installation presentation[1]

Upload: flokkas

Post on 05-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Installation Presentation[1]

    1/71

  • 7/31/2019 Installation Presentation[1]

    2/71

    TOOLS AND EQUIPMENTS NEEDED FOR INSTALLATION

  • 7/31/2019 Installation Presentation[1]

    3/71

  • 7/31/2019 Installation Presentation[1]

    4/71

    A,B,CA,B,C

    Corner and Wal lPanel ins t a l la t ionCorner and Wal lCorner and Wal l

    Panel ins t a l la t ionPanel ins t a l la t ion

  • 7/31/2019 Installation Presentation[1]

    5/71

    Establish guide lines, vertical line at 18 in. o.c and horizontal line 9.8ft o.c

    Vertical lines for Studs and Horizontal lines for runner below and above.

    Wooden Wall or Concrete Wall is applicable

    Vertical line formetal studs

    18

    Horizontal line forupper runner

    Horizontal linefor lower runner

  • 7/31/2019 Installation Presentation[1]

    6/71

    Base Runner 0.5mm thk

    Screw Hole

    Align the lower starter using base line, mark the holes and drill holes.

    Runner L= 9 ft, 7 holes per 9 ftlength

  • 7/31/2019 Installation Presentation[1]

    7/71

    Concrete Drill Bit

    Case 1 : If the wall is made of wood, no need to bore a hole, directly use screw.

    Case 2 : If the wall is made of concrete, bore a hole for plastic tox.

  • 7/31/2019 Installation Presentation[1]

    8/71

    Plastic Tox

  • 7/31/2019 Installation Presentation[1]

    9/71

    Lower Runner

    Drill hole according to the screw slot on the runner ( 7 slots per pc.)

  • 7/31/2019 Installation Presentation[1]

    10/71

    Upper Runner

    Mark the holes on the upper runner. (7 slots per pc.)

  • 7/31/2019 Installation Presentation[1]

    11/71

    Drill holes on the slots , insert plastic tox and fix the screw using portable drill.

    For wooden walls, directly use wood screw.

    St d f i d @ l f ll l th St d f i

  • 7/31/2019 Installation Presentation[1]

    12/71

    Stud facing down @ panel full length Stud facing up

    Stud facing down @ corner

    18

    6.0

    Upper runnerFull panel length

    On the 6 ft full length, insert 4pcs studs @ 18 o.c with first and last stud facing down.

    18

    4

    Intermediate studs spacing will still be 18 but facing up.

  • 7/31/2019 Installation Presentation[1]

    13/71

    Mark the holes on the studs and remove it for drilling holes.

    Vertical Studs

    Upper Runner

  • 7/31/2019 Installation Presentation[1]

    14/71

    Drill holes using impact drill , insert plastic tox and fix the wood screw.

  • 7/31/2019 Installation Presentation[1]

    15/71

    Drilled holes

    Re-insert the studs after drilling and fix the tox and screw.

  • 7/31/2019 Installation Presentation[1]

    16/71

    Plastic spacers

    Use plastic spacers to get the vertical plumbness of the stud.

  • 7/31/2019 Installation Presentation[1]

    17/71

    Fix the screw after placing the spacers.

    Plastic Spacers Screw and Tox

  • 7/31/2019 Installation Presentation[1]

    18/71

    FINAL RUNNER & STUDS INSTALLATION

  • 7/31/2019 Installation Presentation[1]

    19/71

    Base Drain

    Starter

    Attach the base drain on the lower runner and fix it using metal screw

    Next, Attach the starter as shown.

  • 7/31/2019 Installation Presentation[1]

    20/71

    T-Joiner

    On top of the studs facing down, attach the T-Joiner.

  • 7/31/2019 Installation Presentation[1]

    21/71

    T-Joiner attachment illustration.

  • 7/31/2019 Installation Presentation[1]

    22/71

    Studs facing down T-Joiner

    Base Drain

    Starter Cutting detail

  • 7/31/2019 Installation Presentation[1]

    23/71

    Starter

    T-Joiner

    Base Drain

    Corner Installation Detail.

  • 7/31/2019 Installation Presentation[1]

    24/71

    Corner Panel Installation.

  • 7/31/2019 Installation Presentation[1]

    25/71

    T-Joiner Clip

    Corner Clip

    Corner Panel, T-Joiner Clip and Corner Clip Installation.

  • 7/31/2019 Installation Presentation[1]

    26/71

    Screw Installation.

  • 7/31/2019 Installation Presentation[1]

    27/71

    Final Corner Panel Installation.

  • 7/31/2019 Installation Presentation[1]

    28/71

    Full Brick Panel

    Corner panel

    Install Full Panel after the Corner Panel installation.

  • 7/31/2019 Installation Presentation[1]

    29/71

    Stud Clip

    Insert the stud clip and fix it using metal screw.

  • 7/31/2019 Installation Presentation[1]

    30/71

    Illustration on Panel and Stud clip installation.

  • 7/31/2019 Installation Presentation[1]

    31/71

    T-Joiner Clip

    T-Joiner

    T-Joiner Clip and Panel Installation detail.

  • 7/31/2019 Installation Presentation[1]

    32/71

    T-Joiner Clip

    T-Joiner

    T-Joiner & Clip Detail

  • 7/31/2019 Installation Presentation[1]

    33/71

    Full Panel and Corner Panel connection detail.

  • 7/31/2019 Installation Presentation[1]

    34/71

    Installation of next panel and thereafter.

  • 7/31/2019 Installation Presentation[1]

    35/71

  • 7/31/2019 Installation Presentation[1]

    36/71

  • 7/31/2019 Installation Presentation[1]

    37/71

    Installation continued

  • 7/31/2019 Installation Presentation[1]

    38/71

  • 7/31/2019 Installation Presentation[1]

    39/71

  • 7/31/2019 Installation Presentation[1]

    40/71

  • 7/31/2019 Installation Presentation[1]

    41/71

    Silicon Rubber Installation.

    Silicon Rubber

    Rubber Roller

  • 7/31/2019 Installation Presentation[1]

    42/71

    Silicon Rubber final installation

  • 7/31/2019 Installation Presentation[1]

    43/71

    The EcoWALL Exterior Panel System

  • 7/31/2019 Installation Presentation[1]

    44/71

    DD

    Window CornerWindow Corner

    ins ta l la t ionins ta l la t ion

  • 7/31/2019 Installation Presentation[1]

    45/71

    Stud face down

  • 7/31/2019 Installation Presentation[1]

    46/71

    runners

    Stud face down

    Install first lower runner and upper runner, then the vertical stud.

  • 7/31/2019 Installation Presentation[1]

    47/71

    Aluminum Window

    runner

    Stud face up

    Stud facedown

    Window Installation Detail

  • 7/31/2019 Installation Presentation[1]

    48/71

    L-Male Adaptor

    Install the L-Male Adaptor on the upper runner and on the vertical studs aroundthe window.

  • 7/31/2019 Installation Presentation[1]

    49/71

    L-Male Adaptor

    L-Male Adaptor on the vertical studs.

  • 7/31/2019 Installation Presentation[1]

    50/71

    T-Joiner below window

    Complete accessories for window panel installation.

  • 7/31/2019 Installation Presentation[1]

    51/71

    Granite Panel Installation.

  • 7/31/2019 Installation Presentation[1]

    52/71

    L-Female Adaptor

    Installation of L-Female adaptor to lock the panel.

  • 7/31/2019 Installation Presentation[1]

    53/71

  • 7/31/2019 Installation Presentation[1]

    54/71

    45 deg. Angle cut on corner

    Installation of L-Female adaptor to lock the panel vertically.

  • 7/31/2019 Installation Presentation[1]

    55/71

  • 7/31/2019 Installation Presentation[1]

    56/71

    Final installation detail for window portions.

  • 7/31/2019 Installation Presentation[1]

    57/71

    Actual sample of window installation.

  • 7/31/2019 Installation Presentation[1]

    58/71

    EE

    Ins ide & Out s ideIns ide & Out s ideCorner ins t a l la t ionCorner ins t a l la t ion

  • 7/31/2019 Installation Presentation[1]

    59/71

    Studs facing down

    In-Corner Installation using Aluminum Corner.

  • 7/31/2019 Installation Presentation[1]

    60/71

    W-Type Aluminum adaptor

    Attached the W-Type adaptor using metal screw.

  • 7/31/2019 Installation Presentation[1]

    61/71

  • 7/31/2019 Installation Presentation[1]

    62/71

    Install the granite panels.

  • 7/31/2019 Installation Presentation[1]

    63/71

  • 7/31/2019 Installation Presentation[1]

    64/71

    Final Installation of In-Corner Aluminum Adaptor.

  • 7/31/2019 Installation Presentation[1]

    65/71

    Outer-Corner Installation Details.

    Y-Aluminum Adaptor

  • 7/31/2019 Installation Presentation[1]

    66/71

    Attach Y-Aluminum adaptor to the stud using screw.

  • 7/31/2019 Installation Presentation[1]

    67/71

    Install the panels as shown.

  • 7/31/2019 Installation Presentation[1]

    68/71

    Insert the W-Aluminum adaptor to lock the panels.Remove plastic cover.

  • 7/31/2019 Installation Presentation[1]

    69/71

    Secure its tightness so that it fits with the Y-Male Adaptor.

  • 7/31/2019 Installation Presentation[1]

    70/71

  • 7/31/2019 Installation Presentation[1]

    71/71

    Sample Aluminum Corner.