Innovating in a compact environment. EAST KENT ACCESS PHASE 2 CLIFFSEND UNDERPASS JACKED DECK TUNNEL. JACKED STRUCTURES. ESTABLISHED METHODS. JACKED DECK CONCEPT. JACKED DECK BENEFITS. ALTERNATIVE ABUTMENTS. Jacked Access Box and piled abutments . Jacked foundation and wall boxes. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/1.jpg)
INNOVATING IN A COMPACT ENVIRONMENT
EAST KENT ACCESS PHASE 2CLIFFSEND UNDERPASSJACKED DECK TUNNEL
![Page 2: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/2.jpg)
JACKED STRUCTURES
The concept of horizontal construction to install underground structures developed in mid-late 20th century.
The work is characterized by off-line construction of the permanent structure elements with a relatively short period of installation and minimal disruption to surface facilities.
![Page 3: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/3.jpg)
ESTABLISHED METHODS
![Page 4: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/4.jpg)
JACKED DECK CONCEPT
A patented approach which builds on proven horizontal jacked installation techniques
Based on the installation of a slide path within access tunnels or boxes.
Deck units are jacked in along the slide path as excavation takes place in a compartmentalized shield fixed to the leading unit.
![Page 5: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/5.jpg)
JACKED DECK BENEFITS
Continuous face support
with full structural
lining
Minimizes exposed soil
face
Install greater spans and
longer drive lengths
Close installation
accuracy
![Page 6: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/6.jpg)
ALTERNATIVE ABUTMENTSJacked Access Box and piled abutments
Jacked foundation and wall boxes
Tunnel and piled abutments
![Page 7: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/7.jpg)
EAST KENT ACCESS PHASE 2
Client: Kent County Council
Engineer: Jacobs
Scheme prequalification
in 2008 Bids submitted in March 2009
Original scheme concept for Cliffsend:
Twin Jacked Boxes
Contract Award: VolkerFitzpatrick
HOCHTIEF JV
![Page 8: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/8.jpg)
EAST KENT ACCESS PHASE 2
The East Kent Access road involves:• 8km dual 2 -lane carriageway with 3 roundabouts • An area of outstanding archaeological significance
Design and Construct Structures• 2 span dual carriageway road bridge over railway • A 100m+ underpass under rail tracks and level crossing at Cliffsend
Client’s Perspective• Its not a road scheme• It's a railway crossing scheme with archaeology
![Page 9: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/9.jpg)
SCHEME LAYOUT
A256
A299
CLIFFSEND
![Page 10: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/10.jpg)
CLIFFSEND UNDERPASS
Picture courtesy of VolkerFitzpatrick HOCHTIEF JV
Looking West
![Page 11: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/11.jpg)
KCC/JACOBS TENDER SCHEME
Suggested installation concept based on box jacking
Two parallel boxes 10m wide x 7.2 m high
Total box length 2 x 103 metres, each in three sections
Cover below rail tracks 6m
![Page 12: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/12.jpg)
VolkerFitzpatrick HOCHTIEF JVDesign and Construct Submission
Following Value
Engineering
![Page 13: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/13.jpg)
VolkerFitzpatrick HOCHTIEF JVCLIFFSEND TEAM
Permanent Works Designer Atkins
Third Party Checker Tony
Gee & Partners
Precast Concrete Sian Formwork (Deck)
F P McCann (Segments)
Deck Jacking Mammoet
PilingKeller
TunnellingPilots - Murphy
Deck - McBurney
Jacked Installation Consultant Jacked
StructuresMain ContractorVolkerFitzpatrick
HOCHTIEF JV
![Page 14: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/14.jpg)
GEOLOGY
•Overlying Thanet Sands (1-2m thick)Drift - Head Brickearth
•Overlying Chalk (1-2m thick)Drift - Chalk Head
•Thickness increasing towards the south,Solid - Thanet
Sand
•Underlying entire siteSolid- White Chalk
![Page 15: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/15.jpg)
PILOT TUNNELS
![Page 16: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/16.jpg)
DECK / SHIELD
![Page 17: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/17.jpg)
SLIDE TRACK
![Page 18: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/18.jpg)
ANTI DRAG SYSTEM
![Page 19: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/19.jpg)
JACKING
0102030405060708090100
110
120
130
-
2,500
5,000
7,500
10,000
12,500
15,000 Accumulated Jacking Load Applied
Station (metres)
Tonn
es
![Page 20: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/20.jpg)
EXCAVATION
Average progress 2m / day
![Page 21: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/21.jpg)
NETWORK RAIL INTERFACE
Continuous automatic monitoringTrack fettling during non revenue hours
![Page 22: Innovating in a compact environment](https://reader036.vdocuments.us/reader036/viewer/2022062323/568164ae550346895dd6b9de/html5/thumbnails/22.jpg)
GOING FORWARD
Integrated structural solutions facilitate greater structural lengths and spans
A cost effective approach
Continuous structural ground support reduces risk
Applicable to Underpasses, Metro Stations and Launch Boxes
Early engagement is vital to realise full benefits