installation instructions bolt offset p2b 56636 (p2b-bo-ls)
DESCRIPTION
Take a load off using of the four styles of OWT Post to Beams by resting your beam on the ledge before you attach the adjustable compression plate.TRANSCRIPT
![Page 1: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/1.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
Typical Installation withTimber Bolts (sold separately)
Laredo Sunset shown
Installation Instructions,56636 Bolt Offset (P2B-BO-LS)51736 Bolt Offset (P2B-BO-IW)
Installation Instructions, 56636 1
![Page 2: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/2.jpg)
![Page 3: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/3.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
2 great styles
Same functionality
choose your connection lifestyle
both styles available for most products
Ironwood(517XX series)
Laredo Sunset(566XX series)
Laredo Sunset & Ironwood
Laredo Sunset & Ironwood
3
![Page 4: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/4.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
1.47 MIN1.88 MAX
kit contains 2 assemblies (shown)
314
12.35
note hole location difference between 2
included plates
5663614Installation Instructions, 56636
1275.00
![Page 5: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/5.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
1.50 MIN2.00 MAX
1275.00
kit contains 2 assemblies (shown)
305
12.00
note hole location difference between 2
included plates51736
14Installation Instructions, 56636
![Page 6: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/6.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
Suggested Tools(others may be required)Installation Instructions, 56636 6
![Page 7: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/7.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
note: drill hole BEFORE step 1
56623 option(sold separately)
optional accessory7Installation Instructions, 56636
![Page 8: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/8.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
safe zone for optional temporary hardware
= =
Tool Required3/8" Driver
(HCN) provided
(OWT Timber Screw)provided
step 1Installation Instructions, 56636 8
pencil
repeat on side
beamwidth
optional screw or nail temporary hardware
![Page 9: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/9.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
temporarily install plates and mark center of holes
Prevent Unsightly Breakoutsdrill most of the way from one side DO NOT breakout then repeat from opposite side
step 2Installation Instructions, 56636 9
![Page 10: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/10.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
OWT Timber Bolt(sold separately)
step 310Installation Instructions, 56636
Tool Required3/8" Driver
(HCN) provided
(OWT Timber Screw)provided
![Page 11: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/11.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
Additional Construction Technique11Installation Instructions, 56636
polyurethane between boards
![Page 12: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/12.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
optional 2" Timber Bolt Heavy Duty Washer (OWT-TBW-2)#56680
Additional Construction Technique12Installation Instructions, 56636
![Page 13: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/13.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
ITEM NO. QTY. PART
NUMBER DESCRIPTION
1 1 6x6 Cedar Post 6x6x24.00
2 4 2x8 Cedar Board 2x8x12.00
3 1 56608 6x6 Post Base Kit (6X6-PB-LS)
4 1 56636
5 2 56650 OWT Timber Bolt 6-8"
6 0.48 56627 OWT Timber Screw 3-3/4"
6
2
13
4
5
Additional Construction Technique13Installation Instructions, 56636
![Page 14: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/14.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 5/3/2017 . This information is updated periodically and should not be relied upon after 2 years from 5/3/2017 . Please visit OZCOBP.com to get current information.
pencil
mark ledge location
Y
set saw cut depth;start cuts 1/4" from top
Dato cut for 4x lumber14Installation Instructions, 56636
multiple cuts approximately 1/4"
apart to mark
remove pieces
![Page 15: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/15.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 6/14/2017 . This information is updated periodically and should not be relied upon after 2 years from 6/14/2017 . Please visit OZCOBP.com to get current information.
4x
4x Beam Installation3 style choices•When 4x lumber not available •or cost effectivesee subsequent pages for •details on each style
see product installation instructions for hardware installation
Ian's Concept
Ian's Concept 1
2x Stagger 2x Sandwich
![Page 16: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/16.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 6/14/2017 . This information is updated periodically and should not be relied upon after 2 years from 6/14/2017 . Please visit OZCOBP.com to get current information.
no post cuts
polyurethane adhesive, clamp & nail
3" nail as desired
2x Stagger2Ian's Concept
![Page 17: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/17.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 6/14/2017 . This information is updated periodically and should not be relied upon after 2 years from 6/14/2017 . Please visit OZCOBP.com to get current information.
dato cut (2 sides)
X - 1.75”
Y
X
Y
polyurethane adhesive, clamp & nail
nail as desired
2x SandwichIan's Concept 3
![Page 18: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/18.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 6/14/2017 . This information is updated periodically and should not be relied upon after 2 years from 6/14/2017 . Please visit OZCOBP.com to get current information.
dato cut (2 sides)
X – 1.75”
Y
Y
X
4xIan's Concept 4
![Page 19: Installation Instructions Bolt Offset P2B 56636 (P2B-BO-LS)](https://reader031.vdocuments.us/reader031/viewer/2022020201/568c55881a28ab4916c32be3/html5/thumbnails/19.jpg)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 6/14/2017 . This information is updated periodically and should not be relied upon after 2 years from 6/14/2017 . Please visit OZCOBP.com to get current information.
set saw cut depth;start cuts 1/4" from top
remove pieces
pencil
mark ledge location
Y
multiple cuts approximately 1/4"
apart to mark
Dato cut details5Ian's Concept