Inspection Output (IOR) Generated on 2017.December.08 14:03 Inspection Information Inspection Name Williams - NW Pipeline and Washington State (All U Status PLANNED Start Year 2017 System Type GT Protocol Set ID GT.2016.02 Operator(s) NORTHWEST PIPELINE LLC (13845) Lead Jeffery D Gilliam Team Members Scott A Rukke Observer(s) Brendan Feery Supervisor Kim West Director Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 All Activity End 09/29/2017 Inspection Submitted -- Inspection Approval -- Inspection Summary Purpose of this inspection was to conduct a full II and get the Inspection Scoping Forms completed for all of Williams - Northwest PL (WNW) Units. The team spent a total of sixteen weeks doing a very thorough review of WNW procedures, records, and field assets. There were a number of items found during the inspection that required attention from WNW. All items needing attention were addressed and found satisfactory by the end of the inspection and only one item was noted as a concern. I would recommend a LOC letter for the item of concern. The recommendation is based on the fact that WNW had already identified the valve concern and they have an active program in place to address it by 2019. However, the larger issue as a P&M measure to obtain response times within one hour has not been satisfied and this is where the concern is noted. Scope (Assets) # Short Label Long Label Asset Type Asset IDs Excluded Topics Planned Required Total Inspected Required % Complete 1. Unit 8395 BOISE DISTRICT unit 8395 Plastic pipe Aluminum pipe Copper Pipe Cast or Ductile Iron Offshore GOM OCS Service Line Vault Bottle/Pipe - Holders Storage Fields AMAOP 257 257 257 100.0% 2. Unit 3655 EUGENE DISTRICT unit 3655 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP 257 257 257 100.0% 3. Unit 48785 IDAHO / SPOKANE DISTRICT unit 48785 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore 257 257 257 100.0%

Upload: others

Post on 08-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Inspection Output (IOR) Generated on 2017.December.08 14:03

Inspection Information Inspection Name Williams - NW

Pipeline and Washington State (All U

Status PLANNED

Start Year 2017

System Type GT

Protocol Set ID GT.2016.02

Operator(s) NORTHWEST PIPELINE LLC (13845)

Lead Jeffery D Gilliam

Team Members Scott A Rukke

Observer(s) Brendan Feery

Supervisor Kim West

Director

Plan Submitted 02/22/2017

Plan Approval 02/23/2017 by Kim West

All Activity Start 11/29/2016

All Activity End 09/29/2017

Inspection Submitted --

Inspection Approval --

Inspection Summary Purpose of this inspection was to conduct a full II and get the Inspection Scoping Forms completed for all of Williams - Northwest PL (WNW) Units. The team spent a total of sixteen weeks doing a very thorough review of WNW procedures, records, and field assets. There were a number of items found during the inspection that required attention from WNW. All items needing attention were addressed and found satisfactory by the end of the inspection and only one item was noted as a concern. I would recommend a LOC letter for the item of concern. The recommendation is based on the fact that WNW had already identified the valve concern and they have an active program in place to address it by 2019. However, the larger issue as a P&M measure to obtain response times within one hour has not been satisfied and this is where the concern is noted.

Scope (Assets)

# Short Label Long Label

Asset Type

Asset IDs

Excluded Topics Planned Required

Total Inspected

Required %

Complete

1. Unit 8395 BOISE DISTRICT unit 8395 Plastic pipe Aluminum pipe Copper Pipe Cast or Ductile Iron Offshore GOM OCS Service Line Vault Bottle/Pipe - Holders Storage Fields AMAOP

257 257 257 100.0%

2. Unit 3655 EUGENE DISTRICT unit 3655 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

257 257 257 100.0%

3. Unit 48785 IDAHO / SPOKANE DISTRICT unit 48785 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore

257 257 257 100.0%

Page 2: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

# Short Label Long Label

Asset Type

Asset IDs

Excluded Topics Planned Required

Total Inspected

Required %

Complete GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

4. Unit 48005 KEMMERER DISTRICT unit 48005 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

257 257 257 100.0%

5. Unit 8545 MOAB DISTRICT unit 8545 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

257 257 257 100.0%

6. Unit 48795 OREGON PORTION OF PLYMOUTH DISTRICT

unit 48795 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

257 257 257 100.0%

7. Unit 1305 POCATELLO DISTRICT unit 1305 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

257 257 257 100.0%

8. Unit 4125 VERNAL DISTRICT unit 4125 Storage Fields Bottle/Pipe - Holders

262 262 262 100.0%

Page 3: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

# Short Label Long Label

Asset Type

Asset IDs

Excluded Topics Planned Required

Total Inspected

Required %

Complete Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

9. Unit 8365 WA-UTC/BATTLE GROUND DISTRICT

unit 8365 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe AMAOP

257 257 257 100.0%

10. Unit 8385 WA-UTC/PASCO DISTRICT unit 8385 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe AMAOP Plastic pipe Aluminum pipe

257 257 257 100.0%

11. Unit 3675 WA-UTC/REDMOND DISTRICT unit 3675 Storage Fields Bottle/Pipe - Holders Vault Service Line Offshore GOM OCS Cast or Ductile Iron Copper Pipe Aluminum pipe Plastic pipe

257 257 257 100.0%

12. Unit 8375 WA-UTC/SPOKANE DISTRICT unit 8375 AMAOP Plastic pipe Aluminum pipe Copper Pipe Cast or Ductile Iron OCS GOM Offshore Service Line Vault Bottle/Pipe - Holders Storage Fields

257 257 257 100.0%

Page 4: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

# Short Label Long Label

Asset Type

Asset IDs

Excluded Topics Planned Required

Total Inspected

Required %

Complete

13. Unit 8355 WA-UTC/SUMAS DISTRICT unit 8355 AMAOP Plastic pipe Aluminum pipe Copper Pipe Cast or Ductile Iron OCS GOM Offshore Service Line Vault Bottle/Pipe - Holders Storage Fields

257 257 257 100.0%

a. Percent completion excludes unanswered questions planned as "always observe".

Plans

# Plan Assets Focus Directives

Involved Groups/Subgroups

Qst Type(s) Extent Notes

1. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

n/a SRN.CR, SRN.PD, SRN.DC, SRN.EP, SRN.AR, SRN.MULTI, SRN.FS, SRN.IM, SRN.TQ, SRN.TD, SRN.MO.ABPROCESS.S, SRN.MO.ODORIZE.S, SRN.MO.CLASSLOCATEMAOPREV.S, SRN.MO.MAOPSEGPROTECT.S

-- Detail

2. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

n/a IM.RA.THREATID.P, IM.RA.THREATID.R, IM.RA.RAMOC.P, IM.RA.RAMOC.R, IM.QA.IMMOC.R, DC.MA.NEWPIPE.P, CR.CRMAM.PLANREVIEW.R, MO.GMOPP.PRESSREGCAP.P, MO.GMOPP.PRESSREGCAP.R, MO.GMOPP.PRESSREGTEST.P, MO.GMOPP.PRESSREGTEST.R, FS.CSSYSPROT.RELIEFDISCH.O, FS.CSSYSPROT.CMPRELIEF.R, FS.CSSYSPROT.CMPESDTESTDEV.R, FS.CSSYSPROT.CMPGASDETOM.R, RPT.NR.NOTIFYIMCHANGE.P, RPT.NR.NOTIFYIMCHANGE.R, RPT.RR.SRCR.P, RPT.RR.SRCR.R, RPT.RR.NPMSANNUAL.R, RPT.RR.IMMEDREPORT.P, RPT.RR.IMMEDREPORT.R, TD.ICCG, TD.SP, TD.CPEXPOSED, TD.ICP, TD.SCC, TD.ATM.ATMCORRODEINSP.R, TD.ATM.ATMCORRODEINSP.O, TD.CPMONITOR.DEFICIENCY.R, TD.CPMONITOR.TESTLEAD.P, TD.CPMONITOR.INTFRCURRENT.P, TD.CPMONITOR.TEST.P, TD.CP.ELECISOLATE.R, TD.CP.ELECISOLATE.O, TD.CP.FAULTCURRENT.O, TD.CP.PRE1971.R, TD.COAT.NEWPIPE.P, TD.COAT.EXPOSEINSPECT.O, TD.COAT.EXPOSEREPAIR.P, TD.COAT.NEWPIPE.R

P, R, O Detail

3. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

GT IM Implementation (01/2016)

AR, CR, DC, EP, FS, IM, MO, PD, RPT, SRN, TD, TQ, GENERIC P, R, O, S

Detail

Page 5: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

# Plan Assets Focus Directives

Involved Groups/Subgroups

Qst Type(s) Extent Notes

4. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

n/a EP.ERG.READINESS.O, EP.ERG.INCIDENTANALYSIS.R, EP.ERG.REVIEW.R, EP.ERG.POSTEVNTREVIEW.R, EP.ERG.LIAISON.R, EP.ERG.LOCATION.O, EP.ERG.NOTICES.R

P, R, O, S

Detail

5. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

n/a MO.GOMAOP P, R, O, S

Detail

6. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

n/a AR.SCC.SCCDAREVQUAL.P, AR.SCC.SCCDAREVQUAL.R, AR.SCC.SCCDAREVQUAL.O, AR.SCC.SCCDAPLAN.P, AR.SCC.SCCDADATA.R, AR.SCC.SCCDAMETHOD.R, AR.SCC.SCCDAMETHOD.O, AR.SCC.SCCDANEARNEUTRAL.R, AR.SCC.SCCDAREASSESSINTRVL.R

P, R, O, S

Detail

7. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

n/a PD.OC.TPD.P, PD.OC.TPDONECALL.P, PD.OC.PDPROGRAM.R, PD.PA.EVALPLAN.P, PD.PA.AUDITMETHODS.R, PD.PA.PROGRAMIMPROVE.R, PD.PA.EVALEFFECTIVENESS.R, PD.PA.MEASUREOUTREACH.R, PD.PA.MEASUREUNDERSTANDABILITY.R, PD.PA.MEASUREBEHAVIOR.R, PD.PA.MEASUREBOTTOM.R, PD.PA.EVALIMPL.R

P, R, O, S

Detail

8. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

n/a IM.RA.RADATA.P, IM.RA.RAMETHOD.P, IM.RA.RAFACTORS.P P, R, O, S

Detail

9. Unit 8395, Unit 3655,

n/a MO.GOABNORMAL, MO.GM.ABANDONPIPE.P, MO.GM.ABANDONPIPE.R, MO.GO.SRC.P

P, R, O, S

Detail

Page 6: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

# Plan Assets Focus Directives

Involved Groups/Subgroups

Qst Type(s) Extent Notes

Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

10. Unit 4125 n/a AR.IC.ICDAANALYSIS.R, AR.IC.ICDAPLAN.P, AR.IC.ICDAINTEGRATION.R, AR.IC.ICDADIRECT.R, AR.IC.ICDAREGION.R

P, R, O, S

Detail

11. Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Core AR, CR, DC, EP, FS, IM, MO, PD, RPT, SRN, TD, TQ, GENERIC P, R, O, S

Detail

Plan Implementations

# Activity Name

SMART Act#

Start Date End Date

Focus Directives

Involved Groups/Subgroups

Assets

Qst Type(s)

Planned

Required

Total Inspect

ed

Required %

Complete

1. Conduct Williams II Inspection 154513

11/29/2016

09/29/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

2. Screening Week 154513

02/06/2017

02/10/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

3. Battleground District-WUTC 155113

04/03/2017

04/07/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

4. Redmond District-WUTC 155114

04/17/2017

04/21/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

5. Pasco District - WUTC 155112

04/24/2017

04/28/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

6. Vernal District - PHMSA 155105

06/05/2017

06/09/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

7. Plymouth (192)-PHMSA 155111

06/19/2017

06/23/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

Page 7: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

# Activity Name

SMART Act#

Start Date End Date

Focus Directives

Involved Groups/Subgroups

Assets

Qst Type(s)

Planned

Required

Total Inspect

ed

Required %

Complete

8. Sumas District - WUTC 155115

06/26/2017

06/30/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

9. Eugene - PHMSA 155109

07/10/2017

07/14/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

10.

Boise - PHMSA 155108

07/17/2017

07/21/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

11.

Pocatello - PHMSA 155107

07/24/2017

07/28/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

12.

Kemmerer - PHMSA 155106

07/31/2017

08/04/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

13.

Moab District - PHMSA 155104

08/07/2017

08/11/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

14.

Idaho-Spokane District - WUTC 155116

08/14/2017

08/18/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

15.

Complete HQ and SCC procedure review

154513

09/18/2017

09/22/2017

n/a all planned questions

all assets

all types

3346 3346 3346 100.0%

a. Since questions may be implemented in multiple activities, but answered only once, questions may be represented more than once in this table.

b. Percent completion excludes unanswered questions planned as "always observe".

Forms

No. Entity Form Name Status Date Completed Activity Name Asset

1. Attendance List Attendance Form for Screening Week COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 8395 Unit 3655 Unit 48785 Unit 48005 Unit 8545 Unit 48795 Unit 1305 Unit 4125 Unit 8365 Unit 8385 Unit 3675 Unit 8375 Unit 8355

2. Attendance List Battleground Attendance Week of 4/4/2017 COMPLETED 04/04/2017 Conduct Williams II Inspection

Unit 8365

3. Attendance List Vernal District Attendance List COMPLETED 06/13/2017 Conduct Williams II Inspection

Unit 4125

4. Attendance List Redmond Attendance Week of 4/17/2017 COMPLETED 06/20/2017 Conduct Williams II Inspection

Unit 3675

Page 8: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

No. Entity Form Name Status Date Completed Activity Name Asset

5. Attendance List Plymouth District Attendance List COMPLETED 06/26/2017 Conduct Williams II Inspection

Unit 48795

6. Attendance List Moab District Attendance List COMPLETED 08/10/2017 Conduct Williams II Inspection

Unit 8545

7. Attendance List Boise District Attendance List COMPLETED 11/28/2017 Conduct Williams II Inspection

Unit 8395

8. Attendance List Pasco District Attendance List 6/19/2017 COMPLETED 11/28/2017 Conduct Williams II Inspection

Unit 8385

9. Attendance List Kemmerer District Attendance List COMPLETED 11/28/2017 Conduct Williams II Inspection

Unit 48005

10. Attendance List Pocatello District Attendance List COMPLETED 11/28/2017 Conduct Williams II Inspection

Unit 1305

11. Attendance List Eugene District Attendance List COMPLETED 11/28/2017 Conduct Williams II Inspection

Unit 3655

12. Attendance List Spokane District (Idaho Portion) Attendance List

COMPLETED 11/28/2017 Conduct Williams II Inspection

Unit 48785

13. Attendance List Williams II - Final week of Inspection (week1) COMPLETED 11/28/2017 Conduct Williams II Inspection

Unit 8395 Unit 3655 Unit 48785 Unit 48005 Unit 8545 Unit 48795 Unit 1305 Unit 4125 Unit 8365 Unit 8385 Unit 3675 Unit 8375 Unit 8355

14. Attendance List Williams II - Final week of inspection, (Week 2)

COMPLETED 12/04/2017 Conduct Williams II Inspection

--

15. Attendance List Week Two of II HQ COMPLETED 03/27/2017 Screening Week Unit 8395 Unit 3655 Unit 48785 Unit 48005 Unit 8545 Unit 48795 Unit 1305 Unit 4125 Unit 8365 Unit 8385 Unit 3675 Unit 8375 Unit 8355

16. Attendance List Week One of II HQ COMPLETED 12/04/2017 Screening Week Unit 8395 Unit 3655 Unit 48785 Unit 48005 Unit 8545 Unit 48795 Unit 1305 Unit 4125 Unit 8365 Unit 8385 Unit 3675 Unit 8375 Unit 8355

17. Attendance List Pasco District Attendance List 7/20/2017 COMPLETED 11/28/2017 Pasco District - WUTC Unit 8385

18. Attendance List Pasco District Attendance List 7/19/2017 COMPLETED 11/28/2017 Pasco District - WUTC Unit 8385

19. Attendance List Sumas District Attendance List 6/26/2017 COMPLETED 11/28/2017 Sumas District - WUTC

Unit 8355

20. Attendance List Spokane District Attendance List (WA Portion) COMPLETED 11/28/2017 Idaho-Spokane District - WUTC

Unit 8375

Page 9: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

No. Entity Form Name Status Date Completed Activity Name Asset

21. Inspection Scoping

Inspection Scoping Form for 8395 (Boise District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 8395

22. Inspection Scoping

Inspection Scoping Form for 1305 (Pocatello District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 1305

23. Inspection Scoping

Inspection Scoping Form for 48785 (Idaho/Spokane District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 48785

24. Inspection Scoping

Inspection Scoping Form for 48005 (Kemmerer District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 48005

25. Inspection Scoping

Inspection Scoping Form for 8545 (MOAB District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 8545

26. Inspection Scoping

Inspection Scoping form for 48795 (Oregon Portion of Plymouth District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 48795

27. Inspection Scoping

Inspection Scoping Form for 4125 (Vernal District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 4125

28. Inspection Scoping

Inspection Scoping Form for 8385 (WUTC - Pasco District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 8385

29. Inspection Scoping

Inspection Scoping Form for 3675 (WUTC-Redmond District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 3675

30. Inspection Scoping

Inspection Scoping Form for 8375 (WUTC-Spokane District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 8375

31. Inspection Scoping

Inspection Scoping Form for 8355 (WUTC-Sumas District)

COMPLETED 02/09/2017 Conduct Williams II Inspection

Unit 8355

32. Inspection Scoping

Inspection Scoping Form for 3655 (Eugene District)

COMPLETED 10/03/2017 Conduct Williams II Inspection

Unit 3655

33. Inspection Scoping

Inspection Scoping Form for 8365 (WUTC/Battle Ground District)

COMPLETED 12/08/2017 Conduct Williams II Inspection

Unit 8365

Results (all values, 633 results)

684 (instead of 633) results are listed due to re-presentation of questions in more than one sub-group.

AR.IC: Internal Corrosion Direct Assessment (ICDA)

1. Question Result, ID, References

Sat, AR.IC.ICDAPLAN.P, 192.927(c) (192.927(a);192.927(b))

Question Text Is an adequate ICDA plan and process in place for conducting ICDA?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

2. Question Result, ID, References

Sat, AR.IC.ICDAPLAN.P, 192.927(c) (192.927(a);192.927(b))

Question Text Is an adequate ICDA plan and process in place for conducting ICDA?

Assets Covered Unit 4125

Result Notes Dry Gas Internal Corrosion Direct Assessments - Policy number 07.46.01.02 Rev. 00 Date 02/23/17. This procedure has not been used at this point. Look at the Piceance Lateral for internal corrosion issues.

3. Question Result, ID, References

NA, AR.IC.ICDAINTEGRATION.R, 192.917(b) (192.947(g))

Question Text Do records demonstrate that other data/information was integrated when evaluating data/results?

Assets Covered Unit 4125

Result Notes Dry Gas Internal Corrosion Direct Assessments - Policy number 07.46.01.02 Rev. 00 Date 02/23/17. This procedure has not been used at this point. Look at the Piceance Lateral for internal corrosion issues.

4. Question Result, ID, References

NA, AR.IC.ICDAREGION.R, 192.947(g) (192.927(c)(2);192.927(c)(5))

Page 10: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records demonstrate that ICDA Regions were adequately identified?

Assets Covered Unit 4125

Result Notes Dry Gas Internal Corrosion Direct Assessments - Policy number 07.46.01.02 Rev. 00 Date 02/23/17. This procedure has not been used at this point. Look at the Piceance Lateral for internal corrosion issues.

5. Question Result, ID, References

NA, AR.IC.ICDADIRECT.R, 192.947(g) (192.927(c)(3);192.927(c)(5))

Question Text Do records demonstrate that sites were identified where internal corrosion may be present?

Assets Covered Unit 4125

Result Notes Dry Gas Internal Corrosion Direct Assessments - Policy number 07.46.01.02 Rev. 00 Date 02/23/17. This procedure has not been used at this point.

6. Question Result, ID, References

NA, AR.IC.ICDAANALYSIS.R, 192.947(g) (192.927(c);192.933(b))

Question Text Do records demonstrate than an analysis of the ICDA data and other information was adequate to identify internal corrosion threats to the pipeline?

Assets Covered Unit 4125

Result Notes Dry Gas Internal Corrosion Direct Assessments - Policy number 07.46.01.02 Rev. 00 Date 02/23/17. This procedure has not been used at this point.

AR.IL: In-Line Inspection (Smart Pigs)

7. Question Result, ID, References

Sat, AR.IL.ILIVALIDATE.R, 192.947(g) (192.921(a)(1))

Question Text Do records demonstrate that the operator has validated ILI assessment results per their process?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williard to Washougal 26" Rosen CDX tool - this run was validated and interaction lengths were adjusted to account for tool inaccuracies.

2015 North Seattle Lateral 8" pipeline - 27 validation digs were done.

2016 Soda Springs C/S to Lava Hot Springs C/S 22" - dug 17 validation dig locations and validation with previous tool runs.

Waiting on - Unity plots for each one is attached.

AR.RC: Repair Criteria

8. Question Result, ID, References

Sat, AR.RC.SCHEDULEIMPL.R, 192.947(f) (192.933(d))

Question Text Do records demonstrate that defects in covered segments were remediated (i.e., repair, pressure reduction, or notification to PHMSA) within the applicable mandatory time limits of 192.933(d)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes North Seattle Lateral - one example of an immediate repair and its remediation was completed.

South Seattle lateral - 10/12 inch pipeline - after excavation it was not an immediate repair.

Page 11: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

AR.RMP: Repair Methods and Practices

9. Question Result, ID, References

Sat, AR.RMP.METHOD.R, 192.709(a) (192.713(a);192.713(b);192. 717(a);192.717(b);B31.8S Section 7)

Question Text From the review of records, were all repairs performed in accordance with procedures, applicable sections of 49 CFR Parts 192 and the guidance of B31.8S, Section 7, and the Pipeline Repair Manual, Revision 5?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Looked over the repairs made to the two below indications and they followed the repair criteria.

North Seattle Lateral - one example of an immediate repair and its remediation was completed.

South Seattle lateral - 10/12 inch pipeline - after excavation it was not an immediate repair.

10. Question Result, ID, References

Sat, AR.RMP.REPAIRQUAL.R, 192.807(b) (192.805(h))

Question Text From the review of selected records, were personnel performing repairs, other than welding, and post repair tests qualified for the task they performed?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Shelton lateral is a 8" PL with an MAOP 809 psig in the Redmond District had a leak repaired on July 13, 2015. Reviewed NDT qualifications for Larry Schewe. Reviewed OQ qualifications for the following: Michael Wolfe was the coating applicator; Jacob Kiliz and Blaine Maples did the excavation work; the welder was Miguel A Serrano and Ernest Martinez.

11. Question Result, ID, References

Sat, AR.RMP.REPLACESTD.R, 192.713(a) (Part 192 Subpart D)

Question Text From the review of records, were any components that were replaced constructed to the same or higher standards as the original component?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Used 8.625" x 0.322" Gr. X-52, ERW pipe and Trenton Wax Tape coating.

AR.SCC: Stress Corrosion Cracking Direct Assessment (SCCDA)

12. Question Result, ID, References

Sat, AR.SCC.SCCDAREVQUAL.P, 192.915(a) (192.915(b))

Question Text Does the process require that operator/vendor personnel (including supervisors) who review and evaluate SCCDA assessment results meet appropriate training, experience, and qualification criteria?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Reviewed section 1.6 from the Williams Stress Corrosion Cracking Direct Assessment Plan. Revision 00.

13. Question Result, ID, References

NA, AR.SCC.SCCDAREVQUAL.R, 192.947(e) (192.915(a);192.915(b))

Question Text Do records demonstrate that operator/vendor personnel, including supervisors, who conduct assessments or review assessment results, are qualified for the tasks they perform?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

14. Question Result, ID, References

Sat, AR.SCC.SCCDAREVQUAL.R, 192.947(e) (192.915(a);192.915(b))

Page 12: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records demonstrate that operator/vendor personnel, including supervisors, who conduct assessments or review assessment results, are qualified for the tasks they perform?

Assets Covered Unit 3655, Unit 8375

Result Notes Check personnel qualification records for SCCDA activities during the week of September 18th.

9/18/2017 - PureHM was the contractor. Reviewed qualified personnel. Reviewed the SCC presentation and job package for Spokane.

15. Question Result, ID, References

NA, AR.SCC.SCCDAREVQUAL.O, 192.915(a) (192.915(b))

Question Text From the observation of selected integrity assessments, are operator and vendor personnel, including supervisors, who conduct assessments or review assessment results, qualified for the tasks they perform?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8355

Result Notes No activities performed as of HQ inspection date.

16. Question Result, ID, References

NC, AR.SCC.SCCDAREVQUAL.O, 192.915(a) (192.915(b))

Question Text From the observation of selected integrity assessments, are operator and vendor personnel, including supervisors, who conduct assessments or review assessment results, qualified for the tasks they perform?

Assets Covered Unit 3655, Unit 8375

Result Notes No field observations performed for this activity.

17. Question Result, ID, References

Sat, AR.SCC.SCCDAPLAN.P, 192.929(b)

Question Text Is an adequate plan developed for performing SCCDA, if the conditions for SCC were present?

Assets Covered Unit 3655, Unit 8375

18. Question Result, ID, References

NA, AR.SCC.SCCDAPLAN.P, 192.929(b)

Question Text Is an adequate plan developed for performing SCCDA, if the conditions for SCC were present?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

19. Question Result, ID, References

Sat, AR.SCC.SCCDADATA.R, 192.947(g) (192.929(b)(1))

Question Text Do records demonstrate that data was collected and evaluated?

Assets Covered Unit 3655, Unit 8375

20. Question Result, ID, References

NA, AR.SCC.SCCDADATA.R, 192.947(g) (192.929(b)(1))

Question Text Do records demonstrate that data was collected and evaluated?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8355

Result Notes No assessments have been perform at this time of the HQ portion of the Williams II inspection. This procedure will be used later this year.

21. Question Result, ID, References

NA, AR.SCC.SCCDAMETHOD.R, 192.947(g) (192.929(b)(2))

Page 13: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records demonstrate that an assessment was performed using one of the methods specified in B31.8S Appendix A3?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No assessments have been perform at this time of the HQ portion of the Williams II inspection. This procedure will be used later this year.

22. Question Result, ID, References

Sat, AR.SCC.SCCDAMETHOD.R, 192.947(g) (192.929(b)(2))

Question Text Do records demonstrate that an assessment was performed using one of the methods specified in B31.8S Appendix A3?

Assets Covered Unit 3655

Result Notes Williams is attempting to get EMAT approved for use in the suspected SCC areas. This approval is expected on November 12, 2017.

23. Question Result, ID, References

NC, AR.SCC.SCCDAMETHOD.O, 192.929

Question Text From field observations, was SCCDA performed in accordance with 192.929 and the SCCDA plan?

Assets Covered Unit 3655, Unit 8375

Result Notes No assessments have been perform at this time of the HQ portion of the Williams II inspection. This procedure will be used later this year.

24. Question Result, ID, References

NA, AR.SCC.SCCDAMETHOD.O, 192.929

Question Text From field observations, was SCCDA performed in accordance with 192.929 and the SCCDA plan?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

25. Question Result, ID, References

NA, AR.SCC.SCCDANEARNEUTRAL.R, 192.947(g) (192.929(b)(2))

Question Text From the review of the results of selected integrity assessments, was the pipeline evaluated for near neutral SCC?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8355

Result Notes No assessments have been perform at this time of the HQ portion of the Williams II inspection. This procedure will be used later this year.

26. Question Result, ID, References

Sat, AR.SCC.SCCDANEARNEUTRAL.R, 192.947(g) (192.929(b)(2))

Question Text From the review of the results of selected integrity assessments, was the pipeline evaluated for near neutral SCC?

Assets Covered Unit 3655, Unit 8375

Result Notes Near Neutral was the primary SCC that was being investigated.

27. Question Result, ID, References

NA, AR.SCC.SCCDAREASSESSINTRVL.R, 192.947(d) (192.939(a)(3))

Question Text From the review of the results of selected integrity assessments, did the operator determine a reassessment interval based on SCCDA results?

Assets Covered Unit 8395, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8355

Result Notes No assessments have been perform at this time of the HQ portion of the Williams II inspection. This procedure will be used later this year.

28. Question Result, ID, References

NA, AR.SCC.SCCDAREASSESSINTRVL.R, 192.947(d) (192.939(a)(3))

Page 14: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text From the review of the results of selected integrity assessments, did the operator determine a reassessment interval based on SCCDA results?

Assets Covered Unit 3655, Unit 8375

Result Notes No such event occurred, or condition existed, in the scope of inspection review. SCCDA was stopped in Eugene District after a feature was found to be leaking. Then Williams began the application for the EMAT approval.

CR.CRMAM: Alarm Management

29. Question Result, ID, References

Sat, CR.CRMAM.PLANREVIEW.R, 192.631(e)(4)

Question Text Do records indicate review of the alarm management plan at least once each calendar year, but at intervals not exceeding 15 months, in order to determine the effectiveness of the plan?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Reviewed the alarm management plan review summary for 2014-2016. 3 revisions from the 2016 review. 2 revisions from the 2015 review.

Reviewed Table 1a - Alarm Priority Assessment.

Reviewed the KPI - Key Performance Indicators.

Controllers use the NASA TLX Nasa Taskload Index to assess their workload during normal operations.

Reviewed 2014-2016 revision history of the alarm management plan.

DC.MA: Materials

30. Question Result, ID, References

Sat, DC.MA.NEWPIPE.P, 192.53(a) (192.53(b);192.53(c);192.55(a);192.55(b);192.55(c);192.55(d);192.55(e))

Question Text Does the process require new steel pipe to be qualified in accordance with 192.55(a)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure number is 850.1405 ERW pipe manufacturing specification and 850.1410 for the DSAW.

EP.ERG: Emergency Response

31. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 4125

Result Notes Review local Emergency Response Manual and training records.

32. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 3675

33. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 8545

Page 15: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

34. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

35. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 8365

Result Notes Reviewed the manual and the annual review records for 2015, 2016 and 2017.

36. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 8355

Result Notes Reviewed the Emergency Response Plan - Sumas Copy. There is also a plan in the Mount Vernon District office.

Reviewed two years of district employee training.

37. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

38. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 48785, Unit 8375

Result Notes This appears to be ok.

39. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 48795

Result Notes This appeared to be ok.

40. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 8385

41. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 48005

Page 16: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes This looked acceptable.

42. Question Result, ID, References

Sat, EP.ERG.REVIEW.R, 192.605(a)

Question Text Have annual reviews been conducted of the emergency plans and procedures as required, and any updates completed as appropriate?

Assets Covered Unit 3655

Result Notes Reviewed the last three years of records.

43. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 8545

Result Notes Reviewed existing plan for the MOAB District.

44. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 48005

Result Notes Reviewed existing plan for the Kemmerer District.

45. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

46. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 8355

47. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 3675

Result Notes All supervisors have a thumb drive with the plans and procedures. Hard copies are also at each compressor.

48. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 8385

Result Notes Reviewed the Pasco District Manual.

49. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 8365

Result Notes Reviewed existing plan for the Battleground District.

50. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Page 17: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 48795

Result Notes Reviewed existing plan for the Oregon Portion of Plymouth District.

51. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

52. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 4125

Result Notes Observed the local manual.

53. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 3655

Result Notes This appears to be acceptable.

54. Question Result, ID, References

Sat, EP.ERG.LOCATION.O, 192.615(b)(1)

Question Text Are supervisors provided the applicable portions of the emergency plan and procedures?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

55. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 8395

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

56. Question Result, ID, References

Sat, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 48005

Result Notes There was one incident at the N2 meter station happening approximately 3 months prior to this inspection. Reporting look ok, but no root cause analysis completed on the incident yet.

57. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

• No reportable incidents that triggered the emergency plan.

58. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Page 18: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 3655

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

59. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 48785, Unit 8375

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

60. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

61. Question Result, ID, References

Sat, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 8545

Result Notes One report for a regulator valve failure on 11/17/16 over 3 MCF released prompted report.

62. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 8365

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

Answer in the field. No such event over the last three years.

63. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 4125

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

64. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 1305

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

65. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 48795

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

Page 19: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

66. Question Result, ID, References

NA, EP.ERG.NOTICES.R, 192.615(a)(1)

Question Text Do records indicate receiving, identifying, classifying and communication of notices of events requiring immediate response in accordance with procedures?

Assets Covered Unit 8385

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

Answer in the field. No such event over the last three years.

67. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 8355

Result Notes Reviewed the emergency response equipment list and inspected the emergency response trailer which is based at the Sumas compression station.

68. Question Result, ID, References

NA, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 3655

Result Notes Trailer has been purchased, but has not been assembled yet.

69. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 3675

Result Notes Checked in the field. Each district makes the decision whether they need an emergency trailer.

Redmond has a trailer.

Section 9 in Williams' site specific emergency plan lists the tools and equipment necessary for an emergency.

70. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 8395

Result Notes This appeared to be ok.

71. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 48785, Unit 48005, Unit 8545, Unit 1305, Unit 8375

Result Notes This appeared to be ok.

72. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Page 20: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 8385

Result Notes Inspected the E-response equipment trailer and gear. List to be uploaded.

73. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 48795

Result Notes Review trailer and equipment list.

74. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 4125

Result Notes This was verified.

75. Question Result, ID, References

Sat, EP.ERG.READINESS.O, 192.615(a)(4)

Question Text Are personnel, equipment, tools, and materials needed at the scene of an emergency available as required by its procedures?

Assets Covered Unit 8365

Result Notes This was verified in the field.

76. Question Result, ID, References

Sat, EP.ERG.INCIDENTANALYSIS.R, 192.605(a) (192.617)

Question Text Do records indicate actions initiated to analyze accidents and failures, including the collection of appropriate samples for laboratory examination to determine the causes of the failure and minimize the possibility of recurrence, in accordance with its procedures?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Looked at Shelton Lateral Failure in July 13, 2015 and Wenatchee Lateral Failure in December 16, 2013.

77. Question Result, ID, References

Sat, EP.ERG.POSTEVNTREVIEW.R, 192.605(a) (192.615(b)(1);192.615(b)(3))

Question Text Do records indicate review of employee activities to determine whether the procedures were effectively followed in each emergency?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Looked at Shelton Lateral Failure in July 13, 2015 and Wenatchee Lateral Failure in December 16, 2013.

78. Question Result, ID, References

Sat, EP.ERG.LIAISON.R, 192.605(a) (192.615(c)(1);192.615(c)(2);192.615(c)(3);192.615(c)(4);192.616(c);ADB-05-03) (also presented in: PD.PA)

Question Text Do records indicate that liaison has been established and maintained with appropriate fire, police, public officials, and utility owners?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached attendance sheets.

FS.CSSYSPROT: Compressor Station System Protection

79. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Page 21: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 3675

80. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 48795, Unit 8385

Result Notes Review each compressor Station in the Plymouth District.

81. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 8355

82. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 8365

Result Notes This was verified for the three compressor stations in the Battleground District.

83. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 8395

Result Notes Review each compressor Station in the Boise District.

84. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 4125

Result Notes Each compressor station (Vernal and Rangely) for this district was checked.

85. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 8545

Result Notes Review each compressor Station in the Moab District.

Page 22: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

86. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

87. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 3655

Result Notes Review each compressor Station in the Eugene District.

88. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 1305

Result Notes Review each compressor Station in the Pocatello District.

89. Question Result, ID, References

Sat, FS.CSSYSPROT.ESDLOCATION.O, 192.167(a)(4)

Question Text Does each compressor station have an emergency shutdown system that is capable of being operated from at least two locations which are: 1) Outside the gas area of the station, 2) Near the exit gates, if the station is fenced, or near emergency exits, if not fenced, 3) And not more than 500 feet (153 meters) from the limits of the station?

Assets Covered Unit 48005

Result Notes Review each compressor Station in the Kemmerer District.

90. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

91. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 3655

Result Notes Verified in the field.

92. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 8395

Result Notes Verified in the field.

93. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Page 23: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 8365

Result Notes Verified in the field.

94. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 48005

Result Notes Verified in the field.

95. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 8545

Result Notes Verified in the field.

96. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 1305

Result Notes Verified in the field.

97. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 3675

98. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 4125

Result Notes Each compressor station (Vernal and Rangely) for this district was checked.

99. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 8355

100. Question Result, ID, References

Sat, FS.CSSYSPROT.RELIEFDISCH.O, 192.169(b)

Question Text Do pressure relief valves exhaust gas to a location where the gas will not cause a hazard?

Assets Covered Unit 48795, Unit 8385

Result Notes Review each compressor Station in the Plymouth District.

101. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 3675

Result Notes Dave Cullom and Derek Norwood returned to the Chehalis compressor station and observed the annual fire and gas detection testing.

102. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Page 24: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 8355

Result Notes Reviewed relief device records for 2014-17.

103. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 8385

Result Notes Reviewed the following compressor records:

Goldendale 2013 - 2016. (2017 not completed yet)

Roosevelt 2013 - 2016. (2017 not completed yet)

Zillah (mobile) 2014 - 2017

104. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 48785, Unit 8375

Result Notes The last three years appear to be ok.

105. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 48795

Result Notes Reviewed Plymouth and Meacham Compressor Stations.

106. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 8365

Result Notes Reviewed all regulator and pressure relief station maintenance records from 2013 - 2016.

107. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 3655

Result Notes Reviewed the last three years for each compressor station.

108. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

Page 25: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

109. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

110. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 4125

Result Notes Reviewed Rangley and Vernal Compressor Station relief valves.

111. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 48005

Result Notes These appear to be acceptable.

112. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPRELIEF.R, 192.709(b) (192.709(c);192.731(a);192.731(b);192.731(c))

Question Text Do records document with adequate detail that all inspection and testing of compressor station pressure relief devices with the exception of rupture disks have occurred at the required interval?

Assets Covered Unit 8545

Result Notes This appeared to be adequate.

113. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 8385

Result Notes Reviewed the following compressor records:

Goldendale 2014 - 2016. (2017 not completed yet)

Roosevelt 2014 - 2016. (2017 not completed yet)

Zillah (mobile) 2014 - 2017 (done in May)

114. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 48795

Result Notes Reviewed Plymouth and Meacham Compressor Stations.

115. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 1305

Result Notes The records appeared to be ok.

Page 26: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

116. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 8545

Result Notes There appears to be an issue with Pleasant View Compressor Station ESD Test Station annual check. It does not appear that all ESD stations were tested in 2016. This record was provided later this same week.

117. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 8355

Result Notes Reviewed the following tests:

Mt Vernon A plant 2014-16

Mt Vernon B plant 2014-16

Mt Vernon C plant 2014-16

Sumas A plant 2014-16

Sumas B plant 2014-16

Sumas C plant 2014-16

Sumas D plant 2014-16

118. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 4125

Result Notes Reviewed ESD records for Vernal and Rangely Compressor Station

119. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

120. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 8365

Page 27: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes • Reviewed maintenance records for ESD from 2013 - 2016. All good.

121. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 48785, Unit 8375

Result Notes The only compressor station in this district is Mesa C/S. All records for the past three years were check.

122. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 3675

Result Notes Reviewed records for Sumner, Tumwater, and Snohomish for the past three years.

123. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 48005

Result Notes ESD testing form for Green River is due by August 13, 2017. This item needs to be provided by the end of the inspection.

124. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPESDTESTDEV.R, 192.709(c) (192.731(c))

Question Text Do records document the inspection and testing of all compressor station emergency shutdown devices at the required frequency?

Assets Covered Unit 3655

Result Notes Looked over the last three years for each compressor station.

125. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 48005

Result Notes Green River Station Units A and B needs the record for 2017. Done on May 11 of 2016, close to the 15 month limit in August. Need by the end of this inspection.

Records were provided on 9/27/2017 and uploaded.

126. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 8365

Result Notes • Reviewed maintenance records for Gas Detection from 2013 - 2016. All good.

127. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Page 28: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

128. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 3655

Result Notes Check all stations for the past three years.

129. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 8385

Result Notes Reviewed the following compressor records:

Goldendale 2014 - 2017

Roosevelt 2014 - 2017.

Zillah (mobile) 2014 - 2017

130. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 4125

Result Notes Reviewed records for Vernal and Rangely.

131. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 8545

Result Notes Reviewed 2014 to mid 2017 annual and quarterly calibration.

132. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 8355

Result Notes Gas heads are functionally tested annually and calibrated quarterly.

Reviewed records from 2014-17

133. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 3675

Result Notes Reviewed records for Sumner, Tumwater, and Snohomish for the past three years.

134. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Page 29: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 48785, Unit 8375

Result Notes There was five new gas detectors installed in 2017 at the Mesa C/S.

135. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 48795

Result Notes Reviewed Plymouth and Meacham Compressor Stations.

136. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDETOM.R, 192.709(c) (192.736(c))

Question Text Do records document that all compressor station gas detection and alarm systems are being maintained and tested as required?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

137. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

138. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 8545

Result Notes Verified in the field.

139. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 8365

Result Notes Verified in the field.

140. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 3675

Result Notes This was checked at all compressor stations in this district.

141. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 4125

Result Notes This was checked at both compressor stations.

Page 30: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

142. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 8395

Result Notes Verified in the field.

143. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 48795, Unit 8385

Result Notes This was verified in the field.

144. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 48005

Result Notes Verified in the field.

145. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 3655

Result Notes Verified in the field.

146. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 1305

Result Notes Verified in the field.

147. Question Result, ID, References

Sat, FS.CSSYSPROT.CMPGASDET.O, 192.736(a) (192.736(b))

Question Text Have adequate gas detection and alarm systems been installed in selected applicable compressor buildings?

Assets Covered Unit 8355

FS.FG: Facilities General

148. Question Result, ID, References

Sat, MO.GM.ABANDONPIPE.P, 192.605(b)(1) (192.727(a);192.727(b);192.727(c);192.727(d);192.727(e);192.727(f);192.727(g)) (also presented in: MO.GM)

Question Text Does the process include adequate requirements for the abandonment and deactivation of pipelines and facilities?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 70.15.01 Rev. 13 - 02/25/13 - Abandonment or Deactivation of Facilities.

149. Question Result, ID, References

Sat, MO.GM.ABANDONPIPE.R, 192.709(c) (192.727(a);192.727(b);192.727(c);192.727(d);192.727(e);192.727(f);192.727(g)) (also presented in: MO.GM)

Page 31: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records indicate pipelines and facilities were abandoned or deactivated in accordance with requirements?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

IM.BA: Baseline Assessments

150. Question Result, ID, References

Sat, IM.BA.BANEW.P, 192.911(p) (192.905(c);192.921(f);192.921(g))

Question Text Does the process include requirements for updating the assessment plan for newly identified areas and newly installed pipe?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 10.06.01 Rev. 05 12/31/12 - Baseline Assessment Plan Review

151. Question Result, ID, References

Sat, IM.BA.BANEW.R, 192.947(d) (192.905(c);192.911(p);192.921(f);192.921(g))

Question Text Do records demonstrate that the assessment plan has been adequately updated for new HCAs and newly installed pipe?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

IM.CA: Continual Evaluation and Assessment

152. Question Result, ID, References

Sat, IM.CA.PERIODICEVAL.P, 192.937(b) (192.917(a);192.917(b);192.917(c);192.917(d);192.917(e))

Question Text Does the process include requirements for a periodic evaluation of pipeline integrity based on data integration and risk assessment to identify the threats specific to each covered segment and the risk represented by these threats?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes

Williams incorporated a change in this procedure that allowed new information to be incorporated into the risk assessment in a timely manner.

153. Question Result, ID, References

Sat, IM.CA.PERIODICEVAL.R, 192.947(d) (192.917(a);192.917(b);192.917(c);192.917(d);192.917(e);192.937(b))

Question Text Do records demonstrate that periodic evaluations of pipeline integrity have been performed based on data integration and risk assessment to identify the threats specific to each covered segment and the risk represented by these threats?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes

Language will be revised per discussions on 9/20/2017.

Williams did incorporate the SCC threat information into the Risk Model on September 20,, 2017.

154. Question Result, ID, References

Sat, IM.CA.REASSESSMETHOD.R, 192.947(d) (192.937(c))

Question Text Do records document the assessment methods to be used and the rationale for selecting the appropriate assessment method?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 32: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes This appears to be ok.

155. Question Result, ID, References

NA, IM.CA.LOWSTRESSREASSESS.P, 192.941(a) (192.941(b);192.941(c))

Question Text Does the process include requirements for the "low stress reassessment" method to address threats of external and/or internal corrosion for pipelines operating below 30% SMYS?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such assets operated by this operator.

156. Question Result, ID, References

NA, IM.CA.LOWSTRESSREASSESS.R, 192.947(d) (192.941(a);192.941(b);192.941(c))

Question Text Do records demonstrate that the implementation of "low stress reassessment" method to address threats of external and/or internal corrosion is adequate and being performed as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such assets operated by this operator.

157. Question Result, ID, References

Sat, IM.CA.REASSESSINTERVAL.P, 192.937(a) (192.939(a);192.939(b);192.913(c))

Question Text Is the process for establishing the reassessment intervals consistent with 192.939 and ASME B31.8S-2004?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This appears to be ok.

158. Question Result, ID, References

Sat, IM.CA.REASSESSINTERVAL.R, 192.947(d) (192.937(a);192.939(a);192.939(b);192.913(c))

Question Text Do records demonstrate that reassessment intervals were established consistent with the requirements of the operator's procedures?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This appeared to be ok.

IM.HC: High Consequence Areas

159. Question Result, ID, References

Sat, IM.HC.HCAPIR.R, 192.947(d) (192.903;192.905(a))

Question Text Do records demonstrate the use of potential impact radius (PIR) for establishment of high consequence areas consistent with requirements of 192.903?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 07.20.01.02 Rev. 01 - 12/06/16

160. Question Result, ID, References

Sat, IM.HC.HCASITES.R, 192.947(d) (192.903;192.905(b))

Question Text Do records indicate identification of identified sites being performed as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 07.20.01.01 Rev. 03 12/06/16 Structure Verification

161. Question Result, ID, References

NA, IM.HC.HCAMETHOD1.R, 192.947(d) (192.903 (1)(i);192.903(1)(ii);192.903(1)(iii);192.903(1)(iv))

Question Text Do records demonstrate that application of the 192.903 High Consequence Area definition (1) for the identification of HCAs was adequate?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 33: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

162. Question Result, ID, References

Sat, IM.HC.HCAMETHOD2.R, 192.947(d) (192.905(a);192.903(2)(ii))

Question Text Do records demonstrate that the application of 192.903 High Consequence Area definition (2) for identification of HCAs was adequate?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 07.20.01.02 Rev. 01 - 12/06/16 Section 4.0 See attachment

163. Question Result, ID, References

Sat, IM.HC.HCANEW.P, 192.905(c)

Question Text Does the process include a requirement for evaluation of newly identified areas that may show that a pipeline segment impacts a high consequence area?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See section 4.0

164. Question Result, ID, References

Sat, IM.HC.HCANEW.R, 192.947(d) (192.905(c))

Question Text Do records demonstrate that evaluations of newly identified areas that may show that a pipeline segment impacts a high consequence area are being performed as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This is being done via annual field surveys for new structures

165. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 8395

Result Notes Verified in the field.

166. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 3655

Result Notes Verified in the field.

167. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 4125

Result Notes This was checked in the few locations they had.

168. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 8355

Result Notes All HCA's were driven and appeared to be well marked and accurate.

169. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 8365

Page 34: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes Winlock Meter Station U/S of Chehalis Compressor Station did have an HCA adjacent to the pipeline that has not been identified previously. This has now been updated in Williams system.

170. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 3675

Result Notes HCA on the Grotto Line near YMCA parking lot – need to have tree trimmed or removed on U/S side of parking lot and bushes cut on D/S side of parking lot with additional markers installed on the pavement. This was taken care of by the end of the inspection. This was verified by photos of the area.

171. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 8545

Result Notes Verified in the field.

172. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 48005

Result Notes Verified in the field.

173. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 48795, Unit 8385

Result Notes This was reviewed for the Pasco and Plymouth Districts.

174. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 1305

Result Notes Verified in the field.

175. Question Result, ID, References

Sat, IM.HC.HCADATA.O, 192.905(c)

Question Text Are HCAs correctly identified per up-to-date information?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

IM.PM: Preventive and Mitigative Measures

176. Question Result, ID, References

Sat, IM.PM.PMMGENERAL.P, 192.935(a)

Question Text Does the process include requirements to identify additional measures to prevent a pipeline failure and to mitigate the consequences of a pipeline failure in a high consequence area?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williams -10.06.01 Baseline Assessment Plan Review Rev.5 -12/31/12

177. Question Result, ID, References

Sat, IM.PM.PMMGENERAL.R, 192.947(d) (192.935(a))

Page 35: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records demonstrate that additional measures have been identified and implemented (or scheduled) beyond those already required by Part 192 to prevent a pipeline failure and to mitigate the consequences of a pipeline failure in an HCA?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes A list of all HCAs with applicable PMM listed per HCA along with beginning MP for each HCA. This will be provided by the end of the second week of the HQ.

178. Question Result, ID, References

Sat, IM.PM.PMMTPD.R, 192.947(d) (192.917(e)(1);192.935(b)(1);192.935(e))

Question Text Do records demonstrate that preventive & mitigative measures have been implemented regarding threats due to third party damage as required by the process?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Review PMM for TPD in the field records. This will be provided by the end of the second week of the HQ.

179. Question Result, ID, References

Sat, IM.PM.PMMREVQUAL.R, 192.947(e) (192.915(c))

Question Text Do records demonstrate that personnel who implement preventive and mitigative measures or directly supervise excavation work are qualified?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

180. Question Result, ID, References

Sat, IM.PM.PMMTPDSMYS.P, 192.935(d) (192.935(e);192 Table E.II.1)

Question Text Does the process include requirements for preventive and mitigative requirements for pipelines operating below 30% SMYS?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes They are not doing Low Stress assessments and leak surveys are being done on frequency required by 192.706.

181. Question Result, ID, References

Sat, IM.PM.PMMTPDSMYS.R, 192.947(d) (192.935(d);192.935(e);192 Table E.II.1)

Question Text Do records demonstrate that preventive and mitigative requirements for pipelines operating below 30% SMYS are being performed as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

182. Question Result, ID, References

Sat, IM.PM.PMMOF.R, 192.947(d) (192.935(b)(2))

Question Text Do records demonstrate that significant threats due to outside force (e.g., earth movement, floods, unstable suspension bridge) are being adequately addressed?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Matt Bayne showed a list on the screen of each HCA where P&M activities were being performed.

183. Question Result, ID, References

Sat, IM.PM.PMMCORR.R, 192.947(b) (192.917(e)(5))

Question Text Do records demonstrate that required actions are being taken to address significant corrosion threats as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

Page 36: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

184. Question Result, ID, References

Sat, IM.PM.PMMASORCV.P, 192.935(c)

Question Text Does the process include requirements to decide if automatic shut-off valves or remote control valves represent an efficient means of adding protection to potentially affected high consequence areas?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 07.20.01.02 Rev.01 Date 12/06/16 - Procedure should be revised to indicate the threshold for response time above which automation is required. This appears to have been addressed and the procedure section is attached.

185. Question Result, ID, References

Concern, IM.PM.PMMASORCV.R, 192.947(d) (192.935(c))

Question Text Do records demonstrate that the operator has determined, based on risk, whether automatic shut-off valves or remote control valves should be added to protect high consequence areas?

Assets Covered Unit 8365, Unit 3675

Result Issue Summary These valves should be replaced and made into RCV/ACV based on current conditions and response times. Estimated response times are most likely in excess of two plus hours to close them.

Result Notes Operator noted via their Risk Analysis that RCVs or ACVs were not required. However, while inspecting the area it was obvious that most valves could not be reached and operated safely. Every valve had the packing stem seals degrading where the operator required this void to be filled with heavy oil to make an affective seal when the valve was operated. This is shown by two valves that have been added to the valve stem in the attached picture to allow for the heavy oil to be injected in to the stem packing area.

186. Question Result, ID, References

Sat, IM.PM.PMMASORCV.R, 192.947(d) (192.935(c))

Question Text Do records demonstrate that the operator has determined, based on risk, whether automatic shut-off valves or remote control valves should be added to protect high consequence areas?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8385, Unit 8375, Unit 8355

Result Notes See attachment.

IM.QA: Quality Assurance

187. Question Result, ID, References

Sat, IM.QA.QARM.R, 192.947(d) (192.911(l))

Question Text Do records demonstrate that the quality assurance process for risk management applications is being completed as required by ASME B31.8S, Section 12?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

188. Question Result, ID, References

Sat, IM.QA.IMPERSONNEL.R, 192.947(e) (192.915(a);192.915(b);192.915(c))

Question Text Do records demonstrate that personnel involved in the integrity management program are qualified for their assigned responsibilities?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

189. Question Result, ID, References

Sat, IM.QA.IMNONMANDT.P, 192.7(a)

Question Text Does the process include requirements that non-mandatory requirements (e.g., "should" statements) from industry standards or other documents invoked by Subpart O (e.g., ASME B31.8S-2004 and NACE SP0502-2008) be addressed by an appropriate approach?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 37: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes See attached table for non mandatory statements.

190. Question Result, ID, References

Sat, IM.QA.IMMOC.R, 192.947(d) (192.909(a);192.909(b);192.911(k))

Question Text Do records demonstrate that changes that may impact pipeline integrity are being managed as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Global list of MOCs for the IMP program for 2013-2016.

191. Question Result, ID, References

Sat, IM.QA.IMPERFEFECTIVE.P, 192.945(a) (192.913(b);192.951)

Question Text Does the process for measuring IM program effectiveness include the elements necessary to conduct a meaningful evaluation?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes The procedure reviewed is 10.24.01-Measuring Integrity Management Plan Performance. See attachment.

192. Question Result, ID, References

Sat, IM.QA.IMPERFEFECTIVE.R, 192.947(d) (192.913(b);192.945(a);192.951)

Question Text Do records demonstrate that the methods to measure Integrity Management Program effectiveness provide effective evaluation of program performance and result in program improvements where necessary?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

193. Question Result, ID, References

Sat, IM.QA.IMPERFMETRIC.R, 192.947(d) (192.913(b);192.945(a);192.951)

Question Text Do records demonstrate that performance metrics are providing meaningful insight into integrity management program performance?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

194. Question Result, ID, References

Sat, IM.QA.RECORDS.R, 192.947(a) (192.947(b);192.947(c);192.947(d);192.947(e);192.947(f);192.947(g);192.947(h);192.947(i))

Question Text Are required records being maintained for the useful life of the pipeline?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

IM.RA: Risk Analysis

195. Question Result, ID, References

Sat, IM.RA.THREATID.P, 192.917(a) (192.917(e);192.913(b)(1))

Question Text Does the process include requirements to identify and evaluate all potential threats to each covered pipeline segment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Viewed procedure 10.13.00.03 Annual Threat and Risk Algorithm.

Page 38: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Williams is in the process of updating all of their IM program and procedures. This was reviewed on September 19, 2017 and appeared to be ok.

196. Question Result, ID, References

Sat, IM.RA.THREATID.R, 192.947(b) (192.917(a);192.917(e);192.913(b)(1))

Question Text Do records demonstrate that all potential threats to each covered pipeline segment have been identified and evaluated?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williams is in the process of updating all of their IM program and procedures. The process has been updated, but the recent discovery of SCC on the Eugene Lateral has not been incorporated yet. This is expected to be done in October, 2017. Williams will provide results at the end of October for verify this has been done. This was corrected by the end of the week of September 22, 2017.

197. Question Result, ID, References

Sat, IM.RA.RADATA.P, 192.917(b) (192.917(e)(1);192.911(k))

Question Text Does the process include requirements to gather and integrate existing data and information on the entire pipeline that could be relevant to covered segments?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Viewed procedure 10.33.00.03 Data Management Policy - 10.33.01 is the actual procedure.

Williams is in the process of updating all of their IM program and procedures. Review this in September 18, 2017.

198. Question Result, ID, References

Sat, IM.RA.RADATA.R, 192.947(b) (192.917(b);192.917(e)(1);192.911(k))

Question Text Do records demonstrate that existing data and information on the entire pipeline that could be relevant to covered segments being adequately gathered and integrated?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Data is stored in PODS along with weighting of each threat category.

199. Question Result, ID, References

Sat, IM.RA.RAMETHOD.P, 192.917(c) (192.917(d))

Question Text Does the process include requirements for a risk assessment that follows ASME B31.8S-2004, Section 5, and that considers the identified threats for each covered segment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Viewed policy 10.25.00.08 Williams Risk Analysis. Actual procedure is 10.25.01.

Williams is in the process of updating all of their IM program and procedures. Review this in September 18, 2017. This was reviewed the week of September 18, 2017 and found acceptable.

200. Question Result, ID, References

Sat, IM.RA.RAMETHOD.R, 192.947(b) (192.917(c);192.917(d))

Question Text Do records demonstrate that the risk assessment follows ASME B31.8S-2004, Section 5, and considers the identified threats for each covered segment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Waiting on records.

Williams is in the process of updating all of their IM program and procedures. Review this in September 18, 2017. This was reviewed the week of September 18, 2017 and found acceptable.

201. Question Result, ID, References

Sat, IM.RA.RAFACTORS.P, 192.917(c)

Page 39: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Does the process include requirements that factors that could affect the likelihood of a release, and factors that could affect the consequences of potential releases, be accounted for and combined in an appropriate manner to produce a risk value for each pipeline segment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williams is in the process of updating all of their IM program and procedures. Review this in September 18, 2017. This was reviewed the week of September 18, 2017 and found acceptable.

202. Question Result, ID, References

Sat, IM.RA.RAFACTORS.R, 192.947(b) (192.917(c))

Question Text Do records demonstrate that risk analysis data is combined in an appropriate manner to produce a risk value for each pipeline segment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williams is in the process of updating all of their IM program and procedures. Review this in September 18, 2017. This was reviewed the week of September 18, 2017 and found acceptable.

203. Question Result, ID, References

Sat, IM.RA.RAMOC.P, 192.917(c)

Question Text Does the process provide for revisions to the risk assessment if new information is obtained or conditions change on the pipeline segments?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williams is in the process of updating all of their IM program and procedures. Review this in September 18, 2017. This was reviewed the week of September 18, 2017 and found acceptable.

204. Question Result, ID, References

Sat, IM.RA.RAMOC.R, 192.947(b) (192.917(c))

Question Text Was the risk assessment revised as necessary as new information is obtained or conditions change on the pipeline segments?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williams is in the process of updating all of their IM program and procedures. Review this in September 18, 2017. This was reviewed the week of September 18, 2017 and found acceptable.

205. Question Result, ID, References

Sat, IM.RA.RAMOC.O, 192.917(c)

Question Text Are conditions on the pipeline segments accurately reflected in the appropriate risk assessment data and information?

Assets Covered Unit 48795, Unit 8385

Result Notes Reviewed each HCA in the Plymouth and Pasco Districts.

206. Question Result, ID, References

Sat, IM.RA.RAMOC.O, 192.917(c)

Question Text Are conditions on the pipeline segments accurately reflected in the appropriate risk assessment data and information?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 1305, Unit 8375

Result Notes This appeared to be ok.

207. Question Result, ID, References

Sat, IM.RA.RAMOC.O, 192.917(c)

Question Text Are conditions on the pipeline segments accurately reflected in the appropriate risk assessment data and information?

Assets Covered Unit 4125

Result Notes This was checked in the field.

Page 40: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

208. Question Result, ID, References

Sat, IM.RA.RAMOC.O, 192.917(c)

Question Text Are conditions on the pipeline segments accurately reflected in the appropriate risk assessment data and information?

Assets Covered Unit 8355

209. Question Result, ID, References

Sat, IM.RA.RAMOC.O, 192.917(c)

Question Text Are conditions on the pipeline segments accurately reflected in the appropriate risk assessment data and information?

Assets Covered Unit 3675

Result Notes This was checked in the field.

210. Question Result, ID, References

Sat, IM.RA.RAMOC.O, 192.917(c)

Question Text Are conditions on the pipeline segments accurately reflected in the appropriate risk assessment data and information?

Assets Covered Unit 8365

Result Notes This was verified in the field.

MO.GOABNORMAL: Gas Pipeline Abnormal Operations

211. Question Result, ID, References

Sat, MO.GOABNORMAL.ABNORMAL.P, 192.605(a) (192.605(c)(1))

Question Text Does the process include procedures for responding to, investigating, and correcting the cause of the listed abnormal operating conditions?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure was updated.

212. Question Result, ID, References

Sat, MO.GOABNORMAL.ABNORMAL.R, 192.605(a) (192.605(c)(1))

Question Text Did personnel respond to indications of abnormal operations as required by procedures?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments as examples of AO form.

213. Question Result, ID, References

Sat, MO.GOABNORMAL.ABNORMALCHECK.P, 192.605(a) (192.605(c)(2))

Question Text Does the process include procedures for checking variations from normal operation after abnormal operation has ended at sufficient critical locations in the system to determine continued integrity and safe operation?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment - procedure contains this requirement.

214. Question Result, ID, References

Sat, MO.GOABNORMAL.ABNORMALNOTIFY.P, 192.605(a) (192.605(c)(3))

Question Text Does the process include procedures for notifying responsible operator personnel when notice of an abnormal operation is received?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment - procedure contains this requirement.

215. Question Result, ID, References

Sat, MO.GOABNORMAL.ABNORMALREVIEW.P, 192.605(a) (192.605(c)(4))

Page 41: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Does the process include procedures for periodically reviewing the response of operator personnel to determine the effectiveness of the procedures controlling abnormal operation and taking corrective action where deficiencies are found?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment - procedure contains this requirement.

216. Question Result, ID, References

Sat, MO.GOABNORMAL.ABNORMALREVIEW.R, 192.605(a) (192.605(c)(4))

Question Text Do records indicate periodic review of work done by operator personnel to determine the effectiveness of the abnormal operation procedures and corrective action taken where deficiencies are found?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

MO.GOCLASS: Gas Pipeline Class Location

217. Question Result, ID, References

Sat, MO.GO.CONTSURVEILLANCE.R, 192.709(c) (192.613(a);192.613(b);192.703(b);192.703(c)) (also presented in: MO.GO)

Question Text Do records indicate performance of continuing surveillance of facilities as required, and also the reconditioning, phasing out, or MAOP reduction in any pipeline segment that was determined to be in unsatisfactory condition but on which no immediate hazard existed?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure looks ok that is attached. More observations will happen during the inspection.

MO.GOMAOP: Gas Pipeline MAOP

218. Question Result, ID, References

Sat, MO.GOMAOP.MAOPDETERMINE.P, 192.605(b)(1) (192.619(a);192.619(b))

Question Text Does the process include procedures for determining the maximum allowable operating pressure for a pipeline segment in accordance with 192.619?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes There is one location where the Grand Father Clause is used to establish MAOP in an HCA. One such HCA exists on the Moses' Lateral 8" x 0.188" w.t. X-42, ERW - this section is 1700 feet - this section was replaced due to corrosion in 1959. This was a new HCA determined to exist in 2016. The MAOP is 811 psig. Williams is running Rosen (AFD) Seam MFL which is like a (TFI) on March 29th to investigate the seams.

219. Question Result, ID, References

Sat, MO.GOMAOP.MAOPDETERMINE.R, 192.709(c) (192.619(a);192.619(b))

Question Text Do records indicate determination of the MAOP of pipeline segments in accordance with 192.619 and limiting of the operating pressure as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes We looked at Bellingham, WA lateral and loop. Also, looked at the Wenatachee Lateral.

220. Question Result, ID, References

Sat, MO.GOMAOP.MAOPLIMIT.P, 192.605(a) (192.605(b)(5))

Question Text Does the process include procedures for starting up and shutting down any part of the pipeline in a manner to assure operation with the MAOP limits, plus the build-up allowed for operation of pressure-limiting and control devices?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This appeared to be ok.

Page 42: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

221. Question Result, ID, References

Sat, MO.GOMAOP.MAOPLIMIT.R, 192.603(b) (192.605(b)(5))

Question Text Do records indicate operation within MAOP limits, plus the build-up allowed for operation of pressure-limiting and control devices, was assured while starting up and shutting down any part of the pipeline?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This appeared to be ok.

MO.GM: Gas Pipeline Maintenance

222. Question Result, ID, References

Sat, MO.GM.ABANDONPIPE.P, 192.605(b)(1) (192.727(a);192.727(b);192.727(c);192.727(d);192.727(e);192.727(f);192.727(g)) (also presented in: FS.FG)

Question Text Does the process include adequate requirements for the abandonment and deactivation of pipelines and facilities?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 70.15.01 Rev. 13 - 02/25/13 - Abandonment or Deactivation of Facilities.

223. Question Result, ID, References

Sat, MO.GM.ABANDONPIPE.R, 192.709(c) (192.727(a);192.727(b);192.727(c);192.727(d);192.727(e);192.727(f);192.727(g)) (also presented in: FS.FG)

Question Text Do records indicate pipelines and facilities were abandoned or deactivated in accordance with requirements?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

224. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 8355

Result Notes Reviewed all valve records for the entire district from 2013 to 2017. Most valves are maintained in September so many of the 2017 cycles were not completed yet. Three maintenance forms were missing for 2013 but electronic backup copies were available. There were no issues with valves and records were well maintained.

225. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 3655

Result Notes Looked at the last three years of valve records.

226. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

227. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 48785, Unit 8375

Page 43: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes One valve to check on the CDA Extension Line number 2409.

228. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

229. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 8365

Result Notes Looked at all of the valve records for the district.

230. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 3675

Result Notes Seven MLV's have been automated since 2014.

231. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 8385

Result Notes Valve section maintenance is organized by mini districts:

Kennewick mini 2014 - 2017

Zillah mini 2014 - 2017

Wenatchee mini 2014 - 2016 (2017 not completed yet)

Roosevelt mini 2014 - 2017 (one in 2017)

Prosser mini 2014 - 2017

Goldendale mini 2014 - 2017

232. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 4125

Result Notes Reviewed last three years of records.

233. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 48795

Page 44: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes Reviewed Plymouth, Meacham Compressor Stations and pipeline valves.

234. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 48005

Result Notes Check grease fittings on MLVs.

235. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.R, 192.709(c) (192.745(a);192.745(b))

Question Text Do records indicate proper inspection and partial operation of transmission line valves that may be required during an emergency as required and prompt remedial actions taken if necessary?

Assets Covered Unit 8545

Result Notes Reviewed 2014 to 2017 valve records.

236. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 8395

Result Notes Verified in the field.

237. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 48005

Result Notes Verified in the field.

238. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 8545

Result Notes Verified in the field.

239. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 8375

Result Notes This appeared to be ok.

240. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 3655

Result Notes Verified in the field.

241. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 48785

Result Notes This issue was resolved during our November 7th conference call.

242. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Page 45: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 48795, Unit 8385

Result Notes Reviewed each MLV and Tap Valve location in the Plymouth and Pasco Districts.

243. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 3675

Result Notes This was checked in the field.

244. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 1305

Result Notes Verified in the field.

245. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 4125

Result Notes This was checked in the field.

246. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 8365

Result Notes This was verified in the field.

247. Question Result, ID, References

Sat, MO.GM.VALVEINSPECT.O, 192.745(a) (192.745(b))

Question Text Are field inspection and partial operation of transmission line valves adequate?

Assets Covered Unit 8355

Result Notes All block valves were inspected. A sampling of valves were operated including manual and automatic gas operated. No operational issues.

MO.GO: Gas Pipeline Operations

248. Question Result, ID, References

Sat, MO.GO.CONTSURVEILLANCE.R, 192.709(c) (192.613(a);192.613(b);192.703(b);192.703(c)) (also presented in: MO.GOCLASS)

Question Text Do records indicate performance of continuing surveillance of facilities as required, and also the reconditioning, phasing out, or MAOP reduction in any pipeline segment that was determined to be in unsatisfactory condition but on which no immediate hazard existed?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure looks ok that is attached. More observations will happen during the inspection.

249. Question Result, ID, References

Sat, MO.GO.SRC.P, 192.605(a) (192.605(d);191.23(a))

Question Text Does the process include instructions enabling personnel who perform operation and maintenance activities to recognize conditions that may potentially be safety-related conditions?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

Page 46: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

MO.GMOPP: Gas Pipeline Overpressure Protection

250. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGCAP.P, 192.605(b)(1) (192.743(a);192.743(b);192.743(c))

Question Text Does the process include procedures for ensuring, either by testing or a review of calculations, at intervals not exceeding 15 months, but at least once each calendar year, that the capacity of each pressure relief device at pressure limiting stations and pressure regulating stations has sufficient capacity, and for installing a new or additional device if a relief device is determined to have insufficient capacity?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

251. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGCAP.R, 192.709(c) (192.743(a);192.743(b);192.743(c))

Question Text Do records indicate testing or review of the capacity of each pressure relief device at each pressure limiting station and pressure regulating station as required and a new or additional device installed if determined to have insufficient capacity?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such relevant facilities/equipment existed in the scope of inspection review at the Compressor Stations since they all have kill switches for overpressure protection with relief valve back up that is not required per regulation.

Check in the field.

252. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.P, 192.605(b)(1) (192.739(a);192.739(b))

Question Text Does the process include procedures for inspecting and testing each pressure limiting station, relief device, and pressure regulating station and their equipment at intervals not exceeding 15 months, but at least once each calendar year as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

253. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 8385

Result Notes Reviewed the following:

Zillah MS 2014-16

Yakima firing 2014-16

Yakima Chief 2014-16

Yakima MS 2014-16

Wenatchee Reg 2014-16

Walla Walla MS 2014-16

Unocal Finley Reg 2014-16

Sunnyside 2014-16

Sandvik Reg 2014-16

Page 47: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Richland Y Reg 2014-16

Quincy MS 2014-17

Prosser MS 2014-16

Plymouth MS 2014-16

Peterson MS out of service as of 2012

North Selah MS 2013-16

Moxee MS 2014-16

Kittitas MS no relief here as of 2007

Kennewick Reg 2014-17

Kawecki Reg 2014-16

John Day Dam reg 2014-17

John Day Dam Relief 2014-17

Grandview Reg 2014-16

Goldendale 2014-16

Ellensburg Reg 2014-16

DeHann Dairy 2014-16

Brulotte Hop Reg 2014-16

Benton PUD MS 2014-17

Alcoa 2014-17

254. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 48795

Result Notes Looked at Milton-Freewater; Athena MS Regulator and Relief; Herminston MS Regulator and Relief Valve.

255. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 8355

Result Notes Reviewed from 2013 to 2017. Most 2017 cycles have not been completed yet. There was some documentation missing from the folders but the inspection forms were all found in the office. No issues with regulator devices.

256. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Page 48: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 48785, Unit 8545, Unit 8375

Result Notes These appeared to be ok.

257. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

258. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 4125

Result Notes Looked at the last three years of records for the kill switches at the compressor stations.

259. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

260. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 48005

Result Notes Look at valve Cig 14 in the field. This was found to be ok.

261. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 8365

Result Notes Look at years 2013, 2014 and 2015 for all locations.

262. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 3655

Result Notes Looked at all meter stations for the past three years.

263. Question Result, ID, References

Sat, MO.GMOPP.PRESSREGTEST.R, 192.709(c) (192.739(a);192.739(b))

Question Text Do records indicate inspection and testing of pressure limiting, relief devices, and pressure regulating stations as required and at the specified intervals?

Assets Covered Unit 3675

Result Notes Reviewed the last three to four years for inspection records.

MO.RW: ROW Markers, Patrols, Leakage Survey and Monitoring

Page 49: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

264. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 4125

Result Notes Looked at the last three years of data.

265. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8365

Result Notes Looked at the past three years for the District.

266. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8355

Result Notes Reviewed patrols for Class 3 areas: Done quarterly.

Line 1401, Sedro Woolley, Arlington, Granite Falls (2014 - 2017)

Line 1408, Granite Falls, Arlington, Sedro Woolley (2014 - 2017)

Line 2459, Stanwood (2014 - 2017)

Class 1&2 semi annual Patrols (2014 - 2017)

Line 1401,

Line 1408,

2400 Bellingham Lateral

2459 Stanwood Lateral

2467 Bellingham Lateral

1401 Granite Falls semi annuual

1401 Arlington semi annuual

1401 Sedro Woolley

1401 Deming

1401 Mushroom Farm

1408 Granite Falls

1408 Arlington

1408 Sedro Woolley

Page 50: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

1408 Deming

1408 Mushroom Farm

2459 Stanwood

Instrumented Leak Surveys Class 3 (Flame Pak) semi annual

1401 Granite Falls

1401 Arlington

1401 Sedro Woolley missing 1st half 15 and 2nd 16

1401 Deming

1401 Mushroom Farm same issue as above

1408 Granite Falls

1408 Arlington

1408 Sedro Woolley

1408 Deming

1408 Mushroom Farm

2459 Stanwood

267. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

268. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 3675

Result Notes Looked at the last three years.

269. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

270. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Page 51: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 3655

Result Notes Looked at the last three years.

271. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8385

272. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 48785, Unit 48005, Unit 8545, Unit 8375

273. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 48795

Result Notes Looked at Oregon area ROW patrols.

274. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8545

Result Notes Verified in the field.

275. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 48005

Result Notes Verified in the field.

276. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 3655

Result Notes Verified in the field.

277. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8355

278. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 48785, Unit 8375

Result Notes Some minor ROW clearing was needed in Idaho.This was taken care of and verified during our November 7th conference call.

279. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 48795, Unit 8385

Result Notes Reviewed each HCA in the Plymouth and Pasco Districts.

Page 52: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

280. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 1305

Result Notes Verified in the field.

281. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8365

Result Notes ROW was in good shape in the Battleground District.

282. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8395

Result Notes Verified in the field.

283. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 4125

Result Notes Looked at the last three years of data.

284. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW, PD.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 3675

285. Question Result, ID, References

Sat, MO.RW.LEAKAGE.R, 192.709(c) (192.706;192.706(a);192.706(b))

Question Text Do records indicate leakage surveys conducted as required?

Assets Covered Unit 8365

Result Notes Laser leak survey procedure for using LIDAR is attached. Looked at the past three years for the District.

Check these records in the Redmond District as this is the only one where this technology is used to meet Part 192 requirements.

286. Question Result, ID, References

Sat, MO.RW.LEAKAGE.R, 192.709(c) (192.706;192.706(a);192.706(b))

Question Text Do records indicate leakage surveys conducted as required?

Assets Covered Unit 3675

Result Notes Aerial patrols, walking and driving patrols are conducted.

287. Question Result, ID, References

Sat, MO.RW.LEAKAGE.R, 192.709(c) (192.706;192.706(a);192.706(b))

Question Text Do records indicate leakage surveys conducted as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 1305, Unit 8375

Page 53: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

288. Question Result, ID, References

Sat, MO.RW.LEAKAGE.R, 192.709(c) (192.706;192.706(a);192.706(b))

Question Text Do records indicate leakage surveys conducted as required?

Assets Covered Unit 8385

289. Question Result, ID, References

Sat, MO.RW.LEAKAGE.R, 192.709(c) (192.706;192.706(a);192.706(b))

Question Text Do records indicate leakage surveys conducted as required?

Assets Covered Unit 8355

Result Notes Reviewed leak surveys for all Class 3 areas and class 1&2, both instrumented and non instrumented. This district does not use laser flyover surveys.

Line 1401, Sedro Woolley, Arlington, Granite Falls (2014 - 2017)

Line 1408, Granite Falls, Arlington, Sedro Woolley (2014 - 2017)

Line 2459, Stanwood (2014 - 2017)

Class 1&2 semi annual Patrols and visual leak surveys (2014 - 2017)

Line 1401,

Line 1408,

2400 Bellingham Lateral

2459 Stanwood Lateral

2467 Bellingham Lateral

1401 Granite Falls semi annuual leak surveys

1401 Arlington semi annuual

1401 Sedro Woolley

1401 Deming

1401 Mushroom Farm

1408 Granite Falls

1408 Arlington

1408 Sedro Woolley

1408 Deming

1408 Mushroom Farm

2459 Stanwood

Page 54: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Instrumented Leak Surveys Class 3 (Flame Pak) semi annual

1401 Granite Falls

1401 Arlington

1401 Sedro Woolley

1401 Deming

1401 Mushroom Farm

1408 Granite Falls

1408 Arlington

1408 Sedro Woolley

1408 Deming

1408 Mushroom Farm

2459 Stanwood

290. Question Result, ID, References

Sat, MO.RW.LEAKAGE.R, 192.709(c) (192.706;192.706(a);192.706(b))

Question Text Do records indicate leakage surveys conducted as required?

Assets Covered Unit 4125

Result Notes Looked at the last three years of data.

291. Question Result, ID, References

Sat, MO.RW.LEAKAGE.R, 192.709(c) (192.706;192.706(a);192.706(b))

Question Text Do records indicate leakage surveys conducted as required?

Assets Covered Unit 48795

Result Notes Looked at Oregon records.

PD.OC: One-Call Damage Prevention

292. Question Result, ID, References

Sat, PD.OC.TPD.P, 192.614(c)(1)

Question Text Does the process specify how reports of Third Party Activity and names of associated contractors or excavators are input back into the mail-outs and communications with excavators along the system?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 07.60.01.05 Rev. 00 03/30/17 - Excavation Damage and Near Miss Reporting

293. Question Result, ID, References

Sat, PD.OC.TPDONECALL.P, 192.614(c)(3)

Question Text Does the process specify how reports of TPD are checked against One-Call tickets?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

Page 55: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

294. Question Result, ID, References

Sat, PD.OC.PDPROGRAM.R, 192.614(c)

Question Text Does the damage prevention program meet minimum requirements specified in 192.614(c)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

PD.PA: Public Awareness

295. Question Result, ID, References

Sat, EP.ERG.LIAISON.R, 192.605(a) (192.615(c)(1);192.615(c)(2);192.615(c)(3);192.615(c)(4);192.616(c);ADB-05-03) (also presented in: EP.ERG)

Question Text Do records indicate that liaison has been established and maintained with appropriate fire, police, public officials, and utility owners?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached attendance sheets.

296. Question Result, ID, References

Sat, PD.PA.EVALPLAN.P, 192.616(i) (192.616(c);API RP 1162 Section 8;API RP 1162 Appendix E)

Question Text Does the program include a process that specifies how program implementation and effectiveness will be periodically evaluated?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments for the last three years and copy of effectiveness section of plan.

297. Question Result, ID, References

Sat, PD.PA.EVALIMPL.R, 192.616(c) (192.616(i);API RP 1162 Section 8.3)

Question Text Has an audit or review of the operator's program implementation been performed annually since the program was developed?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached records from the last three years.

298. Question Result, ID, References

Sat, PD.PA.AUDITMETHODS.R, 192.616(c) (192.616(i);API RP 1162 Section 8.3)

Question Text Was one or more of the three acceptable methods (i.e., internal assessment, 3rd-party contractor review, or regulatory inspections) used to complete the annual audit or review of program implementation?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This was acceptable.

299. Question Result, ID, References

Sat, PD.PA.PROGRAMIMPROVE.R, 192.616(c) (API RP 1162 Section 8.3)

Question Text Were changes made to improve the program and/or the implementation process based on the results and findings of the annual audit(s)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached records from the last three years.

300. Question Result, ID, References

Sat, PD.PA.EVALEFFECTIVENESS.R, 192.616(c) (API RP 1162 Section 8.4)

Question Text Have effectiveness evaluation(s) of the program been performed for all stakeholder groups in all notification areas along all systems covered by the program?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 56: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes See attached records from the last three years.

301. Question Result, ID, References

Sat, PD.PA.MEASUREOUTREACH.R, 192.616(c) (API RP 1162 Section 8.4.1)

Question Text In evaluating effectiveness, was actual program outreach for each stakeholder audience tracked?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached records from the last three years.

302. Question Result, ID, References

Sat, PD.PA.MEASUREUNDERSTANDABILITY.R, 192.616(c) (API RP 1162 Section 8.4.2)

Question Text In evaluating program effectiveness, was the percentage of each stakeholder audience that understood and retained the key information from the messages determined?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached records from the last three years.

303. Question Result, ID, References

Sat, PD.PA.MEASUREBEHAVIOR.R, 192.616(c) (API RP 1162 Section 8.4.3)

Question Text In evaluating program effectiveness, was evaluation made of whether appropriate preventive, response, and mitigative behaviors were understood and likely to be exhibited?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached records from the last three years.

304. Question Result, ID, References

Sat, PD.PA.MEASUREBOTTOM.R, 192.616(c) (API RP 1162 Section 8.4.4)

Question Text Were bottom-line results of the program measured by tracking third-party incidents and consequences including: (1) near misses, (2) excavation damages resulting in pipeline failures, (3) excavation damages that do not result in pipeline failures?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached records from the last three years.

PD.RW: ROW Markers, Patrols, Monitoring

305. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 4125

Result Notes Looked at the last three years of data.

306. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 3675

Result Notes Looked at the last three years.

307. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

308. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Page 57: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 3655

Result Notes Looked at the last three years.

309. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8365

Result Notes Looked at the past three years for the District.

310. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

311. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8355

Result Notes Reviewed patrols for Class 3 areas: Done quarterly.

Line 1401, Sedro Woolley, Arlington, Granite Falls (2014 - 2017)

Line 1408, Granite Falls, Arlington, Sedro Woolley (2014 - 2017)

Line 2459, Stanwood (2014 - 2017)

Class 1&2 semi annual Patrols (2014 - 2017)

Line 1401,

Line 1408,

2400 Bellingham Lateral

2459 Stanwood Lateral

2467 Bellingham Lateral

1401 Granite Falls semi annuual

1401 Arlington semi annuual

1401 Sedro Woolley

1401 Deming

1401 Mushroom Farm

1408 Granite Falls

Page 58: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

1408 Arlington

1408 Sedro Woolley

1408 Deming

1408 Mushroom Farm

2459 Stanwood

Instrumented Leak Surveys Class 3 (Flame Pak) semi annual

1401 Granite Falls

1401 Arlington

1401 Sedro Woolley missing 1st half 15 and 2nd 16

1401 Deming

1401 Mushroom Farm same issue as above

1408 Granite Falls

1408 Arlington

1408 Sedro Woolley

1408 Deming

1408 Mushroom Farm

2459 Stanwood

312. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 48795

Result Notes Looked at Oregon area ROW patrols.

313. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 48785, Unit 48005, Unit 8545, Unit 8375

314. Question Result, ID, References

Sat, MO.RW.PATROL.R, 192.709(c) (192.705(a);192.705(b);192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Do records indicate that ROW surface conditions have been patrolled as required?

Assets Covered Unit 8385

315. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Page 59: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8545

Result Notes Verified in the field.

316. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 48785, Unit 8375

Result Notes Some minor ROW clearing was needed in Idaho.This was taken care of and verified during our November 7th conference call.

317. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 3655

Result Notes Verified in the field.

318. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 48005

Result Notes Verified in the field.

319. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8355

320. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 48795, Unit 8385

Result Notes Reviewed each HCA in the Plymouth and Pasco Districts.

321. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 4125

Result Notes Looked at the last three years of data.

322. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8395

Result Notes Verified in the field.

323. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 3675

324. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Page 60: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 1305

Result Notes Verified in the field.

325. Question Result, ID, References

Sat, MO.RW.ROWCONDITION.O, 192.705(a) (192.705(c)) (also presented in: MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW, MO.RW)

Question Text Are the ROW conditions acceptable for the type of patrolling used?

Assets Covered Unit 8365

Result Notes ROW was in good shape in the Battleground District.

RPT.NR: Notices and Reporting

326. Question Result, ID, References

Sat, RPT.NR.NOTIFYIMCHANGE.P, 192.909(b)

Question Text Is the process for notifying PHMSA and/or state/local authorities of significant changes to the Integrity Management Program adequate?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure is in the process of being updated.

327. Question Result, ID, References

Sat, RPT.NR.NOTIFYIMCHANGE.R, 192.947(i) (192.909(b))

Question Text Do records demonstrate that PHMSA and/or state/local authorities were notified of significant changes to the Integrity Management Program?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Look for letter to PHMSA about significant change to the Williams Companies IM Plan.

RPT.RR: Regulatory Reporting (Traditional)

328. Question Result, ID, References

Sat, RPT.RR.IMMEDREPORT.P, 191.5(b) (191.7)

Question Text Is there a process to immediately report incidents to the National Response Center?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Williams updated the WA state notification number in the procedure.

329. Question Result, ID, References

Sat, RPT.RR.IMMEDREPORT.R, 191.5(a) (191.7(a))

Question Text Do records indicate immediate notifications of incidents were made in accordance with 191.5?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

330. Question Result, ID, References

Sat, RPT.RR.SRCR.P, 192.605(a) (191.23(a);191.23(b);191.25(a);191.25(b))

Question Text Do the procedures require reporting of safety-related conditions?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes All conditions requiring reports to be submitted is covered by the attached procedures.

331. Question Result, ID, References

NA, RPT.RR.SRCR.R, 191.23(a) (191.23(b);191.25(a);191.25(b))

Question Text Do records indicate safety-related condition reports were filed as required?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 61: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

332. Question Result, ID, References

Sat, RPT.RR.NPMSANNUAL.R,

Question Text Do records indicate NPMS submissions were completed each year, on or before March 15, representing all in service, idle and retired assets as of December 31 of the previous year (excludes distribution lines and gathering lines), and that if no modifications occurred, an email was submitted stating that fact?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

SRN.AR: Assessment and Repair

333. Question Result, ID, References

NIC, SRN.AR.B318S.S, N/A (N/A)

Question Text Has the operator considered the appropriate industry standards?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Will email a pdf list of standards and references they have adopted.

334. Question Result, ID, References

NIC, SRN.AR.ILIUSE.S, N/A (N/A)

Question Text Are ILI tools utilized to assess the integrity of any pipeline systems?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Yes. Specific tools for specific threats were reviewed. No issues.

335. Question Result, ID, References

NIC, SRN.AR.THREATID.S, N/A (N/A)

Question Text Have specific threats been identified that require specific ILI tools to be used on any pipeline system in the last 3 years?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Yes - SCC

336. Question Result, ID, References

NIC, SRN.AR.ASSESSDELAY.S, N/A (N/A)

Question Text Has the performance of any integrity assessments been delayed such that a schedule or required timeframe was exceeded?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes All integrity assessments performed as required.

337. Question Result, ID, References

NIC, SRN.AR.PRESSREDSD.S, N/A (N/A)

Question Text Has a pressure reduction been taken or a pipeline shutdown in the last 3 years in response to remediate a condition identified from an integrity assessment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes • Pressure reductions were reviewed. No issues.

338. Question Result, ID, References

NIC, SRN.AR.REPCRIT.S, N/A (N/A)

Question Text Does the operator utilize the same response/repair criteria in HCA and non HCA's?

Page 62: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached procedure.

339. Question Result, ID, References

NIC, SRN.AR.CRACKIDENT.S, N/A (N/A)

Question Text Have any cracks or crack-like features been identified and remediated on any of the pipeline system in the last 3 years?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes N. Seattle lateral and Willard to Washougal. May add question in this area.

340. Question Result, ID, References

NIC, SRN.AR.CONTRACTASSESS.S, N/A (N/A)

Question Text Are contractor personnel used to perform assessment and repair tasks; and if so, what are the tasks that contractors typically perform for the operator?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Contractors always have company employee oversight.

341. Question Result, ID, References

NIC, SRN.AR.LINEREPLACEMOVE.S, N/A (N/A)

Question Text Have any pipeline movement or replacement projects been performed in the last 3 years? If so, identify the projects and locations.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes May want to look at the Kalama strain relief project.

342. Question Result, ID, References

NIC, SRN.AR.INTEGRITYPROJECT.S, N/A (N/A)

Question Text Describe the most significant integrity assessments, remediation, replacement, and reconditioning projects that will be taking place this year.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

SRN.TQ: Training and Qualification

343. Question Result, ID, References

NIC, SRN.TQ.OQPLANMOD.S, N/A (N/A)

Question Text Has the manual of written procedures been significantly modified since the last PHMSA OQ inspection?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Add T&Q questions.

344. Question Result, ID, References

NIC, SRN.TQ.OQCONST.S, N/A (N/A)

Question Text Is new construction covered under the OQ Plan?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No issues with this question.

345. Question Result, ID, References

NIC, SRN.TQ.OQISSUES.S, N/A (N/A)

Question Text Have all open enforcement issues been remediated?

Page 63: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No open issues of enforcement for OQ.

346. Question Result, ID, References

NIC, SRN.TQ.OQSITEVARIATION.S, N/A (N/A)

Question Text How are site specific variations accounted for?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This is being done.

347. Question Result, ID, References

NIC, SRN.TQ.OQPERSONNEL.S, N/A (N/A)

Question Text How many personnel are covered by the OQ Plan, both in house and contractor?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes NWP Employees covered by our OQ Plan is approximately 182.

Contractor Companies working for NWP is about 284 between 2014, 2015 and 2016.

The Williams OQ Plan definition of a contractor is:

An individual, a company employing individuals, subcontracted individuals, vendor, or any other entity performing Covered Tasks by mutual agreement for Williams.

348. Question Result, ID, References

NIC, SRN.TQ.OQERP.S, N/A (N/A)

Question Text Does the OQ Plan address Emergency Response Training and Qualification or is this contained elsewhere (such as Emergency Response Plan)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No issues. Training procedures found in section 7 of the Emergency Response Procedures Manual.

349. Question Result, ID, References

NIC, SRN.TQ.OQREMOVAL.S, N/A (N/A)

Question Text Has an OQ-qualified individual been removed from performing a covered task?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes One employee in the Vernal district was removed. This employees records were reviewed.

The polarity was read incorrectly on a critical bond. CP-409 task

The employee was removed from the ability to conduct this task until further training was provided. Documentation and email chains were reviewed.

SRN.CR: CRM, SCADA, and Leak Detection

350. Question Result, ID, References

NIC, SRN.CR.SCADACONDITION.S, N/A (N/A)

Question Text Is there a SCADA System or other remote/field automation utilized?

Page 64: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes The SCADA system is comprised of redundant systems located at our Primary Site (Salt Lake City) and Backup Site (Evanston, WY). The system is composed of a pair of Real-time and Historical servers in Salt Lake City as well as a single real-time and historical servers in Evanston. They poll field devices over various types of communication channels. The sites polled by the SCADA system includes: compressor, meter, valve, chromatograph and regulator stations. Some sites are controllable by pipeline control, while others are polled for data gathering purposes only. The SCADA team works closely with Pipeline Control, Field Automation and Field Communications to establish new or update existing sites.

351. Question Result, ID, References

NIC, SRN.CR.LOGGING.S, N/A (N/A)

Question Text Is there a logging process for system events, alarms, and commands?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes The process of the SCADA system captures the events alarms and commands and writes them to a historical database. Examples of data collected are trending, workstation logins, operator commands/controls, operational events, alarms and any database configuration changes.

The PAS alarm management software captures alarms that are annunciated/presented to Pipeline Control consoles. This allows Pipeline Control to gather valuable information for frequent updates of alarms and events.

A review was conducted through interviews with controllers on the types of alarms that their SCADA system generates and what data is captured and documented such as over pressure conditions.

Discussed that MAOP plus allowable buildup now needs to be reported.

Shift change protocol was discussed. This is the process for communicating info from one controller to the next. 15-30 minute shift overlap. All logged electronically.

352. Question Result, ID, References

NIC, SRN.CR.CONTROLCNTR.S, N/A (N/A)

Question Text Where is the main Control Center located?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes 295 Chipeta Way, Salt Lake City, UT 84108

353. Question Result, ID, References

NIC, SRN.CR.CONTROLLERS.S, N/A (N/A)

Question Text How many controllers are there total and per shift, and what is their work schedule/shift?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes They use a modified Dupont rotating shift schedule. Always two controllers in the room.

Controllers in total with 2 per shift; see sample schedule below; shifts are from 6 am to 6 pm with a 15 to 30 minute shift turnover prior to beginning each shift; 1 Floating Controller; 2 Pipeline Controller Lead; and 1 Manager. 63 hours max work time with 35 hours in between day and night shift.

Page 65: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Salt Lake City North Console Schedule

Week M T W T F S 1 X N N N N X 2 X D D D X X 3 F F F X X N 4 N X X X D D 5 D X X X X X

Salt Lake City South Console Schedule Week M T W T F S 1 X N N N N X 2 X D D D X N 3 N X X X D D 4 D X X X X X

354. Question Result, ID, References

NIC, SRN.CR.SCADACOVERAGE.S, N/A (N/A)

Question Text How are SCADA Systems implemented and used in the system?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Mile post 756.2 is the break point between the North and South Division.

The Salt Lake City SCADA system polls 2 defined areas: North Division and South Division. Twelve (12) groups are divided into these two (2) divisions. (Note: ?areas? and ?groups? are terms used in SCADA)

The sites polled by the North and South Division SCADA system includes: compressor, meter, valve, chromatograph and regulator stations. Some sites are controllable by pipeline control, while others are polled for data gathering purposes only.

SCADA data is used primarily for monitoring and controlling the pipeline, but it is also used to feed various applications (e.g. FlowCal measurement system, NWP Passage system / Scheduling system, OMS ? maintenance scheduling system.)

355. Question Result, ID, References

NIC, SRN.CR.SCADACOMPLY.S, N/A (N/A)

Question Text Is SCADA or other forms of automation used to help achieve compliance with Federal pipeline regulations, and if so, to what extent?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes SCADA displays are used collect, organize and display operational parameters to the Pipeline Controller who is responsible for monitoring and taking appropriate action when abnormal conditions and alarms occur. The SCADA displays indicate MOP/MAOP limits to the Pipeline Controller and station automation is

Page 66: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

programmed to respond to increasing pressure profiles on the pipeline by reducing compressor RPM, shutting down compressor units, and shutting down the compressor station as the pressure increases. Alarms are logged into SCADA. SCADA systems are not generally the only documentation for documenting compliance or reportable events. Other forms are used in addition to the recorded SCADA information.

356. Question Result, ID, References

NIC, SRN.CR.LEAKDET.S, N/A (N/A)

Question Text How are leaks detected (system in place, procedures available)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Leak Detection is performed through our Public Awareness Program, pipeline patrol, and 24-hour monitoring in the Pipeline Control Center. A rate of change (roc) alarm annunciates in the control center if the pressure change meets or exceeds the specific calculation requirements of the SCADA system. Pipeline Controllers monitor operational parameters on the pipeline and respond to abnormal conditions and alarms.

SRN.DC: Design and Construction

357. Question Result, ID, References

NIC, SRN.DC.CONSTPROCNEW.S, N/A (N/A)

Question Text Is the process different for managing "new facility" construction projects vs. managing "maintenance" construction projects?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No issues.

358. Question Result, ID, References

NIC, SRN.DC.CONSTOQ.S, N/A (N/A)

Question Text Does the process differentiate between new construction and operation/maintenance as relates to OQ applicability?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No issues.

359. Question Result, ID, References

PAC, SRN.DC.DAMAGE1ST2NDPARTY.S, N/A (N/A)

Question Text Within the last 3 years have there been any "first party" (operator personnel-caused) or "second party" (operator's contractor personnel-caused) damages to in-service pipeline caused by construction activity near the line?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Issue Summary Two 2nd party hits were reviewed.

Review new procedures that were implemented after the

October 22, 2014 (Boise)

August 15, 2016 (Pasco)

Procedure pending implementation (requires training) Published in January 2017. Not enacted yet!!

Result Notes Two 2nd party hits were reviewed.

Review new procedures that were implemented after the

Page 67: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

October 22, 2014 (Boise)

August 15, 2016 (Pasco)

Procedure pending implementation (requires training) Published in January 2017. Not enacted yet!!

360. Question Result, ID, References

NIC, SRN.DC.LEAKMATCONST.S, N/A (N/A)

Question Text Any construction or material related leaks on pipelines or components within the last 3 years, including material incompatibilities?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes The UTC reviewed a seam leak on the Shelton Lateral at the time it occurred in 2015 and was repaired in 2016. At the time a tool run was not feasible. The pipeline has since been made piggable. A tool run is scheduled for 2017. The leak was caused by a manufacturing flaw.

No issues noted.

361. Question Result, ID, References

NIC, SRN.DC.CONSTHYDROFAIL.S, N/A (N/A)

Question Text Have there been any post-construction (pre-commissioning, including replacement projects) hydrotest failures within the last 3 years?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes None in the last three years.

362. Question Result, ID, References

PAC, SRN.DC.PROJECT.S, N/A (N/A)

Question Text Are pipeline and pipeline component construction project activities planned to be underway within the next 6 months?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Issue Summary Poor cover on pipe in the Redmond District.

Result Notes Nations Pasture pipeline in the Redmond district is nearly on the surface. The swamp weights are above ground. Permitting issues are stopping Williams from adding depth on top of the pipe. HDD not feasible due to peat and sandy soils. Can't add depth due to flood plain. Army Corps of Engineers are involved.

Review in the field during the unit inspection if possible.

363. Question Result, ID, References

NIC, SRN.DC.PROJECTPRESSTEST.S, N/A (N/A)

Question Text Are pressure tests scheduled to occur within the next 6 months on existing pipelines or existing pipeline components (tests that are to be performed independent from normal post-construction testing)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes DOT project near MP 563, retest scheduled for 2017, 6 integrity assessment pressure tests scheduled for 2017. (2428 N Seattle, 2489 river road, 2407 Dalles, 2458 Vancouver Loop segments 1 & 2, 2421 Vancouver) Possible retests on Nooksack RV Lowering/Replace project and Hedges Line Lowering Southridge Road, and Lava to Pocatello 1400 line.

Page 68: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

364. Question Result, ID, References

NIC, SRN.DC.PROJECTSPECS.S, N/A (N/A)

Question Text Do written specifications or standards and drawings specify that the pipeline facility project (steel line pipe, compressor station, or pressure regulating/overpressure facilities) is to be constructed per code requirements?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes WilSOP Design Manual

01 41 01D RAGAGEP and Applicable Regulations and Industry Standards

Examples:

• Specification for Wall Thickness Design 840.0620 • Specification for Uncased Pipeline Crossings 840.1410 • ASME B31.8 Transmission Facility Piping Systems 40 05 31E • Specification for Meter Station Design 849.0601

365. Question Result, ID, References

NIC, SRN.DC.CONSTOQTASK.S, N/A (N/A)

Question Text What are the identified OQ program covered tasks that could be performed on the following construction-related projects: 1) new facility construction projects (including facility tie-in, commissioning, and start-up), and 2) maintenance construction projects (projects relating to facility replacement and testing attributable to compliance with the operations and maintenance sections of the regulations)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes The OQ plan does not specifically require OQ tasks for new construction. Refer to Appendix A ? C in the Williams OQ Plan for a list of Covered Tasks for O&M related construction. See email from Edgar with attached CT list.

Reviewed Williams Covered Task List, last updated 8/22/2016

SRN.EP: Emergency Preparedness and Response

366. Question Result, ID, References

NIC, SRN.EP.EPACTIVATE.S, N/A (N/A)

Question Text Have situations been experienced in the past 3 years that required activation of an emergency response in accordance with procedures?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes One incident that was not NRC worthy and Scott was out on this repair.

367. Question Result, ID, References

NIC, SRN.EP.EPDRILLS.S, N/A (N/A)

Question Text Have drills, including unannounced drills and/or drills outside of normal working hours, been conducted?

Page 69: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes None known at this time, but the operator will check the schedule.

368. Question Result, ID, References

NIC, SRN.EP.EPREVISION.S, N/A (N/A)

Question Text Have emergency procedures been revised in the past 3 years due to deficiencies identified during a drill or post-incident analysis?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

369. Question Result, ID, References

NIC, SRN.EP.EPTRAINING.S, N/A (N/A)

Question Text Has the emergency response training program been revised in the past 3 years due to deficiencies identified during a drill or post-incident analysis?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event happened.

SRN.FS: Facilities and Storage

370. Question Result, ID, References

NIC, SRN.FS.HCAFACILITY.S, N/A (N/A)

Question Text Are any facilities located in high consequence areas (HCAs)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes HCAs have been determined for Compressor and meter Stations based on the PIR of the piping within the station. Based on this criteria the following stations have been identified; Sumner CS, Novelty Hill MS, North Pasco MS, Gresham MS. The BAP references these HCAs.

Sumner CS and Novelty Hill MS are in Redmond. Inspect in field.

371. Question Result, ID, References

NA, SRN.FS.CMPSTATIONDIST.S, N/A (N/A)

Question Text Have compressor stations that supply gas directly to a distribution system that has no other adequate sources of gas available been significantly modified or constructed within the last 5 years?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such relevant facilities/equipment existed in the scope of inspection review.

SRN.IM: Integrity Management

372. Question Result, ID, References

NIC, SRN.IM.HCANEW.S, 192.905(c)

Question Text Have any new HCA's been identified in the last 3 years based on new information that may show that a pipeline segment impacts a high consequence area?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Yes.

Page 70: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

List available.

After they're identified an annual meeting is scheduled to discuss the new HCA's. An MOC is then issued.

Buffers are added to the centerline. See procedure.

HCA's are added to the IM Program and an assessment is scheduled to be conducted within the next 10 years.

373. Question Result, ID, References

NIC, SRN.IM.HCAMETHOD.S, 192.903(1)(i) (192.903(1)(ii);192.903(1)(iii);192.903(1)(iv))

Question Text Is method 1 or method 2 of the 192.903 High Consequence Area definition for the identification of HCAs used?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Method 2 is used.

Take the PIR or 660' (whichever is greater) and add another 100'.

Worst case scenario is 36" at 960 psig.

374. Question Result, ID, References

NIC, SRN.IM.RAMOD.S, 192.917(a) (192.917(e)(2);ASME B31.8S-2004, Section 2.2 and Section 5.10)

Question Text Describe the most significant modifications that have been made to the IM processes to identify and evaluate all potential threats to each covered pipeline segment in the last 3 years.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes • o Automated data collection

Shifted to quantitative risk model.

Threat identification view shows threat susceptibility across the organization.

Refer to RAP Manual and RAD for details.

Change risk model analysis from annual to monthly

Increase asset scope from HCA's to all pipe

Consider all 9 threats times consequence equals risk

375. Question Result, ID, References

NIC, SRN.IM.BAPSCHEDULE.S, N/A (N/A)

Question Text Have the timing requirements in the BAP schedule for completing the assessment activities for all covered segments been met?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 71: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes This appears to be acceptable.

376. Question Result, ID, References

NIC, SRN.IM.PERIODICEVALMOC.S, N/A (N/A)

Question Text Describe the most significant actions implemented to address the threats identified and the risk represented by these threats as a result of a periodic evaluation for a specific covered segment.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachement.

377. Question Result, ID, References

NIC, SRN.IM.PMIMPGENERAL.S, N/A (N/A)

Question Text Describe the most significant additional measures implemented in the last 3 years to prevent a pipeline failure and to mitigate the consequences of a pipeline failure in a high consequence area?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Waiting on spreadsheet from Matt.

378. Question Result, ID, References

NIC, SRN.IM.PMIMPTHREAT.S, N/A (N/A)

Question Text Describe the most significant preventive and mitigative measures that have been implemented in the last 3 years regarding threats due to third party damage, outside force damage, or corrosion as required by the process.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Waiting on spreadsheet from Matt.

379. Question Result, ID, References

NIC, SRN.IM.PERFMEASURE.S, N/A (N/A)

Question Text What has been learned as a result of the evaluation of the performance measures, and what significant changes have been made to the IMP as a result of the evaluation of the performance measures in the last 3 years?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached spreadsheet.

380. Question Result, ID, References

PAC, SRN.IM.MOC.S, N/A (N/A)

Question Text Describe the most significant changes that have been implemented and moved through the Management of Change (MOC) processes for risk management applications in the last 3 years.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Issue Summary New Risk Model has been implemented.

Result Notes New Risk Model has been implemented so this entire module will be implemented. This is a potential issue since procedures appear to have not been developed prior to activity implementation.

381. Question Result, ID, References

NA, SRN.IM.EXCPERFORM.S, 192.913

Question Text Is there any deviating from certain requirements of Subpart O by using a performance-based approach that satisfies the requirements for exceptional performance, as defined in 192.913?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No exceptional performance claim in any portion of the program.

SRN.MO: Maintenance and Operations

Page 72: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

382. Question Result, ID, References

NIC, SRN.MO.ABPROCESS.S, N/A (N/A)

Question Text Describe the process for responding to and learning from abnormal operation events.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes 07.16.01.05 - Abnormal Operations: Gas Transportation

Reviewed form used for documenting AO's.

383. Question Result, ID, References

NIC, SRN.MO.ODORIZE.S, N/A (N/A)

Question Text Are any portions of the pipeline system(s) non-odorized?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Redmond District Odorized Pipelines ? N. Seattle and S. Tacoma laterals (Williams maintains odorant). S. Seattle and N. Tacoma (Puget maintains odorant).

Eugene District ? Entire district is odorized. NW Natural injects the odorant at Washougal CS, which would include the Camas Eugene mainline and loop line, and Eugene Grants Pass laterals.

Battleground District ? Three miles of Camas Eugene mainline are odorized by others. The Dalles Lateral is odorized by others. NWN

Sumas District ? The Stanwood lateral is odorized by Cascade.

No naturally odorized lines.

384. Question Result, ID, References

NIC, SRN.MO.CLASSLOCATEMAOPREV.S, N/A (N/A)

Question Text Has there been a class location change occur in the past 3 years that required a study and the subsequent confirmation or revision of the pipeline segment's MAOP?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

385. Question Result, ID, References

NIC, SRN.MO.MAOPSEGPROTECT.S, N/A (N/A)

Question Text Are there any segment-specific MAOP protection controls in place?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes They do have some of these facilities, but Scott is familiar with most of them.

386. Question Result, ID, References

NA, SRN.MO.AMAOP.S, N/A (N/A)

Question Text Does the operator have any segments of pipeline that are operating under the alternate maximum allowable operating pressure limitations?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

Page 73: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

SRN.MULTI: Multi-Module Screening Question

387. Question Result, ID, References

NIC, SRN.MULTI.RECORDLOCATE.S, N/A (N/A)

Question Text Where are the records kept, or electronically available, for: (see Considerations)

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Records could be stored in Salt Lake City, Tulsa, Houston or field locations.

388. Question Result, ID, References

NIC, SRN.MULTI.NEARMISS.S, N/A (N/A)

Question Text Are "near misses" tracked, and if so, how are "near misses" defined?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Definition of Near Miss - An event that did not result in undesired consequence, including but not limited to injury, illness, or damage, but could have potentially resulted in injury, illness, or damage.

389. Question Result, ID, References

NIC, SRN.MULTI.ASSETCHANGE.S, N/A (N/A)

Question Text Describe the significant asset acquisitions, mergers and divestitures in the last five years.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes For NWP facilities there been no acquisitions/divestitures to the system in the last five years. Josh: Klamath Falls lateral sale was in June 2012 according to Xan Kotter.

390. Question Result, ID, References

NIC, SRN.MULTI.IMPLANMOD.S, N/A (N/A)

Question Text Describe the most significant changes to the IMP processes and procedures since the last IMP or II IMP-related inspection.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Last IMP inspection was in 2015 by Eastern and Southern PHMSA regions. No significant changes were made as a result of that inspection.

391. Question Result, ID, References

PAC, SRN.MULTI.OMPLANMOD.S, N/A (N/A)

Question Text Has the manual of written procedures been significantly modified since the last PHMSA O&M inspection?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Issue Summary All of the O&M manual is in the process of being combined across all Williams Operating Companies.

Result Notes All of the O&M manual is in the process of being combine across all Williams Operating Companies and I recommend that a team O&M inspection be performed.

392. Question Result, ID, References

PAC, SRN.MULTI.IDLEPIPE.S, N/A (N/A)

Question Text Are any pipelines currently identified as "idle"?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Issue Summary Review isolation of Bellingham Lateral in-service status.

Result Notes Review isolation of Bellingham Lateral from the mainline or in-service status.

393. Question Result, ID, References

NIC, SRN.MULTI.IDLERETURN.S, N/A (N/A)

Question Text Have any pipelines been returned to service in the last 3 years that were previously considered to be "idle"?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 74: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes No pipelines fit this criteria.

394. Question Result, ID, References

NIC, SRN.MULTI.OMMOC.S, N/A (N/A)

Question Text How are systemic maintenance and operations changes handled?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

395. Question Result, ID, References

NIC, SRN.MULTI.SRCR.S, N/A (N/A)

Question Text Discussion of SRCRs.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes April 2013 there were anomalies in Kamas to Eugene, OR in Eugene District. These are now closed.

396. Question Result, ID, References

NIC, SRN.MULTI.ANNUALREPORT.S, N/A (N/A)

Question Text Discussion of Annual Reports

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Annual reports were done as required.

397. Question Result, ID, References

NIC, SRN.MULTI.REPAIR.S, N/A (N/A)

Question Text Discussion of Anomaly repairs.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No issues on this item as most of the repairs being done are re-coats.

398. Question Result, ID, References

NIC, SRN.MULTI.NEWFACILITIES.S, N/A (N/A)

Question Text Have any new facilities or components been constructed/added within the last three years that did not meet the notification requirements?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See project spreadsheet, New Valves 1400 MP 6.3 (for compliance order) & 1400 705.1, New meter stations added. Cheyenne Gate Meter Station, Keys Road Meter Station(station added on existing Grays harbor facilities, Southridge MS, East Hamilton Meter Station.

399. Question Result, ID, References

NIC, SRN.MULTI.OPERATERESTRICT.S, N/A (N/A)

Question Text Are there any operational restrictions (for example, reduced operational pressure) that have been put on the system?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

400. Question Result, ID, References

NIC, SRN.MULTI.SIMULATOR.S, N/A (N/A)

Question Text Is a simulator used to perform control center training?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Yes, a computerized pipeline simulator is used to train Pipeline Controllers to recognize and respond to abnormal and emergency conditions. See list of training simulation scenarios.

1. Communications failure with unexplained pressure deviation

Page 75: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

2. Hazardous Gas Alarm with Station ESD

3. Pressure Deviations indicating a Major Line Break

4. Unexplained Gas Quality Encounter

5. Meter station rupture

6. Winter Load Compressor Shutdown

7. Fire Monitor Alarm with station ESD

Normal Operations with high deliveries to customer

401. Question Result, ID, References

NIC, SRN.MULTI.FACILITIES.S, N/A (N/A)

Question Text Verification of system configuration and assets.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes We reviewed the system map provided by Chris Mason.

402. Question Result, ID, References

NIC, SRN.MULTI.ENFORCEMENT.S, N/A (N/A)

Question Text Discussion of Enforcement

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This is ok since the only one is John Haddow.

403. Question Result, ID, References

NIC, SRN.MULTI.ACCIDENTREPORT.S, N/A (N/A)

Question Text Discussion of accident/incidents reports.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Wash out in Washington in the Pasco District resulting in an incident report.

404. Question Result, ID, References

NIC, SRN.MULTI.GRANDFATHER.S, N/A (N/A)

Question Text Are there any facilities grandfathered under various code requirements?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes From: Johnson, Christian Sent: Wednesday, February 08, 2017 12:57 PM To: Kushlan, Josh <[email protected]> Subject: Grandfathered pipe

MOP_DET_METHOD c

Sum of LENGTH_IN_MILES CLASS Total 1 1042.0899 2 66.0716 3 46.1724

Page 76: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Grand Total 1154.3339

Christian Johnson

Pipeline Safety West Gas & Liquids

Regulatory Compliance Specialist III

Wk: 801.584.6737

[email protected]

405. Question Result, ID, References

NA, SRN.MULTI.POSTACCIDENTMOC.S, N/A (N/A)

Question Text Have any procedures been revised due to deficiencies identified during a post-accident analysis?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

406. Question Result, ID, References

NIC, SRN.MULTI.RECOAT.S, N/A (N/A)

Question Text Are any pipeline re-coating project activities scheduled to occur within the next 6 months?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

SRN.PD: Public Awareness and Damage Prevention

407. Question Result, ID, References

PAC, SRN.PD.PAPROGRAM.S, N/A (N/A)

Question Text Discussion of the overall Public Awareness Program.

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Issue Summary This was made a PAC so that we can review the 2016 Effectiveness results which are currently being compiled.

Result Notes Williams Public Awareness coordinator called in to discuss their PA program.

We discussed their effectiveness review through a desktop Skype.

The 2016 Annual Program Implementation Evaluation (11/11/2016) was reviewed. (API 1162)

Also reviewed the Effectiveness Evaluation Program conducted in Feb/March 2016 for the 2015 program. They are currently working on the 2016 program results.

One third party damage reviewed from 2016.

This was made a PAC so that we can review the 2016 Effectiveness results which are currently being compiled.

Page 77: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Requested all audience response records.

Jeff requested any third party damage where coating or other damage occurred and had to be remediated. He wants the root cause analysis of the damage to review.

408. Question Result, ID, References

NIC, SRN.PD.ONECALLPROCESS.S, N/A (N/A)

Question Text Are One-Call tickets handled in one centralized location or in some other manner?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Yes. They use Earth to record tickets handled.

The one call tickets are integrated into the Integrity Management program. Data is pulled from Earth. One call density is integrated into the threat matrix for third party damage.

Density is determined by dividing a single one call into multiple dynamic segments that are all affected and in close proximity. This was the most fair way to integrate a single one call that could affect multiple segments.

Dynamic segment - pipeline is segmented any time the risk changes. Pipe is essentially isolated into various risk segments. i.e. pipe type, w.t., coating etc.

No pipeline is not susceptible to 3rd party risk. For this reason when assessments are done a high resolution geometry tool is always run.

409. Question Result, ID, References

NIC, SRN.PD.ONECALLRESPOND.S, N/A (N/A)

Question Text Does a group respond to One-Call requests or is the function handled by specific individuals?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Handled by specific individuals.

410. Question Result, ID, References

NIC, SRN.PD.POPGROWTH.S, N/A (N/A)

Question Text Where are the areas of fastest growth (population/infrastructure)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Highest population growth. Boise/Idaho area.

No projected population growth is tracked.

The Pocatello District along the I-84 corridor is probably the highest growing in population density. Many segments are changing from Class 2 to Class 3.

3,850 miles of pipeline total.

Currently there are 177.2 miles in an HCA (approx. 4.5%)

Class 3 - 295 miles

Class 2 -

Page 78: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Class 1 -

411. Question Result, ID, References

NIC, SRN.PD.TPDFOLLOWUP.S, N/A (N/A)

Question Text Do you have a program to track and follow up with Third Party offenders?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Response from Public Safety & Security:

Yes, Third Party offenders are tracked in the incident management system ? Gensuite, which includes information collected through the Common Ground Alliance (CGA) Damage Information Reporting Tool (DIRT). This information is then added to the internal DIRT tracking database that is submitted to the CGA annually. Offenders are added to the next annual Public Awareness Mailing. WILSOP Procedure 10.17.03 ?Damage Prevention for Excavation and Trenching, section 7.0 for reference to Damage Information Reporting Tool and 7.1.1 and 7.1.2 on forms and Gensuite reporting. In addition, see Public Awareness Program Plan 10.0 Excavators, 10.1 Identification section for reference to this process.

Reviewed the repeat offender list. Discussed the new requirements and mechanism for capturing the data and penalizing repeat offenders.

412. Question Result, ID, References

NIC, SRN.PD.PADPEXCAVATION.S, N/A (N/A)

Question Text How are excavation related events analyzed and the findings incorporated back into the Public Awareness and Damage Prevention programs?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Excavation related events are entered in the incident management system ? Gensuite. The incidents and near misses are reviewed by the Public Safety and Security Department daily to determine historical outreach that has been conducted with the excavator as well as any additional outreach that may need to be conducted moving forward. Both historical and additional outreach is documented by the Public Safety and Security Department within the notes section of the incident or near miss in Gensuite. Regardless of historical or additional outreach, the excavator is added to the next annual Public Awareness Mailing. A list of third party ?offenders? is provided to the mailing vendor each year for inclusion into the annual mailing program.

SRN.TD: Time-Dependent Threats

413. Question Result, ID, References

NA, SRN.TD.BAREPIPENOCP.S, N/A (N/A)

Question Text Are there any bare pipelines that are not protected from external corrosion with cathodic protection?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

414. Question Result, ID, References

NIC, SRN.TD.CORROSIONCNTRL.S, N/A (N/A)

Question Text Are any Corrosion Control activities being performed during this inspection?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

415. Question Result, ID, References

NA, SRN.TD.CPSEPARATE.S, N/A (N/A)

Question Text Are there any separately protected short sections of mains or transmission line, not in excess of 100 feet for which monitoring CP once each calendar year not to exceed 15 months is impractical?

Page 79: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

416. Question Result, ID, References

NIC, SRN.TD.ATMCORRODE.S, N/A (N/A)

Question Text Discussion of Atmospheric Corrosion Control Program

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

417. Question Result, ID, References

NIC, SRN.TD.EXTCORROSION.S, N/A (N/A)

Question Text Discussion of External Corrosion Control Program

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Pipe and facilities are handled the same.

418. Question Result, ID, References

PAC, SRN.TD.INTCORROSION.S, N/A (N/A)

Question Text Discussion of Internal Corrosion Control Program

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Issue Summary Vernal District has a Piceance Creek Lateral that has had internal corrosion.

Result Notes Vernal District has a Piceance Creek Lateral that has had internal corrosion.

419. Question Result, ID, References

NIC, SRN.TD.SCC.S, N/A (N/A)

Question Text Discussion of SCC Program

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This program has been expanded in a positive way by now looking at all areas.

420. Question Result, ID, References

NA, SRN.TD.AMPHOTERIC.S, N/A (N/A)

Question Text Is there any amphoteric metal (aluminum) included in a submerged or buried pipeline system?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

421. Question Result, ID, References

NIC, SRN.TD.CPPROJECT.S, N/A (N/A)

Question Text Have you completed any projects related to corrosion control in the past 3 years?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Look in the Battleground District for new CP facilities.

From: Johnson, Christian Sent: Wednesday, February 08, 2017 12:57 PM To: Kushlan, Josh <[email protected]> Subject: Grandfathered pipe

MOP_DET_METHOD c

Page 80: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Sum of LENGTH_IN_MILES CLASS Total 1 1042.0899 2 66.0716 3 46.1724 Grand Total 1154.3339

Christian Johnson

Pipeline Safety West Gas & Liquids

Regulatory Compliance Specialist III

Wk: 801.584.6737

[email protected]

TD.ATM: External Corrosion - Atmospheric

422. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 3655

Result Notes Checked the last three years of observations.

423. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 48785, Unit 8375

Result Notes Records appear to be ok, check a few locations in the field.

424. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 4125

Result Notes This is an every three year requirement and I looked at the 2014/15 survey.

425. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 48795

Result Notes Looked at records for the Plymouth District for the last three years.

426. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 8545

Result Notes These appeared to be ok.

Page 81: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

427. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 48005

Result Notes Records look ok for this item.

428. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 8365

429. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

430. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 8355

Result Notes Reviewed 2014 - 2017 for all above ground facilities. All good.

Noted 3 surveyed facilities that were rated as poor with some general corrosion. Verified follow up and re-coat and records were good.

431. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 8385

Result Notes Records look good for Pasco DIstrict.

432. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 3675

Result Notes Reviewed records for the last three years.

433. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.R, 192.491(c) (192.481(a);192.481(b);192.481(c))

Question Text Do records document inspection of aboveground pipe for atmospheric corrosion?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

434. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.O, 192.481(b) (192.481(c);192.479(a);192.479(b);192.479(c))

Question Text Is pipe that is exposed to atmospheric corrosion protected?

Assets Covered Unit 48795

Result Notes Reviewed each above ground coating condition at every location in the Plymouth and Pasco Districts.

435. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.O, 192.481(b) (192.481(c);192.479(a);192.479(b);192.479(c))

Question Text Is pipe that is exposed to atmospheric corrosion protected?

Page 82: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8355

436. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.O, 192.481(b) (192.481(c);192.479(a);192.479(b);192.479(c))

Question Text Is pipe that is exposed to atmospheric corrosion protected?

Assets Covered Unit 3675

Result Notes Several areas were noted as needing repainting. The areas in question was repainted by the end of the inspection.

437. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.O, 192.481(b) (192.481(c);192.479(a);192.479(b);192.479(c))

Question Text Is pipe that is exposed to atmospheric corrosion protected?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 1305, Unit 8375

Result Notes Most districts were in need of some minor touch up painting in various areas. All of the painting appeared to be taken care of by the end of this inspection.

438. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.O, 192.481(b) (192.481(c);192.479(a);192.479(b);192.479(c))

Question Text Is pipe that is exposed to atmospheric corrosion protected?

Assets Covered Unit 4125

Result Notes This was checked at most MLVs and all span locations. This district appeared to be in very good shape.

439. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.O, 192.481(b) (192.481(c);192.479(a);192.479(b);192.479(c))

Question Text Is pipe that is exposed to atmospheric corrosion protected?

Assets Covered Unit 8365

Result Notes One span was in need of touch up painting. The span in question was repainted by the end of the inspection.

440. Question Result, ID, References

Sat, TD.ATM.ATMCORRODEINSP.O, 192.481(b) (192.481(c);192.479(a);192.479(b);192.479(c))

Question Text Is pipe that is exposed to atmospheric corrosion protected?

Assets Covered Unit 8385

TD.CPMONITOR: External Corrosion - CP Monitoring

441. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

442. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 1305

Result Notes This appeared to be adequate.

443. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 8395

Page 83: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes This appeared to be adequate.

444. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 3655

Result Notes This appeared to be adequate.

445. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 48005

Result Notes This appeared to be adequate.

446. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 8545

Result Notes This appeared to be adequate.

447. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 4125

Result Notes This was checked at most MLVs, critical bonds, and all span locations. This district appeared to be in very good shape.

448. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 8365

Result Notes This was verified in the field and all rectifiers are remote monitored.

449. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 8355

Result Notes All above ground facilities were inspected. No inadequate CP reads were observed. All transfer points were tested for isolation from downstream facilities. All isolation points were good.

450. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 48795, Unit 8385

Result Notes All readings observed was above the minimum criteria.

451. Question Result, ID, References

Sat, TD.CPMONITOR.MONITORCRITERIA.O, 192.463(a)

Page 84: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Are methods used for taking CP monitoring readings that allow for the application of appropriate CP monitoring criteria?

Assets Covered Unit 3675

Result Notes This appeared to be adequate.

452. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.P, 192.605(b)(2) (192.465(a))

Question Text Does the process adequately describe how to monitor CP that has been applied to pipelines?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This appeared to be ok.

453. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 8385

454. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 3655

Result Notes This appears to be ok.

455. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

456. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 8355

Result Notes Reviewed 2014-17 surveys. Including casings and foreign structures. All good.

457. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 48785, Unit 8375

Result Notes These appeared to be ok.

458. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 48795

459. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

460. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Page 85: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 8545

Result Notes One TP location missed, but CP is adequate for the area.

461. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 4125

Result Notes There are a few low reading locations which I will check in the field.

462. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 8365

Result Notes Looked at the last three years of data.

463. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 48005

Result Notes This appears to be ok.

464. Question Result, ID, References

Sat, TD.CPMONITOR.TEST.R, 192.491(c) (192.465(a))

Question Text Do records adequately document cathodic protection monitoring tests have occurred as required?

Assets Covered Unit 3675

Result Notes Reviewed the last three years of readings.

465. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 3655

Result Notes Reviewed the last three years.

466. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 3675

Result Notes Reviewed the last three years of data.

467. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 8355

Result Notes Reviewed rectifier records for 2014-17. Rectifiers are read on a monthly basis. All good.

468. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 8395

Page 86: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes Reviewed the records for the last three years.

469. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 8385

Result Notes Records look good for Pasco DIstrict.

470. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 4125

Result Notes Reviewed the last three years.

471. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 48785, Unit 8545, Unit 8375

Result Notes These appeared to be ok.

472. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 8365

Result Notes Looked at the last three years of readings.

473. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 48795

Result Notes Rectifiers records look good for Plymouth DIstrict.

474. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 48005

Result Notes These appear to be acceptable.

475. Question Result, ID, References

Sat, TD.CPMONITOR.CURRENTTEST.R, 192.491(c) (192.465(b))

Question Text Do records document details of electrical checks of sources of rectifiers or other impressed current sources?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

476. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 1305

Page 87: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes One area is waiting on a CIS to be completed. This was verified and resolved during our November 7th conference call.

477. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 8355

Result Notes No issues.

478. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

479. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 48795

Result Notes Records look good for Plymouth DIstrict.

480. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 48005

Result Notes The records appear to be ok.

481. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 8365

Result Notes It appear that all items were addressed in a timely fashion.

482. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 3675

483. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 48785, Unit 8545, Unit 8375

Result Notes These appeared to be ok.

484. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 8385

Result Notes This issue was resolved during our November 7th conference call.

485. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Page 88: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 4125

Result Notes Yes - there are several locations where CP deficiencies have been corrected.

486. Question Result, ID, References

Sat, TD.CPMONITOR.DEFICIENCY.R, 192.491(c) (192.465(d))

Question Text Do records adequately document actions taken to correct any identified deficiencies in corrosion control?

Assets Covered Unit 3655

Result Notes This appears to be ok - with a few new ground beds and deep wells installed.

487. Question Result, ID, References

Sat, TD.CPMONITOR.TESTLEAD.P, 192.605(b)(2) (192.471(a);192.471(b);192.471(c);192.469)

Question Text Does the process provide adequate instructions for the installation of test leads?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This appeared to be ok.

488. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.P, 192.605(b)(2) (192.473(a))

Question Text Does the process give sufficient guidance and detail for identifying areas of potential stray current so the detrimental effects of stray currents can be minimized through a continuing program?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This appeared to be ok.

489. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 8385

Result Notes Records look good for Pasco DIstrict.

490. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

491. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 3655

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

492. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 8395

Result Notes There are twenty two critical bonds.

493. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Page 89: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 48795

Result Notes Records look good for Plymouth DIstrict.

494. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 48005

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

495. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

496. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 4125

Result Notes Checked this item for last three years.

497. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 8545

Result Notes Six critical bonds in the MOAB District.

498. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 8365

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

499. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 48785, Unit 8375

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

500. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.R, 192.491(c) (192.473(a))

Question Text Do records document that the operator has minimized the detrimental effects of stray currents when found?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

Page 90: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

501. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 48005

Result Notes This appeared to be adequate.

502. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 48785, Unit 8375

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

503. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 4125

Result Notes In a couple of areas the interference currents from other pipelines was not allowing an -850mV reading, but the 100 mV shift was being maintained.

504. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 8355

505. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 8545

Result Notes This appeared to be adequate.

506. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 3655

Result Notes This appeared to be adequate.

507. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 8365

Result Notes No critical bonds in this district and no interference currents observed.

508. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 8395

Result Notes This appeared to be adequate.

Page 91: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

509. Question Result, ID, References

NA, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

510. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 1305

Result Notes This appeared to be adequate.

511. Question Result, ID, References

Sat, TD.CPMONITOR.INTFRCURRENT.O, 192.473(a)

Question Text Are areas of potential stray current identified, and if found, the detrimental effects of stray currents minimized?

Assets Covered Unit 48795, Unit 8385

Result Notes All readings observed was acceptable.

512. Question Result, ID, References

Sat, TD.CP.RECORDS.P, 192.605(b)(2) (192.491(a);192.491(b);192.491(c)) (also presented in: TD.CP, TD.CPEXPOSED)

Question Text Does the process include records requirements for the corrosion control activities listed in 192.491?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

513. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8365

Result Notes Checked over the last three years of records.

514. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8545

Result Notes The records appear to be ok.

515. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8385

Result Notes Records look good for Pasco DIstrict.

516. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Page 92: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 48795

Result Notes Records look good for Plymouth DIstrict.

517. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

518. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 3655

Result Notes Yes - all information provided on maps and records.

519. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8355

520. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

521. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 3675

Result Notes This appeared to be ok.

522. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48005

Result Notes This appears to be ok.

523. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48785, Unit 8375

Result Notes These appeared to be ok.

Page 93: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

524. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 4125

Result Notes Yes - these locations are located adequately.

TD.CP: External Corrosion - Cathodic Protection

525. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 48005

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

526. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 8385

Result Notes No bare or ineffectively coated pipe.

527. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

528. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 1305

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

529. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 4125

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

530. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Page 94: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 48785, Unit 8545, Unit 8375

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

531. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 8365

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

532. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 8395

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

533. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 48795

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

534. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 3655

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

535. Question Result, ID, References

NA, TD.CP.PRE1971.R, 192.491(c) (192.457(b))

Question Text Do records document that pipelines installed before August 1, 1971 (except for cast and ductile iron lines) which are 1) bare or ineffectively coated transmission lines or 2) bare or coated pipes in compressor, regulator or meter stations have been cathodically protected in areas where active corrosion was found in accordance with Subpart I or Part 192?

Assets Covered Unit 8355

Result Notes No bare or ineffectively coated pipe.

536. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 3675

Page 95: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes This appeared to be ok.

537. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 4125

Result Notes This appeared to be acceptable.

538. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 48005

Result Notes This appears to be ok.

539. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

540. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 48795

Result Notes Records look good for Plymouth DIstrict.

541. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8365

Result Notes All instances with constant casing shorts has been filled with non-metallic fill and is pigged every seven years.

542. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

543. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8545

Page 96: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes This appeared to be correct.

544. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

545. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 3655

Result Notes This appears to be ok.

546. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8385

Result Notes Records look good for Pasco DIstrict.

547. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.R, 192.491(c) (192.467(a);192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Do records adequately document electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8355

548. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8395

Result Notes This appeared to be adequate.

549. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 3655

Result Notes This appeared to be adequate.

550. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 48005

Result Notes This appeared to be adequate.

Page 97: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

551. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 48795

Result Notes This appeared to be adequate.

552. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8355

Result Notes All isolation points were tested and were good.

553. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 1305

Result Notes This appeared to be adequate.

554. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8545

Result Notes This appeared to be adequate.

555. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8385

Result Notes Some areas needing attention.

556. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 8365

Result Notes One 4" bridge crossing was in need of isolation flange kit to be replaced. This was fixed by the end of this inspection.

557. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 4125

Result Notes This was checked at all above ground pipelining locations visited.

Page 98: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

558. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 3675

Result Notes Several areas were noted for the Redmond District this is pending remediation by the operator. All of the areas in question were addressed and taken care by the end of this inspection.

559. Question Result, ID, References

Sat, TD.CP.ELECISOLATE.O, 192.467(a) (192.467(b);192.467(c);192.467(d);192.467(e))

Question Text Are measures performed to ensure electrical isolation of each buried or submerged pipeline from other metallic structures unless they electrically interconnect and cathodically protect the pipeline and the other structures as a single unit?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

560. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

561. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 48005

Result Notes This appeared to be adequate.

562. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 8365

Result Notes This appeared to be handled well.

563. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 48795, Unit 8385

Result Notes All area observed appeared to be acceptable.

564. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 1305

Result Notes This appeared to be adequate.

565. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 8355

Result Notes This was checked at all above ground pipelining locations visited.

Page 99: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

566. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 8545

Result Notes This appeared to be adequate.

567. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 3655

Result Notes This appeared to be adequate.

568. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 8395

Result Notes This appeared to be adequate.

569. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 4125

Result Notes This was checked at all above ground pipelining locations visited.

570. Question Result, ID, References

Sat, TD.CP.FAULTCURRENT.O, 192.467(f)

Question Text Are fault current and lightning protection for the pipeline installed and inspected?

Assets Covered Unit 3675

Result Notes This was checked at all above ground pipelining locations visited.

571. Question Result, ID, References

Sat, TD.CP.RECORDS.P, 192.605(b)(2) (192.491(a);192.491(b);192.491(c)) (also presented in: TD.CPMONITOR, TD.CPEXPOSED)

Question Text Does the process include records requirements for the corrosion control activities listed in 192.491?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

572. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8365

Result Notes Checked over the last three years of records.

573. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8545

Result Notes The records appear to be ok.

Page 100: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

574. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48785, Unit 8375

Result Notes These appeared to be ok.

575. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8385

Result Notes Records look good for Pasco DIstrict.

576. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48795

Result Notes Records look good for Plymouth DIstrict.

577. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

578. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 3655

Result Notes Yes - all information provided on maps and records.

579. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8355

580. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 1305

Page 101: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes Reviewed the records for the last three years.

581. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 3675

Result Notes This appeared to be ok.

582. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48005

Result Notes This appears to be ok.

583. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED, TD.CPEXPOSED)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 4125

Result Notes Yes - these locations are located adequately.

TD.COAT: External Corrosion - Coatings

584. Question Result, ID, References

Sat, TD.COAT.NEWPIPE.P, 192.605(b)(2) (192.455(a)(1);192.461(a);192.461(b);192.483(a))

Question Text Does the process require that each buried or submerged pipeline installed after July 31, 1971, be protected against external corrosion with an adequate coating unless exempted by 192.455(b)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

585. Question Result, ID, References

Sat, TD.COAT.NEWPIPE.R, 192.491(c) (192.455(a)(1);192.461(a);192.461(b);192.483(a))

Question Text Do records document that each buried or submerged pipeline installed after July 31, 1971, has been protected against external corrosion with an adequate coating unless exempted under 192.455(b)?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

586. Question Result, ID, References

Sat, TD.COAT.EXPOSEINSPECT.R, 192.491(c) (192.459)

Question Text Do records show that exposed buried pipe coating was inspected to determine if it is deteriorating?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

587. Question Result, ID, References

Sat, TD.COAT.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried pipe coating inspected to determine if it is deteriorating?

Page 102: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 3675

Result Notes Waiting on field touch up for this item. This was taken care by the end of this inspection.

588. Question Result, ID, References

Sat, TD.COAT.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried pipe coating inspected to determine if it is deteriorating?

Assets Covered Unit 8355

Result Notes All above ground facilities inspected had good coating. Two areas of coating needed to be repaired and were noted. One was the Stanwood Lateral where an ultrasonic meter was recently removed and one was the Mount Vernon compressor station Plant B suction piping where recent maintenance damaged a small portion of coating. Both were minor and will be recoated asap.

589. Question Result, ID, References

Sat, TD.COAT.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried pipe coating inspected to determine if it is deteriorating?

Assets Covered Unit 4125

Result Notes Two areas were noted during the inspection where additional top soil was to be placed around valve stems and blow-off risers at the soil to air interface. Both locations was on the Piceance Lateral.

590. Question Result, ID, References

Sat, TD.COAT.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried pipe coating inspected to determine if it is deteriorating?

Assets Covered Unit 48795, Unit 8385

Result Notes All area observed appeared to be acceptable.

591. Question Result, ID, References

Sat, TD.COAT.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried pipe coating inspected to determine if it is deteriorating?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 1305, Unit 8375

Result Notes This appeared to be ok.

592. Question Result, ID, References

Sat, TD.COAT.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried pipe coating inspected to determine if it is deteriorating?

Assets Covered Unit 8365

Result Notes This appeared to be acceptable in all areas checked.

593. Question Result, ID, References

Sat, TD.COAT.EXPOSEREPAIR.P, 192.605(b)(2) (192.455(a))

Question Text Does the process require that deteriorated coating be repaired when found on exposed buried pipe?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

TD.CPEXPOSED: External Corrosion - Exposed Pipe

594. Question Result, ID, References

Sat, TD.CPEXPOSED.EXPOSEINSPECT.P, 192.605(b)(2) (192.459)

Question Text Does the process require that exposed portions of buried pipeline must be examined for external corrosion?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached.

Page 103: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

595. Question Result, ID, References

Sat, TD.CPEXPOSED.EXPOSECORRODE.P, 192.605(b)(2) (192.459)

Question Text Does the process require further examination of exposed buried pipe if corrosion is found?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached.

596. Question Result, ID, References

Sat, TD.CPEXPOSED.EXPOSEINSPECT.R, 192.491(c) (192.459)

Question Text Do records adequately document that exposed buried piping was examined for corrosion?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

597. Question Result, ID, References

NA, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Assets Covered Unit 8365

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

598. Question Result, ID, References

NA, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Assets Covered Unit 48795, Unit 8385

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

599. Question Result, ID, References

Sat, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Assets Covered Unit 3655

Result Notes This appeared to be adequate.

600. Question Result, ID, References

Sat, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Assets Covered Unit 8395

Result Notes This appeared to be adequate.

601. Question Result, ID, References

Sat, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Assets Covered Unit 48785, Unit 48005, Unit 8545, Unit 1305, Unit 8375

Result Notes This appeared to be ok.

602. Question Result, ID, References

NA, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

603. Question Result, ID, References

NA, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Page 104: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 4125

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

604. Question Result, ID, References

NA, TD.CPEXPOSED.EXPOSEINSPECT.O, 192.459

Question Text Is exposed buried piping examined for corrosion?

Assets Covered Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

605. Question Result, ID, References

Sat, TD.CPEXPOSED.EXTCORRODEEVAL.P, 192.605(b)(2) (192.485(a);192.485(b);192.485(c))

Question Text Does the process give sufficient guidance for personnel to evaluate the remaining strength of externally corroded pipe?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attached.

606. Question Result, ID, References

Sat, TD.CPEXPOSED.EXTCORRODEEVAL.R, 192.491(c) (192.485(a);192.485(b);192.485(c))

Question Text Do records document adequate evaluation of externally corroded pipe?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

607. Question Result, ID, References

Sat, TD.CPEXPOSED.EXTCORRODREPAIR.P, 192.605(b)(2) (192.485(a);192.485(b);192.485(c))

Question Text Does the process give sufficient guidance for personnel to repair or replace pipe that is externally corroded to an extent that there is not sufficient remaining strength in the pipe wall?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

608. Question Result, ID, References

Sat, TD.CPEXPOSED.EXTCORRODREPAIR.R, 192.491(c) (192.485(a);192.485(b);192.485(c))

Question Text Do records document the repair or replacement of pipe that has been externally corroded to an extent that there is not sufficient remaining strength in the pipe wall?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

609. Question Result, ID, References

Sat, TD.CP.RECORDS.P, 192.605(b)(2) (192.491(a);192.491(b);192.491(c)) (also presented in: TD.CPMONITOR, TD.CP)

Question Text Does the process include records requirements for the corrosion control activities listed in 192.491?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

610. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8365

Result Notes Checked over the last three years of records.

Page 105: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

611. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8545

Result Notes The records appear to be ok.

612. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8385

Result Notes Records look good for Pasco DIstrict.

613. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48795

Result Notes Records look good for Plymouth DIstrict.

614. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

615. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 3655

Result Notes Yes - all information provided on maps and records.

616. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 8355

617. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

618. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Page 106: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 3675

Result Notes This appeared to be ok.

619. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48005

Result Notes This appears to be ok.

620. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 4125

Result Notes Yes - these locations are located adequately.

621. Question Result, ID, References

Sat, TD.CP.RECORDS.R, 192.491(a) (also presented in: TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CPMONITOR, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP, TD.CP)

Question Text Do records indicate the location of all items listed in 192.491(a)?

Assets Covered Unit 48785, Unit 8375

Result Notes These appeared to be ok.

TD.ICP: Internal Corrosion - Preventive Measures

622. Question Result, ID, References

Sat, TD.ICP.EXAMINE.P, 192.605(b)(2) (192.475(a);192.475(b))

Question Text Does the process direct personnel to examine removed pipe for evidence of internal corrosion?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Procedure 20.04.01 Rev. 16 05/26/16 Pipeline Examination See section 1.6 on page 5.

623. Question Result, ID, References

Sat, TD.ICP.EXAMINE.R, 192.491(c) (192.475(a);192.475(b))

Question Text Do records document examination of removed pipe for evidence of internal corrosion?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

624. Question Result, ID, References

NA, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 8365

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

625. Question Result, ID, References

Sat, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 8545

Result Notes This appeared to be adequate.

Page 107: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

626. Question Result, ID, References

Sat, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 1305

Result Notes This appeared to be adequate.

627. Question Result, ID, References

Sat, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 8395

Result Notes This appeared to be adequate.

628. Question Result, ID, References

Sat, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 3655

Result Notes This appeared to be adequate.

629. Question Result, ID, References

Sat, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 48005

Result Notes This appeared to be adequate.

630. Question Result, ID, References

NA, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

631. Question Result, ID, References

NA, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 4125

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

632. Question Result, ID, References

NA, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

633. Question Result, ID, References

Sat, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 48785, Unit 8375

Result Notes This appeared to be ok.

634. Question Result, ID, References

NA, TD.ICP.EXAMINE.O, 192.475(a) (192.475(b))

Question Text Is removed pipe examined for evidence of internal corrosion?

Assets Covered Unit 48795, Unit 8385

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

Page 108: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

635. Question Result, ID, References

Sat, TD.ICP.EVALUATE.P, 192.605(b)(2) (192.485(c))

Question Text Does the process give sufficient guidance for personnel to evaluate the remaining strength of pipe that has been internally corroded?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachments.

636. Question Result, ID, References

Sat, TD.ICP.EVALUATE.R, 192.491(c) (192.485(c))

Question Text Do records document adequate evaluation of internally corroded pipe?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

637. Question Result, ID, References

Sat, TD.ICP.REPAIR.P, 192.491(c) (192.485(a);192.485(b))

Question Text Does the process give sufficient guidance for personnel to repair or replace pipe that has internally corroded to an extent that there is no longer sufficient remaining strength in the pipe wall?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes e 20.11.01 - Internal Corrosion Inspection Rev. 13 - 01/30/2013

638. Question Result, ID, References

Sat, TD.ICP.REPAIR.R, 192.485(a) (192.485(b))

Question Text Do records document the repair or replacement of pipe that has been internally corroded to an extent that there is not sufficient remaining strength in the pipe wall?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

TD.ICCG: Internal Corrosion - Corrosive Gas

639. Question Result, ID, References

Sat, TD.ICCG.CORRGAS.P, 192.605(b)(2) (192.475(a))

Question Text If the process does not preclude corrosive gas to be transported by pipeline, does the process also require that the corrosive effect of the gas on the pipeline be investigated and steps be taken to minimize internal corrosion?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes This procedure was updated and finalized on 08/17/2017. It is attached.

640. Question Result, ID, References

Sat, TD.ICCG.CORRGAS.R, 192.491(c) (192.475(a))

Question Text Do records document if corrosive gas is being transported by pipeline, including the investigation of the corrosive effect of the gas on the pipeline and steps that have been taken to minimize internal corrosion?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

641. Question Result, ID, References

Sat, TD.ICCG.CORRGASPRVNT.P, 192.605(b)(2) (192.475(a))

Question Text If the process does not allow the transportation of corrosive gas, is guidance provided how the transportation of corrosive gas will be prevented?

Page 109: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Part of the procedure being developed by GC available in September.

642. Question Result, ID, References

Sat, TD.ICCG.CORRGASPRVNT.R, 192.491(c) (192.475(a))

Question Text If the transportation of corrosive gas is not allowed, then do records document actions taken to prevent the transportation of corrosive gas?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

643. Question Result, ID, References

NA, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 3675

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

644. Question Result, ID, References

NA, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

645. Question Result, ID, References

NA, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 8365

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

646. Question Result, ID, References

Sat, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 48005

Result Notes This appeared to be adequate.

647. Question Result, ID, References

Sat, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 3655, Unit 48785, Unit 1305, Unit 8375

Result Notes This appeared to be ok.

648. Question Result, ID, References

NA, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 48795, Unit 8385

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

649. Question Result, ID, References

Sat, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 8545

Page 110: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

650. Question Result, ID, References

NA, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 8395

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

651. Question Result, ID, References

Sat, TD.ICCG.CORRGASPRVNT.O, 192.475(a)

Question Text If the transportation of corrosive gas is not allowed, is the transportation of corrosive gas prevented?

Assets Covered Unit 4125

Result Notes All receipt points in this district appeared to have H2S, Moisture, and CO2 analyzers installed.

652. Question Result, ID, References

Sat, TD.ICCG.CORRGASACTION.P, 192.605(b)(2) (192.477)

Question Text Does the process give adequate direction for actions to be taken if corrosive gas is being transported by pipeline?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Part of the procedure being developed by GC available in September.

653. Question Result, ID, References

Sat, TD.ICCG.CORRGASACTION.R, 192.491(c) (192.477)

Question Text Do records document the actions taken when corrosive gas is being transported by pipeline?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

654. Question Result, ID, References

NA, TD.ICCG.CORRGASACTION.O, 192.477

Question Text Are adequate actions taken when corrosive gas is being transported by pipeline?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

TD.SP: Special Permits

655. Question Result, ID, References

NA, TD.SP.CONDITIONS.P, 190.341(d)(2)

Question Text Has a process been developed as necessary for complying with the special permit conditions?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

656. Question Result, ID, References

NA, TD.SP.CONDITIONS.R, 190.341(d)(2)

Question Text Do records demonstrate compliance with all special permit or waiver requirements?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

657. Question Result, ID, References

NA, TD.SP.CONDITIONS.O, 190.341(d)(2)

Question Text Are special permit requirements being complied with?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Page 111: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes No such event occurred, or condition existed, in the scope of inspection review.

TD.SCC: Stress Corrosion Cracking

658. Question Result, ID, References

Sat, TD.SCC.SCCIM.P, 192.911(c) (192.917(a)(1))

Question Text Does the integrity management program have a process to identify and evaluate stress corrosion cracking threats to each covered pipeline segment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes Plan was reviewed. Williams SCC Management Plan. Revision 01

659. Question Result, ID, References

Sat, TD.SCC.SCCIM.R, 192.947(d) (192.917(a)(1))

Question Text Do integrity management program records document results of studies to identify and evaluate stress corrosion cracking threats to each covered pipeline segment?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

660. Question Result, ID, References

Sat, TD.SCC.SCCREPAIR.R, 192.709(a) (192.703(b))

Question Text Do records document that the operator has properly remediated any occurrences of SCC?

Assets Covered Unit 8395, Unit 3655, Unit 48785, Unit 48005, Unit 8545, Unit 48795, Unit 1305, Unit 4125, Unit 8365, Unit 8385, Unit 3675, Unit 8375, Unit 8355

Result Notes See attachment.

TQ.OQ: Operator Qualification

661. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 48795

Result Notes Training records for Emergency Procedures looked good for the Plymouth District.

662. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 8385

Result Notes A list of employees working in the district along with their qualifications was provided at the beginning of the Pasco office visit. While records were reviewed the list was used to verify that employees performing covered tasks and signing off on the records were qualified to perform the assigned covered tasks.

663. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 3675

Result Notes Looked over the OQ records for the all personnel for the past year.

664. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Page 112: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Assets Covered Unit 8355

Result Notes Reviewed operator qualification stats during a review of records.

665. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 1305

Result Notes This appears to be ok.

666. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 8365

Result Notes Looked at records for Stephen Jensen and Harley Eppler.

667. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 8545

Result Notes This appeared to be adequate.

668. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 4125

Result Notes Reviewed records for Ray A Miller, Bret J Coltharp, Rhet B Tinker, and Steve C Mahler.

669. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 48785, Unit 8375

Result Notes These appeared to be ok.

670. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 8395

Result Notes This appears to be ok.

671. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 3655

Result Notes This appears to be ok.

672. Question Result, ID, References

Sat, TQ.OQ.RECORDS.R, 192.807

Page 113: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Question Text Do records document the evaluation and qualifications of individuals performing covered tasks, and can the qualification of individuals performing covered tasks be verified?

Assets Covered Unit 48005

Result Notes This appears to be ok.

TQ.TR: Training of Personnel

673. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 48005

Result Notes This appears to be ok.

674. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 8395

Result Notes This appears to be satisfactory.

675. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 3655

Result Notes Checked the last three years.

676. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 4125

Result Notes Looked at records for the pass three years.

677. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 8365

Result Notes Looked at the last three years.

678. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 48795

Result Notes OQ records look good for the Plymouth District.

679. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 1305

Result Notes Reviewed the records for the last three years.

680. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 3675

Page 114: Inspection Output (IOR) · Plan Submitted 02/22/2017 Plan Approval 02/23/2017 by Kim West All Activity Start 11/29/2016 Activity End 09/29/2017 Inspection Submitted -- Inspection

Result Notes We looked at the last three years.

681. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 48785, Unit 8375

Result Notes These appeared to be ok.

682. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 8385

Result Notes Records provided for employees showing training was conducted on:

March 23, 2014

October 28, 2014

June 23, 2015

June 29, 2016

683. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 8355

Result Notes Reviewed last two emergency response training classes.

684. Question Result, ID, References

Sat, TQ.TR.TRAINING.R, 192.615(b)(2) (192.807(a);192.807(b))

Question Text Is training for emergency response personnel documented?

Assets Covered Unit 8545

Result Notes Reviewed training records for 2015, 2016 and 2017.

Report Parameters: Results: all

Acceptable Use: Inspection documentation, including completed protocol forms, summary reports, executive summary reports, and enforcement documentation are for internal use only by federal or state pipeline safety regulators. Some inspection documentation may contain information which the operator considers to be confidential. In addition, supplemental inspection guidance and related documents in the file library are also for internal use only by federal or state pipeline safety regulators (with the exception of documents published in the federal register, such as advisory bulletins). Do not distribute or otherwise disclose such material outside of the state or federal pipeline regulatory organizations. Requests for such information from other government organizations (including, but not limited to, NTSB, GAO, IG, or Congressional Staff) should be referred to PHMSA Headquarters Management.