installation instructions forinstallation 3 3 4 4 1 figure b note: use only two vandal resistant...
TRANSCRIPT
POWDER COATED AND STAINLESS STEEL PARTITIONS
INSTALLATION INSTRUCTIONS FOR
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
While all materials and standard mounting selections are present, in order tocover the numerous choices of hardware, we have presented each material
with it's default hardware. Therefore, while each type is covered, it will be withit's most common mounting style (i.e. continuous brackets on ceiling-hung,
piano hinges on Polymer)
This installation guide was designed to cover as many variations of hardwareand mounting styles possible, while also trying to keep it light and focused.
Please read all steps in their entirety before beginning actual install, as somefield conditions and hardware combinations may require alternate installation.
Thank you for choosing Global Partitions
Ceiling Anchored Page
22
19Panel To Pilaster/Wall Two Ear Assembly.................
Pilaster/Panel Alcove Assembly................................
Panel To Pilaster/Wall One Ear Assembly.................
Pilaster/Wall One Ear Assembly................................ 21
20
Step 4,5,6...................................................................
Step 1,2,3...................................................................
18
17
5Pilaster/Wall One Ear Assembly................................
Pilaster/Panel Alcove Assembly................................
Panel To Pilaster/Wall One Ear Assembly.................
Pilaster/Wall One Ear Assembly................................ 15
16
14
Panel To Pilaster/Wall Two Ear Assembly.................
Step 4,5,6....................................................................
Step 1,2,3...................................................................
12
13
11
8A-8BDoor Hardware Assembly (Typical All Styles) ...
Floor AnchoredUrinal Screen Assembly.............................................
Headrail Assembly.....................................................
Page10
9
Pilaster/Panel Inline Assembly..................................
Pilaster/Panel Alcove Assembly................................
7
6
2Step 4,5,6....................................................................
Panel To Pilaster/Wall One Ear Assembly.................
Panel To Pilaster/Wall Two Ear Assembly.................
4
3
Floor Anchored/Overhead BracedStep 1,2,3...................................................................
Page1
Table Of Contents
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
Powder coated metal / Stainless steel
The Components for this project have been custom fabricated. They areguaranteed with respect to manufacture and workmanship and were inspected
at the factory.Before beginning work, the units should be inspected. If damage occurred intransit, report immediately to the freight company or other agencies that may
have caused the damage.
25Panel To Pilaster/Wall Two Ear Assembly.................
Product Information
Urinal Screen Assembly.............................................
Pilaster/Wall One Ear Assembly................................
Panel To Pilaster/Wall One Ear Assembly.................
Care And Maintenance Of Toilet Partitions................
Page
34
32
33
31
Panel To Pilaster/Wall Two Ear Assembly.................
Full Height Bracket Kits
Pilaster/Panel Inline Assembly..................................
Pilaster/Panel Alcove Assembly................................
Panel To Pilaster/Wall One Ear Assembly.................
Pilaster/Wall One Ear Assembly................................
28
Page
30
29
27
26
Floor Anchored And Ceiling AnchoredStep 1,2,3...................................................................
Step 4,5,6....................................................................
Page
24
23
Table Of Contents
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
FIGURE 1
17"
Page 1
STEP 3POSITION PANEL
PILASTERCENTER LINE
FIGURE 3
48"
WALL PILASTERCENTER LINE
FLOORFASTENERLOCATIONS
STEP 2WALL BRACKETS AND FLOOR BRACKETS
17"17"
PANELCENTER LINE
FIGURE 2
48"48"
17"
48"
STEP 1LAYOUT
12" SUPPORT
LC
LCLC
LC LCLC
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
A. Review the layout drawings and package lists that have accompanied this job.
B. Before proceeding,confirm that backing of walls and floor is adequate to support secure mounting of the toilet compartment units.
C. Establish and mark pilaster center line from back wall.
D. Establish and mark panel center lines for wall brackets.
E. Establish pilaster floor fastener locations from side wall according to shop drawings. (Note floor fasteners are located roughly 1" from lockstrip edge of pilaster. Larger overhead-braced
pilasters will have multiple stems. Use only the 2 outside stems for floor attachment. Conversely, 3" and 4" pilasters will use only
F. Mark wall bracket holes using the brackets as templates.
A. Using shop drawings, drill holes for wall brackets and floor fastenings for particular fastening devices supplied.
B. Insert anchoring devices in walls and secure wall brackets.
C. Insert expansion shields. Position shoe clips and then "L" brackets over expansion shields and secure loosely with screws.
A. Place panel on a support, 12" above the floor.
B. Set it into wall brackets,but do not fasten panel at this time.
Detail of pilaster mounting can be found in Step 5.
(Securingly loosely at this time will allow for lateral pilaster adjustment.)
one " L" clip on one of the two stems.
Typically 1/4" drill bits can be used throughout. An assortment of bit sizes are recommended as site conditions vary.
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
FIGURE 4
A. Plumb each pilaster and fasten the pilaster to panel using "U" brackets and sheet metal screws.
B. Establish door openings by setting pilaster mounting.
C. Tighten self tapping screw to "L" brackets.
D. Slide stainless steel shoe down to floor level, firmly engaging shoe clips.
F.Remove panel support device.
Page 2
STEP 5INSTALL PILASTERS
STEP 4PILASTER PREPARATION
FIGURE 5
REAR
FRONT
STEP 6SECURING PILASTERS/PANELS
FIGURE 6
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
A. Refer to layout drawings for placement of U-brackets in position on rear of pilasters. Make sure
brackets are in alignment with wall brackets.
B. Fasten U-brackets to pilaster with sheet metal screws.
NOTE: Pilasters at wall do not require U-brackets,but should be prepared for wall (and floor fastening) as required by compartment layout.
A. Inspect stainless steel shoe carefully for bowing. If shoe seems wide, squeeze edges and center to ensure
shoe will not bow away from pilaster faces.
B. Place pilaster between "L" brackets and fasten loosely with screws at pre-drilled locations at each side.
( 3" and 4" pilasters will have only 1 "L" clip.)Adjust threaded Jack bolt until it reaches floor.
Slide stainless steel shoe carefully over mounting end of pilaster and leave approximately 5" above bottom end of pilaster.
Shoe can be held in place with painters tape to avoid sliding.
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
DIMENSIONTO SUITINSTALLATION
5"(APPROX.)
Fasten pilaster to panel using sheetmetal screws(Refer to steps 4 & 6 )
Pre-drill for screws with 1/8" bit.
Pilasters must be both plumb and level. To assist inleveling, headrail may be lightly positioned acrossadjacent pilasters(do not fasten at this time)
Remove support device.
FLOOR ANCHORED/OVERHEAD BRACEDPANEL TO PILASTER/WALLTWO EAR ASSEMBLY
4 1
5"(APPROX.)
33
FIGURE A
4
DIMENSIONTO SUITINSTALLATION
33
44 1
FIGURE B
NOTE:Use Only Two Vandal Resistant 5/8" SMSTo Diagonally Fasten U-bracketTo Pilaster.
FIGURE B
Page 3
5
5
5"(APPROX.)2
2
DIMENSIONTO SUITINSTALLATION
5
55
Plastic Shields
4
DIMENSIONTO SUITINSTALLATION
2
FIGURE A
53
5 3
55"(APPROX.) 1
4
Vandal Resistant 5/8" S.M.S (12)
(4)
Vandal Resistant 2 1/2" S.M.S
5
4
(4)
"U" Bracket2
3
1 Two Ear Bracket
(2)
(2)
Panel Hardware Kit (P/N 40-8515020G) Includes:CHROME PLATED ZAMAC
PART ID. DESCRIPTION QTY
5
5
5
5
5
5
5
5
Panel Hardware Kit (P/N 40-8265021G) Includes:STAINLESS STEEL
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
DIMENSIONTO SUITINSTALLATION4
4
NOTE:Use Only Two Vandal Resistant 5/8" SMSTo Diagonally Fasten U-bracket To Pilaster.
FIGURE B
Page 4
25"(APPROX.)
5
FIGURE B2
5
DIMENSIONTO SUITINSTALLATION
5
5"(APPROX.)
33
1
(4) Plastic Shields
DIMENSIONTO SUITINSTALLATION
44
FIGURE A
5DIMENSIONTO SUITINSTALLATION
2
FIGURE A
5"(APPROX.)
33
33
44
1
Vandal Resistant 5/8" S.M.S
5"(APPROX.)1
(12)
FLOOR ANCHORED/OVERHEAD BRACEDPANEL TO PILASTER/WALLONE EAR ASSEMBLY
QTYDESCRIPTIONPART ID.
3 Vandal Resistant 2 1/2" S.M.S
5
4
(4)
One Ear Bracket
"U" Bracket2
1
(2)
(2)
Panel Hardware Kit (P/N 40-8515010G) Includes:CHROME PLATED ZAMAC
Fasten pilaster to panel using sheetmetal screws(Refer to steps 4 & 6 )
Pre-drill for screws with 1/8" bit.
Pilasters must be both plumb and level. To assist inleveling, headrail may be lightly positioned acrossadjacent pilasters(do not fasten at this time)
Remove support device.
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
5
5
5
5
5
5
5
5
5
5
5
5
Panel Hardware Kit (P/N 40-8265011G) Includes:STAINLESS STEEL
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
NOTE:Replace Vandal Resistant 2 1/2" SMSWith Vandal resistant 5/8"SMSTo Fasten Pilaster To Panel.
ALTERNATE
Page 5
4
3 1
22
4
FIGURE A
3
14
4
Fasten using sheet metal screws.
Pilasters must be both plumb and level. To assist inleveling, headrail may be lightly positioned acrossadjacent pilasters(do not fasten at this time)
Establish bottom door openings by adjustingpilaster "L" brackets (anchoring) to desired positionand tightening screws.(See step 6)
FLOOR ANCHORED/OVERHEAD BRACEDPILASTER/WALLASSEMBLY
3
FIGURE ASEE SHOP DRAWINGS FORPILASTER TO WALL SPACING
22
4
3
13
1
22
4
3
(2)1 One Ear Wall Bracket
Vandal Resistant 2 1/2" S.M.S
Vandal Resistant 5/8" S.M.S
Plastic Shields
4
(4)
(8)
(4)
3
2
DESCRIPTION
Pilaster/Wall Hardware Kit (P/N 40-8515210G) Includes:CHROME PLATED ZAMAC
PART ID. QTY
4
4
4
4
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
Pilaster/Wall Hardware Kit (P/N 40-8265211G) Includes:STAINLESS STEEL
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
KNOCK OUTWITH PLIERS
SEE PAGE 8 FORDOOR APPLICATION3 1
DIMENSIONTO SUITINSTALLATION
STEP 2
6 35"(APPROX.)
FIGURE A
Page 6
322
77
ATTACH TOPANEL
75
5 ATTACH TOPILASTER
7
2DIMENSIONTO SUITINSTALLATION
336
22
2
STEP 1
SEE SHOPDRAWINGS FORPILASTER TOWALL SPACING
3
FIGURE A5 7
2
5"(APPROX.)3 38
42
5
KNOCK OUTWITH PLIERS
7
22 4
33
Vandal Resistant 1" S.M.S (4)
Bracket Headrail Satin "F" Zamac
1
4
(1)
1" One Ear Wall Bracket
8
Alcove Clip
7
(2)
(2)
FLOOR ANCHORED/OVERHEAD BRACEDPILASTER/PANEL ALCOVEONE EAR ASSEMBLY
Vandal Resistant 2 1/2" S.M.S
Vandal Resistant 5/8" S.M.S
5
Plastic Shields
6
4
(10)
(14)
(10)
1 1/4" One Ear Wall Bracket
2
3
1 (2)
Alcove Hardware Kit (P/N 40-8517310G) Includes:CHROME PLATED ZAMAC
DESCRIPTIONPART ID. QTY
Note: CHROME PLATEDReplace KIt#8517310 with Kit#8517320for two ear panel locations.
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
4
4
4
4
4
4
4
4TO EASE INSTALLATION, BOTTOMCLIP SHOULD BE ATTACHED TO PANELBEFORE SETTING ON PILASTER.
Alcove Hardware Kit (P/N 40-8267311G) Includes:STAINLESS STEEL
Note: STAINLESS STEELReplace Kit#8267311 with Kit#8267321for two ear panel locations.
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
OPTIONALTwo Vandal Resistant 5/8" SMSMay be Used (But Not Recommended)To Fasten brackets To Panel.
Page 7
FLOOR ANCHORED/OVERHEAD BRACEDPILASTER/PANEL/PILASTER INLINEASSEMBLY
NOTE:Offset brackets for screw clearance.
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
14 13
9
1313
8
6
1447
Page 8A
Long keyInstall doorstop and keeperat height toaccept latch pin. FIGURE 2
Short key
5
141710
16
11
(1) 8 Hinge Nut 5/16"
(2) 15 Vandal Resistant S.M.S. 5/8"1513
1217 Latch Concealed Stop And Keeper
16
15
Step Bolt 1/2"
(1)
(1)
14
132
141
3 Vandal Resistant Step Bolts 1 1/4" long13
14 Vandal Resistant Barrel Nut
12 Bumper And Coathook
(5)
(5)
(1)
10
11
Knob Concealed Latch Male w/ spring washer
Knob Concealed Latch Female
9 Box Cam Nylon
(1)
(1)
(1)
1 Hinge Top Pilaster Bracket (1)
7 Hinge Washer External
5
6 Hinge Washer Internal
Hinge Pintle Nylon
(1)
(1)
(1)
3 Nylon Hinge Pin
4 Hinge Botom Pilaster Bracket
2 Hinge Bushing Nylon
(1)
(1)
(1)
DOOR HARDWAREASSEMBLY
(P/N 40-8513500G) Includes:CHROME PLATED ZAMAC
PART ID. DESCRIPTION QTY
9
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
Install outsidelatch escutcheon.Note: Remove and disposeof clear plastic ring that keepsspring washer in place, before installing.
Install inside turning knob and secure together with provided screw.
B. Secure upper door hinge (with bushing lip upward) to pilaster with two through bolts and barrel nuts.
A. Secure lower door pilaster hinge (with cam pintle in place) to pilaster with two through bolts.
C. Insert box cam into lower door hinge portion, short key toward edge of door (figure 2)
D. Lowest point of cam pintle sets door "rest" position. Rotate pintle to desired position, then tighten locking nut.
E. Install door by placing the box cam over the hinge pintle. Position top of door over upper pilaster hinge and insert hinge pin until flush with top of door.
Note that the cammed hinge will force the door to rise when opened. Take this into consideration when installing and allow adequate space.
(P/N 40-8263501G) Includes:STAINLESS STEEL
Insert until flush with door. (E.)
ALL MOUNTING STYLESPOWDER COATED / STAINLESS STEEL
NOTE: When door pulls are used (#21, 13), offset pulls either adjacent to or above and below knobs.
Coathooks in non-handicap stalls can be mounted to suit.
14 13
9
1313
8
6
1447
Page 8B
Long keyInstall doorstop and keeperat height toaccept latch pin. FIGURE 2
Short key
5
(2) 22 Vandal Resistant S.M.S. 5/8"
141710
16
16
18 Step Bolt 1/2" (1)
Vandal Resistant Step Bolts 1 1/4" long
21 Pull Handle
13
20 St/St Hinge Pin
(2)
(4)
(1)
(1) 8 Hinge Nut 5/16"
(2) 15 Vandal Resistant S.M.S. 5/8"1513
Door Hardware Kit (P/N 40-8513510G) H/C Includes:CHROME PLATED ZAMAC
18
19
ADA Handle
Bumper
PART ID. DESCRIPTION
(1)
(1)
QTY
OUTSWING DOOR HARDWARE PROVIDED FOR OUTSWING DOORS.
1217 Latch Concealed Stop And Keeper
16
15
Step Bolt 1/2"
(1)
(1)
14
132
141
20 Vandal Resistant Step Bolts 1 1/4" long13
14 Vandal Resistant Barrel Nut
12 Bumper And Coathook
(5)
(5)
(1)
10
11
Knob Concealed Latch Male w/ spring washer
Knob Concealed Latch Female
9 Box Cam Nylon
(1)
(1)
(1)
1 Hinge Top Pilaster Bracket (1)
7 Hinge Washer External
5
6 Hinge Washer Internal
Hinge Pintle Nylon
(1)
(1)
(1)
3 Nylon Hinge Pin
4 Hinge Botom Pilaster Bracket
2 Hinge Bushing Nylon
(1)
(1)
(1)
DOOR HARDWARE - OUTSWINGASSEMBLY
(P/N 40-8513500G) Includes:CHROME PLATED ZAMAC
PART ID. DESCRIPTION QTY
9
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
B. Secure upper door hinge (with bushing lip upward) to pilaster with two through bolts and barrel nuts.
A. Secure lower door pilaster hinge (with cam pintle in place) to pilaster with two through bolts.
C. Insert box cam into lower door hinge portion, short key toward edge of door (figure 2)
D. Lowest point of cam pintle sets door "rest" position. Rotate pintle to desired position, then tighten locking nut.
E. Install door by placing the box cam over the hinge pintle. Position top of door over upper pilaster hinge and insert hinge pin until flush with top of door.
Note that the cammed hinge will force the door to rise when opened. Take this into consideration when installing and allow adequate space.
(P/N 40-8263501G) Includes:STAINLESS STEEL
Insert until flush with door. (E.)
ALL MOUNTING STYLESPOWDER COATED / STAINLESS STEEL
21
21
NOTE: When door pulls are used (#21, 13), offset pulls either adjacent to or above and below knobs.
Coathooks in handicap stalls should be no higher than 48" A.F.F.
Door pulls will be thru-boltedwith #13 at a location to suitno higher than 48" above finishedfloor, per ADA.
NOTE: Door pulls will not mate-up.They will have exposed bolt headson opposite door side.
13
13
13
13
Page 9
5
2
51
5
35
3
4
14
4
5 VandalResistant S/S 5/8" S.M.S (4)
Plastic Shield (2)
1
2
3
Headrail Cap Satin Zamac (1)
Vandal Resistant S/S 2 1/2" S.M.S (2)
Headrail Satin "F" Zamac Bracket (2)
HEADRAILASSEMBLY Headrail Hardware Kit (P/N 40-8448100G) Includes:
DESCRIPTIONPART ID. QTY
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
43
FIGURE A
224 4
4 2
4
3 1 44
2
3FIGURE A 1
34
2244
33 4
41
QTYPART ID. DESCRIPTION
(4) Plastic Shields3
Vandal Resistant 5/8" S.M.S4 (8)
Two Ear Wall U/S Bracket
Vandal Resistant 2 1/2" S.M.S2
1
(4)
(2)
URINAL SCREENASSEMBLY Urinal Screen Hardware Kit (P/N 40-8511281G) Includes:
CHROME PLATED ZAMAC
Page 10
LC
LC
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
A. Before proceeding,confirm that backing of wall is adequate to support and secure mounting of urinal screens.Check dwgs for layout.
B. Insert anchoring devices in walls and secure wall brackets with 2 1/2" s.m.s.
C. Place urinal screen on a support, 12" above the floor.
D. Set U/S into wall brackets and fasten urinal screen at this time,using 5/8" fasteners.
Urinal Screen Hardware Kit (P/N 40-8261281G) Includes:STAINLESS STEEL
FLOOR ANCHORED- OVERHEAD BRACEDPOWDER COATED / STAINLESS STEEL
A. Place panel on a support, 12" above the floor.
B. Set it into wall brackets,but do not fasten panel at this time.
STEP 3POSITION PANEL
NOTE: FLOOR MUST BE CONCRETE.
A. Review the layout drawngs and package lists that have accompanied this job.
B. Before proceeding,confirm that backing of walls and floor is adequate to support secure mounting of the toilet compartment units.
C. Establish and mark pilaster center line from back wall.
D. Establish and mark panel center lines for wall brackets.
E. Establish pilaster floor fastener locations from side wall according to shop drawings. (Note floor fasteners are located 1" from edge of pilaster.)
F. Mark wall bracket holes using brackets as templates.
STEP 2WALL BRACKETS AND FLOOR BRACKETS LC
LC LCLC LCLC
LCLC
48"
48"
17"
17"
48"
PANELCENTER LINE
12" SUPPORT
PILASTERCENTER LINE
FIGURE 3
FLOORFASTENERLOCATIONS
17"
FIGURE 2
WALL PILASTERCENTER LINE
FIGURE 1
Page 112171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
A. Drill holes for wall brackets of 1/4" and floor fastenings of 3/8" for fastening devices
supplied.
B. Insert anchoring devices in walls and secure wall brackets.
C. Install wedge anchor with shoe clip washer and nut into concrete floor (min. 2 1/2") and tighten.
STEP 1LAYOUT
FLOOR ANCHOREDPOWDER COATED / STAINLESS STEEL
A. Level each pilaster by adjusting both support nuts to desired position.
B. Plumb each pilaster and fasten the pilaster to panel with "u" brackets using through bolts or sheet metal screws.
C. Establish door openings by setting pilaster mounting channel to desired position on anchor.
D. Tighten locking nuts on top of pilaster mounting channel.
E. Slide stainless steel shoe down to floor level, firmly engaging shoe clips.
F. Remove panel support device.
STEP 6SECURING PILASTERS /PANELS
STEP 4PILASTER PREPARATION
A. On each wedge anchor thread place one shoe clip and 3/8" support nut down to approximately 1" up from floor level and place round washer over each anchor.
B. Inspect shoe for bowing. Squeeze edges and center of shoe to ensure shoe will not bow away from pilaster faces. Slide stainless steel shoe carefully over mounting end of pilaster and leave approximately 5" above end.
C. Position pilaster on anchors and secure lightly with flat washers and 3/8" locking nuts.
A. Align U-brackets in position on rear of pilasters. Refer to layout drawings for placement.
B. Fasten U-brackets to pilaster with sheet metal screws pre-drilling with 1/8" bit.
C. Pilasters at wall do not require U-brackets,but should be prepared for wall (and floor fastening) as required by compartment layout.
STEP 5INSTALL PILASTERS
FIGURE 5
LC
FIGURE 4
FIGURE 6
FRONT
REAR
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
Page 12
FLOOR ANCHOREDPOWDER COATED / STAINLESS STEEL
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
DIMENSIONTO SUITINSTALLATION
5"(APPROX.)
Fasten pilaster to panel using sheetmetal screws(Refer to steps 4 & 6 )
Pre-drill for screws with 1/8" bit.
Pilasters must be both plumb and level. To assist inleveling, headrail may be lightly positioned acrossadjacent pilasters(do not fasten at this time)
Remove support device.
FLOOR ANCHOREDPANEL TO PILASTER/WALLTWO EAR ASSEMBLY
4 1
5"(APPROX.)
33
FIGURE A
4
DIMENSIONTO SUITINSTALLATION
33
44 1
FIGURE B
NOTE:Use Only Two Vandal Resistant 5/8"SMS To Diagonally Fasten U-bracketTo Pilaster.
FIGURE B
Page 13
5
5
5"(APPROX.)2
2
DIMENSIONTO SUITINSTALLATION
5
55
Plastic Shields
4
DIMENSIONTO SUITINSTALLATION
2
FIGURE A
53
5 3
55"(APPROX.) 1
4
Vandal Resistant C/P 5/8" S.M.S (12)
(4)
VandalResistant C/P 2 1/2" S.M.S
5
4
(4)
"U" Bracket2
3
1 Two Ear Bracket
(2)
(2)
Panel Hardware Kit (P/N 40-8515020G) Includes:CHROME PLATED ZAMAC
PART ID. DESCRIPTION QTY
5
5
5
5
5
5
5
5
Panel Hardware Kit (P/N 40-8265021G) Includes:STAINLESS STEEL
FLOOR ANCHOREDPOWDER COATED / STAINLESS STEEL
DIMENSIONTO SUITINSTALLATION
FIGURE B
55"(APPROX.)
5
5"(APPROX.)
DIMENSIONTO SUITINSTALLATION
3
144
3
NOTE:Use Only Two Vandal resistant 5/8" SMSTo Diagonally Fasten U-bracket To Pilaster.
FIGURE B
Page 14
2
5
2
5
5
5
(4) Plastic Shields
5"(APPROX.)
5
FIGURE A
DIMENSIONTO SUITINSTALLATION
33
DIMENSIONTO SUITINSTALLATION
144
5"(APPROX.)
FIGURE A
5
2
33
54
4
1
Vandal Resistant 5/8" S.M.S (12)
Panel Hardware Kit (P/N 40-8515010G) Includes:CHROME PLATED ZAMAC
PART ID.
FLOOR ANCHOREDPANEL TO PILASTER/WALLONE EAR ASSEMBLY
5
3
4
Pilasters must be both plumb and level.
2
1
QTYDESCRIPTION
Vandal Resistant 2 1/2" S.M.S (4)
"U" Bracket (2)
One Ear Bracket (2)A. Plumb pilaster and fasten pilaster to panel using through bolts or sheet metal screws and "U" brackets.
B. Establish bottom door openings by adjusting pilaster and tightening screws.(Refer to step 4 & 6)
C. Remove support device.
Panel Hardware Kit (P/N 40-8265011G) Includes:STAINLESS STEEL
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected]
5
5
5
5
5
5
5
5
5
FLOOR ANCHOREDPOWDER COATED / STAINLESS STEEL
(2)1 One Ear Wall Bracket
4
Pilasters must be both plumb and level.
3
2
(4) Plastic Shields
Vandal Resistant 5/8" S.M.S (8)
Vandal Resistant 2 1/2" S.M.S (4)
Pilaster/Wall Hardware Kit (P/N 40-8515210G) Includes:CHROME PLATED ZAMAC
FLOOR ANCHOREDPILASTER/WALL ASSEMBLY
PART ID. DESCRIPTION QTY
4
FIGURE B
NOTE:Replace Vandal Resistant 2 1/2" SMSWith Vandal Resistant 5/8" SMSTo Fasten Pilaster To Panel Instead Of Wall.
3 1
22
FIGURE A
3
4
4
4
1
3
SEE SHOP DRAWINGS FORPILASTER TO WALL SPACING
22
FIGURE A
13
3
22
1 4
3
Pilaster/Wall Hardware Kit (P/N 40-8265211G) Includes:STAINLESS STEEL
4
4
4
4
4
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 15
FLOOR ANCHOREDPOWDER COATED / STAINLESS STEEL
Pre-drill for screws with 1/8" bit.
NOTE:Replace Vandal Resistant 2 1/2"With Vandal Resistant 5/8"To Fasten Pilaster To Panel.
1 44
33
55
2
33
441
33
SEE SHOPDRAWINGS FORPILASTER TOWALL SPACING
44
44
3
SEE PAGE 8FOR DOORAPPLICATION
6FLAT STRIKE& KEEPER#8263100
55
2
5
(4) Plastic Shields
Vandal Resistant 5/8" S.M.S (8)
Vandal Resistant 2 1/2" S.M.S (4) 3
6
3
4
6 One Ear Wall Bracket (2)
PART ID.
Pilaster/Wall Hardware Kit (P/N 40-8515210G) Includes:CHROME PLATED ZAMAC
DESCRIPTION QTY
Vandal Resistant 5/8" S.M.S (12)
Note:Replace P/N#40-8515010G with P/N#40-8515020Gfor two ear locations.
FLOOR ANCHOREDPILASTER/PANEL ALCOVE ASSEMBLY
(2)1 One Ear Bracket
5
4
(4) Vandal Resistant 2 1/2" S.M.S
Plastic Shields (4)
3
2 "U" Bracket (2)
PART ID.
Panel Hardware Kit (P/N 40-8515010G) Includes:CHROME PLATED ZAMAC
DESCRIPTION QTY
FIGURE A
FIGURE A
PILASTERSIDE
Panel Hardware Kit (P/N 40-8265011G) Includes:STAINLESS STEEL
Panel Hardware Kit (P/N 40-8265211G) Includes:STAINLESS STEEL
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 16
5
5
5
5
5
5
5
5
5
5
5
5
FLOOR ANCHOREDPOWDER COATED / STAINLESS STEEL
FIGURE 1
17"
48"
PANELCENTER LINE
PILASTERCENTER LINE
WALL PILASTERCENTER LINE
17"
48"
STEP 1LAYOUTCEILING HUNG
STEP 2WALL BRACKETS
STEP 3POSITION PANEL
FIGURE 2
FIGURE 3
A. Drill holes for wall brackets of appropriate size for particular fastening devices supplied. Typically 1/4" drill bits can be used throughout.
B. Insert anchoring devices in walls and secure wall brackets.
C. Pilaster at wall should be prepared for wall and ceiling fastening as required by compartment layout.
A. Place panel on a support, 12" above the floor.
B. Set it into wall brackets,but do not fasten panel at this time as it may need to be raised or lowered to sit flush with pilaster bottoms.
A. Review the layout drawings and package lists that have accompanied this job.
B. Top of the finished ceiling and bottom edge of structural support should not exceed 1".
C. Before proceeding, confirm that backing of wall and ceiling support is adequate to secure mounting of toilet compartment units.
D. Confirm correct location and condition of threaded ceiling rods. These should project 2" to 2-1/2" below finished ceiling.
E. Establish and mark pilaster and panel center lines in relation to ceiling rod locations and drawings. Bolts will be located 1"
F. Mark wall bracket holes using brackets as templates.
17"
48"
17"
48"
12" SUPPORT
LCLCLC
LCLCLC
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 17
from edge of pilaster
CEILING-HUNGPOWDER COATED / STAINLESS STEEL
A. Level each pilaster by adjusting both support nuts to desired position.
B. Plumb each pilaster and fasten the pilaster to panel using through bolts or sheet metal screws.
C. Establish door openings by setting pilaster mounting channel to desired position on stud.
D. Tighten locking nuts on top of pilaster mounting channel.
E. Slide stainless steel shoe up to ceiling level, firmly engaging shoe clips.
F. Fasten panel to wall brackets using through bolts.
G. Remove panel support device.
STEP 6SECURING PILASTERS TO PANELS
STEP 4PILASTER PREPARATION
STEP 5INSTALL PILASTERS
A. Align U-brackets in position on rear of pilasters.Refer to layout drawings.
B. Fasten U-brackets to pilaster with sheet metal screws pre-drilling with 1/8" bit.
C. Pilasters at wall do not require U-brackets.
LC
FIGURE 6
FIGURE 4REAR
FRONT
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 18
5" above bottom end. mounting end of pilaster and leave approximatelyA. Slide stainless steel shoe carefully over
NOTE: STRUCTURAL STEEL BY OTHERS
B. Thread support nuts and mounting washers over threaded rods to support pilaster mounting bar.
C. Position pilaster and mounting channel on threaded rods and attach lightly with square flat washer, lockwasher and locking nut.
CEILING-HUNGPOWDER COATED / STAINLESS STEEL
FIGURE B
3
5"(APPROX.)
3
44 1
FIGURE A
5"(APPROX.)
2
5
NOTE:Use Only TwoVandal resistant 5/8"SMSTo Diagonally Fasten U-bracket To Pilaster.
FIGURE B
5
2
5"(APPROX.)
43
3
5"(APPROX.)
4 1
CEILING HUNGPANEL TO PILASTER/WALLTWO EAR ASSEMBLY
Fasten pilaster to panel using through boltswith barrel nuts or sheet metal screws.
Pilasters must be both plumb and level.(do not fasten at this time)
Establish bottom door openings by adjustingpilaster and tightening screws.(Refer to step 6)
PART ID.
5
3
4
2
1
Vandal Resistant 5/8" S.M.S (12)
Panel Hardware Kit (P/N 40-8265021G) Includes:STAINLESS STEEL
Vandal Resistant 2 1/2" S.M.S
Plastic Shields
"U" Bracket
(4)
(4)
(2)
Two Ear Bracket
DESCRIPTION
(2)
QTY
Panel Hardware Kit (P/N 40-8515020G) Includes:CHROME PLATED ZAMAC
5
5
2
5
5
1
3
FIGURE A
5
4
3
5
4
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 19
5
5
5
5
5
5
5
5
CEILING-HUNGPOWDER COATED / STAINLESS STEEL
4
3
FIGURE B
5"(APPROX.)
55
2
5"(APPROX.)
2
NOTE:Use Only TwoVandal Resistant 5/8" SMSTo Diagonally Fasten U-bracket To Pilaster.
FIGURE B
5
5
5
5
5
FIGURE A
144
3
2
5"(APPROX.)
FIGURE A
3
41
3
5
(2)"U" Bracket2
Vandal Resistant 5/8" S.M.S
Vandal Resistant 2 1/2" S.M.S
Plastic Shields
5"(APPROX.)
33
44 1
4
5
3
(4)
(12)
(4)
Panel Hardware Kit (P/N 40-8265011G) Includes:STAINLESS STEEL
One Ear Bracket
CEILING HUNGPANEL TO PILASTER/WALLONE EAR ASSEMBLY
1
PART ID. DESCRIPTION QTY
(2)
Fasten pilaster to panel usingsheet metal screws.
Pilasters must be both plumb and level.(do not fasten at this time)
Establish bottom door openings by adjustingpilaster and tightening screws.(Refer to step 6)
5
5
5
5
5
5
5
5
5
5
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 20
Panel Hardware Kit (P/N 40-8515010G) Includes:CHROME PLATED ZAMAC
CEILING-HUNGPOWDER COATED / STAINLESS STEEL
(8)
(4)
(4)
QTY
33
2
1
2
FIGURE A
NOTE:Replace Vandal Resistantt 2 1/2" SMSWith Vandal Resistant 5/8"SMSTo Fasten Pilaster To Panel.
4
4
1 4
4
SEE SHOP DRAWINGS FORPILASTER TO WALL SPACING
3 1
2
3
2
FIGURE A
4
22
Pilasters must be both plumb and level.
33
1 4
Plastic Shields
Vandal Resistant 2 1/2" S.M.S
Vandal Resistant 5/8" S.M.S
3
4
CEILING HUNGPILASTER/WALLASSEMBLY
One Ear Wall Bracket
Pilaster/Wall Hardware Kit (P/N 40-8515210G) Includes:CHROME PLATED ZAMAC
PART ID.
1
2
DESCRIPTION
(2)
Pilaster/Wall Hardware Kit (P/N 40-8265211G) Includes:STAINLESS STEEL
4
4
4
4
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 21
CEILING-HUNGPOWDER COATED / STAINLESS STEEL
4 1
NOTE:Replace Vandal Resistant 2 1/2" SMSWith Vandal Resistant 5/8" SMSTo Fasten Pilaster To Panel.
Vandal Resistant 5/8" S.M.S
Vandal Resistant 2 1/2" S.M.S
6
44
633
55
1
4
SEE PAGE 8FOR DOORAPPLICATION
144
33
SEE SHOPDRAWINGS FORPILASTER TOWALL SPACING
43
3
55
33
4
1
4
5
Plastic Shields (4)
(8)
(4)
(P/N 40-8515210G) Includes:CHROME PLATED ZAMAC
(P/N 40-8515010G) Includes:CHROME PLATED ZAMAC
Vandal Resistant 2 1/2" S.M.S
Vandal Resistant 5/8" S.M.S
Note:Replace P/N#40-8515010G with P/N#40-8515020Gfor two ear locations.
PART ID.
3
6
DESCRIPTION
One Ear Wall Bracket
5
3
4 Plastic Shields
CEILING HUNGPILASTER/PANEL ALCOVEASSEMBLY
2
1
PART ID.
"U" Bracket
One Ear Bracket
DESCRIPTION
QTY
(2)
(12)
(4)
(4)
(2)
(2)
QTY
FLAT STRIKE& KEEPER#8263100FIGURE A
FIGURE A
PILASTERSIDE
(P/N 40-8265011G) Includes:STAINLESS STEEL
(P/N 40-8265211G) Includes:STAINLESS STEEL
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 22
5
5
5
5
5
5
5
5
5
5
5
5
CEILING-HUNGPOWDER COATED / STAINLESS STEEL
STEP 1LAYOUTFLOOR AND CEILING ANCHORED
STEP 2WALL BRACKETS AND FLOOR BRACKETS
A. Drill holes for wall brackets and floor fastenings of appropriate size for particular fastening devices supplied. Typically 1/4" drill bits can be used throughout.
B. Insert anchoring devices in walls and secure wall brackets.
C. Insert anchors and ceiling bolts. Position shoe clips and "L" brackets . Details in STEP 5.
(Note ceiling "L" brackets engraved for identification)
A. Place panel on a support, 12" above the floor.
B. Set it into wall brackets,but do not fasten panel at this time.
STEP 3POSITION PANEL
17"
FIGURE 3
PILASTERCENTER LINE
FLOORFASTENERLOCATIONS
48"
WALL PILASTERCENTER LINE
PANELCENTER LINE
CEILINGFASTENERLOCATIONS
PILASTERCENTER LINE
FIGURE 2
17"
48"
17"
48"
FIGURE 1
A. Review the layout drawings and package lists that have accompanied this job.
B. Before proceeding,confirm that backing of walls and floor is adequate to support secure mounting of the toilet compartment units.
C. Establish and mark pilaster center line from back wall.
D. Establish and mark panel center lines for wall brackets.
E. Establish pilaster floor and ceiling fastener locations from side wall according to shop drawings. (Note fasteners are located roughly 1" from lockstrip edge of pilaster.)
F. Mark wall bracket holes using brackets as templates.
12" SUPPORT
17"
48"
LCLCLC
LCLCLC
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 23
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
A. Plumb each pilaster by adjusting self tapping screws at top & bottom to desired position & tighten.
B. Fasten the pilaster to panel using sheet metal screws.
C. Establish door openings by setting pilaster to desired position. (Refer to layout drawings)
D. Slide stainless steel shoe up to ceiling level & down to floor level, firmly engaging shoe clips.
E. Fasten panel to wall brackets using sheet metal screws.
F. Remove panel support device.
NOTE:STRUCTURAL STEEL BYOTHERS
A. Slide stainless steel shoescarefully over mounting ends ofpilaster and leave approximately 5"space from end.
B. Place pilaster between "L"brackets adjust jack leveling boltand fasten loosely with screws atpredrilled locations at each side.
STEP 5INSTALL PILASTERS
FIGURE 5
LCA. Align U-brackets in position on rear of pilasters.Refer to layout drawings.
B. Fasten U-brackets to pilaster with sheet metal screws.
C. Pilasters at wall do not require U-brackets,but should be prepared for wall (floor & ceiling fastening) as required by compartment layout.
STEP 4PILASTER PREPARATION
FIGURE 4REAR
FRONT
STEP 6SECURING PILASTERS TO PANELS
FIGURE 6
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 24
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
4 1
FIGURE B
5
5"(APPROX.)2
5"(APPROX.)
DIMENSIONTO SUITINSTALLATION
33
NOTE:Use Only TwoVandal Resistant 5/8" SMSTo Diagonally Fasten U-bracket To Pilaster.
FIGURE B
52
5
55
DIMENSIONTO SUITINSTALLATION
2
FIGURE A
4DIMENSIONTO SUITINSTALLATION
5
DIMENSIONTO SUITINSTALLATION
5"(APPROX.)
144
33
5"(APPROX.)
4
FIGURE A
5
5
5
51
4
FLOOR AND CEILING ANCHOREDPANEL TO PILASTER/WALLTWO EAR ASSEMBLY
Fasten pilaster to panel using sheet metal screws.
Pilasters must be both plumb and level.(do not fasten at this time)
Establish bottom door openings by adjustingpilaster and tightening screws.(Refer to step 6)
Panel Hardware Kit (P/N 40-8265021G) Includes:STAINLESS STEEL
PART ID.
Panel Hardware Kit (P/N 40-8515020G) Includes:CHROME PLATED ZAMAC
5
3
4
2
1
Vandal Resistant C/P 5/8" S.M.S (12)
Vandal Resistant C/P 2 1/2" S.M.S
Plastic Shields
"U" Bracket
(4)
(4)
(2)
Two Ear Bracket
DESCRIPTION
(2)
QTY
5
5
5
5
5
5
5
5
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 25
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
DIMENSIONTO SUITINSTALLATION
FIGURE B
5"(APPROX.) 2
FIGURE B
5
5"(APPROX.)
DIMENSIONTO SUITINSTALLATION
33
144
5
FIGURE A
DIMENSIONTO SUITINSTALLATION
2
5"(APPROX.)
33
DIMENSIONTO SUITINSTALLATION
5"(APPROX.)44 1
FLOOR AND CEILING ANCHOREDPANEL TO PILASTER/WALLONE EAR ASSEMBLY
Fasten pilaster to panel using sheet metal screws.
Pilasters must be both plumb and level.(do not fasten at this time)
Establish bottom door openings by adjustingpilaster and tightening screws.(Refer to step 6)
PART ID.
5
3
4
2
1
Vandal Resistant 5/8" S.M.S (12)
Panel Hardware Kit (P/N 40-8265011G) Includes:STAINLESS STEEL
Vandal Resistant 2 1/2" S.M.S
Plastic Shields
"U" Bracket
(4)
(4)
(2)
DESCRIPTION
One Ear Bracket
QTY
(2)
Panel Hardware Kit (P/N 40-8515010G) Includes:CHROME PLATED ZAMAC
FIGURE A
NOTE:Use Only Two Vandal Resistant 5/8"To Diagonally Fasten U-bracket To Pilaster.
52
5
55
4
5
1
33
5
4
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 26
5
5
5
5
5
5
5
5
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
3 1
22
FIGURE A
3
SEE SHOP DRAWINGS FORPILASTER TO WALL SPACING
22
3 13
FLOOR AND CEILING ANCHOREDPILASTER/WALLASSEMBLY
Fasten pilaster to panel using sheet metal screws.
Pilasters must be both plumb and level.(do not fasten at this time)
Establish bottom door openings by adjustingpilaster and tightening screws.(Refer to step 6)
PART ID.
4
3
2
1
Pilaster/Wall Hardware Kit (P/N 40-8265211G) Includes:STAINLESS STEEL
Vandal Resistant 5/8" S.M.S
Plastic Shields
(8)
(4)
Vandal Resistant 2 1/2" S.M.S
One Ear Wall Bracket
DESCRIPTION
(4)
(2)
QTY
Pilaster/Wall Hardware Kit (P/N 40-8515210G) Includes:CHROME PLATED ZAMAC
ALTERNATENOTE:Replace vandal Resistant 2 1/2" SMSWith Tamper Resistant 5/8" SMSTo Fasten Pilaster To Panel.
4
4
4
41
FIGURE A
4
22
341
3
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 27
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
KNOCK OUTWITH PLIERS
SEE PAGE 8FOR DOORAPPLICATION
3 1
DIMENSIONTO SUITINSTALLATION
FIGURE A
STEP 2
6
35"(APPROX.)
32
2
775
ATTACH TOPANEL
7
ATTACH TOPILASTER
STEP 1
5
22
2DIMENSIONTO SUITINSTALLATION
336
2
7
KNOCK OUTWITH PLIERS
FIGURE A5 7
SEE SHOPDRAWINGS FORPILASTER TOWALL SPACING
35"(APPROX.)
5
22
7
3 13
FLOOR AND CEILING ANCHOREDPILASTER/PANEL ALCOVEASSEMBLY
NOTE: Use 40-8517320G for two ear alcove.
Alcove Hardware Kit (P/N 40-8267311G) Includes:STAINLESS STEEL
Alcove Hardware Kit (P/N 40-8517310G) Includes:CHROME PLATED ZAMAC
8
7
6
5
2
4
3
1
PART ID.
Bracket Headrail Satin "F" Zamac (NOT USED FOR FTC) (1)
1" One Ear Wall Bracket
Vandal Resistant 1" S.M.S
Alcove Clip
(4)
(2)
(2)
(10) Vandal Resistant 2 1/2" S.M.S
Vandal Resistant 5/8" S.M.S
Plastic Shields
(14)
(10)
1 1/4" One Ear Wall Bracket
DESCRIPTION
(2)
QTY
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 28
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
TO EASE INSTALLATION, BOTTOMCLIP SHOULD BE ATTACHED TO PANELBEFORE SETTING ON PILASTER.
OPTIONALTwo Vandal Resistant 5/8" SMSMay be Used (But Not Recommended)To Fasten brackets To Panel.
FLOOR AND CEILING ANCHOREDPILASTER/PANEL/PILASTER INLINEASSEMBLY
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 29
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
OPTIONAL FULL HEIGHTPANEL TO PILASTER/WALLTWO EAR ASSEMBLY
DESCRIPTION
Panel Hardware Kit (P/N 8446020) Includes:ALUMINUM FULL HEIGHT
PART ID. QTY
Panel Hardware Kit (P/N 8266020) Includes:STAINLESS FULL HEIGHT
2171 Liberty Hill Rd.,Eastanollee, GA 30538 Phone:(706)827-2700 Fax:(706)827-2710Website: www.globalpartitions.com Email: [email protected] Page 30
FLOOR TO CEILINGPOWDER COATED / STAINLESS STEEL
hole location tosuit installation
(12) 5 Vandal Resistant 2 1/2" S.M.S
7 Vandal Resistant 5/8" S.M.S
6 Plastic Shields
(12)
(12)
4 Vandal Resistant Barrel Nut
2
3 Vandal Resistant Step Bolts 1" Long
"U" Bracket
(12)
(1)
(12)
1 Two Ear Bracket (1)
3 55
466 5
66
3 5
6 46
3 55
4
4
3 55
66 1
3
7 4
3
7 4
7
3
4
3
7 42
Optional Panel Kit (P/N 8XX 6010) Includes:(1) Ear Bracket
2171 Liberty Hill Rd. Eastanollee, GA 30538 Phone:(706) 827-2700 Fax:(706) 827-2710Website: www.globalpartitions.com Email: [email protected]
Under no circumstances should these components besubjected to:
*Abrasive powders or pads*Water closet cleaners*Ceramic tile cleaners
*Solutions containing more than 1% by volume ofammonia
*Solutions containing acids or lye*Solutions containing enzymes
Attention to work progress during new construction orrenovation is important.
Other trades and cleaning services may use agents forceramics and tiles that will damage these components
In order to provide toilet partitions with thecare and maintenance, the following instructions
must be followed.
A. All surfaces must be kept clean with water and amild soap solution only.
B. In order to provide toilet partitions with the propercare and maintenance, the above instructions must be
followed.
WARNING
CARE AND MAINTENANCE OFTOILET PARTITIONS
Page 31