Page 1: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Staying Current

INSTALLED BASE MIGRATION SOLUTIONSWong Yung Onn

20th October 2016

Page 2: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Delivering continuous

evolution for

40+ years

Honeywell Evolution Vision

• Keep your reliable system running longer with different modernization options

• Protect intellectual property and capital investments

• Provide services support for upgrade to the new technology

Committed to Protecting Your Automation Investments

Page 3: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

1983 – TDC 3000 Universal Station

Committed to Protecting Your Automation Investments

Technology Development in the Past – Summary

1988 – Process Manager

1996 – FSC integrated in TPS / TPN

2004 – Experion Station TPS

2007 – C300 and SM integrated in Experion PKS

1975 – TDC 2000

Classic Technology

21th CenturyTechnology

2010 – Unified HMI using Experion PKS

2013 – Ethernet based EUCN and EHPM

Page 4: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

TDC/TPS Evolution to Experion

History Module

NIMHG

Application Module

ACE-TExperion Server -TPS

HPM

LM

Hiway

Controllers

C300

Safety Manager

Experion Orion Console

Experion Station –TPS

Level 2 SwitchLocal Control Network

Fault Tolerant

Ethernet

C300-UHIO

C300

EHPM

Universal

Control

Network

Data

Hiway

Control

Network

ENB EHB

Control

Firewall

FSC

ENIM

ELMM

Evolving in Managed Stages

Page 5: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

TPS Merges into Experion

C300

Safety Manager

Vision

EHPMExperion Station

Fault-Tolerant Ethernet

TPS Components Gradually Melt into Experion

Page 6: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Unified Control Environment Benefits

• Expansions with controllers of choice

• Replication of Control functions

• Replication of applications and HMI

Process ExpansionEfficiency

Up to 50% reduction in engineering cost

• Better diagnostics

• Reduced maintenance

• Skilled labor availability

Maintenance Efficiency

Maintenance cost reduction >5% with

modernization

Sustainability

• Keeps your plant running longer

• Protects your Intellectual property (IP)

• Protects your CAPEX investments

• Utilize skills / resources

IP, CAPEX life extension to 2035

Support Longevity and Improved Plant Performance

Page 7: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

LCN

UC

N

C300

NIM

HM/AM

ACE

ESV-T

(H)PM

FSC

Triconex

US

PCUS

GUS

Orion EST

SM

EUCNENIM

EHP

M

EHPM Solutions Phase 1First Release in 2013

FTE

TPN/EPKS Control Networks as of Today

LM

Expansions and One-Time UCN Upgrade Solution

Page 8: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

FTE infrastructure engineering and setup

• FTE cables installation

• Level 2 switches installation

• CF9 firewalls Installation

Preparation for Modernization

Page 9: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

What is new: Simplified Migration Approach

The Honeywell solution

• Step-wise UCN controllers upgrade

• TRUE on-process infrastructure setup

• TRUE on-process HPM-EHPM upgrade

• No changes - control, applications, HMI

• Coax <-> FTE devices peer-to-peer communication on the hybrid UCN

The Best Control Network Modernization We Have Ever Made

Addressed Customer needs

• Investment Linearity

• Investment planning flexibility

• Eliminate process downtime

• Minimized engineering effort

• Minimized upgrade/expansion risks

Page 10: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

LCN

UC

N

NIM

HM/AM

ACE

ESV-T

(H)PM

FSC

Triconex

US

PCUS

GUS

Orion EST

SM

EUCN

C300

OPM & step-wise upgrades using ENBPlanned 4Q2016 – ENB (Enhanced Network Bridge)

TPN686.1; EPKS R432.1

FTE

ENB

Step 1: Setup Hybrid UCN (NIM to ENB upgrade)

LM

Reduced Downtime by TRUE On-Process NIM-ENB Upgrade

Page 11: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

• Create a back-up – checkpoint

• Power down – secondary NIM

• Upgrade the hardware

o Select 3 slot position

o Setup FTE index, UCN address

o Connect FTE cables

• Power-up/Load secondary

• Power down – primary NIM

• Upgrade the hardware

• Power-up/Load primary

• Upgrade - completed

TRUE On-process Upgrade : NIM to ENB

Page 12: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Primary NIM to ENB Upgrade

Front View

Rear View

ENIM node 17 - EUCN 4

ENB node 30 – (E)UCN 10

UCN 10coax

EUCN 10FTE

ENB node 30 (E)UCN 10

ENIM node 17EUCN 4

Page 13: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

LCN

UC

N

HM/AM

ACE

ESV-T

HPM

FSC

Triconex

US

PCUS

GUS

Orion EST

SM

EUCN

C300

HPM to EHPM upgradePlanned 4Q2016 – TRUE On-Process Upgrade

Retain peer-to-peer communication

FTE

ENB

EHPM

Step 2: On-process HPM to EHPM Upgrades

LM

Reduced Downtime by TRUE On-Process HPM-EHPM Upgrades

Page 14: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

• Create a back-up – checkpoint

• Power down – secondary HPM

• Upgrade the hardware

o Setup FTE index, UCN address

o Replace hardware

o Connect FTE cables

• Power-up/Load secondary

• Power down – primary HPM

• Upgrade the hardware

• Power-up/Load primary

• Upgrade - completed

TRUE On-process Upgrade Steps: HPM to EHPM

Page 15: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

LCN

UC

N

HM/AM

ACE

ESV-T

FSC

Triconex

US

PCUS

GUS

Orion EST

SM

EUCN

C300

FSC to SM upgradePlanned 3Q2016 - Off-Process Upgrade SM R160.2

TUV approved migration tools

FTE

ENB

EHPM

SM

Step 3: Upgrade FSC Controllers to SM on EUCN

LM

No Application Changes for FSC - SM on EUCN Upgrades

Page 16: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

• Create a back-up – checkpoint

• Upgrade FSC software to R800

• Transition FSC software to SM

• Power down the cabinet

• Execute hardware changes

o Replace card files

o Install SM Central Parts

o Connect FTE cables

• Power-up SM

• Install applications

• Reload Checkpoint

• Upgrade - completed

Off-process upgrade steps: FSC to SM on EUCN

TÜV Approved

Verification

Page 17: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

LCN

UC

N

HM/AM

ACE

ESV-T

Triconex

US

PCUS

GUS

Orion EST

SM

EUCN

C300

Triconex-SMM to Triconex-TCMI upgradePlanned end 2017 - Off-Process Upgrade TPN R687

FTE

ENB

EHPM

SM

TCMI

Step 4: Triconex-SMM to Triconex-TCMI on EUCN Upgrade

LM

No TPS Applications and Displays Changes

Page 18: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

• Create a back-up – checkpoint

• Upgrade Triconex to V10.3 or later & include TCM module

• Execute application changes on Triconex system

• Install Honeywell TCMI

• Power down Triconex

• Execute hardware changes

o Install TCM card

o Connect TCM-TCMI cables

• Power-up Triconex system

• Power up TCMI and Checkpoint load

• Upgrade - completed

Off-process Upgrade steps to Triconex-TCMI

TCMI

Triconex

Page 19: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

LCN

UC

N

HM/AM

ACE

ESV-TUS

PCUS

GUS

Orion EST

SM

EUCN

C300

LM/IPC 620 to ELMM/C300 upgradeReleased 2015

FTE

ENB

EHPM

SM

TCMI

Step 5: LM/IPC620 to ELMM/C300 on EUCN Upgrade

ELMM LM

Low- Risk and Minimum-Downtime Upgrade for LM

Page 20: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Execute Engineering Activities (Offline activity)

o Build C300 control strategies from IPC 620 Ladder logic using

the LM – C300 conversion tool

Create Checkpoint - LMM and backup all the IPC data

Shutdown IPC, LMM and LCS IOMs

Execute Hardware Changes

o Remove LM, LCS IOMs and mount C300, ELMM

o Connect CF9 with ELMM to L2 switch having the ENIM

o Make all necessary power and switch connections

o Follow standard C300 power on procedures

Load ELMM with TPN R685.3 or later personality

Restore LMM checkpoint on ELMM

Load C300 controller and Series C / PM IO

Upgrade completed

Upgrade steps: LM/IPC 620 to ELMM/C300

Page 21: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

LCN

UC

N

HM/AM

ACE

ESV-T

Triconex

US

PCUS

GUS

Orion EST

SM

EUCN

C300

ENB to ENIM changeoverDisconnect coax UCN cables

FTE

ENB

EHPM

SM

TCMI

ENIM

Step 6: Changeover ENB to ENIM

ELMM

Step-Wise Control Network Upgrade Completion

Page 22: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

• Create a back-up – checkpoint

• Power down secondary ENB

• Disconnect UCN coax cable

• Remove EPNI and EPNI IO boards

• Power-up/load secondary – ENB becomes ENIM

• Power down primary ENB

• Disconnect UCN coax cable

• Remove EPNI and EPNI IO boards

• Power-up/load Primary – ENB becomes ENIM

• Changeover - completed

On-process ENB to ENIM Changeover

Page 23: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Additional Benefits from Simplified Migration

• Investment linearity

• Step-wise incremental upgrades

• On-process changes

• Changes during shutdown

Automation Planning

Up to 80% automation planning accuracy

improvement

• No changes in control, applications, HMI

• Independence from ageing workforce knowledge

• Minimal engineering / training requirements

Modernization Investment

Total upgrade investment reduction larger than 25%

Production Downtime

• TRUE On-Process initial setup

• TRUE On-Process HPM to EHPM upgrade

• On-Process change to the final setup

Reduce up to 30% of production downtime for

migration activities

Reduced Risk and Investments Savings

Page 24: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

The TRUE On-Process HPM-EHPM Upgrade

Availability of process view / control at any time

23

NIM C300

HPM

PM I/O

Series C I/O

Control

Room

Plant

ENB

EHPM FTE

Co

ax

ENIM

Page 25: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Support Status Updates

o 31st August 2015: C200/C200E and Series A I/O withdrawn from

Sales for all new installations and expansions. Transit to Legacy

Support Phase. Spare Parts are available.

o 2019: C200/C200E transit to Phased Out Support. Parts limited

based on Repair & Exchange and Certified Recycled Parts.

C200/C200E Support

Page 26: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Migration Path

o C200/C200E with PMIO

o C200/C200E to C300 upgrade kit available to fit in the

space of a single C200/C200E chassis

o Minimal changes with engineering tools to import Control

Strategies to C300

o Graphics remain unchanged

o Phase migration supported with retention of IO and field

wiring

o Upgrade may be conducted while system remains online

through careful planning and mitigation of risk

o C200/C200E with Series A I/O

o Plan to move to C300 retaining IOs untouched

C200/C200E and Series A I/O Support

Page 27: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

40 Years Honeywell Safety System Evolution

FSC - Safety Manager Evolutions

Euro-Relay

Solid State

COSI-V1

Plug and Play – V2

‘Flash’

QMR FSC-blue

Rel20x Rel50x Rel530 Rel60x Rel70x

Y1975 Y2000

New FTA

Y1999Y1998

HD-AI

Y1996 Y2009 Y2016….

TMR

Y2004

FGS

‘07

SM

Honeywell Integrated ICSS solutions

Y1994

FSC

Y1998

Table 1 Safety Managerwith Native I/O

Wildevuur

Pepperl & Fuchs

Y1984

Page 28: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

The FSC Evolution Path

Revolutionary Technology Delivered in an Evolutionary Way

TUV approved Migration

- Available

Safety Manager

Safety Manager

Processors

FSC Processor

Racks

IO - FSC v1/v2

Field interface

Marshalling

FSCUCN/Modbus eUCN / FTE

IO - v1/v2 or blue

Field interface

Marshalling

SIL3 SafeNet

- Future Option

IO - FSC v1/v2

1 – Extending lifetime

5 –

Intr

late

st sa

fety

fe

atu

res

3 – Investment Retention

4 – Maintain field interface

2 – Maintain Safety Application

6 – Minimized staff re-training

Page 29: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Best Investment Choice for Life Extension

(Minimal Disruption Option)

FSC with FSC I/O

Safety Manager

with SM I/O

FSC with

SM I/O

Safety Manager

with FSC I/O

Page 30: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

29

Continuous Innovation: Experion LCN

History Module

Network Interface Module

Hiway Gateway

Application Module

ACE-T / E-APPExperion Server -TPS

HPM

Logic Manager

Basic Controller

C300C300

Safety Manager

Level 2 SwitchLocal Control Network

Fault Tolerant

Ethernet

C300-UHIO

ELMM

EHPMUniversal

Control

Network

Basic

Hiway

ENB EHB

Control

Firewall

Experion LCN Bridge

Catalyst 2960 Series PoE-24

SYST

DUPLX

SPEED

MODE

COC IS

1 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1X

2X

POWER OVER ETHERNET

13X

14X

11X

12X

23X

24X

STAT

RPS

PoE

ENIM

Experion Station-TPS

• Moving towards the next Evolution: ELCN

Page 31: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

ELCN Node Types

• T-Nodes

- EST, ESVT, ACET, EAPP

- Embeds Experion T-Node subsystem within Experion node

- Deployment consistent with standard Experion node

Eliminate LCNP4 and Coax LCN/MAU connection

• Appliance Nodes

- AM, EHB, HM, ENIM, NG

- LCN personality is standalone on platform

No co-existence with Experion node software

- Deployment options

Universal Embedded Appliance (UEA) Physical - ARM based

Virtual Appliance - x86 based

30

Page 32: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

New Experion LCN Hardware• Universal Embedded Appliance (UEA)

- ELCN Bridge and Appliance Physical Nodes

- Triconex Communications Module Interface (TCMI) replaces Triconex SMM

- ¼ the size of a Classic LCN Node – LCN Cabinet, Dell Cabinet Mount

1.75 in44.45 mm

19 in482.6 mm

Key SwitchMigration and selection buttons

Display

First Module Second Module

Front

BackAC Power Fan/Vent

FTE A and B

Module RedundancyPort

TCMI PortsRear Module is removable

MAU Ports

Page 33: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Delivering continuous

evolution for

40+ years

Honeywell Evolution Vision

• Keep your reliable system running longer with different modernization options

• Protect intellectual property and capital investments

• Provide services support for upgrade to the new technology

Committed to Protecting Your Automation Investments

Page 34: INSTALLED BASE MIGRATION SOLUTIONS - Honeywell · Staying Current Wong Yung Onn INSTALLED BASE MIGRATION SOLUTIONS 20th October 2016

Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved.

Thank You