inspection & testing plan_piping job

8
attachment-1 piping PP-QC-GG-004 Rev. 0 Page 1 of 8 Logo Perusahaan "X" DISCIPLINE = PIPING WORK DOCUMENT NO = PP-QC-GG-004 LEGEND: "H" = HOLD POINT " W " = WITNESS INSPECTION " SW " = SPOT WITNESS "A" = APPROVAL DOCUMENT " R " = REVIEW AND COMMENT " D " = VERIFICATION BY REPORT NO ACTIVITY/PROCESS DESCRIPTION QUALITY CONTROL ACTIVITY ACCEPTANCE CRITERIA CONTR COMPANY MIGAS 1 PIPING INSTALLATION 1.1 Material a Material identification and surface qua Confirm colour coding Mill Certificate SP-PI-PP-001 W SW API 5L 1.2 Receiving and storage Confirm storage material PP-CO-GG-007 SP-PI-PP-002 W SW 1.3 Preparation SP-PI-PP-001 ANSI B31.1, ANSI B31.3 SP-PI-PP-002 ANSI B31.8, WPS a Cutting Visual inspection PP-PI-PP-008 W SW PP-PI-PP-009 b Edge preparation Visual inspection W SW c Preheat Visual inspection W SW d Alignment Visual inspection W SW e Tack welding Visual inspection W SW 1.4 Welding PP-PI-PP-013 ANSI B31.1, ANSI B31.3 PP-PI-PP-014 ANSI B31.8, WPS, API 1104 a WPS/PQR Qualification test Witness Inspection W W A W b Welder Qualification test Witness Inspection W W A W 1.5 Visual Inspection of weldments Visual inspection WPS, API 1104 W SW 1.6 Post Weld Heat Treatment Witness Inspection WPS, API 1104 W W 1.7 Hardness Test Witness Inspection WPS, API 1104, ANSI B31. W W ANSI B31.1, ANSI B31.3 ASME IX INSPECTION & TEST PLAN AT FIELD QUALITY CONTROL PROCEDURE REFERENCE THI PAR

Upload: chandrasitorus1304

Post on 31-Aug-2015

3 views

Category:

Documents


2 download

TRANSCRIPT

Attachment ITP at Field

piping INSPECTION & TEST PLAN AT FIELDLogo Perusahaan "X"DISCIPLINE=PIPING WORKDOCUMENT NO=PP-QC-GG-004LEGEND:"H" =HOLD POINT" W " = WITNESS INSPECTION" SW " = SPOT WITNESS"A" =APPROVAL DOCUMENT" R " = REVIEW AND COMMENT" D " = VERIFICATION BY REPORTNOACTIVITY/PROCESS DESCRIPTIONQUALITY CONTROL ACTIVITYQUALITY CONTROL PROCEDURE REFERENCEACCEPTANCE CRITERIACONTRCOMPANYMIGASTHIRD PARTY1PIPING INSTALLATION1.1MaterialaMaterial identification and surface qualityConfirm colour codingMill CertificateSP-PI-PP-001WSWAPI 5L1.2Receiving and storageConfirm storage materialPP-CO-GG-007SP-PI-PP-002WSW1.3PreparationSP-PI-PP-001ANSI B31.1, ANSI B31.3SP-PI-PP-002ANSI B31.8, WPSaCuttingVisual inspectionPP-PI-PP-008WSWPP-PI-PP-009bEdge preparationVisual inspectionWSWcPreheatVisual inspectionWSWdAlignmentVisual inspectionWSWeTack weldingVisual inspectionWSW1.4WeldingPP-PI-PP-013ANSI B31.1, ANSI B31.3PP-PI-PP-014ANSI B31.8, WPS, API 1104aWPS/PQR Qualification testWitness InspectionWWAWbWelder Qualification testWitness InspectionWWAW1.5Visual Inspection of weldmentsVisual inspectionWPS, API 1104WSW1.6Post Weld Heat TreatmentWitness InspectionWPS, API 1104WW1.7Hardness TestWitness InspectionWPS, API 1104, ANSI B31.8WWANSI B31.1, ANSI B31.3ASME IX1.8Nondestructive TestingPP-QC-GG-005ASME V, ASME IXPP-PI-PP-013ANSI B31.1, ANSI B31.3aRadiographic ExaminationVisual inspectionPP-PI-PP-014ANSI B31.8WWWbLiquid PenetrantVisual inspectionSWSWWcMagnetic ParticleVisual inspectionSWSWW1.9Weld repairVisual inspectionWWW1.10Traceability (incl welding comsumable) recordsVisual inspectionWSW1.11Bolting and GasketaBolt tighteningVisual inspectionVendor procedureAISC & Manufacture StdWWbBolt coatingVisual inspectionVendor procedureSP-ME-ME-025SWSW1.12Line CheckaLine LayoutVisual inspectionIsometric / P&IDWSWbSize, RatingVisual inspectionIsometric / P&IDWSWcValve, Fitting, Vent and Drain ArrangementsVisual inspectionIsometric / P&IDWSWdSupportsVisual inspectionIsometric / P&IDWSWeHydrotest PackageVisual inspectionIsometric / P&IDWW/A1.13Pressure TestVisual inspectionIsometric / P&IDHH1.14Flushing, Cleanout, and purgeVisual inspectionIsometric/P&IDWW1.15Underground PipingaBlast and coat prior to installationVisual inspectionIsometric/P&IDWSWbPlacement of pipe in trenchVisual inspectionIsometric/P&IDWSWcWire brush and wrap closure weldVisual inspectionIsometric/P&IDWSWdHoliday test coatingVisual inspectionIsometric/P&IDWWeBack fill trenchVisual inspectionIsometric/P&IDWWfFlush/test systemVisual inspectionIsometric/P&IDWW2INSULATION AND JACKET INSTALLATION2.1Before application workManufacture standardSP-PI-PP-005Purchase orderPP-CO-GG-003aCheck material quality and dimensionVisual inspectionApproved drawingSWSWbCheck storage condition of insulation and jacketVisual inspectionWSWmaterial from moisture, water of raincConfirmation of correct insulation and jacketVerificationWSWsystemdCheck piping to be insulated/jacketed on theirVisual inspectionsurface and insulation support2.2During application workManufacture standardSP-PI-PP-005PP-CO-GG-003aWeather conditionVerificationApproved drawingWSWbInsulation/jacket thickness/ number of layerVisual inspectionWSW2.3Final visual checkVisual inspectionManufacture standardSP-PI-PP-005WSWPP-CO-GG-003Approved drawing