installing fusion block system...

2
Installing Fusion Block System accessory Installing Fusion Block System accessory Install your watercooling system to the motherboard using the bundled accessories to obtain the best thermal solution. Package contents 1 2 For watercooling system with 3/8” ID tubes 1. Firmly press a tube clip and fit the tube into the clip. 2. Press the clip and connect the tube to the waterblock. When done, release the clip to tighten the two together. 3. Repeat Step and 2 for another tube. Make sure that both tubes are well connected to prevent leak, and then fill the coolant into the reservoir. 3/8” ID tubes x 2 1/2” to 3/8” ID fittings x 2 10mm to 3/8” ID fittings x 2 /2” ID tube clips x 2 tube clips x 2 3/8” ID tube clips x 6

Upload: others

Post on 28-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Installing Fusion Block System accessorydlsvr04.asus.com/pub/ASUS/mb/socket775/Blitz_Extreme/FusionBlock_QIG.pdf · 2 Installing Fusion Block System accessory 5 6 5. Press the clip

Installing Fusion Block System accessory �

Installing Fusion Block System accessoryInstall your watercooling system to the motherboard using the bundled accessories to obtain the best thermal solution.

Package contents

1 2

For watercooling system with 3/8” ID tubes1. Firmlypressatubeclipandfitthetubeintotheclip.2. Press the clip and connect the tube to the waterblock. When done, release

the clip to tighten the two together.3. Repeat Step � and 2 for another tube. Make sure that both tubes are well

connectedtopreventleak,andthenfillthecoolantintothereservoir.

3/8” ID tubes x 2 1/2”to3/8”IDfittingsx2 10mmto3/8”IDfittingsx2

�/2” ID tube clips x 2tube clips x 2 3/8” ID tube clips x 6

Page 2: Installing Fusion Block System accessorydlsvr04.asus.com/pub/ASUS/mb/socket775/Blitz_Extreme/FusionBlock_QIG.pdf · 2 Installing Fusion Block System accessory 5 6 5. Press the clip

2 Installing Fusion Block System accessory

5 6

5. Press the clip and connect the assembled tube to the waterblock. When done, release the clip to tighten the two together.

6. Repeat Step � to 5 for another tube. Make sure that both tubes are well connectedtopreventleak,andthenfillthecoolantintothereservoir.Thepicture shows a watercooling system installed to the motherboard.

321 4

For watercooling system with 1/2” or 10mm ID tubes1. Insertafitting(1/2”to3/8”IDor10mmto3/8”ID)intothetube.

Your watercooling system may come with tube clips. Use the clips to fasten the fittingsandthetubestogether.

2. Connectasupplied3/8”IDtubetothefitting.3. Firmly press a tube clip and hitch it to the bottom end of the 3/8” ID tube.4. Press another clip and hitch it to the top end of the 3/8” ID tube.