installation of aerial multi-axis platform (amp) at tinker afb
DESCRIPTION
Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB. Mark Nelson May 2007. Jacobs Engineering. Buildings and Infrastructure. Other. Chemicals, Petrochemicals, and Fertilizers. Pulp and Paper. Pharmaceuticals and Biotechnologies. High Tech ( JT ). Petroleum - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/1.jpg)
1
Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB
Mark Nelson
May 2007
![Page 2: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/2.jpg)
2
Jacobs Engineering
Other
Chemicals, Petrochemicals, and Fertilizers
Pharmaceuticalsand Biotechnologies
High Tech (JT)
Federal Programs/Defense and Aerospace (JT)
Petroleum (Oil, Gas, and Refining)
Pulp and Paper
Buildings and Infrastructure
Jacobs Technology (JT)
![Page 3: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/3.jpg)
3
Jacobs Technology – Technical Services
![Page 4: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/4.jpg)
4
Objectives
Present AMP installation in Bldg 3001. Fully understand needs and expectations. Present safety features and procedures. Establish safety requirements.
![Page 5: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/5.jpg)
5
Contract Requirements
Install one AMP in Bldg 3001 to support KC-135 maintenance.
Provide user manual and training on safe operation & maintenance of AMP.
Under warranty for 12 months. USTAE is the AMP vendor. Expected completion date: 31 July 07.
![Page 6: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/6.jpg)
6
Aerial Multi-Axis Platform (AMP)
![Page 7: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/7.jpg)
7
Animation of AMP in Bldg 3001
![Page 8: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/8.jpg)
8
AMP Travel Path Dashed line represents AMP travel around aircraft in
Dock 1 with horizontal stabilizer removed.
![Page 9: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/9.jpg)
9
Maintenance Activities & Requirements
Access to wings, engines, fuselage and horizontal stabilizer.
Removal & installation of horizontal stabilizer? Removal & installation of vertical stabilizer? Removable handrails or gates? Move personnel from platform to aircraft and
back? Use AMP as a hoist? Interface with special handling gear like a sling?
![Page 10: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/10.jpg)
10
AMP Work Platform
![Page 11: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/11.jpg)
11
Comparison to Hexagon Platform
![Page 12: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/12.jpg)
12
AMP Positions Relative to Aircraft
![Page 13: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/13.jpg)
13
Clearance over Wing
![Page 14: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/14.jpg)
14
Access to Engines and Wings
![Page 15: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/15.jpg)
15
Access to Wings
![Page 16: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/16.jpg)
16
Interference with Horizontal Stabilizer
![Page 17: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/17.jpg)
17
Clearance over Horizontal Stabilizer
![Page 18: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/18.jpg)
18
Interface with Fuselage
![Page 19: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/19.jpg)
19
Interface with Fuselage (continued)
![Page 20: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/20.jpg)
20
Interface with Fuselage (continued)
![Page 21: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/21.jpg)
21
AMP Control System
![Page 22: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/22.jpg)
22
AMP Radio Control Unit
![Page 23: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/23.jpg)
23
AMP Radio Control Unit (continued)
![Page 24: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/24.jpg)
24
System Safety Analysis
Formal analysis performed by Jacobs last year. Identified and assessed hazards. Developed countermeasures. Followed: Mil-Std-882, AFOSH 91-501, OSHA-29
CFR, ANSI A10.28, ANSI C2, NESC, NFPA 70, NEC
Control system safety analysis performed by USTAE via Genesis / Rockwell who owns Allen-Bradley.
![Page 25: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/25.jpg)
25
Safety Checklist Items
Control System - Failsafe PTO switch on radio control unit Safe-Stop button Limit movement within safe envelope via software Dual processors Dual encoders Double brakes – engage with power loss Cable tension limits via sensors & software
Collision Avoidance Power-on beacon Contact sensor Two-way radios Spotter on floor
![Page 26: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/26.jpg)
26
Safety Checklist Items (continued)
Safe escape and rescue Controlled descent device Secondary Radio Control Unit on the floor
Fall protection Handrails Personal Fall Arrest System (PFAS) Anti-slip surface on platform floor
Fire extinguisher AMP wiring complies with codes Load tests – 3 times rated load Warning labels
![Page 27: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/27.jpg)
27
Safety Procedures
User manual – operations & maintenance Training and certification of operators Use of primary and secondary radio control units
Override by secondary unit – keep in secure area
Role of Spotter. Use of control descent device Use of PFAS
![Page 28: Installation of Aerial Multi-Axis Platform (AMP) at Tinker AFB](https://reader036.vdocuments.us/reader036/viewer/2022062517/56812de8550346895d934239/html5/thumbnails/28.jpg)
28
Issues or Concerns?