Andreas Jahn Senior Associate The Regulatory Assistance Project (RAP) ® Anna-Louisa-Karsch-Straße 2 D-10178 Berlin Germany +49 30 700 1435 421 [email protected] raponline.org 22. October 2018 Berlin IEA Committee on Energy Research and Technology EXPERTS’ GROUP ON R&D PRIORITY-SETTING AND EVALUATION Insights on planning for power system regulators

Upload: others

Post on 23-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Andreas Jahn

    Senior Associate

    The Regulatory Assistance Project (RAP)®

    Anna-Louisa-Karsch-Straße 2

    D-10178 Berlin

    Germany

    +49 30 700 1435 421

    [email protected]

    raponline.org

    22. October 2018 – Berlin

    IEA Committee on Energy Research and Technology

    EXPERTS’ GROUP ON R&D PRIORITY-SETTING AND EVALUATION

    Insights on planning for power system regulators

  • Regulatory Assistance Project (RAP)®

    RAP believes competitive energy markets, properly

    framed, are best able to deliver a low-carbon power

    system at the lowest reasonable cost

    Lessons learned from many jurisdiction prove for

    required examples

    • Reliability - definition and mechanism

    • Location matters

    • Need for flexibility

    • Demand side integration

    2

  • Regulatory Assistance Project (RAP)®

    2a Delivering reliability at least cost

  • Regulatory Assistance Project (RAP)® Source: W. Hogan, Harvard University, Kennedy School of Gov.4

    Reliability, objectively

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    60,000

    70,000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

    Ave

    rage

    val

    ue

    of

    lost

    load

    ($

    /MW

    h)

    Annual duration of firm load curtailment (hours)

    One event in ten years

    24 hours in ten years

    Optimal?

    Price cap

  • Regulatory Assistance Project (RAP)® 5

    What is the role of markets?

    Can markets deliver sufficient investment to

    meet established expectations for reliable

    electric services?

    Energy-only

    Deliver reliability at least cost

    Capacity

    Administrative interventions –Price caps, high

    reserve margins…

  • Regulatory Assistance Project (RAP)® 6

    Operating Reserve Demand Curve in Texas/ERCOT and PJM

    Source: Hogan, W. & pope, S for FTI Consulting & ERCOT

  • Regulatory Assistance Project (RAP)® 7

    Increasing administrative “reliability” interventions harm market benefits

    Energy-only market

    Reserve shortage pricing

    Strategic reserve

    Capacity market

    Increasing level of

    interventions

    weaken energy-

    only price signals

  • Regulatory Assistance Project (RAP)®

    2b Increasing need for flexibility

  • Regulatory Assistance Project (RAP)® 9

    RE supply drives need for flexibility and power prices, e.g. in Germany

    Source: Agora-Energiewende.de – April 29th to May 6th 2018

  • Regulatory Assistance Project (RAP)® 10

    There are many sources of flexibility

    „Capability“

    markets

  • Regulatory Assistance Project (RAP)® 11

    Toward capability, not capacity

  • Regulatory Assistance Project (RAP)®

    To achieve system security and resource

    adequacy (the two dimensions of reliability) at

    least cost, flexibility is key.

    • Focus on capability instead of capacity

    • System services with ramping quality

    • Storage e.g., along with supply and demand

    • Increase balancing areas (to limit flexibility need)

    • Shorten dispatch intervals

    12

    Regulatory requirements

  • Regulatory Assistance Project (RAP)®

    2c Considering locational value

  • Regulatory Assistance Project (RAP)® 14

    Locational value

    The value of power

    supply is linked to

    location, due to

    availability of (un-)

    congested networks

    This locational marginal

    pricing (LMP) is

    addressed by nodal

    pricing, e.g. in the US

    Prices by nodes in Texas Source: ERCOT

    chea

    p->

    -

    >

    ->

    ex

    pen

    sive

  • Regulatory Assistance Project (RAP)® 15

    Europe: Locational value not reflected in national bidding “zones”

    Source: CEREG (Belgium Regulator 2016)

  • Regulatory Assistance Project (RAP)®

    • Location-related marginal costs need to be

    reflected in market prices

    • Transition from one to another system is

    difficult/expensive

    • Bidding zones only as a quick fix/interim solution

    • In the long run, nodal pricing is the only

    cost-efficient solution

    16

    Regulatory considerations

  • Regulatory Assistance Project (RAP)®

    2f Benefits from demand side resources

  • Regulatory Assistance Project (RAP)® 18

    Demand is willing to respond –screen shot of German demand curve is flattening curve becameless steep

    Source: Epexspot

    €/MWh

    Demand and supply bids, Sept 14th, midnight to 1 a.m.

  • Regulatory Assistance Project (RAP)® 19

    Customers’ peak demand reduction from time-varying rate pilots

  • Regulatory Assistance Project (RAP)®

    Because supply is not an end in itself, it is needed to

    satisfy demand:

    • Consider the benefit of savings and the shift in

    load compared to supply and transmission

    investments

    • Create markets with fair competition for all

    resources, including demand-side resources

    20

    Regulatory consideration

  • Regulatory Assistance Project (RAP)®

    • Optimizing overall system flexibility is the key to

    cost-effective reliability

    • Of the many possible sources of flexibility, flexible

    demand is likely to be the lowest cost, the most

    readily available and the least well developed

    • Well-regulated competitive markets that price

    energy, based on its true locational marginal cost

    and drives those price signals to all customers able

    and willing to respond to them is essential

    21

    Key message

  • Andreas Jahn

    Senior Associate

    The Regulatory Assistance Project (RAP)®

    +49 30 700 1435 421

    [email protected]

    raponline.org

    Anna-Louisa-Karsch-Straße 2

    D-10178 Berlin

    Germany

    About RAPThe Regulatory Assistance Project (RAP)® is an

    independent, non-partisan, non-governmental

    organization dedicated to accelerating the transition

    to a clean, reliable, and efficient energy future.

    Learn more about our work at raponline.org