inline with mestecc aspiration · berkaitan rang undang-undang pelindungan alam sekitar rundingan...
TRANSCRIPT
For more information, please scan me!
INTEGRITY, EXCELLENCE & FUTURE FOCUS
INLINE WITH MESTECC ASPIRATION
WHAT ARE THE NEW
INITIATIVES?
Cease Illegal
Plastics Recycling
Activities
Focusing Open
Burning Control at
Johan Setia
Fortifying Special
Management of
Scheduled e-
Waste
Fortifying Sustainable
Managers to
Embrace EMT in
Regulated
Community
Law Reform
Enhancing
Environmental
Recognition7
Uplifting Services
Through Nudge
Approaches6
Embracing
Industrial
Revolution 4.08
For more information, please scan me!
OUR GOAL: FACILITATING COMPLIANCE
ASPIRATION: ADVOCATING SUSTAINABLE DEVELOPMENT FOR
THE WELL-BEING OF THE PEOPLE THROUGH EMBRACING
ENVIRONMENTAL MAINSTREAMING
GUIDED SELF-REGULATION TOOLS
EP EB EMC EF ERCEC ET
Environmental Policy
Environmental Budgeting
Environmental Monitoring Committee
Environmental Facility
Environmental Competency
Environmental Reporting &
Communication
Environmental Transparency
Islamic Perspective
Environmental Perspective
Pride of
Environmental
Excellence
Self
Regulation
Environmental
Mainstreaming
EM
SR
EE
Pathway Towards Achieving Sense of Pride of Environmental Excellence
TAQWA
(Piety)
AMAL SOLEH(Good Deeds- Pillars)
EHSAN(Sweetness of Faith)
UPLIFTING ENFORCEMENT STRATEGY
Command
& Control
(C&C)
Guided Self-
Regulation
(GSR)
Complement
For more information, please scan me!
INCREASING ENVIRONMENTAL INSPECTION OF LICENCED
PREMISES UNDER SECTION 18(1) EQA 1974 AND
MANUFACTURING INDUSTRIES AND SEWAGE FACILITIES
INITIATIVE
DOE to submit information about
the definition of compliance, how to
measure the rate of compliance and
check and balance of compliance to
YBM
Field inspection (FI) = Command
and control (CAC) + Environmental
Mainstreaming Tools (EMT)
verification
Environmental Mainstreaming
Tools – target 70% (7/7 EMT) and
CAC
Engagement with each specific
industrial sector:
• DOE HQ – with industry
association and stakeholders.
• DOE State – with licenced
premises at least twice a year.
For more information, please scan me!
PENUTUPAN 100 PREMIS KITAR SEMULA SISA PLASTIK HARAM
INISIATIF
Penutupan 100 premis
kitar semula plastik haram
Penguatkuasaan
bersepadu akan
ditubuhkan dengan
agensi yang berkaitan di
setiap negeri
For more information, please scan me!
Q1 2019
Q2 2019• Full implementation of Action Plan.
• Action Plan undertaken by
department and agency
• 3 stages of actions:
Prevention
Fire suppression
Enforcement
Some text here
Implementation of prevention measures:
• Establish Johan Setia Open Burning
Prevention Community
• Awareness program among farmers and
related agencies
• Patrol to prevent open burning in Johan
Setia
• Ensure availability of water supply for
fire suppression
• Proposed lead agency – Unit Pengurusan
Bencana Negeri Selangor (UPBN)
TOWARDS ZERO OPEN BURNING AND PREVENT LOCAL HAZE
JOHAN SETIA OPEN BURNING
ACTION PLAN
For more information, please scan me!
IMPROVING EIA PROCESS – HOLISTIC AND COMPREHENSIVE
APPROACH BY FORTIFYING EIA PROCEDURES
INITIATIVE
Action Plan/ Lead
Measures• Stakeholder engagement in Quarter 1
• Findings of the engagement session
will be tabled to YBM for the way
forward in Quarter 2
OUTCOME:
Quality Control in EIA
Report/ Process
Report of the findings to
improve EIA procedures and
process
Deliverables
KPI Target1 stakeholder engagement
1 report
1 meeting with YBM
For more information, please scan me!
IMPROVE EIA GUIDELINES IN ACCORDANCE TO CURRENT ORDER,
ENVIRONMENTAL QUALITY (PRESCRIBED ACTIVITIES)
(ENVIRONMENTAL IMPACT ASSESSMENT) ORDER 2015
INITIATIVE
Timeline: In 2019
Action Plan/ Lead
Measures• Appointment of consultants in Quarter 1
• Stakeholder engagement in Quarter 2
• Draft guidelines in Quarter 3
• Final Report in Quarter 4
Resource Required• Development Expenditure –
RMK11 RP4
• Outsource
Deliverables3 EIA Guidelines for:
• Agriculture, Fisheries and
Forestry Activities
• Industry Activities
• Housing, Industrial Estate
Development, New Township
Development, Transportation,
Road, and Aerodrome Activities
KPI Target: 3 EIA Guidelines
OUTCOME:
Quality Control In EIA
Report/ Process
For more information, please scan me!
IMPLEMENTING MONETARY FINES FOR DAMAGING THE ENVIRONMENT
INITIATIVE
OUTCOMEDeterrent Sentence to the
Environmental Offenders
and
Create Environmental
Awareness
KPI TARGET• 30 cases to be referred to
Deputy Public Prosecutor
(DPP) for court action
• 150 number of cases
compounded
ACTION PLAN• Under Section 34A(8) EQA
1974 – Maximum fines
RM500,000 and
imprisonment not exceeding
5 years or both
• Law reform - Environmental
Protection Act (EPA 20XX)
with new penalty amount
01
02
03
04
05
1
3
2
Manpower, logistic
(vehicles, equipment) and
budget
RESOURCE REQUIRED5
DELIVERABLESQuarterly compliance report on
EIA approved projects
4
For more information, please scan me!
CONTINUOUS MONITORING OF COMPLIANCE FOR PROJECTS
INITIATIVE
Submit information on
number of audit reports
and spot checks to YBM
Online submission of
environmental monitoring
report (EMR)
Third party auditor under
section 33A by an auditor
registered with the DOE is
required
Assessment of EIA
auditors by DOE
Implementation of 7
Environmental
Management Tools (EMT)
KPI TARGET100% enforcement inspection of
EIA approved projects:
300 - Q1
650 - Q2
1000 - Q3
1200 - Q4
DELIVERABLESQuarterly compliance report
OUTCOME:
100% Enforcement
Inspection of EIA
Approved Projects
RESOURCE REQUIREDManpower, logistic (vehicles,
equipment) and budget
For more information, please scan me!
PEMANTAPAN PELAKSANAAN PERWAKILAN KUASA
DI BAWAH SEKSYEN 49, AKAS 1974
INISIATIF
Perakuan Perintah
Kualiti Alam
Sekitar
(Perwakilan Kuasa)
dari Menteri
Penyediaan
Prosedur Tetap
Operasi (PTO)
Kelulusan Perintah
Kualiti Alam Sekitar
(Perwakilan Kuasa)
dari Jabatan Peguam
Negara
Penyediaan
maklumat pelaksaan
perwakilan kuasa
oleh agensi yang
diwakilkan kuasa
Perundangan
termasuk tindakan
perundangan oleh
agensi yang
diwakilkan kuasa
Rundingan awam
dengan pihak
berkepentingan
Pelaporan
Pelaksanaan
Penguatkuasa oleh
agensi yang
berkaitan dan kesan
kepada komuniti
(kepada Menteri)
Perintah Kualiti
Alam Sekitar
(Perwakilan
kuasa)
diwartakan
Q1 Q2 Q3 Q4
For more information, please scan me!
GUBALAN BARU AKTA PELINDUNGAN ALAM SEKITAR
INISIATIF
Kelulusan dasar
pengubalan undang-
undang Akta Pelindungan
Alam Sekitar oleh
MESTECC
Rundingan awam dengan
pihak berkepentingan
berkaitan rang undang-
undang pelindungan alam
sekitar
Rundingan dengan ahli
parlimen berkaitan
dengan rang undang-
undang pelindungan alam
sekitar
Kelulusan rang undang-
undang dari Jabatan
Peguam Negara
Rang undang-undang
dibentangkan di Parlimen
Q1 Q4Q2 Q3
For more information, please scan me!
ACTION PLAN TIMELINE
CLEAN AIR REGULATIONS 2014
Resolve compliance
issues with focus
on 3 main sectors –
palm oil mills,
powrer plants and
oil & gas
Promote
industrial
sectors to
display
information on
the company’s
regulatory
compliance to
the public
Troubleshoot
technical issues
regarding compliance
to Clean Air
Regulations 2014
through technical
committee meeting.
Promote good
practice
Engagement
with related
industries
Q1 2019 Q2 2019
TOWARDS FULL
CLEAN AIR REGULATIONS 2014
COMPLIANCE BY JUNE 2019
90% COMPLIANCE OF
EMISSION STANDARD BY
THE INDUSTRIALSECTORS
For more information, please scan me!
TOWARDS A GREEN
LOOP RECYCLING
IN MANAGING
SCHEDULED
E-WASTES
IN MALAYSIA
Technical Cooperation
DOE- JICA
Development of legal
framework and drafting
of the Scheduled
Electrical and
Electronic Equipment
Wastes Regulations
201X
Engagement with
Stakeholders
• Government
agencies
• State Government
• Industry
• NGOs
The Project For
Development of
Mechanism For Household
E-waste Management in
Malaysia Refrigerator
Washing Machine
Air-conditioner
Television
Computer
Mobile phones
Special Sector under DOE
set-up to administer
scheduled E-waste
management system in
Malaysia (6 regulated items) Public
Schools and IPT
Industry
NGOs
Improper
management of
scheduled e-wastes
Endorsement of the
Scheduled Electrical and
Electronic Equipment
Wastes Regulations 201X
by AGC
Communication,
Education
and Public Awareness
(CEPA)
IN MALAYSIA
ROADMAP OF SCHEDULED
E-WASTE MANAGEMENT SYSTEM
Q4
2015-2018
2019
Improper dismantling
Dumped at the landfill
Open burning
Polluting the environment
Causing health hazards
For more information, please scan me!
FOR MANAGEMENT OF SCHEDULED WASTES OF ABANDONED
VEHICLES
ESTABLISHMENT OF LICENSING GUIDELINES FOR
AUTHORIZING AUTOMOTIVE TREATMENT
FACILITIES (AATF)
Cooperation with
Government Agencies
Establishment of
Communication Plan
Licensing &
Enforement
Stakeholders
Engagement
Public Awareness
MANAGING
SCHEDULED WASTES
IN THE ABANDONED
VEHICLES IN AN
ENVIRONMENTALLY
SOUND MANNER
(ESM)
For more information, please scan me!
ENGAGING THE INDUSTRY PROGRAM – ENVIRONMENTAL
SUSTAINABILITY MANAGER
INITIATIVE
Quarter 1
2019
Quarter 2
2019
Quarter 3
2019Quarter 4
2019
• National Environment Day (NED)
• Interactive Exhibitions
• Community Outreach Programs
• Promotion of Anugerah Langkawi
• Award Ceremony for
Environmental Award and SLAAS
• 200 Strategic Partnerships
• 1700 Environmental Sustainability
Managers
• World Ozone Day Program
• Workshops on Sekolah Lestari –
Anugerah Alam Sekitar (SLAAS)
• 150 Strategic Partnerships
• 1275 Environmental Sustainability
Managers
• 50 Strategic Partnerships
• 425 Environmental
Sustainability Managers
• Earth Day Program
• World Environment Day Program
• Dialogue With Industries
• 100 Strategic Partnerships
• 850 Environmental Sustainability
Managers
For more information, please scan me!
DEVELOP GUIDELINES ON NUDGE METHODOLOGY IN FORTIFYING
ENVIRONMENTAL SUSTAINABILITY MANAGER
INITIATIVE
Q4
Q3
Q2
Q1
1 Guidance
document on
Nudge
Nudge committee Implementation
Measurement
Nudge is intended to stimulate and foster the practice of pro-
environmental behavior among Malaysians- To foster the desired outcome for better decision making & behavioural adoption