installation instructions for vinyl new … instructions for vinyl new construction ... check...

12
1 REMEMBER: ALWAYS USE THE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT. Homes built before 1978 may contain lead paint. All replacement installations must comply with the U.S. EPA’s Lead-Based Paint Renovation, Repair, and Painting Program (RRP Rule). Read more about the RRP Rule and lead-safe work practices, on the U.S. EPA’s website at: www.epa.gov/lead Your Window Order Will Be Packaged With The Following: Replacement Window with Nail Fin Attached or Shipped Loose (3 1 4" Frame Depth) • Mullion Kit (If applicable) ! ! This installation manual is intended for residential and light commercial applications less than four stories in height. Your installation is subject to all codes and restrictions set by your local governments or municipalities, which may require additional procedures not listed in this installation manual . Tools & Materials You Will Need: • Measuring Tape • Hammer • Level • (1) box Stainless Steel or Galvanized Roofing Nails • Power Drill & Assorted Drill Bits • Square • Stiff Putty Knife • 9" Flashing in accordance with ASTM D-779 • Soft Mallet • Weather-Resistant Barrier Paper • 1 doz. 1 4" Wood Shims • Staple Gun and Staples • High Quality Silicone Window Caulking in accordance with ASTM C 920, Class 25 • Batt Insulation or AAMA approved Non-Expanding Window Insulation Foam in accordance with ASTM C 1620. Installation Screwpack Contents: (4) 3 8" hole plugs (4) #8 x 2" Phillips panhead screws (4) #8 x 2 1 2" Phillips panhead screws (4) Foam Corner Gaskets (16) #6 x 1 4" Phillips Panhead nail fin screws To cover the installation screw holes For jamb installation except for picture windows For jamb installation on picture windows only For nail fin or nail fin with J channel application in field. For nail fin or nail fin with J channel application in field. INSTALLATION INSTRUCTIONS FOR VINYL NEW CONSTRUCTION WINDOWS

Upload: ngokhuong

Post on 11-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

1

REMEMBER: ALWAYS USE THE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

Homes built before 1978 may contain lead paint. All replacement installations must comply with the U.S. EPA’s Lead-Based Paint Renovation, Repair, and Painting Program (RRP Rule). Read more about the RRP Rule and lead-safe work practices, on the U.S. EPA’s website at: www.epa.gov/lead

Your Window Order Will Be Packaged With The Following:

•Replacement Window with Nail Fin Attached or Shipped Loose (31⁄4" Frame Depth)

•MullionKit(Ifapplicable)

!

!This installation manual is intended for residential and light commercial applications less than four stories in height. Your installation is subject to all codes and restrictions set by your local governments or municipalities, which may require additional procedures not listed in this installation manual .

Tools & Materials You Will Need:

•MeasuringTape •Hammer

•Level •(1)boxStainlessSteelorGalvanizedRoofingNails

•PowerDrill&AssortedDrillBits •Square

•StiffPuttyKnife •9"FlashinginaccordancewithASTMD-779

•SoftMallet •Weather-ResistantBarrierPaper

•1doz.1⁄4"WoodShims •StapleGunandStaples

•HighQualitySiliconeWindowCaulkinginaccordancewithASTMC920,Class25

•BattInsulationorAAMAapprovedNon-ExpandingWindowInsulationFoaminaccordancewithASTMC1620.

Installation Screwpack Contents:

(4) 3⁄8"holeplugs

(4)#8x2"Phillipspanhead screws

(4)#8x21⁄2"Phillipspanhead screws

(4)FoamCornerGaskets

(16)#6x1⁄4"PhillipsPanheadnailfinscrews

To cover the installation screw holes

For jamb installation except for picture windows

For jamb installation on picture windows only

FornailfinornailfinwithJchannelapplicationinfield.

FornailfinornailfinwithJchannelapplicationinfield.

INSTALLATION INSTRUCTIONS FOR VINYL NEW CONSTRUCTION WINdOWS

Page 2: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

2

inspect new window1Step 1- Unwrap window and thoroughly inspect new window for any shipping or material damages.

Ifanycomponentof themain frame isdamaged,pleasecontactyourdealer for replacementsBEFOREyoubegindemolitionoftheexistingwindow.

Movingparts,locks,balances,glass,rails,etc.canberepairedeasilyAFTER the window is installed.

Step 2- After inspecting the new window, shut and lock it This will allow the seals, locks, interlocks and weatherstripping to engage.

Step 3- Remove screen and lay aside. You will be re-inserting the screen in Procedure 9.

!

! tips to Follow BeFore You Begin installation:

• ApprovedsealantsforusemustmeettherequirementsofASTMC920,Class25.

• Windowflashingmustbeusedwithallwindowinstallationstopreventairandwaterinfiltration.FlashallwindowsinaccordancewiththeASTME2112standards,includingmethodsA,A1,B,andB1.9"flashingshouldbeusedinallapplicationsorconformtolocalcode.

• Allflashingmaterialmustbebarriercoatedreinforcedandprovideatwenty-fourhourminimumprotectionfromwaterpenetrationwhentestedinaccordancewithASTMD-779.

• Allflashingandweatherresistantbarrier(housewrap/buildingpaper)materialsmustbeinstalledinaweatherboard fashion - layered and installed starting at the bottom working upward.

• dO NOT INSTALLroofingnailsontonailingfinwithanairgunorpneumaticdevice.Doingsowillcausedistortionorfractureofthenailingfins.Allnailingfinsmustbesecuredbyhandthroughthepre-punchednailing holes.

• Fastenersforsecuringtheflashingmustbenon-corrosive.Acceptablefasteners:staplesappliedwithahammer,tackerorstapler.Staplingofselfadhesiveflashingisrecommendedtokeepitcurlinginextremeweatherconditions.

• Fastenersforsecuringthenailfinofthewindowmustbenon-corrosivegalvanizedroofingnailsatleast13⁄4"inlengthandtheheadoftheroofingnailmustbewideenoughtocoverthepre-punchedslotofthenailingfin.Theroofingnailmustbeabletopenetratetheframingmaterialbyatleast1".

• dO NOT OBSTRUCT WEEPHOLES withflashingorsealant.Theweepholeslocatedatthebottomsillarea of a window are necessary in order to prevent water accumulation.

• TheplasticappliedtoUVresistantpaintfinishwindowsisfortheprotectionofthepaintfinishandshouldremain on the window until the installation is complete.

• Slopedsillsaredesignedtodirectwatertotheoutsideofthebuilding.Anycoveringortrimappliedtotheproductwillneedtoallowforproperdrainage.Failuretodosowillcreateariskofwaterinfiltration.

Page 3: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

3

Step 1- Measurethewidthandheightofthenewwindow.

Thetip-to-tipmakesizeshouldbebigenoughtofittheframedroughopeningtoallowaclearancefor shimming and insulation.

Seesizingchartonbelow:

Rough Opening Vs. Make Size

VinylModels: RO Width RO Height

Double Hung ,CasementAwning, Slider, Picture

RO (-) 1⁄4"width=Unitmakesize

RO (-) 3⁄8"height=UnitMakeSize

Exact Sizing

Exactsizesaretheactualwindowtiptotipfinishedsizes.Allowable factory tolerance is plus or minus 1⁄16".

ExactSizesaremanufacturedonthefollowingincrements:

Width Height1⁄8",1⁄4",3⁄8",1⁄2",5⁄8",3⁄4",7⁄8",1"

1⁄8",1⁄4",3⁄8",1⁄2",5⁄8",3⁄4",7⁄8",1"

measure the new window2

RO Width minus (-) 1⁄4" is Window Make Size Width

RO Heightminus (-)

3⁄8" is

Window Make Size

Height

check rough opening3

Step 1- Clean rough opening area of any leftoverconstruction debris.

Step 2- Checkroughopening tomakesure it is levelplumb, and square.

!Rough opening must be level,square,and structurally adequate. The studs should be free of voids, holes, chipping, twisting or other conditions that will not allow for proper installation and sealing.

2 Check for level, plumb and square

Page 4: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

4

Step 1- Place a 3⁄8"continousbeadofsealantaroundtheentireperimeteroftheinsideofthenailingfinofthe window, making sure the sealant is aligned and coveringthepre-punchedholesinthenailingfin.important! DO NOT leave any holes unsealed.

install Flashing4!

Flashing material must be barrier reinforced and must provide twenty-four hour minimum protection from waterinaccordancewithASTMD-779.Checkyourlocalbuildingcodesforanyadditionalrequirementsin your area.

Step 1- Using 9" wide flashing material, apply a horizontal piece at thebottomofthesillareamakingsurethesidesareextended9"oneachside(inorderfortheflashingtomeetwiththeverticalpieces).

Step 2- Securetheflashingatthetopcornerusingastaplegun,makingsurethelocationofthestaplewillbecoveredbythenailfinofthewindow.

The bottom and the ends maybe taped down in order prevent weather damage until the weather resistant barrier is installed.

Step 3- Cutthevertical(jamb)flashingssothatthelengthextendsbeyondthebottomofthewindowverticallyapproximately81⁄2"sothatyouleave 1⁄2"short fromthebottomof thesillflashingandtoextendbeyond the top of the window an additional 81⁄2"sothattheheadflashingwilloverlaptheverticalflashingsby1⁄2".

Step 4- Securetheverticalflashingsattheoutsideedgesusingastaplegunmakingsuretooverlapthebottomsillflashing.important! Do notsecurethebottomsoftheverticalflashings-youwillneedtoinstall weather resistant barrier in Procedure 7 that will require it to betuckedbehindtheverticalflashings.

!

! After the sealant is applied, immediately install the product before a skin can form on the sealant’s surface.

install window5STOP

Ifthewindowsneedtobefieldmulled,pleasegotoPage9forinstructionsonfieldmullingthewindowbefore placing into the opening.

1 ApplyBottomHorizontalFlashing

Extend each side 9"

from Opening

2

3 ApplyVerticalFlashing

! dO NOT STAPLEBottom of Vertical Flashings

1 ApplySealant

INTERIOR

2

Page 5: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

5

install window5

Step 2- Immediately set the window into the rough framed opening,pullingthenailingfininagainstthesheathingandbeddingthewindow and the sheathing into the sealant, forming a gasket betweenthewindowandtheflashing.

Step 3- Fastenwithoneroofingnailinstalledintothetopcornerofnailingfin.

shimming & securing window6Install Shims at Center, Sides, Sill and Header2

2 Install Shims every 16" distance

3 Check for level

Makesurethesillofthewindowhasacontinoussupportunderneath.Ifshimmingisrequired,makecertain to prevent twisting or binding of the window frame.

Step 1- From inside the home, unlock and raise sash slightly above sill and check margins between bottom of sash and top of sill. Adjust by pulling sill up or down.

Step 2- From the inside of the home, install shimsataminimumof16"intervalsatthe center meeting rail, sill, and header. See illustration.

Step 3- Checksillwithalevelandadjustshimsto level the sill. Re-adjust side clearance if necessary. Shim both sides of window and adjust shims to make diagonal measurements equal with the window plumb.

dO NOT FORCE SHIMS INTO PLACE- doing so will cause window to become out of square and sashes to operately poorly.

2 Install window into opening

3Fasten OneCorner

!

Check

Margins1

INTERIOR

!

Page 6: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

6

shimming & securing window6

Step 4- Installjambinstallationscrewsfordoublehungsandsliders:(4)#8x2"PhillipsPanheadScrewsat the top and bottom jambs. On double hungs, movebalancecoverslightlydowntoexposetophole, slide it up into position after installing the screw.

ForPicturewindows,install:(4)#8x21⁄2"PhillipsPanhead Screws.

Checkoperationofsash.

Step 5- From inside the house, adjust the single jamb adjuster by snugging it against the rough opening. dO NOT OVERTIGHTEN. Checkoperation of sash.

dO NOTUSEPNEUMATICGUN!

3

Step 1- Installa3⁄8"beadofsealantontotheexteriortopheader.

Step 2- Cuttheheaderflashingsamelengthas the bottom piece and install overlapping the vertical pieces. .

dO NOT INSTALLroofingnailsontonailingfinwithanairgunorpneumaticdevice.Doingsowillcausedistortionorfractureofthenailingfins.Allnailingfinsmustbesecuredbyhandthroughthepre-punchednailing holes.

installing Flashing & weather resistant Barrier71 Apply ample size

bead of sealant

2 Install HeaderFlashing

!EXTERIOR

dOUBLE HUNG/SLIdERS

INTERIOR

PICTURE WINdOWAWNINGS/CASEMENTS

INTERIOREXTERIOR

Install (4) #8 x 2" Phillips Panhead Screws at top andbottom jambs

44 Install (4) #8 x 21⁄2"

Phillips Panhead Screws - 2 at each jamb and 2 at header

4

!

5 AdjustJamb Adjuster

INTERIOR

Step 6- Using a hammer, (DONOTUSEAPNEUMATICGUN)andinstalla 13⁄4"roofingnailintothepre-punchednailfinholes.RoofingNailsshould be installed at a minimum of 8-12” apart all around theexteriorperimeterofthewindowframe,includingtheheadofthewindow.

Page 7: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

7

! All weather resistant barrier must be installed in a weatherboard fashion around the entire perimeter of the windoworwindowopening(workingfromthebottomfirstandmovingupwards)

installing Flashing & weather resistant Barrier7

Weather Barrier FlWeather Barrier Fl

Weather Barrier Fla

Weather Barri

Weather Barrier Flashing

Weather Barrier Flashing

Weather Barrier Flashin

Weather Barrier Flashing

Weather Barrier Flashing

Weather Barrier FlashingWeather Barrie

r Fl

Weather Barrier Flashing

Weather Barrier Flashing

Weather Barrier Fl

Weather Barrier Flashi

Weather Barrier Flashing

Weather Barrier Flashi

er Barrie

r Flashing Weather Barrie

r Flashing

Weather Barrier Flashi

Weather Barrier Flashi

Weather Barrier Flashi

Weather Barrier FlashWeather Barrier Flash

Weather Barrier Flashing

ather Barrier Flashing

eather Barrier Flashing

Weather Barrier Flashin

Weather Barrier Flashin

ther Barrier Flashing

W

eather B

arrier F

lashing

Weather Barrier

Weather Barrier

Step 3- Checkwindowforplumb,levelandsquare.

Step 4- Starting from the bottom and working upwards, install weather-resistantbarrierontheexterioroftheroughopening.

important! Makesureyoutuckthebarrierbehindtheverticalflashing.

Step 5- Using a staple gun, secure the weather-resistant barrier with staples.

4 Tuck Bottom First Layer Under Vertical Flashing

5 Secure withStaple Gun

applY insulation8insulate to maximizeenergy

efficiency

Step 1- To maximize energy efficiency, insulate any gaps betweenwindow frameandopening. Usingbatt insulationandaflatputty knife, insert into the cavities between the window frame and the rough opening.

OR

UsinganAAMAapprovedASTMC1620non-expandingfoam,fillthe cavities between the window frame and the rough opening.

Step 2- Checkmarginsbetweensashandwindowframe.

DONOTOVERSTUFFthebattinsulation.Doingsowillcausethe window to become out of square and sashes will not operate properly.

!

!

Page 8: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

8

SQUARING THE WINdOW: Adjustthewindowintheopeningsothattheedgeoftheglazing

beadisparalleltotheinsideedgeoftheframe.Ifthemarginsbetweenframeandglazingbeadarenotparallel,thesasheswillnot operate properly.

Adjust the jamb installation screws by loosening or tightening in order to achieve proper margins between sash and window frame.

Ifnecessary,shimthewindowinordertoachievealeveland

square window.

Uneven Sashes

Final adjustments to window9

Even Sashes

SILL IS CROWNEd (Sashes Not Operating Properly):

Step 1- Open and close the sash. The sash should lock securely and not bind when opened or closed.

Additional2"screwsmaybeneededforthesillasnecessarytorelieve any crown condition.!

Step 1- Checkthewindowoperationbyunlockingandoperatingbothsash and tilt mechanicisms.

Step 2- Installholeplugsforthejaminstallationscrews.

Step 3- Slide balance cover (located in the jamb pocket above the bottom sash) up into position at the head of the window frame.

Step 4- Installscreen.

Step 2- OnCasement/Awnings: Place2"screwsapprox.2" fromthekeepersidedownthroughthesill.Ifneedbe,thehingeplatescrewcanberemovedandanother2”screwusedtodraw the sill down.

Sealant must be used on any screws secured through the sill.

The keeper located on the sash can be adjusted up or down, where applicable, to align with the locking mechanism.

CrownedSill !

Page 9: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

9

mulling windows in Field

Tools You May Need:•Powerdrill&assorteddrillbits

•Pre-cuttreatedplywood(sizedependingonmodelofwindow)

•1⁄16"x3⁄8"GlazingTape

MULLING VINYL dOUBLE HUNGS:

Step 1- Install1⁄16"x 3⁄8"doublesidedglazingtapeto inside of frame of each window and to each side of plywood(see illustration).

Step 2- Install(pre-cuttothewindowmakesize)treated plywood, making sure each piece adherestotheglazingtape.

Step 3- Installthesnapmullion(orHmullion)toboththeinteriorandexteriorsidesofbothwindows.

Ifyourwindowunithasbeenshippedlooseandyouneedtomullthewindowstogetherintheinstallationfield,pleasefolloweachsteplistedthatistheappropriatescenariotoyourapplication.

SnapMullionAdds 3⁄16" in overall width

#8 x 2" Phillips Panhead Installation Screws

3⁄8" HolePlug

3⁄8" x 2 3⁄4" Treated Plywood

1⁄16" x 3⁄8" Glazing Tape - in 6 places

Step 4- Frominsidethehome,installthe#8x2"Phillips panhead installation screw in 3-4 locations staggered depending on height ofwindow.Ifyouusethefactorypreppedlocation on one window, make sure you stagger (or place 3⁄8"-1⁄2"directlybelowthefactory prepped hole) the other installation screw on the opposite window to prevent the screws from hitting.

Step 5- Installholeplugsforthemulledsideonly.

Afterthewindowunitshavebeenfieldmulled,proceed to Procedure 5 - Install Window

2

1

3

3

43⁄8" HolePlug

55

Page 10: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

10

MULLING VINYL SLIdERS:

Adds 3⁄16" in overall width

3⁄8" x 1 1⁄2" Treated plywood

3⁄8" HolePlug#8 x 2"

Phillips panhead installation screws

1⁄16" x 3⁄8" Glazing Tape - in 6 places

Step 1- Install 1⁄16"x 3⁄8"doublesided g laz ingtape to inside of frame of each window and to each side of plywood (see illustration).

Step 2- Install(pre-cuttothewindowmakesize)treated plywood, making sure each pieceadherestotheglazingtape.

Step 3- Install thesnapmullion(orHmullion)toboththeinteriorandexteriorsidesofboth windows.

Step 4- Remove track insert from interior jamb cavity.

Step 5- From inside the home, install the #8 x 2"Phillips Panhead installation screw in 3-4 locations staggered depending on height of window. If you use the factory preppedlocation on one window, make sure you stagger the other installation screw on the opposite window to prevent the screws from hitting (or place 3⁄8"-1⁄2"directlybelowthefactory prepped hole).

Step 6- Installholeplugsforthemulledsideonly.

Field mulling VinYl windows

Afterthewindowunitshavebeenfieldmulled,proceed to Procedure 5 - Install Window

1

2

3⁄8" HolePlug

RemoveTrack Insert

5

4

3 Snap Mullion

3 Snap Mullion

66

Page 11: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

11

Step 1- Install 1⁄16" x 3⁄8" double sided glazingtape to one side of window frame (see illustration) and attach opposite window, makingsuretheglazingtapeadherestoboth window frames.

Step 2- Installthesnapmulliontoboththeinteriorandexteriorsidesofbothwindows.

Step 3- Frominsidethehome, install the#8x2"PhillipsPanheadinstallationscrewin3-4 locations staggered depending on heightofwindow.Ifyouusethefactoryprepped location on one window, make sure you stagger the other installation screw on the opposite window to prevent the screws from hitting.

Step 4- Installholeplugsforthemulledsideonly.

Adds 1⁄8"to Overall Width

3⁄8" HolePlug

Snap mullion

1⁄8" x 1⁄2" Glazing Tape - 3 areas

MULLING CASEMENTS/AWNINGS:

#8 x 2" Phillips Panhead installation screws

Field mulling VinYl windows

Afterthewindowunitshavebeenfieldmulled,proceed to Procedure 5 - Install Window

1

2

2

3

44 3⁄8" Hole

Plug

Page 12: INSTALLATION INSTRUCTIONS FOR VINYL NEW … INSTRUCTIONS FOR VINYL NEW CONSTRUCTION ... Check operation of sash. ... dO NOT INSTALL roofing nails onto nailing fin with an air gun or

12

MULLING dOUBLE HUNG TO PICTURE WINdOW:

dOUBLE HUNG PICTURE

H Mullion

#8 x 2" Phillips Panhead Installation Screws

1⁄16" x 3⁄8" Glazing Tape - 8 areas

3⁄8" x 3" Treated Plywood

3⁄8" x 1 3⁄8" Treated Plywood

Step 1- Install1⁄16"x3⁄8"doublesided g l a z i n gtape to 2 sides on the double hungframe,2 sides on the picture windowframeandexteriorsidesofbothpiecesof plywood.

Step 2- Install(pre-cuttothewindowmakesize)treated plywood, making sure each piece adherestotheglazingtape.Thedoublehung frame will use 3⁄8" x 3"TreatedPlywood and the picture window frame will use 3⁄8"x13⁄8"TreatedPlywood.

Step 3- InstalltheHmulliontoboththeinteriorandexteriorsidesofbothwindows.

Step 4- From inside the home, install the #8 x2"Phillips panhead installation screwsinthe double hung frame and the #8 x21⁄2"PhillipsPanheadinstallationscrewsinthe picture window frame in 3-4 locations staggereddependingonheightofwindow.Ifyou use the factory prepped locationon one window, make sure you stagger the other installation screw on the opposite window to prevent the screws from hitting.

Step 5- Installholeplugsforthemulledsideonly.

Field mulling VinYl windows

#8 x 21⁄2" Phillips Panhead Installation Screws

Version 1.6 - 09.27.2011 - © 2011 ProVia - S-MK-30074

Afterthewindowunitshavebeenfieldmulled, proceed to Procedure 5 - Install Window

1

2

2

3

4

4

2150 State Route 39Sugarcreek, OH 44681

330.852.4711 330.852.2107 fax

www.proviaproducts.com

5

5

53⁄8" HolePlug