54 0,00 0,00 -4,00
28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 279,75 -59,93 3,42 - -0,18 0,00 0,00 8,26
57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 282,24 -60,00 3,44 - -0,18 0,00 0,00 8,47
86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 285,66 -60,11 3,47 - -0,19 0,00 0,00 8,70
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.48 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 274,43 -59,76 2,99 - -0,79 0,00 0,00 11,95
27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 264,71 -59,45 2,99 0,00 -1,55 0,00 0,00 22,00
56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 266,56 -59,51 2,99 0,00 -1,55 0,00 0,00 21,93
39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 266,23 -59,50 2,99 -4,83 -0,77 0,00 0,00 34,03
10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 263,85 -59,42 2,99 -4,83 -0,76 0,00 0,00 34,11
68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 270,01 -59,62 2,99 -4,82 -0,78 0,00 0,00 33,91
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.49 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
Name 7 Station Fence East Ld = 53,4 dB(A) Ln = 53,4 dB(A)
11 Building vent., exhaust 1 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 286,71 -60,14 2,99 -5,09 -2,31 0,00 0,00 21,45
69 Building vent., exhaust 1 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 225,50 -58,05 2,99 -5,67 -1,72 0,00 0,00 23,55
40 Building vent., exhaust 1 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 240,96 -58,63 2,99 -5,49 -1,89 0,00 0,00 22,98
41 Building vent., exhaust 2 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 244,02 -58,74 2,99 -5,75 -1,72 0,00 0,00 22,79
12 Building vent., exhaust 2 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 289,30 -60,22 2,99 -5,08 -2,33 0,00 0,00 21,36
70 Building vent., exhaust 2 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 228,77 -58,18 2,99 -5,94 -1,54 0,00 0,00 23,32
13 Building vent., exhaust 3 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 275,79 -59,80 2,99 -4,78 -2,41 0,00 0,00 22,00
42 Building vent., exhaust 3 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 231,20 -58,27 2,99 -5,53 -1,75 0,00 0,00 23,44
71 Building vent., exhaust 3 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 215,83 -57,67 2,99 -5,10 -1,98 0,00 0,00 24,24
72 Building vent., exhaust 4 on roof Compressor Building Unit 6 0,00 0,00 86,00 86,00 0,00 219,92 -57,84 2,99 -5,04 -1,99 0,00 0,00 24,12
14 Building vent., exhaust 4 on roof Compressor Building Unit 4 0,00 0,00 86,00 86,00 0,00 279,01 -59,90 2,99 - -0,23 0,00 0,00 17,22
43 Building vent., exhaust 4 on roof Compressor Building Unit 5 0,00 0,00 86,00 86,00 0,00 234,75 -58,40 2,99 -5,81 -1,56 0,00 0,00 23,21
29 Control valve (eingehaust) Unit 4 0,00 0,00 87,00 87,00 3,01 274,48 -59,76 -4,54 0,00 -1,12 2,44 0,00 27,03
58 Control valve (eingehaust) Unit 5 0,00 0,00 87,00 87,00 3,01 227,06 -58,12 -4,48 0,00 -0,93 2,40 0,00 28,89
87 Control valve (eingehaust) Unit 6 0,00 0,00 87,00 87,00 3,01 211,47 -57,50 -4,45 0,00 -0,86 2,38 0,00 29,58
160 Distrib. pipe 1 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 283,74 -60,05 3,90 0,00 -7,35 0,00 0,00 22,09
161 Distrib. pipe 2 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 282,81 -60,02 3,89 0,00 -7,33 0,00 0,00 22,13
132 Distrib. pipe 3 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 281,87 -59,99 3,89 0,00 -7,31 0,00 0,00 22,18
133 Distrib. pipe 4 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 280,73 -59,96 3,88 0,00 -7,28 0,00 0,00 22,23
134 Distrib. pipe 5 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 279,80 -59,93 3,88 0,00 -7,26 0,00 0,00 22,28
135 Distrib. pipe 6 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 278,88 -59,90 3,87 0,00 -7,24 0,00 0,00 22,33
136 Distrib. pipe 7 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 277,76 -59,87 3,87 0,00 -7,21 0,00 0,00 22,38
137 Distrib. pipe 8 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 276,83 -59,84 3,86 0,00 -7,19 0,00 0,00 22,43
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.50 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
138 Distrib. pipe 9 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 275,91 -59,81 3,86 0,00 -7,17 0,00 0,00 22,47
139 Distrib. pipe 10 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 274,76 -59,77 3,85 0,00 -7,14 0,00 0,00 22,53
140 Distrib. pipe 11 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 273,84 -59,74 3,85 0,00 -7,12 0,00 0,00 22,58
141 Distrib. pipe 12 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 272,91 -59,71 3,84 0,00 -7,10 0,00 0,00 22,62
142 Distrib. pipe 13 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 271,78 -59,68 3,84 0,00 -7,07 0,00 0,00 22,68
143 Distrib. pipe 14 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 270,85 -59,65 3,83 0,00 -7,05 0,00 0,00 22,73
144 Distrib. pipe 15 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 269,93 -59,62 3,83 0,00 -7,03 0,00 0,00 22,78
145 Distrib. pipe 16 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 268,79 -59,58 3,82 0,00 -7,00 0,00 0,00 22,83
146 Distrib. pipe 17 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 267,86 -59,55 3,82 0,00 -6,98 0,00 0,00 22,88
147 Distrib. pipe 18 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 266,94 -59,52 3,81 0,00 -6,96 0,00 0,00 22,93
148 Distrib. pipe 19 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 265,82 -59,48 3,81 0,00 -6,93 0,00 0,00 22,99
149 Distrib. pipe 20 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 264,90 -59,45 3,80 0,00 -6,91 0,00 0,00 23,03
150 Distrib. pipe 21 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 263,98 -59,42 3,80 0,00 -6,88 0,00 0,00 23,08
151 Distrib. pipe 22 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 262,84 -59,39 3,79 0,00 -6,86 0,00 0,00 23,14
152 Distrib. pipe 23 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 261,92 -59,36 3,79 0,00 -6,84 0,00 0,00 23,19
153 Distrib. pipe 24 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 260,99 -59,32 3,78 0,00 -6,81 0,00 0,00 23,24
154 Distrib. pipe 25 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 259,87 -59,29 3,78 0,00 -6,79 0,00 0,00 23,29
155 Distrib. pipe 26 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 258,95 -59,26 3,77 0,00 -6,76 0,00 0,00 23,34
156 Distrib. pipe 27 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 258,03 -59,23 3,77 0,00 -6,74 0,00 0,00 23,39
157 Distrib. pipe 28 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 256,89 -59,19 3,76 0,00 -6,71 0,00 0,00 23,45
158 Distrib. pipe 29 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 255,97 -59,16 3,75 0,00 -6,69 0,00 0,00 23,50
159 Distrib. pipe 30 downstream Transportation Gas Cooler 0,00 0,00 76,00 9,10 85,59 0,00 255,05 -59,12 3,75 0,00 -6,67 0,00 0,00 23,55
2 Exhaust Stack Opening Unit 4 0,00 0,00 87,18 2,01 90,21 0,00 267,31 -59,53 2,99 -3,61 -0,95 0,00 0,00 29,11
60 Exhaust Stack Opening Unit 6 0,00 0,00 87,18 2,01 90,21 0,00 208,70 -57,38 2,99 -3,60 -0,76 0,00 0,00 31,45
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.51 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
31 Exhaust Stack Opening Unit 5 0,00 0,00 87,18 2,01 90,21 0,00 249,21 -58,92 2,99 -3,61 -0,90 0,00 0,00 29,77
53 Exhaust duct outsde compressor Unit 5 0,00 0,00 79,44 6,01 87,23 0,00 245,35 -58,79 4,53 - -0,25 0,00 0,00 19,51
82 Exhaust duct outsde compressor Unit 6 0,00 0,00 79,47 5,96 87,23 0,00 210,64 -57,46 4,28 0,00 -1,76 0,00 0,00 32,29
24 Exhaust duct outsde compressor Unit 4 0,00 0,00 79,58 5,82 87,23 0,00 269,85 -59,61 4,66 0,00 -2,09 2,47 0,00 32,65
169 Facade E Power Generation Gas II 97,00 37,00 58,49 36,40 74,11 3,00 432,40 -63,71 5,10 -8,64 -0,82 0,00 0,00 9,03
22 Facade E, build. vent. air inlet I Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 270,70 -59,64 4,96 0,00 -1,56 0,00 0,00 15,82
80 Facade E, build. vent. air inlet I Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 210,53 -57,46 4,66 0,00 -1,34 0,00 0,00 17,94
81 Facade E, build. vent. air inlet II Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 219,17 -57,81 4,72 0,00 -1,37 0,00 0,00 17,60
23 Facade E, build. vent. air inlet II Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 277,48 -59,86 4,98 0,00 -1,58 0,00 0,00 15,61
78 Facade E, door 1 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 208,52 -57,37 4,64 0,00 -1,14 0,00 0,00 17,14
20 Facade E, door 1 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 269,13 -59,59 4,95 0,00 -1,43 0,00 0,00 14,94
19 Facade E, door 2 Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 279,45 -59,92 4,99 0,00 -1,48 0,00 0,00 14,60
77 Facade E, door 2 Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 221,66 -57,91 4,72 0,00 -1,21 0,00 0,00 16,63
21 Facade E, package ventilation, air ou Compressor Building Unit 4 0,00 0,00 78,00 1,00 78,00 3,00 274,72 -59,77 4,19 -2,54 -0,24 0,00 0,00 22,63
79 Facade E, package ventilation, air ou Compressor Building Unit 6 0,00 0,00 78,00 1,00 78,00 3,00 215,68 -57,67 3,70 0,00 -0,50 0,00 0,00 26,53
170 Facade N Power Generation Gas II 97,00 37,00 58,49 53,35 75,77 3,00 440,04 -63,86 5,11 - -0,73 0,00 0,00 -0,69
6 Facade N, GT air intake Compressor Building Unit 4 0,00 0,00 74,26 3,75 80,00 3,00 288,15 -60,18 4,18 - -0,21 0,00 0,00 14,23
35 Facade N, GT air intake Compressor Building Unit 5 0,00 0,00 74,26 3,75 80,00 3,00 244,92 -58,77 3,87 - -0,17 0,00 0,00 9,22
64 Facade N, GT air intake Compressor Building Unit 6 0,00 0,00 74,26 3,75 80,00 3,00 229,53 -58,21 3,72 - -0,17 0,00 0,00 14,14
5 Facade N, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 282,98 -60,03 5,00 -9,95 -0,26 0,00 0,00 6,83
63 Facade N, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 225,09 -58,04 4,75 - -0,21 0,00 0,00 7,39
34 Facade N, build. vent. air intlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 250,07 -58,95 4,87 - -0,35 0,00 0,00 -0,63
171 Facade N, door Power Generation Gas II 97,00 30,00 64,01 4,84 70,86 3,00 438,68 -63,83 5,33 - -0,91 0,00 0,00 -6,07
33 Facade N, large door Compressor Building Unit 5 94,00 30,00 59,73 15,57 71,66 3,00 240,78 -58,62 4,39 - -0,93 0,00 0,00 -3,19
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.52 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
62 Facade N, large door Compressor Building Unit 6 94,00 30,00 59,73 15,57 71,66 3,00 234,15 -58,38 4,34 - -0,79 0,00 0,00 -0,21
4 Facade N, large door Compressor Building Unit 4 94,00 30,00 59,73 15,57 71,66 3,00 293,48 -60,34 4,68 - -0,93 0,00 0,00 -0,69
65 Facade N, package ventilation, air i Compressor Building Unit 6 0,00 0,00 74,02 2,50 78,00 3,00 229,53 -58,21 4,27 - -0,08 0,00 0,00 15,24
7 Facade N, package ventilation, air i Compressor Building Unit 4 0,00 0,00 74,02 2,50 78,00 3,00 288,15 -60,18 4,62 - -0,09 0,00 0,00 15,07
36 Facade N, package ventilation, air inlet Compressor Building Unit 5 0,00 0,00 74,02 2,50 78,00 3,00 244,92 -58,77 4,38 - -0,09 0,00 0,00 11,07
8 Facade N, small door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 295,71 -60,41 5,04 - -0,94 0,00 0,00 -4,37
66 Facade N, small door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 236,10 -58,45 4,80 - -0,80 0,00 0,00 -3,67
168 Facade S Power Generation Gas II 97,00 37,00 63,49 58,05 81,13 3,00 436,78 -63,80 5,11 0,00 -1,01 0,00 0,00 24,44
52 Facade S, build. vent. air inlet Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 230,08 -58,23 4,78 0,00 -1,42 0,00 0,00 17,20
17 Facade S, build. vent. air inlet Compressor Building Unit 4 94,00 38,00 63,05 4,00 69,07 3,00 276,40 -59,82 4,98 0,00 -1,58 0,00 0,00 15,64
75 Facade S, build. vent. air inlet Compressor Building Unit 6 94,00 38,00 63,05 4,00 69,07 3,00 214,39 -57,62 4,69 0,00 -1,35 0,00 0,00 17,79
51 Facade S, door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 223,69 -57,99 4,74 0,00 -1,22 0,00 0,00 16,55
16 Facade S, door Compressor Building Unit 4 94,00 25,00 64,73 2,13 68,02 3,00 282,94 -60,03 5,00 0,00 -1,50 0,00 0,00 14,49
74 Facade S, door Compressor Building Unit 6 94,00 25,00 64,73 2,13 68,02 3,00 220,22 -57,85 4,72 0,00 -1,20 0,00 0,00 16,68
37 Facade S, small door Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 238,37 -58,54 4,81 - -0,91 0,00 0,00 -6,16
165 Facade W Power Generation Gas II 97,00 37,00 58,49 36,20 74,08 3,00 444,40 -63,95 5,13 - -0,76 0,00 0,00 1,28
48 Facade W, build. vent. air inlet I Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 248,48 -58,90 4,87 - -0,32 0,00 0,00 0,70
49 Facade W, build. vent. air inlet II Compressor Building Unit 5 94,00 38,00 63,05 4,00 69,07 3,00 240,92 -58,63 4,83 - -0,23 0,00 0,00 4,40
45 Facade W, door 1 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 250,36 -58,96 4,87 - -0,91 0,00 0,00 -5,39
46 Facade W, door 2 Compressor Building Unit 5 94,00 25,00 64,73 2,13 68,02 3,00 238,87 -58,56 4,82 - -0,75 0,00 0,00 1,62
47 Facade W, package ventilation outlet Compressor Building Unit 5 0,00 0,00 78,00 1,00 78,00 3,00 243,90 -58,74 3,96 - -0,08 0,00 0,00 13,43
18 Facade east Compressor Building Unit 4 94,00 48,00 42,00 359,86 67,56 3,00 273,98 -59,75 3,41 0,00 -0,61 0,00 0,00 13,62
76 Facade east Compressor Building Unit 6 94,00 48,00 42,00 359,86 67,56 3,00 214,39 -57,62 3,18 0,00 -0,48 0,00 0,00 15,65
32 Facade north Compressor Building Unit 5 94,00 48,00 42,00 282,61 66,51 3,00 244,93 -58,77 3,25 - -0,27 0,00 0,00 -4,89
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.53 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
61 Facade north Compressor Building Unit 6 94,00 48,00 42,00 282,61 66,51 3,00 229,20 -58,20 3,22 - -0,28 0,00 0,00 0,41
3 Facade north Compressor Building Unit 4 94,00 48,00 42,00 282,61 66,51 3,00 287,54 -60,17 3,42 - -0,37 0,00 0,00 0,01
73 Facade south Compressor Building Unit 6 94,00 48,00 42,00 304,43 66,84 3,00 213,50 -57,58 3,13 0,00 -0,48 0,00 0,00 14,90
50 Facade south Compressor Building Unit 5 94,00 48,00 42,00 304,43 66,84 3,00 230,54 -58,25 3,25 0,00 -0,52 0,00 0,00 14,32
15 Facade south Compressor Building Unit 4 94,00 48,00 42,00 304,43 66,84 3,00 275,46 -59,79 3,37 0,00 -0,61 0,00 0,00 12,80
44 Facade west Compressor Building Unit 5 94,00 48,00 42,00 359,86 67,56 3,00 244,88 -58,77 3,26 - -0,30 0,00 0,00 -0,55
88 Filter IV Filter 0,00 0,00 69,80 5,25 77,00 0,00 330,66 -61,38 5,44 0,00 -1,70 0,00 0,00 19,36
89 Filter V Filter 0,00 0,00 69,80 5,25 77,00 0,00 339,68 -61,61 5,46 0,00 -1,73 0,00 0,00 19,11
91 Fuel Gas Skid, facade E Fuel Gas Skid II 87,00 37,00 45,32 126,06 66,33 3,00 390,31 -62,82 4,56 0,00 -1,13 0,00 0,00 9,93
92 Fuel Gas Skid, facade E, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 389,62 -62,81 5,26 0,00 -1,13 0,00 0,00 -3,51
94 Fuel Gas Skid, facade N Fuel Gas Skid II 87,00 37,00 45,32 63,58 63,35 3,00 395,32 -62,93 4,57 -2,77 -1,14 0,00 0,00 4,08
95 Fuel Gas Skid, facade N, door Fuel Gas Skid II 87,00 37,00 45,32 4,84 52,17 3,00 395,42 -62,93 5,26 -6,53 -1,04 0,00 0,00 -10,07
96 Fuel Gas Skid, facade W Fuel Gas Skid II 87,00 37,00 45,32 130,90 66,49 3,00 398,24 -63,00 4,61 -4,26 -1,17 0,00 0,00 5,68
90 Fuel Gas Skid, roof Fuel Gas Skid II 87,00 37,00 45,32 123,97 66,25 0,00 394,25 -62,91 4,50 -4,72 -1,14 0,00 0,00 1,99
98 Gas Cooler 3/4 Transportation Gas Cooler 0,00 0,00 66,04 496,15 93,00 0,00 271,38 -59,66 2,99 0,00 -2,54 0,00 0,00 33,79
102 Gas Cooler 3/4, distrib. pipe 1 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 288,20 -60,19 3,88 0,00 -7,58 0,00 0,00 24,94
103 Gas Cooler 3/4, distrib. pipe 2 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 287,29 -60,16 3,87 0,00 -7,56 0,00 0,00 24,98
104 Gas Cooler 3/4, distrib. pipe 3 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 286,38 -60,13 3,87 0,00 -7,54 0,00 0,00 25,03
105 Gas Cooler 3/4, distrib. pipe 4 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 285,26 -60,10 3,86 0,00 -7,51 0,00 0,00 25,08
106 Gas Cooler 3/4, distrib. pipe 5 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 284,35 -60,07 3,86 0,00 -7,49 0,00 0,00 25,13
107 Gas Cooler 3/4, distrib. pipe 6 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 283,44 -60,04 3,85 0,00 -7,47 0,00 0,00 25,17
108 Gas Cooler 3/4, distrib. pipe 7 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 282,34 -60,01 3,85 0,00 -7,44 0,00 0,00 25,23
109 Gas Cooler 3/4, distrib. pipe 8 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 281,43 -59,98 3,84 0,00 -7,42 0,00 0,00 25,27
110 Gas Cooler 3/4, distrib. pipe 9 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 280,51 -59,95 3,84 0,00 -7,40 0,00 0,00 25,32
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.54 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
111 Gas Cooler 3/4, distrib. pipe 10 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 279,39 -59,92 3,83 0,00 -7,37 0,00 0,00 25,38
112 Gas Cooler 3/4, distrib. pipe 11 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 278,48 -59,89 3,83 0,00 -7,35 0,00 0,00 25,42
113 Gas Cooler 3/4, distrib. pipe 12 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 277,57 -59,86 3,83 0,00 -7,32 0,00 0,00 25,47
114 Gas Cooler 3/4, distrib. pipe 13 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 276,47 -59,83 3,82 0,00 -7,30 0,00 0,00 25,52
115 Gas Cooler 3/4, distrib. pipe 14 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 275,56 -59,80 3,82 0,00 -7,28 0,00 0,00 25,57
116 Gas Cooler 3/4, distrib. pipe 15 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 274,65 -59,77 3,81 0,00 -7,25 0,00 0,00 25,62
117 Gas Cooler 3/4, distrib. pipe 16 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 273,53 -59,73 3,81 0,00 -7,23 0,00 0,00 25,68
118 Gas Cooler 3/4, distrib. pipe 17 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 272,63 -59,70 3,80 0,00 -7,20 0,00 0,00 25,72
119 Gas Cooler 3/4, distrib. pipe 18 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 271,72 -59,67 3,80 0,00 -7,18 0,00 0,00 25,77
120 Gas Cooler 3/4, distrib. pipe 19 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 270,59 -59,64 3,79 0,00 -7,15 0,00 0,00 25,83
121 Gas Cooler 3/4, distrib. pipe 20 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 269,69 -59,61 3,79 0,00 -7,13 0,00 0,00 25,87
122 Gas Cooler 3/4, distrib. pipe 21 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 268,78 -59,58 3,78 0,00 -7,11 0,00 0,00 25,92
123 Gas Cooler 3/4, distrib. pipe 22 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 267,69 -59,54 3,78 0,00 -7,08 0,00 0,00 25,98
124 Gas Cooler 3/4, distrib. pipe 23 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 266,78 -59,52 3,77 0,00 -7,06 0,00 0,00 26,02
125 Gas Cooler 3/4, distrib. pipe 24 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 265,88 -59,49 3,77 0,00 -7,04 0,00 0,00 26,07
126 Gas Cooler 3/4, distrib. pipe 25 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 264,76 -59,45 3,76 0,00 -7,01 0,00 0,00 26,13
127 Gas Cooler 3/4, distrib. pipe 26 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 263,86 -59,42 3,76 0,00 -6,99 0,00 0,00 26,18
128 Gas Cooler 3/4, distrib. pipe 27 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 262,95 -59,39 3,75 0,00 -6,97 0,00 0,00 26,22
129 Gas Cooler 3/4, distrib. pipe 28 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 261,86 -59,35 3,75 0,00 -6,94 0,00 0,00 26,28
130 Gas Cooler 3/4, distrib. pipe 29 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 260,96 -59,32 3,74 0,00 -6,92 0,00 0,00 26,33
131 Gas Cooler 3/4, distrib. pipe 30 Transportation Gas Cooler 0,00 0,00 79,00 9,61 88,83 0,00 260,05 -59,29 3,74 0,00 -6,89 0,00 0,00 26,38
99 Gas Cooler 3/4, gas flow noise Transportation Gas Cooler 0,00 0,00 66,04 496,10 93,00 0,00 271,38 -59,66 2,99 0,00 -2,54 0,00 0,00 33,79
100 Header discharge side Piping 0,00 0,00 80,00 108,19 100,34 0,00 227,21 -58,12 4,38 0,00 -1,26 0,48 0,00 45,82
162 Header startup cooler Filter 0,00 0,00 80,00 113,30 100,54 0,00 227,34 -58,13 4,38 0,00 -1,26 0,32 0,00 45,85
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.55 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
101 Header suction side Piping 0,00 0,00 78,00 112,33 98,50 0,00 227,97 -58,15 4,38 0,00 -1,26 0,51 0,00 43,99
163 Meter Run IV Metering 0,00 0,00 72,70 39,50 88,66 0,00 362,41 -62,18 4,88 0,00 -2,28 0,00 0,00 29,08
164 Meter Run V Metering 0,00 0,00 72,70 39,48 88,66 0,00 365,41 -62,25 4,88 0,00 -2,30 0,00 0,00 29,00
59 Oil Cooler Unit 6 0,00 0,00 78,11 24,50 92,00 0,00 214,06 -57,60 3,46 0,00 -0,83 2,21 0,00 39,24
30 Oil Cooler Unit 5 0,00 0,00 78,11 24,50 92,00 0,00 252,90 -59,05 3,85 - -0,45 10,76 0,00 30,29
1 Oil Cooler Unit 4 0,00 0,00 78,11 24,50 92,00 0,00 271,77 -59,68 4,00 0,00 -1,02 0,03 0,00 35,33
25 Piping suction side Unit 4 0,00 0,00 78,00 34,38 93,36 0,00 271,38 -59,66 4,66 0,00 -1,46 0,72 0,00 37,62
54 Piping suction side Unit 5 0,00 0,00 78,00 34,38 93,36 0,00 222,86 -57,95 4,37 0,00 -1,24 2,00 0,00 40,54
83 Piping suction side Unit 6 0,00 0,00 76,64 34,38 92,00 3,01 206,88 -57,31 -4,44 0,00 -0,49 0,99 0,00 33,76
55 Piping, discharge side Unit 5 0,00 0,00 80,00 30,25 94,81 0,00 215,94 -57,68 4,32 0,00 -1,21 1,63 0,00 41,86
26 Piping, discharge side Unit 4 0,00 0,00 80,00 30,25 94,81 0,00 261,26 -59,33 4,61 0,00 -1,42 0,00 0,00 38,67
84 Piping, discharge side Unit 6 0,00 0,00 80,00 30,69 94,87 0,00 200,39 -57,03 4,19 0,00 -1,14 0,40 0,00 41,29
173 Power Generation Gas II, Exhaust Stack Power Generation Gas II 0,00 0,00 90,00 90,00 0,00 431,44 -63,69 4,73 -6,17 -0,32 0,95 0,00 25,50
167 Roof Power Generation Gas II 97,00 37,00 58,49 104,19 78,67 0,00 438,45 -63,83 4,65 - -0,70 0,00 0,00 5,34
38 Roof Compressor Building Unit 5 94,00 45,00 45,41 297,84 70,15 0,00 236,96 -58,49 2,98 -4,93 -0,48 0,00 0,00 9,22
67 Roof Compressor Building Unit 6 94,00 45,00 45,41 297,84 70,15 0,00 222,11 -57,92 2,97 -4,83 -0,46 0,00 0,00 9,91
9 Roof Compressor Building Unit 4 94,00 45,00 45,41 297,84 70,15 0,00 282,10 -60,00 2,98 -4,74 -0,58 0,00 0,00 7,80
166 Room ventilation, intake Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 444,03 -63,94 -4,64 - -1,05 0,00 0,00 -3,13
172 Room ventilation, outlet Power Generation Gas II 0,00 0,00 76,00 76,00 6,01 442,00 -63,90 -4,63 - -1,04 0,00 0,00 -6,42
93 Ventilation, intake Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 390,96 -62,83 -4,57 0,00 -0,92 0,00 0,00 5,68
97 Ventilation, outlet Fuel Gas Skid II 0,00 0,00 68,00 68,00 6,01 397,59 -62,98 -4,57 - -0,94 0,00 0,00 -7,65
28 air intake duct Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 291,36 -60,28 3,51 -6,81 -0,28 0,00 0,00 16,14
57 air intake duct Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 247,61 -58,87 3,07 - -0,17 0,00 0,00 8,59
86 air intake duct Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 233,41 -58,35 2,98 -9,64 -0,18 0,00 0,00 14,80
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.56 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
Trans Adriatic Pipeline (TAP) AGProposed Gas Compressor Station GCS00 at district Evros, Greece
Construction phase IIcalculated sound propagation according to ISO 9613-2
Sourc
No.
Source Group Li
dB(A)
R'w
dB
Lw'
dB(A)
l or S
m,m²
Lw
dB(A)
Ko
dB
s
m
Adiv
dB
Agr
dB
Abar
dB
Aatm
dB
dLrefl
dB
Cmet Lr,i
dB(A)
85 oil demister Compressor Building Unit 6 0,00 0,00 80,00 80,00 0,00 215,88 -57,68 2,98 -3,72 -1,07 0,00 0,00 20,52
27 oil demister Compressor Building Unit 4 0,00 0,00 80,00 80,00 0,00 274,28 -59,76 2,99 -3,91 -1,22 0,00 0,00 18,10
56 oil demister Compressor Building Unit 5 0,00 0,00 80,00 80,00 0,00 246,82 -58,84 2,98 - -0,70 0,00 0,00 5,19
39 roof, explosion panel Compressor Building Unit 5 94,00 16,00 74,24 154,80 96,14 0,00 237,61 -58,51 2,98 -5,04 -0,67 0,08 0,00 34,98
10 roof, explosion panel Compressor Building Unit 4 94,00 16,00 74,24 154,80 96,14 0,00 282,76 -60,02 2,98 -4,91 -0,82 0,04 0,00 33,41
68 roof, explosion panel Compressor Building Unit 6 94,00 16,00 74,24 154,80 96,14 0,00 222,47 -57,94 2,98 -4,99 -0,64 0,05 0,00 35,60
Werner Genest + PartnerIngenieurgesellschaft mbH
Attachment 3.2.57 GCS00-WGP
127D5, Rev. 00
SoundPLAN 7.1
25
25
25
25
25
25
25
25
25
25
30
30
30
30
30
35
35
35
40
40
4550
5560
65
2 Tavri
1 Thymaria
4 Kipoi
7 Station Fence East
3 Peplos
6 Station Fence South
5 Station Fence West
34942500
34942500
34943000
34943000
34943500
34943500
34944000
34944000
34944500
34944500
34945000
34945000
34945500
34945500
34946000
34946000
34946500
34946500
34947000
34947000
34947500
34947500
34948000
34948000
4547000
4547000
4547500
4547500
4548000
4548000
4548500
4548500
4549000
4549000
4549500
4549500
4550000
4550000
4550500
4550500
4551000
4551000
4551500
4551500
Attachment 4.1
GCS00-WGP
127D5 G1, Rev. 00
Trans Adriatic Pipeline AG
Proposed Gas Compression Station
GCS00 at district Evros, Greece
Construction phase I
Noise Contour Map
Temperature 15 °C
Relative Humidity 70 %
Map Source:
Google Earth
-----------------------------------------------------------
Noise Propagation Outdoor
according to ISO 9613-2
Calculation Parameter:
T = 15°C, Humidity 70%, Air pressure 1015 mbar
Cmet = 0 dB
Wind 3 m/s toward receptor
Ground effect on proposed GCS00: fully reflective, G=0
Ground effect around: Agricultural area, G=0,85
Limits for attenuation by screening:
Single sound screen 20 dB
Multiple sound screens 25 dB
Calculation Grid 50 m
Height of noise contours 2 m above ground
Legend
Receptor
Industry building
noise source (point)
noise source (line)
noise source (area)
Noise Level
LAeq
= 25 dB(A)
= 30 dB(A)
= 35 dB(A)
= 40 dB(A)
= 45 dB(A)
= 50 dB(A)
= 55 dB(A)
= 60 dB(A)
= 65 dB(A)
= 70 dB(A)
= 75 dB(A)
Scale (on paper size A3) 1:20000
00 100 200 400 600 800 1000m
25
25
25
25
25
25
25
30
30
30
30
30
35
35
35
40
40
45
5055
60
65
2 Tavri
1 Thymaria
4 Kipoi
7 Station Fence East
3 Peplos
6 Station Fence South
5 Station Fence West
34942500
34942500
34943000
34943000
34943500
34943500
34944000
34944000
34944500
34944500
34945000
34945000
34945500
34945500
34946000
34946000
34946500
34946500
34947000
34947000
34947500
34947500
34948000
34948000
4547000
4547000
4547500
4547500
4548000
4548000
4548500
4548500
4549000
4549000
4549500
4549500
4550000
4550000
4550500
4550500
4551000
4551000
4551500
4551500
Attachment 4.2
GCS00-WGP
127D5 G1, Rev. 00
Trans Adriatic Pipeline AG
Proposed Gas Compression Station
GCS00 at district Evros, Greece
Construction phase II
Noise Contour Map
Temperature 15 °C
Relative Humidity 70 %
Map Source:
Google Earth
-----------------------------------------------------------
Noise Propagation Outdoor
according to ISO 9613-2
Calculation Parameter:
T = 15°C, Humidity 70%, Air pressure 1015 mbar
Cmet = 0 dB
Wind 3 m/s toward receptor
Ground effect on proposed GCS00: fully reflective, G=0
Ground effect around: Agricultural area, G=0,85
Limits for attenuation by screening:
Single sound screen 20 dB
Multiple sound screens 25 dB
Calculation Grid 50 m
Height of noise contours 2 m above ground
Legend
Receptor
Industry building
noise source (point)
noise source (line)
noise source (area)
Noise Level
LAeq
= 25 dB(A)
= 30 dB(A)
= 35 dB(A)
= 40 dB(A)
= 45 dB(A)
= 50 dB(A)
= 55 dB(A)
= 60 dB(A)
= 65 dB(A)
= 70 dB(A)
= 75 dB(A)
Scale (on paper size A3) 1:20000
00 100 200 400 600 800 1000m
Date 06/2013
Copyright Reserved: This document may not be copied, shown to or placThe latest version of the document is registered in the TAP Project's Data
Trans Adriatic Pipeline AG – Greece (Branch Office)21st Floor, Athens Tower, 2-4 Messogion Ave., 11527
Athens GreeceAthens, GreecePhone.: + 30 210 7454613
Fax: + 30 210 7454300
ced at the disposal of third parties without prior consent of TAP AG.abase.