insta eib h210x297-1 - knxwarehouse.nl · i a knx/eib data rail is not ... advisable to install...

25
Product documentation KNX IP interface Art.-No.: IPS 100 REG ALBRECHT JUNG GMBH & CO. KG Volmestraße 1 D-58579 Schalksmühle Telefon: +49.23 55.8 06-0 Telefax: +49.23 55.8 06-1 89 E-mail: [email protected] Internet: www.jung.de www.jung-katalog.de Issue: 24.03.2010 64542312 R2

Upload: trinhthuy

Post on 30-Apr-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Product documentation

KNX IP interface Art.-No.: IPS 100 REG

ALBRECHT JUNG GMBH & CO. KG Volmestraße 1 D-58579 Schalksmühle

Telefon: +49.23 55.8 06-0 Telefax: +49.23 55.8 06-1 89 E-mail: [email protected] Internet: www.jung.de www.jung-katalog.de Issue: 24.03.2010

64542312 R2

Page 2: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

Content

1 Product definition 3 ................................................................................................................

1.1 Product catalogue 3 ........................................................................................................... 1.2 Function 3 .......................................................................................................................... 1.3 Accessories 4 ....................................................................................................................

2 Fitting, electrical connection and operation 5 .....................................................................

2.1 Safety instructions 5 .......................................................................................................... 2.2 Device components 6 ........................................................................................................ 2.3 Fitting and electrical connection 7 ..................................................................................... 2.4 Commissioning 11 .............................................................................................................

3 Technical data 12 ....................................................................................................................

4 Software description 13 .........................................................................................................

4.1 Software specification 13 ................................................................................................... 4.2 Software "IP interface 720001" 14 .....................................................................................

4.2.1 Scope of functions 14 ................................................................................................. 4.2.2 Software information 15 ............................................................................................. 4.2.3 Functional description 17 ........................................................................................... 4.2.4 Communication parameters in the ETS 18 ................................................................ 4.2.5 Parameters 22 ............................................................................................................

5 Appendix 24 .............................................................................................................................

5.1 Index 24 .............................................................................................................................

Product documentation

Page 2 of 25

Page 3: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

1 Product definition

1.1 Product catalogue

Product name: IP interface Use: Interface Form Rail-mounted device Art.-No.: IPS 100 REG

1.2 Function This product documentation describes the device with the release code "R2" on the device label. Separate product documentation is available for older device variants (no release code).

The device serves as an interface to KNX installations via Ethernet data networks using the Internet protocol (IP). This allows communication between KNW devices and PCs or other data processing devices.The connection to the KNX is set up using a bus connection terminal. The connection to the data network (IP over 10BaseT) is made using a RJ45 socket. For operation, the device requires an additional AC/DC 24 V power supply. This power supply can be added to the interface via the network cable from "Power over Ethernet" according to IEEE 802.3af. Alternatively, the additional power supply can be drawn from the second terminal block (Recommendation: White-yellow connection terminal) from a safety extra-low voltage AC/DC 24 V or a bus voltage supply (unregulated voltage DC 30 V). When the external voltage supply is connected to the second terminal block, the device switches automatically to this.

The device uses the KNXnet/IP tunnelling standard, meaning that telegrams can be sent to KNX installations via an IP network, allowing bus access from a PC. Even if there is no direct network connection between a PC and the device, KNX installations can be accessed remotely using a LAN modem. LAN modems for analogue telephony, ISDN or DSL are available from retail outlets.

The device can offer the following advantages... - Simple connection to higher-level systems using the Internet protocol (IP), - Direct access to the KNX installation from any point in the IP network (KNXnet/IP

tunneling). - Communication between buildings and sites (e.g. networking of branch offices), - Simple connection of visualisation systems and facility management systems.

The device offers up to 5 KNXnet/IP tunnelling connections, meaning that, for example, visualisation and configuration with the ETS3 are possible simultaneously.A data network can be used to set up a direct connection from a PC in the network to the bus, also via an ObjectServer. Compared with KNXnet/IP tunnelling, an ObjectServer has the advantage that communication is still maintained via such network connections, in which the signal runtime takes longer than a second (e.g. satellite connections).The front of the device has LED displays to signal readiness, KNX communication and IP communication. Due to the supported KNX standard, the device can be configured simply and put into operation via the ETS.

Page 3 of 25

  Product definition

Page 4: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

1.3 Accessories Power supply AC 24V~ Art.-No.: WSSV10

Page 4 of 25

  Product definition

Page 5: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

2 Fitting, electrical connection and operation

2.1 Safety instructions Electrical devices may only be fitted and installed by electrically skilled persons. The applicable accident prevention regulations must be observed. Failure to observe the instructions may cause damage to the device and result in fire and other hazards. Use the safety transformer according to DIN EN 61558-2-6 (VDE 0570 Part 2-6) or bell transformer according to DIN EN 61558-2-8 (VDE 0570 Part 2-8).

Page 5 of 25

  Fitting, electrical connection and operation

Page 6: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

2.2 Device components

picture 1: Device components

(1) KNX bus connection (2) Connection for additional AC/DC 24 V power supply (3) Connection for Ethernet data network / LAN (RJ45 socket) (4) LED "RUN" (green)

Signals readiness (additional power supply switched on). (5) LED "LINE" (yellow)

Lights up briefly when data is received at the KNX bus connection. (6) LED "LK" (green)

Signals an active connection to the IP data network (Ethernet Link). (7) LED "RX" (yellow)

Briefly lit up during reception of valid IP telegrams (Ethernet Receive). (8) LED "TX" (red)

Briefly lights up on transmitting IP telegrams (Ethernet Transmit)If the programming button (10) is actuated, the "TX" LED signals the type of IP address assignment to the device for 10 seconds:1x flash: Fixed IP address2x flash: DHCP3x flash: AutoIP

(9) Programming LED (red) (10) Programming button

Page 6 of 25

  Fitting, electrical connection and operation

Page 7: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

2.3 Fitting and electrical connection

DANGER! Electrical shock when live parts are touched. Electrical shocks can be fatal. Before working on the device, disengage all the corresponding miniature circuit breakers. Cover up live parts in the working environment.

DANGER! The additionally connected low voltage supply is connected to the LAN potential through the device. This means that there is no more insulation to the earth (no SELV!) when the LAN shield is earthed. Do not use any KNX supply voltage as an additional power supply, if a bus line is also connected to this power supply.Recommendation: only use the additional power supply for the device.

Fitting the device o Snap onto DIN rail to DIN EN 60715. Observe the installation position (picture 2). i A KNX/EIB data rail is not required.

Connecting the device for the bus line and power supply o Connect the bus (standard bus terminal) and the connection of the power supply according

to the connection diagrams. Power supply either from the network cable "Power over Ethernet" according to IEEE 802.3af - or through the external power supply via the second terminal block (Recommendation: White-yellow connection terminal). When the external voltage supply is connected, the device switches automatically to this.

Page 7 of 25

  Fitting, electrical connection and operation

Page 8: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

picture 2: Electrical connection of the bus line and the external power supplyConnection example with additional power supply (e.g. suitable bell transformer)

Page 8 of 25

  Fitting, electrical connection and operation

Page 9: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

picture 3: Electrical connection of the bus line and the external power supplyConnection example with KNX bus voltage supply

(11) IP interface (12) Separate SELV power supply (e.g. suitable bell transformer or accessories) (13) Ethernet connection point (e.g. switch, router or PC) (14) Ethernet connection cable (e.g. Patch cable) (15) KNX power supply

o Connect the external power supply AC/DC 24 V to the connection terminal (2). Recommendation: Use the white-yellow connection terminal.

o Connect the KNX bus line to the red and black bus terminal (1). o IP connection with RJ45 connector plugged into RJ socket (3). i There is a physical connection to the data network when the green LED "LK" (6) is lit up

permanently.If the yellow LED "RX" (7) is lit up, the device is receiving data from the network.If the red LED "TX" (8) is lit up, the device is transmitting data to the network.

i Depending on application, access requirements, data security and data volume it may be advisable to install independent network paths for individual services using the IP network.

Page 9 of 25

  Fitting, electrical connection and operation

Page 10: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

i The KNX bus connection and the terminal block for the external power supply are galvanically separated from the Ethernet connection.

Page 10 of 25

  Fitting, electrical connection and operation

Page 11: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

2.4 Commissioning Loading the physical address and application software The commissioning of the device is basically confined to programming of the physical address and the application data with the ETS. Project planning and commissioning of the device using the ETS 2, Version 1.2 or higher. The device is connected and ready for operation. An appropriate device must be created and configured in the ETS project. o Activating Programming mode: press the programming button (10) (picture 1).

The programming LED (9) is illuminated. o Program the physical address with the help of the ETS.

The programming LED goes out. o Write the physical address on the device label. o Load the application data into the device using the ETS.

i The IP address is loaded into the device as a parameter together with the application data or is assigned automatically by a DHCP service. If the DHCP function is activated and the DHCP service is missing, then the device automatically assigns itself an IP address using AutoIP.

i After commissioning, the device can be restored to the delivery state by switching on the external power supply and pressing and holding down the Programming button for longer than 6 seconds. The transition to the delivery state is displayed by the Programming LED flashing rapidly. This operation causes all the parameter settings to be deleted.

Assigning additional physical addresses For communication via KNXnet/IP tunnelling and ObjectServer, the device must use a virtual physical address for each connection. These additional physical addresses may not be identical to the physical address of the device and may not be used by any other bus device. In the ETS, the virtual physical addresses should be assigned to dummy devices.The additional addresses for the KNXnet/IP tunnelling can be assigned either manually in the ETS using the communication settings (see chapter 4.2.4. Communication parameters in the ETS) or automatically by the device itself. Addresses are assigned automatically by pressing the Programming button on the device. o With the power supply switched on, press the Programming button (10) for between 5 and

10 seconds. The red programming LED (9) flashes. The device sporadically selects physical addresses and checks whether the addresses in the bus line are still free. The device automatically assigns up to 5 virtual physical addresses in this way. The programming LED goes out at the end of the operation.

i If additional bus devices are added to the installation at a later time, one or all of the virtual physical addresses may be assigned twice. In this case, the automatically assigned addresses must be deleted. Deletion takes place automatically when the Programming button (10) on the device is pressed for longer than 10 seconds. All the addresses are then set to the default value 15.15.255 and the programming LED goes out (9). New address assignment is then possible.

Page 11 of 25

  Fitting, electrical connection and operation

Page 12: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

3 Technical data  

General Ambient temperature -5 ... +45 °C Storage/transport temperature -25 ... +70 °C Relative humidity 5 ... 93 % (No moisture condensation) Fitting width 36 mm / 2 modules Weight approx. 100 g

KNX "BUS" supply KNX medium TP 1 Commissioning mode S mode Rated voltage KNX DC 21 V ... 32 V SELV Current consumption KNX max. 10 mA Connection mode KNX Connection terminal

External supply Rated voltage AC 12 ... 24 V SELV Rated voltage DC 12 ... 30 V SELV Power consumption max. 1.7 W Connection of power supply Connection terminal

Power-over-Ethernet power supply Power over Ethernet IEEE802.3af Rated voltage DC 48 V Power consumption max. 0.8 W

IP IP connection mode RJ45 socket IP communication Ethernet 10BaseT IP transmission rate 10 Mbit/s Protocols ARP, ICMP, IGMP, UDP/IP, DHCP KNXnet/IP Core, Tunneling, Device Management

Page 12 of 25

  Technical data

Page 13: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

4 Software description

4.1 Software specification ETS search paths: Communication / IP / IP interface

Configuration: S-mode standard PEI type: "00"Hex / "0" Dec PEI connector: No connector

Application program:

No. Short description Name Version from mask version

1 Data interface KNXnet/IP IP interface 720001 0.1 1.2

Page 13 of 25

  Software specification

Page 14: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

4.2 Software "IP interface 720001" 4.2.1 Scope of functions - Simple connection to higher-level network systems using the Internet protocol (IP), - Direct access to the KNX installation from any point in the IP network (KNXnet/IP

tunnelling). Use as a data interface to program KNX bus devices or to record telegrams (no bus monitor mode) from ETS 3.0c or higher.

- Simple connection of visualisation systems and facility management systems. - Communication between buildings and sites (e.g. networking of sites). - Simple parameter configuration and commissioning (device programming via the bus)

using ETS 2, Version 1.2 or higher, or ETS 3.

Page 14 of 25

Software "IP interface 720001" Scope of functions

Page 15: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

4.2.2 Software information

ETS Using the device:ETS 3 (Version 3.0c or higher) permits the configuration of KNX installations via the existing IP data network, by using the device with the KNXnet/IP protocol as a standard serial RS232 or USB data interface for communication with the bus. This also includes the download of bus devices or the function of the group bus monitor (no support of bus monitor mode). In older versions of ETS 3 or in ETS 2, the device cannot be used as data interface.The data interface is configured in the ETS using a dialog for setting the communication parameters. The virtual physical address for KNXnet/IP tunnelling can also be assigned automatically during commissioning .

i With some versions of ETS 3, it may occur that, after installing the communication driver and enabling the communication interface, a Windows error message will appear, stating that the "Class" is unknown. In this case, install the Microsoft .NET Framework, which can be downloaded from the Microsoft Update website (file size: approx. 25 MB).

i Unloading from the device using the ETS may terminate with the error message "An internal error has occurred". Then no other bus subscriber can be programmed using the device. On checking the "Settings" in the menu "Tools -> Options -> Communication" the error message "Serious Error" appears. To eliminate the error, either select a different interface or exit the ETS and restart it.

i Should the communication with the bus fail in an existing KNXnet/IP tunnelling connection, then no connection to the bus can be set up, even when the bus voltage returns. Attempts to program will fail. In such cases, either select a different interface or exit the ETS. Only afterwards will it be possible to set up a connection using the previously used IP device. The same behaviour occurs if the power supply to the device fails.

i If the device is used as the active data interface and the internal application program of the device is loaded via the bus, then the ETS error message "Cannot find the device with the physical address %1" will appear. The download is not carried out. Either select a different interface or exit the ETS first. Only afterwards will it be possible to set up a connection using the previously used IP device.

Configuring the device in the ETS:The ETS application program of the device has several parameters for device and IP configuration (see chapter 4.2.5. Parameters). During commissioning, the application program must be loaded into the device using the ETS (see chapter 2.4. Commissioning). It is possible to configure the parameters and load the application into the devices via the bus from ETS 2, Version 1.2.

i The ETS 3 driver does not support the bus monitor and download to local device functions. When a local download to the device is attempted, the following message appears: "Incompatible BCU Version $091A ($0012 required)".

Delivery state When delivered, the physical addresses of the device are preset to 15.15.255. The IP address is assigned automatically by DHCP. If there is no DHCP server in the data network, then the device will assign itself an IP address using AutoIP.

After commissioning, the device can be restored to the delivery state by switching on the external power supply and pressing and holding down the Programming button for longer than 6 seconds. The transition to the delivery state is displayed by the Programming LED flashing rapidly. This operation causes all the parameter settings to be deleted.

Page 15 of 25

Software "IP interface 720001" Software information

Page 16: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

Note on this product documentation This product documentation describes the device with the release code "R2" on the device label. Separate product documentation is available for older device variants (no release code).

Page 16 of 25

Software "IP interface 720001" Software information

Page 17: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

4.2.3 Functional description Use and configuration

A direct connection between a PC or other data processing devices (e.g. visualisations) in the network can be set up for KNX installation using an IP data network and the device. This means that it is possible to access the bus from any point in the IP data network.ETS 3 (Version 3.0c or higher) permits the configuration of KNX installations via the existing IP data network, by using the device with the KNXnet/IP protocol as a standard serial RS232 or USB data interface for communication with the bus. This also includes the download of bus devices or the function of the group bus monitor (no support of bus monitor mode).The data interface is configured in the ETS 3 using a dialog for setting the communication parameters.

Assignment of the IP addresses

The IP addresses of the device are assigned in the ETS configuration or automatically by a DHCP service in the IP network. Assignment by a DHCP service allows changes to the IP addresses without device configuration using the ETS. If no DHCP service is available, then the device will search for its own IP address (AutoIP).If there are questions regarding the setting of the IP parameters of the device or the DHCP, then please contact the local network administrator. i If the Programming button is pressed on the device, the "TX" LED signals the type of IP

address assignment to the device for 10 seconds:1x flash: Fixed IP address2x flash: DHCP3x flash: AutoIP

Page 17 of 25

Software "IP interface 720001" Functional description

Page 18: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

4.2.4 Communication parameters in the ETS For communication via KNXnet/IP tunnelling and ObjectServer, the device must use a virtual physical address for each connection. These additional physical addresses may not be identical to the physical address of the device and may not be used by any other bus device. In the ETS, the virtual physical addresses should be assigned to dummy devices.The additional addresses for the KNXnet/IP tunnelling can be assigned either manually in the ETS using the communication settings or automatically by the device itself (see page 11). Run through the following three steps to configure the communication interface in the ETS 3...

1.Firstly, start the ETS and open the Options dialog of the communication properties. Do this with the program menu "Tools -> Options -> Communication" (picture 4).

picture 4: Options dialog of the communication properties of ETS3

2.Select the "Configure interface" button. The "ETS Connection Manager" window opens (picture 5).

Page 18 of 25

Software "IP interface 720001" Communication parameters in the ETS

Page 19: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

picture 5: ETS Connection Manager

3.Create a new connection. Then press the "New" button. Give the new connection a unique name. Select "Eibnet/IP" as the type (picture 6). Then ETS will search the IP data network automatically for available IP communication devices.

picture 6: Creating the new connection as EIBnet/IP

Page 19 of 25

Software "IP interface 720001" Communication parameters in the ETS

Page 20: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

4.The "Eibnet/IP device" device list contains all the KNX IP devices found in the IP network (picture 7). The device name and the IP address are displayed. The (P) behind this data indicates an activated Programming mode. In this way, individual KNX IP device can be identified in a targeted manner, even in large systems. In the device list, select that device which is to work as the "Device interface" in the configured connection. Clicking the "Rescan" button causes the ETS to start an additional scan, which will then rescan the IP network for KNX IP devices.Then, the configuration of the new connection can be completed by clicking the "OK" button. The communication parameters should remain unchanged.

picture 7: Device list under Communication Parameters with all the KNX IP devices found

5.For stable communication via KNXnet/IP tunnelling, the device must have a virtual physical address for each connection (similar to the local physical address with a RS232 or USB connection). For this, select the new KNXnet/IP connection as the interface in the Options dialog of the Communication parameters (picture 8) and click the "Settings" button.

Page 20 of 25

Software "IP interface 720001" Communication parameters in the ETS

Page 21: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

picture 8: Select the KNXnet/IP communication interface and open the settings

6.The settings of the local interface open (picture 9). The physical address of the IP data interface must now be entered in the "Physical address" box. Ensure that the address is not used by another device in the ETS project, (if necessary, carry out test using ETS "Is this address free?"). After successful address assignment, a dummy device should be inserted in the correct topological point in the ETS project.The physical address "15.15.255" is preset in the delivery state. Clicking the "OK" button terminates the configuration of the IP data interface. The IP connection can then be used.

picture 9: Settings of local communication device

Page 21 of 25

Software "IP interface 720001" Communication parameters in the ETS

Page 22: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

4.2.5 Parameters

Description Values Comment h General

Device name(max. 30 characters)

30-character text,IP interface

This parameter gives the device a unique name of maximum 30 characters, used for detection of the device when searching with a KNXnet/IP visualisation or the ETS.

IP address assignment This parameter specifies the type of IP address assignment.

From DHCP service The necessary IP addresses are assigned to the device by a DHCP server available in a network.

Manual input The necessary IP addresses must be set manually in the ETS. The parameter pages "IP Config 1" and "IP Config 2" are enabled.

i The necessary setting should be agreed with the responsible network administrator.

h IP Config 1

IP address

Byte 1Byte 2Byte 3Byte 4

0...255, 00...255, 00...255, 00...255, 0

With manual IP address allocation, the IP address of the device is set here. The default value for the IP address is 0.0.0.0. This prespecification must be replaced with a valid IP address.

The four bytes of the IP address are set individually. When combined, this produces the known dot notation of an IP address:Byte 1 . Byte 2 . Byte 3 . Byte 4.

IP subnet mask

Byte 1Byte 2Byte 3Byte 4

0...255, 00...255, 00...255, 00...255, 0

With manual IP address allocation, the IP subnet mask of the device is set here. The default value for the subnet mask is 0.0.0.0. This prespecification must be replaced with a valid subnet mask. Valid subnet masks are, for example, 255.255.255.0 or 255.255.240.0.

The four bytes of the subnet mask are set individually. When combined, this produces the known dot notation of a subnet mask:Byte 1 . Byte 2 . Byte 3 . Byte 4.

h IP Config 2

Page 22 of 25

Software "IP interface 720001" Parameters

Page 23: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

IP Standard Gateway

Byte 1Byte 2Byte 3Byte 4

0...255, 00...255, 00...255, 00...255, 0

With manual IP address allocation, the IP address of the gateway is set here. The default value for the IP address is 0.0.0.0. This prespecification must be replaced with a valid IP address.

The standard gateway (e.g. a DSL router) is used to transmit IP telegrams addressed to a computer outside the local network. If the device is to be neither configured nor function with a standard gateway, then the prespecified (invalid) address should be used (0.0.0.0).

The four bytes of the IP address are set individually. When combined, this produces the known dot notation of an IP address:Byte 1 . Byte 2 . Byte 3 . Byte 4.

Page 23 of 25

Software "IP interface 720001" Parameters

Page 24: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

5 Appendix

5.1 Index

B bus line .. ................................................ 8-9

C connection .. ........................................... 7

D Delivery state .. ....................................... 15

E ETS .. ................................................... 15ETS search paths .. ................................ 13

F Fitting the device .. ................................. 7

I IP connection .. ....................................... 9

L Loading the physical address .. .............. 11

P power supply .. ....................................... 7

Art.-No.: IPS 100 REG Page 24 of 25

  Appendix

Page 25: Insta EIB H210x297-1 - knxwarehouse.nl · i A KNX/EIB data rail is not ... advisable to install independent network paths for individual services using the IP ... assignment is then

Art.-No.: IPS 100 REG

ALBRECHT JUNG GMBH & CO. KG Volmestraße 1 D-58579 Schalksmühle

Telefon: +49.23 55.8 06-0 Telefax: +49.23 55.8 06-1 89 E-mail: [email protected] Internet: www.jung.de www.jung-katalog.de

Page 25 of 25

  Appendix