integrated commercial development at zone 5, plot 5, … doc... · 2019. 5. 2. · request for...
TRANSCRIPT
BRIEF DOCUMENT
FOR
INTEGRATED COMMERCIAL DEVELOPMENT
AT ZONE 5, PLOT 5, BANDAR MERU RAYA,
MUKIM HULU KINTA, DAERAH KINTA, PERAK
DARUL RIDZUAN
PCB DEVELOPMENT SDN BHD NO 1-A, Tower B PKNP
Jalan Meru Casuarina Bandar Meru Raya
30020 Ipoh Perak Darul Ridzuan
RFP 5/ZONE 5/PLOT 5/2019/REV.2 2
REQUEST FOR PROPOSAL
CONFIDENTIALITY AND INTELLECTUAL PROPERTY CLAUSE
This Request for Proposal (RFP) is strictly confidential. It is made available to your
organisation on the strict understanding that it will not be shown, read or passed to
any person who is not a current employee of your organisation.
This RFP has been developed in view of PCB Development Sdn Bhd (PCBD)
business strategy requirements. It remains the sole property of PCB Development
Sdn Bhd and as such its contents may not be disclosed by your organisation to any
third party, nor may any original concepts devised by PCB Development Sdn Bhd be
used commercially.
Should a breach of confidentiality and intellectual property right occur at any time
before or after the RFP proposal deadline, PCB Development Sdn Bhd retains the
right to disqualify the proposal and may choose not to invite the defaulting
organisation to any future proposal exercises.
By purchasing the RFP, you agree to be bound by the terms and conditions of
confidentiality and intellectual property right stated in this RFP.
RFP 5/ZONE 5/PLOT 5/2019/REV.2 3
TABLE OF CONTENTS
1. BACKGROUND 4 2. OBJECTIVE 5 3. PURPOSE OF RFP 5 4. SCOPE OF RFP 5 5. THE PROPOSED DEVELOPMENT SITE 7 6. LAND MATTERS 14 7. COMMUNICATION REGARDING THE RFP 17 8. TERMS AND CONDITIONS 17 9. KEY PLAN/SITE PLAN 19
10. TOPOGRAPHY PLAN 19
RFP 5/ZONE 5/PLOT 5/2019/REV.2 4
BACKGROUND
Perak Corporation Berhad (PCB) was established in 1991 with a paid-up capital of RM100
million and as at end of year 2018, the paid-up capital has been increased to RM237 million,
and has been listed on the Main Board of Bursa Saham Malaysia since 2003. Perbadanan
Kemajuan Negeri Perak is the main shareholder of the company with a 52.9% stake. The
early activities of PCB were focused in the management of ports and logistics facilities and
development of new townships. As the company charges forward, it has expanded to
include regional development, hospitality & tourism and development of ports & logistics
infrastructure.
PCB Development Sdn Bhd (PCBD) is one of PCB's main subsidiaries which had undertaken
the development project of Bandar Meru Raya (BMR). The BMR project consists of the
development of a fully integrated township located in Ipoh. BMR a fast-emerging township
dubbed as the “New Heartbeat of Ipoh”, is PCB’s flagship for township development.
Developed as Ipoh’s satellite metropolis, it is designed as the epitome of comprehensive
and integrated destination for work, live, play and learn.
Covering an area of 3,000 acres, BMR’s ecosystem has components of various facilities like
Government Precinct, tourist attractions and public amenities which include a central bus
terminal that enhances intra and inter-state connectivity, a large-scale convention centre,
international and national colleges and schools, a hypermarket, a public park, a world class
animation theme park and 400 lots of commercial units to meet the needs of over 4,000
units of residential in the vicinity. BMR currently houses six government offices in an
expanding Government Precinct. With the relocation of 12 more government agencies in
the pipeline, BMR is set to be the main administrative centre for Perak Darul Ridzuan.
Home to a plethora of integrated businesses, Bandar Meru Raya will boost Perak's appeal as
an investment destination of choice that offers varied prospects. Cognisant of its role, the
company constantly seeks out avenues for development and growth to expand the property
market in the state, both in terms of value and quantity. This paves the way for more
commercial possibilities and opportunities and increases the stable of residential property.
PCB and PCBD have a substantial landbank that would be made available for residential,
commercial and industrial developments.
Realizing the prominence of a Property Development and sustainability to the socio-
economic growth of the State of Perak, PCBD is seeking a Developer with the capacity and
creativity to transform the land included in this RFP by following high development
standards and presenting a commercially viable project for the area. It is anticipated that
the commercial development including other amenities in accordance to local authorities’
requirements for the particular area. The Developer will be expected to coordinate all
aspects of designs and construction with PCBD to ensure that the proposed project matches
the aspiration of PCBD.
RFP 5/ZONE 5/PLOT 5/2019/REV.2 5
PCBD’s intention is to select a Developer and proposal with the highest quality plan(s) to
provide exclusive negotiation period which would enable the parties to undertake proper
due diligence and establish a firm development schedule.
This RFP establishes the fundamental requirements for the development on PCBD’s
landbank. Respondents are invited to submit their proposed development in accordance
with the criteria specified in this RFP document thereby establishing a consistent and
formalized basis on which respondents’ proposals may be evaluated.
OBJECTIVE
The Landowner hereby invites companies/ corporation/ consortium registered with Ministry
of Finance to participate as the developer partner for the said development and facilities in
accordance with this Request for Proposal (RFP).
The Applicant’s proposals for the provision of the development shall be submitted in
accordance with the format as set forth with.
PURPOSE OF THE RFP
Provide applicants with sufficient information to facilitate the preparation and submission of
a proposal to provide the development proposal.
Seek certain information from the applicant which will be used in the evaluation process.
This RFP is not an offer to contract, but seeks the submission of proposals from interested
respondents that may form the basis for negotiation of Landowner-Developer contract with
PCBD.
SCOPE OF RFP
Determine the degree of fit of the proposed development offerings to The Landowner, in
compliance to other government agencies and local authorities’ requirements.
The designated land parcel has been earmarked as thematic enclave with the concept for
hotels, tourist and recreational facilities.
In addition to the above concept, proposer can include other components such as high-end
condominium, service apartment or a retail complex to complement BMR’s hospitality and
tourism themed and integrated new township.
Acquire detailed information of applicants’ company profile, experience, development track
record, state of finance, technical capability, design and management teams, marketing and
sales strategies.
RFP 5/ZONE 5/PLOT 5/2019/REV.2 6
Acquire estimated costing in relation to the proposed Gross Development Value and Gross
Development Cost covering all aspects of the development process and components.
Evaluate the Implementation Plan from Inception to Completion including until Defects
Liability Period ends.
Offer of entitlements and their schedule payments to the Landowner. The Landowner shall entitle for profit sharing from fixed amount quarterly revenue during operation and/or the gross profit of the Development based on as follows:
a.) For commercial, tourism or hospitality developments that will be developed and then
operated by the Developer/Operator, the entitlement shall be based on fixed quarterly revenue (fixed lump sum amount) to the land owner including its duration has to be proposed by the Proposer.
b.) For strata title-based developments for sales such as high-end condominium, apartment
or retail complex and the likes, the Proposer has to propose the profit entitlement to the Landowner based on the percentage of the Gross Profit from the Gross Development Value (GDV) less the Gross Development Cost (GDC).
c.) Combination of above item (a) and (b).
Optional developments as below:
HOSPITALITY, RESIDENTIAL & MIX
USE COMMERCIAL COMPONENTS
REVENUE PROPOSAL & GROSS PROFIT
ENTITLEMENT TO LANDOWNER
i. Develop & Sell High-end
Condominium/Apartment
➢ Developer to propose the percentage
from the Gross Profit (Gross Development
Value from sales revenue less the Gross
Development Cost)
ii. Develop & Operate Service
Apartment
➢ Developer/Operator to propose quarterly
payment of fixed lump sum revenue &
duration.
iii. Develop & Sell (or Operate)
Retail Complex
➢ Developer to propose the percentage
from the Gross Profit (Gross Development
Value from sales revenue less the Gross
Development Cost)
-OR-
➢ Developer/Operator to propose quarterly
payment of fixed lump sum revenue &
duration, if operated.
RFP 5/ZONE 5/PLOT 5/2019/REV.2 7
iv. Develop & Operate Hotel &
Wellness Centre (Complete
with full ID, FF&E with
Operator)
➢ Developer/Operator to propose quarterly
payment of fixed lump sum revenue &
duration.
THE PROPOSED DEVELOPMENT SITE
To carry out PCBD’s vision, this RFP is being called for a proposed development site at Plot
5, Zone 5, Bandar Meru Raya, Mukim Hulu Kinta, Daerah Kinta, Perak Darul Ridzuan.
The land for the proposed development is located at the heart of Bandar Meru Raya and
comprising an area of 32.82 acres.
The proposed development is expected to be economically viable because of its strategic
location and is surrounded by Bandar Meru Raya’s tourist attractions such as the integrated
recreation park – Bulatan Sultan Azlan Shah, Movie Animation Park Studio,
Casuarina@Meru Hotel and Traditional House Restaurant.
The proposed development concept is agglomeration of Business Activities to stimulate
and increase the economic development in the area.
PROPOSED SITE
PLOT 5, ZONE 5,
BANDAR MERU RAYA
PLY
Location Map of Proposed Site (Plot 5, Zone 5, Bandar Meru Raya)
RFP 5/ZONE 5/PLOT 5/2019/REV.2 8
The land is connected to main road Persiaran Meru Raya 2 (66’) and Persiaran Meru Raya 3
(100’).
The land is equipped with major infrastructure centralize facilities such as water supply,
electricity supply, sewerage system, telecommunication system, road and drainage.
Meanwhile the current land use of the land is open field.
The land is zoned as Commercial Zone under Ipoh Local Plan 2020.
Location Map of Proposed Development Site (Not to Scale)
LEBUHRAYA UTARA - SELATAN (Sediada)
15.240m
30.4
80m
(1
00')
DARI J
ELAPAN
G
193664
PT102559
SAH 35m
(212144)
(15437)
RIZAB SUNGAI
RIZ
AB PARIT
7.6
20m
RIZ
AB TALIA
N H
ANTARAN ELEKTRIK
60.3
50m
(1
98')
RIZ
AB PARIT
7.6
20m
30.480m (100')
(33001)
40.234m (132')
(32999)
38051
11705
11698
17510
75146m²(18.57ek)
35m
20.117m
40.234m (132')
30.4
80m
(1
00')
30.480m (100')
RIZ
AB PARIT
7.6
20m
15.240m
20.117m
12.1
92m
12.1
92m
12.192m
15.2
40m
15.2
40m
2118.6m²
44515m²(11.00ek)
JP / 02 / IP / 3996 / R1 - 1
PELAN P. U. TELAH LULUSLIHAT NO. PELAN
3454.0m²
6990m²
771.2m²
3945.5m²
636.1m²
4097m²
1638.0m²
(1.73ek)
(1.01ek)
JP / 97 / IP / 3287 / R2 - 3
LIHAT NO. PELAN
19.44ek
439.7m²
15.240m
55980m²(13.83ek)
15.240m
11354m
²
(2.8
1ek)
7.315m
7.315m
LIHAT PEMBESARAN "B"
7.315m²
66'(2
0.11
7m)
(20.00ek)
15 ekarKolam Rekreasi
3.50 EK
5.97 EK
28205m²(7.15ek)
97487m²( 24.09 ek )
8094m²( 2.00 ek )
PT 167585
80942m²
Dari Changkat Jering
11674
Ke Ipoh
RIZA
B SUNGAI
SAH
35m
(100')
30.480m
15.2
40m
(50
')
20.1
17m
(66')
20.117m (66')
15.2
40m
(50')
20.117m (66')
15.2
40m
(50
')
15.240m (50')
15.2
40m (50
')
40.2
34m (
132')
15.240m (50')
15.2
40m
(50
')
PELAN P.U. TELAH LULUS
NO. PELAN : JP/02/IP/3996/R1-1
12
3
4
5
6
7
8
9 10
4BKOMERSIL
5BKOMERSIL
1BKOMERSIL
RIZAB SUNGAI SAH 35m
15.240m (50')
7.62
0m (2
5')
7.62
0m (2
5')
9B
HIJAU 7.315m
10B
HIJAU 7.315m
JALURAN
JALURAN
14
20.1
17m
(66
')
15.2
40m
(50
')
15.240m (50')
15.240m (50')
22
23
NO. PELAN : JP/97/IP/3287_Z6/P1-0
7B
HIJAU 7.315mJALURAN
ZONE 3
ZONE 6
ZON 8
ZONE 7PK
PK1
TADAHANKOLAM
9.794141° 01' 30"
48.911142°09'40"
29.330145°18'20"56.681
25.347145°52'00"
315° 06' 10" 421.981
PLOT 22
6.40 EK
PK
PK
PK
PK
PK
PLOT 21
PLOT 221F
1J
ZONE 2
4A
4B
5B
6B
3B
15.2
40m
(50
')
9.144m (30')
9.144m (30')
9.14
4m (30
')
6.096m (20')
6.096m (20')
15.2
40m
(50')
15.2
40m
(50')
9.14
4m (30
')
15.240m (50')
15.240m (50')
15.2
40m
(50
')
15.2
40m
(50
')
15.2
40m
(50
')
15.240m (50')
15.240m (50')
15.2
40m
(50
')9.
144m
(30
')
9.14
4m (30
')
20.1
17m
(66
')
20.117m (66')
30.480m (100')
Jaluran Hijau 7.315m
30.4
80m
(10
0')
20.1
17m
(66')
15.240m (50')
15.2
40m
(50')
20.117m (66')
15.240m (50')
15.240m (50')
20.1
17m
(66
')
217°
53'2
0"12
5.31
8
6.223265°00'00"
4.18 ek
U 112768.4T 29025.5
15.240m (50')
6.4
66
172°5
3'2
0"
5.44 ek
3.95 ek
30.480m (100')
30.4
80m
(10
0')
30.480m (100')
15.2
40m
(50
')
15.240m (50')
1.00 ek
1.00 ek
1.00 ek
1.00 ek
1.32 ek
1.32 ek
1.00 ek
1.00 ek
1.00 ek
1.00 ek
1.14 ek
1.10 ek
15.24m (50')
20.1
17m
(66
')
15.2
40m
(50
')
1
2
3
4
5
6
7
8
9
10
11
12
PTTC
7.62
0m (2
5')
1D
ZONE 5
ZONE 4
15.2
40m
(50
')
4
5
7
8
9 10
1BKOMERSIL
2BKOMERSIL
3BKOMERSIL
9B
HIJAU 7.315m
10B
HIJAU 7.315m
JALURAN
JALURAN
7.62
0m (2
5')
U 112646.7
T 28958.1
16.0 EKPT 229142
MYDINHYPERMARKET
HIJAU 7.315mJALURAN
1D
PK
PK
PK
PK
PK
136° 05' 20"
133° 58' 20"
51.14921.437
122°53'50"123°01'20"12.168
127°05'20"
47.614
315° 06 10" 415.250 Jum..
34.12 EKPLOT 21
MASJID
PT2
47231
PT2
47232
PT2
47233
PT2
47234
PT2
47235
PT2
47236
PT2
47237
PT2
47238
PT2
47239
PT2
47240
PT2
47241
PT2
47242
PT2
47243
PT2
47244
PT2
47245
PT2
47246
PT2
47247
PT2
47248
PT2
47249
PT2
47250
PT2
47251
PT2
47252
PT2
47253
PT2
47254
PT2
47255
PT2
47256
PT2
47257
PT2
47279
PT2
47278
PT2
47277
PT2
47276
PT2
47275
PT2
47274
PT2
47273
PT2
47272
PT2
47271
PT2
47270
PT2
47269
PT2
47268
PT2
47267
PT2
47266
PT2
47265
PT2
47264
PT2
47263
PT2
47262
PT2
47261
PT2
47260
PT2
47259
PT2
47258
15.240m (50')
24.994m (82')
PROPOSED SITE
RUMAH TRADISIONAL
MELAYU CASUARINA@MERU
HOTEL
MOVIE ANIMATION
PARK STUDIO
BULATAN SULTAN
AZLAN SHAH
PROPOSED RESORT
HOTEL
PROPOSED SPECIALIST
HOSPITAL
Surrounding Development
RFP 5/ZONE 5/PLOT 5/2019/REV.2 9
Proposed Site as Shown in Red (Not to Scale)
Proposed Site Is Zoned as Commercial
TAMAN REKREASI
?16.42? ?ek
PERNIAGAAN
PT 260666
5.00ek
LOT 328077
ZON PEMISAH
ZON PEMISAH
INSTITUSI
PT371100
364832INSTITUSI
PT204048
PAFA
PERSIARAN MERU RAYA 3
PERS
IARA
N M
ERU
RAYA
2
Riza
b Jalan
365217Kawasan Lapang /Padang Permainan
354388Surau
3543
87TN
B
3543
20
3543
21
3543
22
3543
23
3543
24
3543
25
3543
26
3543
27
3543
28
3543
29
3543
30
3543
31
3543
32
3543
33
3543
34
3543
35
3543
36
3543
37
3543
38
3543
39
3543
40
3543
41
3543
42
3543
43Zon Pemisah
339340
3393
41Zo
n P
emisah
339291
Riza
b Sun
gai Sa
h
Rizab Sungai Sah
Rizab Sungai Sah
Kawasan Lapang
T 29550m
U 112900m
Rizab Sungai Sah
3543
443543
45
3543
46
3543
47
3543
48
3543
49
3543
50
3543
51
3543
52
3543
53
3543
54
3543
55
3543
56
3543
57
3543
58
3543
59
3543
60
3543
61
3543
62
3543
63
3543
64
3543
65
3543
66
3543
67
3543
68
3543
69
3543
70
3543
71
3543
72
3543
73
3543
74
3543
75
3543
76
3543
77
3543
78
3543
79
3543
80
3543
81
3543
82
3543
83
3543
84
3543
85
3543
86
3645
3936
4538
3645
3736
4536
3645
3536
4534
3645
3336
4532
3645
3136
453036
4540
3645
4136
4542
3645
4336
4544
3645
4536
4546
3645
52
3645
51
3645
50
3645
49
3645
48
3645
47
3645
53
3645
8636
4585
3645
8436
4583
3645
8236
4581
3645
8036
4579
3645
7836
4577
3645
7636
4575
3645
7436
4573
3645
8736
4588
3645
89
3646
96
3646
3936
4637
3646
38
3645
9036
4591
3646
35
3646
36
3645
9236
4593
3646
33
3646
34
3645
9436
4595
3646
31
3646
32
3645
9636
4597
3646
29
3646
30
3645
9836
4599
3646
27
3646
28
3646
00
3646
26
3646
4036
4641
3646
4236
4643
3646
4436
4645
3646
46
3646
9536
4694
3646
9336
4692
3646
9136
4690
3646
4736
4648
3646
4936
4650
3646
5136
4652
3646
8936
4688
3646
8736
4686
3646
8536
4684
3646
5336
4654
3647
89
3646
9836
469936
4697
3647
45
3647
4636
4744
3647
0036
4701
3647
0236
4703
3647
0436
4705
3647
0636
4707
3647
4336
4742
3647
4136
4704
3647
3936
4738
3647
3736
4736
3647
3536
4708
3647
09
3647
47
3647
52
3647
51
3647
50
3647
49
3647
48
3647
5336
4754
3647
55
3647
90
3647
8736
4786
3647
56
3648
31
3647
88
3647
84
3647
8536
4782
3647
83
3647
92
3647
9136
4794
3647
9336
4796
3647
9536
4798
3647
9736
4781
3647
80
3647
9936
48003648
3036
4829
3648
2836
4827
3648
2636
48233648
2536
4824
3648
2236
4833
TNB
364834
U 112856.7T 29654.6
12.1
92m (40')
12.192m (40')
12.192m (40')
12.192m (40')
15.2
40m (50')
15.2
40m
(50')
30.4
80m (1
00')
38.3
58
Zon Pemisah
Zon
Pem
isah
339338
364836
364835
LOT PERNIAGAAN
PERUMAHAN
Rizab
Jalan
Rizab JalanRizab Jalan
PT 260965
PERUMAHAN?6.62? ek
?7.04 ?ek
?3.24?? ek
PERNIAGAAN
PLOT 1
PLOT 2
PLOT 7
PLOT 5
PPUPT 260966
4.02?? ?ekPERNIAGAAN
PLOT 6
PERUMAHAN
(KOLEJ UTARA)
PROPOSED SITE
BULATAN
SULTAN AZLAN SHAH
RFP 5/ZONE 5/PLOT 5/2019/REV.2 10
Existing Condition at proposed development site
Existing Condition at proposed development site
RFP 5/ZONE 5/PLOT 5/2019/REV.2 11
Existing Condition at proposed development site
Existing Condition at proposed development site
RFP 5/ZONE 5/PLOT 5/2019/REV.2 12
Infrastructure Facilities Surrounding the Proposed Development Site
Infrastructure Facilities Surrounding the Proposed Development Site
RFP 5/ZONE 5/PLOT 5/2019/REV.2 13
Infrastructure Facilities Surrounding the Proposed Development Site
Infrastructure Facilities Surrounding the Proposed Development Site
RFP 5/ZONE 5/PLOT 5/2019/REV.2 14
LAND MATTERS
Lot Title Plot 5, Zone 5
Municipality Mukim Hulu Kinta
District Daerah Kinta
Town Bandar Meru Raya, Ipoh
State Perak Darul Ridzuan
Gross Land Area 32.82 acres/ 1,429,639.20 sq. ft.
Tenure Freehold
Land Use Category Commercial
Zoning Commercial
Land Charge (land cost plus other charges e.g. main infrastructure cost, quit rents, premium etc)
RM 70.00 per sq. ft.
Total Land Charge (rounded) RM 100,074,700.00
The applicant is not limited only to propose commercial development per se but may also
propose other development components as they deem fit or marketability, subject to the
appropriateness to the Development.
The Applicant is required to demonstrate through drawings, rendering or other such
visualisations on their proposed delivery or submission.
The Applicant also can refer to Economic Value and Development Planning Consultancy
Study Report for Bandar Meru Raya, Ipoh, Perak, which was prepared by CBRE Limited on
June 2015 (refer Appendix I).
As for the land, the following requirements shall be taken into considerations:
• Population Equivalent (P.E) shall not exceed than 2,741 P.E. If the P.E are exceeded,
the Applicant needs to pay additional contribution of RM265.00/P.E to the
Landowner. Meanwhile authority contribution will be calculated and pay to the
respective authority later.
• Water demand shall not exceed than 117,475 gallon per day. If the water demand
are exceeded, the Applicant needs to pay additional contribution of RM5.71/gallon
to the Landowner. Meanwhile authority contribution will be calculated and pay to
the respective authority later.
• Plot ratio is 1:5.
The land cannot be charged to the bank, any financial institutions or third party for any
purposes.
RFP 5/ZONE 5/PLOT 5/2019/REV.2 15
The applicants shall settle by settlement in cash the payment for the Land Charge to the
Landowner as follows: -
YEAR 1
STAGES PAYMENT TERMS
Upon acceptance of the LOI 1% of the Land Charge cost (RM1,00,747.00)
Upon acceptance of the LOA 4% of the Land Charge cost (RM4,002,988.00)
Upon signing Development Agreement
5% of the Land Charge cost (RM5,003,735.00)
Upon approval of “Kebenaran Merancang”
5% of the Land Charge cost (RM5,003,735.00)
Upon approval of Advertising Permit & Developer License (APDL)
5% of the Land Charge cost (RM5,003,735.00)
YEAR 2
STAGES PAYMENT TERMS
Within 1st Quarter (90 days) of the Year 2 from the date of the Agreement.
5% of the Land Charge cost (RM5,003,735.00)
Within 2nd Quarter (180 days) of the Year 2 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 3rd Quarter (270 days) of the Year 2 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 4th Quarter (360 days) of the Year 2 ditto.
5% of the Land Charge cost (RM5,003,735.00)
YEAR 3
STAGES PAYMENT TERMS
Within 1st Quarter (90 days) of the Year 3 from the date of the Agreement.
5% of the Land Charge cost (RM5,003,735.00)
Within 2nd Quarter (180 days) of the Year 3 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 3rd Quarter (270 days) of the Year 3 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 4th Quarter (360 days) of the Year 3 ditto.
5% of the Land Charge cost (RM5,003,735.00)
RFP 5/ZONE 5/PLOT 5/2019/REV.2 16
YEAR 4
STAGES PAYMENT TERMS
Within 1st Quarter (90 days) of the Year 4 from the date of the Agreement.
5% of the Land Charge cost (RM5,003,735.00)
Within 2nd Quarter (180 days) of the Year 4 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 3rd Quarter (270 days) of the Year 4 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 4th Quarter (360 days) of the Year 4 ditto.
5% of the Land Charge cost (RM5,003,735.00)
YEAR 5
STAGES PAYMENT TERMS
Within 1st Quarter (90 days) of the Year 5 from the date of the Agreement.
5% of the Land Charge cost (RM5,003,735.00)
Within 2nd Quarter (180 days) of the Year 5 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 3rd Quarter (270 days) of the Year 5 ditto.
5% of the Land Charge cost (RM5,003,735.00)
Within 4th Quarter (360 days) of the Year 5 ditto.
5% of the Land Charge cost (RM5,003,735.00)
For Hospitality & Commercial Developments (e.g. Hotel, Service Apartment or Condotel &
Retail Complex)
• Developer/Operator to propose quarterly payment of fixed lump sum revenue from the
date of commencement of operation & duration.
For Residential & Retail Complex for Sales:
• The Landowner shall be entitled for profit sharing from the profit of the Development
based on the development’s Gross Development Value (GDV) after deducting the Gross
Development Cost (GDC) whereby the percentage is subject to the proposal by the
applicant.
RFP 5/ZONE 5/PLOT 5/2019/REV.2 17
• The said profit-sharing modes of payments are as follows: -
➢ By instalment in cash which shall be based on the percentage of physical
development’s progress (certified by the authorised personnel) or percentage of
the project sale progress whichever is higher until completion of the
development.
-OR-
➢ Fifty per cent (50%) by instalment in cash which shall be based on the percentage
of physical development’s progress (certified by the authorised personnel) or
percentage of the project sale progress whichever is higher until completion of
the development and the balance of Fifty per cent (50%) to be converted in
number of building/retail units where The Landowner have a right to choose the
units which are not limited to Bumiputra units only. The said units shall be
delivered to the Landowner upon completion of the development.
COMMUNICATIONS REGARDING THE RFP
Applicants are to direct all communications regarding this RFP to:
Mr. Mohd Faizal Bin Nayan Manager, Business and Land Management,
Level 6, Tower B PKNP, No 1-A, Jalan Meru Casuarina, Bandar Meru Raya, 30020 Ipoh, Perak Darul Ridzuan. Telephone No: 05-5019 855 Email: [email protected]
Miss Zahirah Binti Muhamad Salleh Acting Manager, Property Development (Strategic Planning) Level 6, Tower B PKNP, No 1-A, Jalan Meru Casuarina, Bandar Meru Raya, 30020 Ipoh, Perak Darul Ridzuan. Telephone No: 05-5019 807 Email: [email protected]
TERMS AND CONDITIONS
• Applicants shall bear all costs and expenses associated with the preparation,
clarification and submission of their proposal which must be delivered on or before
12.00 noon, 10th June 2019. Proposal received after the closing date and time specified
above will not be entertained.
RFP 5/ZONE 5/PLOT 5/2019/REV.2 18
• Applicants are required to submit RM 1,500.00 (Ringgit Malaysia One Thousand Five
Hundred Only) by way of bankers’ cheque as processing fee in favour of PCB
DEVELOPMENT SDN BHD when submitted the proposal. This amount is not-refundable.
Proposal submitted without the requisite fee specified above will not be entertained.
• One (1) softcopy in the form of DVD and three (3) hardcopies of the proposal must be
submitted to the following address:
Contract and Procurement Division, PCB Development Sdn Bhd,
Tower PKNP, Block B, Level 3, Jalan Meru Casuarina, Bandar Meru Raya,
30020 Ipoh, Perak Darul Ridzuan.
• The Landowner has the absolute discretion to accept or reject the submitted proposal
and is not obligated in any way to award the project to the person(s) and or
company(ies) submitting the proposal. The Landowner is not required to provide any
reason whatsoever and any decision made by The Landowner is deemed final.
• The successful applicant shall furnish The Landowner within fourteen (14) days from the
date of the Letter of Award (LOA) a Performance Bond in the form of a Bank/Insurances
Guarantee for the sum of 5% of Estimated Gross Development Cost (GDC) for every
phase issued by a licensed bank operating in Malaysia strictly for the duration or
Corporate Guarantee from Parent Company.
• The successful applicant shall also furnish The Landowner within fourteen (14) days
from the date of the Letter of Award (LOA) a Design Bond in the form of a
Bank/Insurances Guarantee for the sum of 5% of Estimated Gross Development Cost
(GDC) for every phase issued by a licensed bank operating in Malaysia strictly for the
duration or Corporate Guarantee from Parent Company.
************************************************
THE REMAINING PART OF THIS SECTION
IS INTENTIONALLY LEFT BLANK
************************************************
RFP 5/ZONE 5/PLOT 5/2019/REV.2 19
KEY PLAN / SITE PLAN
RFP 5/ZONE 5/PLOT 5/2019/REV.1 20
RFP 5/ZONE 5/PLOT 5/2019/REV.1 21
TOPOGRAPHY PLAN
RFP 5/ZONE 5/PLOT 5/2019/REV.1 22