instruction manual

20
How to Build a Solar Powered Space Heater

Upload: ayal-bryant

Post on 17-Nov-2014

648 views

Category:

Business


1 download

DESCRIPTION

SOlar Dryer

TRANSCRIPT

Page 1: Instruction manual

How to Build a Solar Powered Space Heater

Page 2: Instruction manual

• Aluminum cans• Black paint• Paint brush• 2” PVC piping and elbows• PVC cement• Tools: – Caulk gun– Measuring tape– Drill– Saw– Sandpaper

PIPING: MATERIALS

Page 3: Instruction manual

NOTE: The amount of cans you use and the number of rows you make depends on the size of the system you wish to create. We made 2 layers of piping with 4 rows of 3 cans each

2. Use the drill to drill four holes in the bottom of each can

3. Connect the cans using caulk:• Apply a thick layer of caulk to the

inside circumference of the can that is receiving the attachment

After attaching the cans, let sit for several hours so caulk can dry/solidify

PIPING: ASSEMBLY1. Clean/rinse out cans

Page 4: Instruction manual

6. Apply layer of PVC cement to the inside circumference of one of the elbow tubes and the outside circumference of one of the 1.5”-long 2” piping

4. Cut six 1.5”-long pieces of 2” piping using a hack saw

5. Using sandpaper:•Smooth the edges of the piping • Sand the inside of each elbow tube about one inch•Sand the outside circumference of each 1.5” piece of 2” piping

7. Insert one of the 1.5” pieces of 2” piping into the inside of the elbow tube and attach second elbow tube (Be sure to align elbow tubes so as to ensure a 180˚ turn)

PIPING: ASSEMBLY

Page 5: Instruction manual

Attach rows of cans to elbow tubes

8. Apply a thick layer of caulk to the inside circumference of the piping and to the outside circumference of the can you wish to attach to the elbows

PIPING: ASSEMBLY

9. Repeat until all rows of cans are attached to the elbow tubes, forming a snake-like figure. Let caulk dry over night

10. Paint piping black

Page 6: Instruction manual

• Wood (for sides and bottom)– Suggested wood for bottom: plywood, chip board, or

floorboards• Black paint• Paint brush• Tools: – Measuring tape– Screwdriver & screws– Saw– Sandpaper– Set square

BOX FRAME: MATERIALS

Page 7: Instruction manual

BOX FRAME: ASSEMBLY1. Measure wood plank for siding• Sides should be long enough to fit around the piping (you may leave a little wiggle room)• Sides should be high enough so that box can fit ~1” of insulation, 1” of zinc plating, and the piping

2. Attach sides with screws using screwdriver• Be sure sides meet at a 90˚ angle• Use 2-3 screws per corner to increase security

3. Create a base for the frame using wood

4. Use sandpaper to smooth surfaces

5. Paint interior of box black

Page 8: Instruction manual

• Insulation– Suggested insulation: cardboard,

newspaper, packing peanuts, Styrofoam, etc.

• Zinc plating• Black paint• Paint brush• Tools:– Metal cutter

INSULATION & REFLECTOR PLATE: MATERIALS

Page 9: Instruction manual

1. Place insulation in bottom of box so that it is about 1” thick

2. Cut zinc plating to fit into inside of box

3. Paint zinc black 4. Place zinc sheet into box on

top of insulation5. Place piping on top of zinc

INSULATION & REFLECTOR PLATE: ASSEMBLY

Page 10: Instruction manual

• Wood for frame• Support for glass– Suggested support: wood, plastic tubing

• Glass– Suggestion: glass should be textured on one side (the

inside) so as to prevent light from escaping• Tools:– Measuring tape– Saw– Nails or screws– Hammer or screwdriver– Caulk gun

TOP: MATERIALS

Page 11: Instruction manual

1. Create a top for the system by creating a wooden frame with dimensions slightly larger than the dimensions of the box

2. Nail or screw the support item (wood, plastic tubing, etc.) onto interior of frame so that glass fits into cover

3. Cut glass so that it fits onto frame of cover– Glass should be cut professionally

4. Secure glass onto frame using caulk

TOP: ASSEMBLY

Page 12: Instruction manual

2. Attach 2” PVC tubes to ends ofpiping and put these through the

holes to create an entrance and exit for the air

ASSEMBLY OF SYSTEM

*If desired, you may create two layers of piping. Make sure sides of box frame are tall enough to fit another layer

1. Cut circular holes in box where piping ends

Page 13: Instruction manual

3. At each exit point, connect the tubes to one another using elbow tubes, 2” piping, and a PVC “Y” connector

ASSEMBLY OF SYSTEM

5. Add legs to the system to create a tilt 6. Paint the system if desired

Page 14: Instruction manual

• Two 4” PVC Caps• 4” PVC piping (about 8 inches)• Motor• Wires• Switch• Plug• Tools:– Screwdriver & screws– drill

FAN: MATERIALS

4” PVC Piping

2” PVC piping

4” PVC capMotor

Plug

4” PVC cap

Page 15: Instruction manual

1. Drill holes into the perimeter of a 4” PVC cap to allow for air flow

2. Drill hole in center of cap big enough so motor can fit into cap

3. Place motor in the hole you drilled in the cap

4. Secure the motor onto cap using screws5. Attach the wires of the fan to a switch

to the system so that the fan can be turned on and off. Connect the wires to a plug.

6. Place the cap onto about 8 inches of 4” PVC piping

7. Drill a hole in the other cap that is big enough so that 2” PVC piping can fit into it

FAN: ASSEMBLY

Page 16: Instruction manual

• ½” PVC Piping (about 29 meters)• ½” PVC elbows• ½” PVC ‘T’ connectors• Black plastic• Electrical tape• Connectors– Suggested connectors: tip ties

• Tools:– Meter stick– Saw– Measuring tape

DRYING SPACE: MATERIALS

Page 17: Instruction manual

1. Cut 29 pieces of ½-inch PVC piping of equal length– One meter pieces will make a 2 meter x 1 meter x 1 meter

space

=elbows=‘T’ connectors

2. Attach the piping using ½-inch PVC elbows – 2 squares– 3 rectangles with a center piece for support (2 sides and a top)

DRYING SPACE: ASSEMBLY

Page 18: Instruction manual

DRYING SPACE: ASSEMBLY

Page 19: Instruction manual

3. In order to attach a bar for clothes to hang:– Attach a ‘T’ to the center of

one of the sides of each square– Attach a few inches of PVC

piping to the ‘T’ so that it hangs down

– At the base of the ‘T’ attach a PVC elbow facing

4. Wrap each side with plastic to create walls

5. Connect the sides using connectors to create a house-like structure– Suggested connectors: zip ties

DRYING SPACE: ASSEMBLY

Page 20: Instruction manual

CONNECT HEATER & SPACE1. Cut a hole in one of the sides of the space and tape a 2” PVC connector in the hole 2. Connect the space heater with the space using 2” piping