insights on planning for power system regulators...insights on planning for power system regulators...
TRANSCRIPT
-
Andreas Jahn
Senior Associate
The Regulatory Assistance Project (RAP)®
Anna-Louisa-Karsch-Straße 2
D-10178 Berlin
Germany
+49 30 700 1435 421
raponline.org
22. October 2018 – Berlin
IEA Committee on Energy Research and Technology
EXPERTS’ GROUP ON R&D PRIORITY-SETTING AND EVALUATION
Insights on planning for power system regulators
-
Regulatory Assistance Project (RAP)®
RAP believes competitive energy markets, properly
framed, are best able to deliver a low-carbon power
system at the lowest reasonable cost
Lessons learned from many jurisdiction prove for
required examples
• Reliability - definition and mechanism
• Location matters
• Need for flexibility
• Demand side integration
2
-
Regulatory Assistance Project (RAP)®
2a Delivering reliability at least cost
-
Regulatory Assistance Project (RAP)® Source: W. Hogan, Harvard University, Kennedy School of Gov.4
Reliability, objectively
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Ave
rage
val
ue
of
lost
load
($
/MW
h)
Annual duration of firm load curtailment (hours)
One event in ten years
24 hours in ten years
Optimal?
Price cap
-
Regulatory Assistance Project (RAP)® 5
What is the role of markets?
Can markets deliver sufficient investment to
meet established expectations for reliable
electric services?
Energy-only
Deliver reliability at least cost
Capacity
Administrative interventions –Price caps, high
reserve margins…
-
Regulatory Assistance Project (RAP)® 6
Operating Reserve Demand Curve in Texas/ERCOT and PJM
Source: Hogan, W. & pope, S for FTI Consulting & ERCOT
-
Regulatory Assistance Project (RAP)® 7
Increasing administrative “reliability” interventions harm market benefits
Energy-only market
Reserve shortage pricing
Strategic reserve
Capacity market
Increasing level of
interventions
weaken energy-
only price signals
-
Regulatory Assistance Project (RAP)®
2b Increasing need for flexibility
-
Regulatory Assistance Project (RAP)® 9
RE supply drives need for flexibility and power prices, e.g. in Germany
Source: Agora-Energiewende.de – April 29th to May 6th 2018
-
Regulatory Assistance Project (RAP)® 10
There are many sources of flexibility
„Capability“
markets
-
Regulatory Assistance Project (RAP)® 11
Toward capability, not capacity
-
Regulatory Assistance Project (RAP)®
To achieve system security and resource
adequacy (the two dimensions of reliability) at
least cost, flexibility is key.
• Focus on capability instead of capacity
• System services with ramping quality
• Storage e.g., along with supply and demand
• Increase balancing areas (to limit flexibility need)
• Shorten dispatch intervals
12
Regulatory requirements
-
Regulatory Assistance Project (RAP)®
2c Considering locational value
-
Regulatory Assistance Project (RAP)® 14
Locational value
The value of power
supply is linked to
location, due to
availability of (un-)
congested networks
This locational marginal
pricing (LMP) is
addressed by nodal
pricing, e.g. in the US
Prices by nodes in Texas Source: ERCOT
chea
p->
-
>
->
ex
pen
sive
-
Regulatory Assistance Project (RAP)® 15
Europe: Locational value not reflected in national bidding “zones”
Source: CEREG (Belgium Regulator 2016)
-
Regulatory Assistance Project (RAP)®
• Location-related marginal costs need to be
reflected in market prices
• Transition from one to another system is
difficult/expensive
• Bidding zones only as a quick fix/interim solution
• In the long run, nodal pricing is the only
cost-efficient solution
16
Regulatory considerations
-
Regulatory Assistance Project (RAP)®
2f Benefits from demand side resources
-
Regulatory Assistance Project (RAP)® 18
Demand is willing to respond –screen shot of German demand curve is flattening curve becameless steep
Source: Epexspot
€/MWh
Demand and supply bids, Sept 14th, midnight to 1 a.m.
-
Regulatory Assistance Project (RAP)® 19
Customers’ peak demand reduction from time-varying rate pilots
-
Regulatory Assistance Project (RAP)®
Because supply is not an end in itself, it is needed to
satisfy demand:
• Consider the benefit of savings and the shift in
load compared to supply and transmission
investments
• Create markets with fair competition for all
resources, including demand-side resources
20
Regulatory consideration
-
Regulatory Assistance Project (RAP)®
• Optimizing overall system flexibility is the key to
cost-effective reliability
• Of the many possible sources of flexibility, flexible
demand is likely to be the lowest cost, the most
readily available and the least well developed
• Well-regulated competitive markets that price
energy, based on its true locational marginal cost
and drives those price signals to all customers able
and willing to respond to them is essential
21
Key message
-
Andreas Jahn
Senior Associate
The Regulatory Assistance Project (RAP)®
+49 30 700 1435 421
raponline.org
Anna-Louisa-Karsch-Straße 2
D-10178 Berlin
Germany
About RAPThe Regulatory Assistance Project (RAP)® is an
independent, non-partisan, non-governmental
organization dedicated to accelerating the transition
to a clean, reliable, and efficient energy future.
Learn more about our work at raponline.org
http://www.raponline.org/