Innovative Joint Designed for 84-Inch Raw Water Tunnel Carrier
Pipe
Glenn A. Davidenko, P.E.
Gedas Grazulis, Welding Engineer
Northwest Pipe Company, Inc.
National Welding Corporation
![Page 2: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/2.jpg)
Presentation Breakdown
– Manufacturer’s Perspective-Presented by Glenn Davidenko
– Installation Perspective Presented by Gedas Grazulis
– Closing-Presented by Glenn Davidenko
– Q & A-Both Presenters
2
![Page 3: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/3.jpg)
Manufacturer’s Perspective
Project Details-84” Carrier Pipe in 96” Casing~3,900 LF – 84” Steel Pipe½” Wall ThicknessBare ID-Cement-Lined In-Place Polyurethane-CoatingWorking Pressure is Approximately 190’ of Head (~83 psi)Butt-Welded Joint was specifiedHorizontal Routing – Mostly Horizontal Curves with Radii down to 800’
3
![Page 4: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/4.jpg)
Manufacturer’s Perspective
4
BUTT-WELDED JOINT PER CONTRACT
![Page 5: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/5.jpg)
Manufacturer’s Perspective
Project Issue Developed
• Tunnel Survey indicated Alignment issues at several locations (Tunnel was not were it’s supposed to be!)
• Installation Contractor was concerned about placing a 50-foot long pipe in a horizontal curve
• Installation Contractor was concerned about being able to weld the butt-welded joints throughout the tunnel
• Installation Contractor requested a meeting of all parties to discuss.
• Pipe Manufacturer previously received approval to start making 50-Foot Joints and any Change was Cost Prohibitive
5
![Page 6: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/6.jpg)
Manufacturer’s Perspective
Key Decision Makers at Project Meeting
• Attendees were Project Manager, AECOM, from China• Contractor Project Manager, Obayoshi, from Japan• Installation Sub-Contractor, National Welding, from
Lithuania• Pipe Manufacturer, Northwest Pipe Company, from
India
6
![Page 7: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/7.jpg)
Manufacturer’s Perspective
Outcome from Project Meeting• Pipe Manufacturer was directed to work with the
Installation Sub-Contractor and propose a solution to this issue.
• REPEATING!!
• Pipe Manufacturer WAS directed to work with the Installation Sub-Contractor and propose a solution to this issue.
7
![Page 8: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/8.jpg)
Manufacturer’s Perspective
Pros for Butt-Welded Joints
• Provide one the strongest joint types
• Resists Higher Pressures• Single Complete Joint
Penetration (CJP)Field-Weld
Cons for Butt-Welded Joints
• Higher Cost to Manufacture
• Limited Installation Flexibility
• Single Inside Fillet Weld
8
![Page 9: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/9.jpg)
Manufacturer’s Perspective
Additional Limits By Installation Sub-Contractor
• Installation Method is Bell Over Spigot• Maximum Rise in Pipe When Placing Weld Bell Over
Spigot is on around 2”• Clearance between Faying Surfaces of the Assembled
Lap-Joint Cannot Exceed 3/16”, per AWWA C206• The Minimum Overlap of the Assembled Lap-Joint is 1”,
or 3 Times Wall Thickness, or 1-1/2”, whichever is greater, per AWWA C206
9
![Page 10: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/10.jpg)
Manufacturer’s Perspective
Next Step for Pipe ManufacturerDraw on 50+ years of experience in
making Integral Joints Using the following Criteria
• Develop a Joint that meets the project requirements (i.e. Pressure, Installation, Flexibility, etc.)
• Develop a Joint that can be consistently manufactured• Develop a Joint that can be field welded• Develop a Joint Using Existing Manufacturing
Techniques• THE SOLUTION!
10
![Page 11: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/11.jpg)
Manufacturer’s Perspective
11
HYBRID LAP-WELDED JOINT
![Page 12: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/12.jpg)
Manufacturer’s Perspective
Key Points of the Hybrid-Weld Bell Joint
• This Joint allows Joints to be supplied with Built-In Miters plus the joint can be pulled as necessary while utilizing the Installation Sub-Contractors Techniques
• All Bell Joints were consistently manufactured• Field Welding occurs at a Single Location
12
![Page 13: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/13.jpg)
Manufacturer’s Perspective
ConclusionsAbout Hybrid Lap-Welded Joint
• Met all Design Requirements from the Engineer, Contractor, Installation Sub-Contractor and Pipe Manufacturer
• Joints Handled all Horizontal Curved Area with no Additional Fit-Up
• Since all Required Joint Deflections were Cut Into Bell Joints Exactly, very little Joint Pulling Was Reported
• The Hybrid-Lap Welded Joint Provided a Winning Solution for This Installation
13
![Page 14: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/14.jpg)
Gedas GrazulisNational Welding Corporation-Installation Perspective
• Pre-Installation Planning
• Commencement of Installation
• Fitting and Welding Operations
14
![Page 15: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/15.jpg)
Pre-Installation Planning
15
•Invert leveled with concrete
•Pipe elevation determined from top of rail height
•Cradle style pipe carrier design
•Tunnel Rail re-installed
![Page 16: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/16.jpg)
Pipe Carrier Requirements
16
•Transportation of pipe through tunnel
•Pipe Clocking
•Lifting and side shift of pipe
•Protecting pipe coating from damage
![Page 17: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/17.jpg)
Transportation
17
![Page 18: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/18.jpg)
Problems:
18
It’s not a matter of if there will be,but of when they will they occur??
![Page 19: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/19.jpg)
Installation Tools
19
![Page 20: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/20.jpg)
Pipe Bracing
20
•Weld on “ears” installed at location•Angle iron at excessive length to
allow for height variation
![Page 21: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/21.jpg)
Welding Operations
21
•FCAW Flux Cored Arc Welding
•Inverter style welding machines
![Page 22: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/22.jpg)
CLOSING
• OWNER and ENGINEER turned over the solution to the Subject Matter Experts (SME) in Their Fields to Work Out the Solution to this Issue. We the Engineer, Contractor, Installation Sub-Contractor and Pipe Manufacturer.
• THE SOLUTION ULTIMATELY WAS THE ENGINEERS AND OWNERS TO ACCEPT, WHICH THEY DID.
• The Team-Approach Solved the Issue and the Team-Approach worked on other Project Issues that Developed.
22
![Page 23: Innovative Joint Designed for 84-Inch Raw Water Tunnel](https://reader031.vdocuments.us/reader031/viewer/2022012423/6177e283304dc058c968742b/html5/thumbnails/23.jpg)
QUESTIONS???Glenn A. Davidenko, P.E.
Gedas Grazulis, Welding Engineer
Northwest Pipe Company, Inc.