  • 8/11/2019 Installation Report Sheet

    1/12

    X (m) Y (m) X (m) Y (m) X (m) Y (m)1 Ground Settlement monitoring marks

    GS1 07-17/9/2014 1191867.010 604003.008 1191867.013 604003.012 -0.003 -0.004 2414.29GS2 07-17/9/2014 1191870.204 604006.855 1191870.200 604006.552 0.004 0.303 2182.76GS3 07-17/9/2014 1191876.591 604014.549 1191876.587 604014.550 0.004 -0.001 2506.99GS4 07-17/9/2014 1191886.173 604026.090 1191886.177 604026.091 -0.004 -0.001 2456.80GS5 07-17/9/2014 1191885.521 604046.127 1191885.522 604046.122 -0.001 0.005 2471.90GS6 07-17/9/2014 1191875.940 604034.586 1191875.935 604034.582 0.005 0.003 2486.88GS7 07-17/9/2014 1191866.358 604023.045 1191866.355 604023.043 0.003 0.002 2441.54GS8 07-17/9/2014 1191859.971 604015.351 1191859.974 604015.350 -0.003 0.000 2262.74GS9 07-17/9/2014 1191856.777 604011.504 1191856.779 604011.500 -0.002 0.003 2264.34

    GS10 07-17/9/2014 1191846.544 604019.999 1191846.492 604019.875 0.052 0.124 2327.76GS11 07-17/9/2014 1191849.738 604023.846 1191849.734 604023.842 0.004 0.004 2121.61GS12 07-17/9/2014 1191856.125 604031.540 1191856.120 604031.538 0.005 0.002 2382.51

    GS13 07-17/9/2014 1191865.707 604043.081 1191865.705 604043.078 0.002 0.003 2415.12GS14 07-17/9/2014 1191875.288 604054.622 1191875.906 604054.527 -0.618 0.095 2570.40GS15 07-17/9/2014 1191842.084 604032.085 1191842.255 604032.218 -0.171 -0.133 2294.97GS16 07-17/9/2014 1191835.248 604039.506 1191835.314 604039.766 -0.066 -0.260 2269.49GS17 07-17/9/2014 1191824.994 604050.638 1191825.486 604050.406 -0.492 0.232 2244.99GS18 07-17/9/2014 1191837.968 604014.366 1191838.261 604014.404 -0.293 -0.038 2604.16GS19 07-17/9/2014 1191822.827 604000.942 1191822.839 604000.937 -0.012 0.005 2175.84GS20 07-17/9/2014 1191810.051 603985.554 1191809.826 603985.905 0.225 -0.351 2375.25GS21 07-17/9/2014 1191797.276 603970.166 1191797.030 603970.180 0.246 -0.014 2337.64GS22 07-17/9/2014 1191788.620 603967.687 1191788.400 603967.662 0.220 0.025 2275.20GS23 07-17/9/2014 1191781.784 603975.108 1191781.763 603975.178 0.021 -0.070 2178.39

    Design Coordinates

    Baseline reading (recording data 18-20/09/2014)

    Difference HeightH (mm)

    INSTALLATION REPORT SHEET(Ground Settlement monitoring monitoring marks, Neighbor building inclination marks, Neighbor building Settlement marks)

    BNG BO CO LP T(im quan trc ln nn, im o nghing v im o ln ca nhng cng trnh ln cn)

    No.Point

    No.Installation date Remark Actual Coordinates

  • 8/11/2019 Installation Report Sheet

    2/12

    GS24 07-17/9/2014 1191771.530 603986.240 1191771.534 603986.235 -0.004 0.005 2179.92GS25 07-17/9/2014 1191761.276 603997.371 1191761.625 603997.311 -0.350 0.060 2215.91GS26 07-17/9/2014 1191749.823 603983.576 1191749.826 603983.581 -0.003 -0.005 2061.30GS27 07-17/9/2014 1191761.363 603973.993 1191761.45 603973.935 -0.087 0.058 2317.04GS28 07-17/9/2014 1191772.902 603964.410 1191772.902 603964.41 0.000 0.000 2264.12GS29 07-17/9/2014 1191780.595 603958.021 1191780.596 603958.023 -0.001 -0.002 2116.86GS30 07-17/9/2014 1191784.442 603954.827 1191784.443 603954.826 -0.001 0.001 2242.30GS31 07-17/9/2014 1191771.670 603939.442 1191771.672 603939.441 -0.002 0.001 2306.70GS32 07-17/9/2014 1191767.824 603942.638 1191767.824 603942.636 0.000 0.002 2244.18GS33 07-17/9/2014 1191760.134 603949.030 1191760.137 603949.027 -0.003 0.003 2190.25GS34 07-17/9/2014 1191748.598 603958.618 1191748.601 603958.623 -0.003 -0.005 2141.94GS35 07-17/9/2014 1191737.062 603968.205 1191737.175 603968.194 -0.113 0.011 2326.67GS36 07-17/9/2014 1191727.028 603955.702 1191727.167 603955.829 -0.139 -0.127 2278.56GS37 07-17/9/2014 1191737.191 603944.670 1191737.241 603944.835 -0.050 -0.166 2286.57GS38 07-17/9/2014 1191747.354 603933.637 1191747.345 603933.847 0.009 -0.210 2291.65GS39 07-17/9/2014 1191755.046 603927.247 1191755.044 603927.248 0.002 -0.001 2272.34GS40 07-17/9/2014 1191758.893 603924.052 1191758.897 603924.047 -0.005 0.005 2321.70GS41 07-17/9/2014 1191737.873 603915.341 1191737.812 603915.093 0.061 0.248 2212.96GS42 07-17/9/2014 1191723.164 603901.723 1191723.394 603901.669 -0.230 0.054 2193.75GS43 07-17/9/2014 1191708.378 603888.012 1191708.668 603888.013 -0.290 -0.001 2192.93GS44 07-17/9/2014 1191679.340 603895.359 1191679.337 603895.36 0.003 -0.001 2725.14GS45 07-17/9/2014 1191675.946 603899.031 1191675.941 603899.026 0.005 0.005 2712.02GS46 07-17/9/2014 1191669.154 603906.371 1191669.16 603906.367 -0.006 0.004 2691.44GS47 07-17/9/2014 1191658.964 603917.378 1191658.966 603917.365 -0.002 0.013 2640.73GS48 07-17/9/2014 1191648.767 603928.379 1191654.329 603919.891 -5.562 8.488 2636.49GS49 07-17/9/2014 1191632.168 603913.043 1191640.033 603907.388 -7.865 5.655 2591.58GS50 07-17/9/2014 1191642.364 603902.041 1191642.365 603902.057 -0.001 -0.016 2624.14GS51 07-17/9/2014 1191652.555 603891.034 1191652.555 603891.047 0.000 -0.013 2621.89GS52 07-17/9/2014 1191659.346 603883.694 1191659.348 603883.696 -0.002 -0.002 2624.02GS53 07-17/9/2014 1191662.740 603880.023 1191662.898 603880.985 -0.158 -0.962 2820.10GS54 07-17/9/2014 1191679.081 603857.905 1191679.084 603857.907 -0.003 -0.003 1997.88GS55 07-17/9/2014 1191675.414 603854.514 1191675.414 603854.511 0.000 0.003 1960.63GS56 07-17/9/2014 1191668.071 603847.726 1191668.072 603847.726 -0.001 0.000 1982.75

  • 8/11/2019 Installation Report Sheet

    3/12

    GS57 07-17/9/2014 1191657.057 603837.544 1191657.06 603837.55 -0.004 -0.006 1932.07GS58 07-17/9/2014 1191646.042 603827.361 1191646.042 603827.37 0.000 -0.009 1997.28GS59 07-17/9/2014 1191655.030 603817.639 1191655.029 603817.646 0.001 -0.007 2131.15GS60 07-17/9/2014 1191666.045 603827.821 1191666.042 603827.821 0.003 0.000 1921.65GS61 07-17/9/2014 1191677.059 603838.004 1191678.988 603835.34 -1.929 2.664 1932.26GS62 07-17/9/2014 1191684.402 603844.792 1191686.427 603842.205 -2.025 2.587 1940.73GS63 07-17/9/2014 1191688.074 603848.186 1191690.211 603845.683 -2.137 2.503 1943.98GS64 07-17/9/2014 1191697.247 603852.143 1191697.255 603852.151 -0.008 -0.008 2054.91GS65 07-17/9/2014 1191704.590 603858.932 1191704.601 603858.937 -0.011 -0.005 2089.07GS66 07-17/9/2014 1191711.992 603865.784 1191712.001 603865.788 -0.009 -0.004 2096.85GS67 07-17/9/2014 1191715.696 603869.208 1191715.702 603869.215 -0.006 -0.007 2091.07GS68 07-17/9/2014 1191722.695 603863.398 1191722.691 603863.401 0.004 -0.003 2141.00GS69 07-17/9/2014 1191719.501 603859.551 1191719.5 603859.551 0.001 0.000 2136.39GS70 07-17/9/2014 1191713.113 603851.857 1191713.116 603851.851 -0.003 0.005 2078.46GS71 07-17/9/2014 1191703.532 603840.316 1191701.885 603841.931 1.647 -1.615 1954.36GS72 07-17/9/2014 1191693.950 603828.774 1191690.628 603831.98 3.322 -3.206 1879.50GS73 07-17/9/2014 1191701.119 603822.823 1191701.115 603822.82 0.004 0.003 2100.65GS74 07-17/9/2014 1191710.701 603834.364 1191708.707 603831.316 1.994 3.048 2129.07GS75 07-17/9/2014 1191720.282 603845.905 1191714.632 603836.763 5.650 9.142 2006.65GS76 07-17/9/2014 1191726.670 603853.599 1191723.077 603844.53 3.593 9.069 1894.09GS77 07-17/9/2014 1191729.864 603857.446 1191731.415 603852.155 -1.551 5.291 2060.38GS78 07-17/9/2014 1191748.070 603855.046 1191747.96 603855.353 0.110 -0.307 2322.79GS79 07-17/9/2014 1191760.987 603870.322 1191760.892 603870.615 0.095 -0.293 2267.44GS80 07-17/9/2014 1191773.840 603885.803 1191773.916 603885.783 -0.076 0.019 2153.81GS81 07-17/9/2014 1191786.535 603901.095 1191786.531 603901.095 0.004 0.000 2282.90GS82 07-17/9/2014 1191790.382 603897.901 1191790.375 603897.894 0.007 0.007 2244.54GS83 07-17/9/2014 1191792.180 603885.818 1191789.595 603883.121 2.585 2.697 2317.82GS84 07-17/9/2014 1191802.413 603874.851 1191799.526 603871.669 2.887 3.182 2470.00GS85 07-17/9/2014 1191812.646 603863.884 1191810.004 603860.883 2.642 3.000 2651.28GS86 07-17/9/2014 1191803.153 603913.284 1191803.151 603913.279 0.002 0.005 2260.34GS87 07-17/9/2014 1191799.307 603916.479 1191799.304 603916.482 0.003 -0.003 2331.41GS88 07-17/9/2014 1191812.088 603931.874 1191812.090 603931.869 -0.002 0.005 2313.82GS89 07-17/9/2014 1191815.935 603928.680 1191815.937 603928.685 -0.002 -0.005 2295.22

    It was demolish by othercompany on date 27/9/2014

    It was demolish by othercompany on date 27/9/2014

    It was demolish by othercompany on date 27/9/2014

    It was demolish by othercompany on date 22/9/2014

  • 8/11/2019 Installation Report Sheet

    4/12

  • 8/11/2019 Installation Report Sheet

    5/12

    BS16 07-17/9/2014 2268.55BS17 07-17/9/2014 3006.47BS18 07-17/9/2014 2408.85BS19 07-17/9/2014 2289.82BS20 07-17/9/2014 2776.85BS21 07-17/9/2014 2868.40BS22 07-17/9/2014 2861.91BS23 07-17/9/2014 2774.07BS24 07-17/9/2014 2326.67BS25 07-17/9/2014 2321.05BS26 07-17/9/2014 2345.10BS27 07-17/9/2014 2352.47BS28 07-17/9/2014 2366.37BS29 07-17/9/2014 2483.03BS30 07-17/9/2014 2449.80BS31 07-17/9/2014 2498.57BS32 07-17/9/2014 2457.36BS33 07-17/9/2014 2479.11BS34 07-17/9/2014 -1336.73BS35 07-17/9/2014 -1334.87BS36 07-17/9/2014 -1293.67

    3 Neighbor building Inclination marksBI1 07-16/9/2014 1191883.864 603974.948 21.447 Height H(m)BI2 07-16/9/2014 1191834.989 603929.604 21.447 Height H(m)BI3 07-16/9/2014 1191803.922 603866.965 19.118 Height H(m)BI4 07-16/9/2014 1191779.519 603886.120 22.407 Height H(m)BI5 07-16/9/2014 1191743.196 603850.458 18.635 Height H(m)BI6 07-16/9/2014 1191732.123 603841.153 16.709 Height H(m)BI7 07-16/9/2014 1191726.409 603835.676 16.118 Height H(m)BI8 07-16/9/2014 1191723.346 603832.902 13.313 Height H(m)BI9 07-16/9/2014 1191714.547 603824.490 20.375 Height H(m)

    BI10 07-16/9/2014 1191701.470 603812.094 20.261 Height H(m)BI11 07-16/9/2014 1191647.355 603837.335 9.776 Height H(m)

    It was demolish by othercompany on date

    5-7/9/2014

  • 8/11/2019 Installation Report Sheet

    6/12

    BI12 07-16/9/2014 1191657.730 603846.966 11.901 Height H(m)BI13 07-16/9/2014 1191666.700 603856.970 12.172 Height H(m)BI14 07-16/9/2014 1191714.354 603899.277 18.526 Height H(m)BI15 07-16/9/2014 1191739.899 603935.509 18.328 Height H(m)BI16 07-16/9/2014 1191720.019 603956.909 18.237 Height H(m)BI17 07-16/9/2014 1191769.876 603994.423 19.016 Height H(m)BI18 07-16/9/2014 1191793.055 603972.646 33.598 Height H(m)BI19 07-16/9/2014 1191818.400 603995.641 33.597 Height H(m)BI20 07-16/9/2014 1191818.664 604001.204 15.323 Height H(m)BI21 07-16/9/2014 1191838.364 604019.487 14.95 Height H(m)

  • 8/11/2019 Installation Report Sheet

    7/12

    1 Ground Settlement monitoring marks

    GS61 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing ondata 6/10/2014

    GS62 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing on

    data 6/10/2014

    INSTALLATION REPORT SHEET

    building Settlement marks)BNG BO CO LP T

    (im quan trc ln nn, im o nghing v im o ln ca nhng cng trnh ln

    No.PointNo.

    Installationdate

    Remark

  • 8/11/2019 Installation Report Sheet

    8/12

    No.PointNo.

    Installationdate

    Remark

    GS63 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing ondata 6/10/2014

    GS71 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing ondata 6/10/2014

  • 8/11/2019 Installation Report Sheet

    9/12

    No.PointNo.

    Installationdate

    Remark

    GS72 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing ondata 6/10/2014

    GS74 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing ondata 6/10/2014

  • 8/11/2019 Installation Report Sheet

    10/12

    No.PointNo.

    Installationdate

    Remark

    GS75 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing ondata 6/10/2014

    GS76 07-17/9/2014

    It was demolish byother company on date27/9/2014 repairing ondata 6/10/2014

  • 8/11/2019 Installation Report Sheet

    11/12

  • 8/11/2019 Installation Report Sheet

    12/12

    No.PointNo.

    Installationdate

    Remark

    GS90

    GS91

    GS92

    BS19

    BS20

    BS21

    BS22

    BS23

    BS24

    It was demolish byother company on date27/9/2014 repairing on

    data 6/10/2014

    It was demolish byother company on date05/9/2014 (Building

    reconstruction).

    07-17/9/2014

    07-17/9/2014