INITIAL FIRE SAFETY ASSESSMENT Factory Name: Jan Fabric Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road Chittagong Chittagong Chittagong Bangladesh Assessor: Emkay Enterprises LTD Date: 08 Apr 2014 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. The Alliance for Bangladesh Worker Safety Page 1/25

Upload: tranthu

Post on 24-Jun-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

INITIAL FIRE SAFETY ASSESSMENT

 

Factory Name: Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul IslamRoad Chittagong Chittagong Chittagong Bangladesh

Assessor: Emkay Enterprises LTD

Date: 08 Apr 2014

 

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 1/25

 Introduction to the Report

The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theAlliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasconducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) forthe Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalrequirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyevaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used byRMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actionsteps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughtechnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagesupport for workers if factories are closed for remediation.

The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute orcontinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providea non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF northe Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

For more information and report feedback please go to: www.bangladeshworkersafety.org. 

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 2/25

GENERAL INFORMATION 

General Information

Factory Name: Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road Chittagong Chittagong Chittagong Bangladesh

Country: Bangladesh

Province: Chittagong

City: Chittagong

Zip Code:

Audit Duration: 1 Days

Re-Audit: Re-Audit After 0 Months

Draft Report Date: 30 April 2014

Final Report Date: To be filled out by the “Alliance QA” representative

Are all Action ItemsFrom PreviousAssessmentCompleted?:

N/A

Buildings in Complex: One 6-story R.C.C building constructed into three parts connected to each others by expansion joint.

Is the building(s) ownedor rented by the Factory:

Rented

Number of BuildingLevels (Stories):

6

Approximate BuildingArea (SF):

1,29,294.00 SF (Part-1: 38,406 SF, Part-2: 57,846 SF, Part-3: 33,042 SF)

Date of BuildingConstruction:

1980

Date of Last BuildingRenovation/Addition:

Unknown

Ancillary Structures inComplex:

None

Approximate AncillaryStructures Area (SF):

None

Number of Occupants: Ground Floor: 30 (Residential Hotel and Market Place); 1st Floor: 25 (Residential hotel and Office: CA Farm,

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 3/25

Travel agency, Doctors Chamber); 2nd Floor: 370 (Jans Fabrics ltd.); .3rd Floor: 100 (Uma Manufactures &Exporters Ltd.); 5th and 4th floor: Vacant

Number of AncillaryLevels (Stories):

None

 

 

 

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 4/25

ASSESSMENT FINDINGS 

Fire Protection Construction

Question: Are openings and penetrations through rated walls and/or assembliesprotected?

 

 

 

 

 

Priority Level: High

Non-Compliance Level: 3

Description: 01. Exits are not fully protected by continuously fire rated assemblies in allfloors. 02. Glass window in the separation wall of void at 2nd & 3rd floor 03.Penetration through the separation wall of sub-store at 3rd floor 04. Noseparation wall between the cutting section and stair of North-East corner at2nd floor. 05. Also non rated glass opening was found between cutting sectionand storage area at 2nd floor.

Source of Findings: Photograph: Non-rated exit assemblies, Glass window in the separation wall ofvoid, Penetration through the wall of sub-store, Penetration through theseparation wall of cutting section & stair, Non-rated glass protected opening.

Suggested Plan ofAction:

Install required fire rated door assemblies at all exits. Provide required fire-resistive rated opening protection (Door, Window, Hatch Cover etc.) atopenings and penetrations through fire rated walls and/or assemblies. Consulta qualified fire protection engineer to design the required rated openingprotection.

Suggested DeadlineDate:

21 Jul 2014

Standard: Includes doors, windows, ducts, piping, etc. Reference Alliance Standards Part4 Section 4.6 Opening Protectives and Section 4.7 Penetrations

Question: Are exit enclosures provided with fire-resistive rated construction barriers?  

Priority Level: High

Non-Compliance Level: 3

Description: Exits are not fully protected by continuously fire rated assemblies as requiredby Alliance Standard. The stairwells of 6-story building are enclosed by 5"masonry brick wall and collapsible gates have been installed in most of theexits leading to the stairwell.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 5/25

Source of Findings: Photograph: Exit enclosure with collapsible gate.

Suggested Plan ofAction:

Provide 2-hour fire-resistive rated construction barriers at exit enclosures with1.5-hour fire-rated opening protection (Door, window etc.). The fire doors shallbe side-hinged doors that swing in the direction of egress with automaticcloser, latching fire exit hardware, and no locking arrangements with aminimum width of 1 m (39 in.). Every door in a stair enclosure serving morethan 4 stories will need to be provided with re-entry provision. Consult aqualified fire protection engineer to design the required rated constructionbarriers with opening protection.

Suggested DeadlineDate:

21 Jul 2014

Standard: Reference Alliance Standards Part 4 Section 4.5 Separation

Question: Are shafts provided with the minimum fire-resistance rating?  

Priority Level: High

Non-Compliance Level: 3

Description: A vertical void was found in this factory building connecting all floors. This voidwas not provided with proper fire barrier separation and opening protection.

Source of Findings: Photograph: Void without opening protection

Suggested Plan ofAction:

Provide 2-hour fire-resistive rated continuous barriers at void enclosures and1.5- hour fire-resistive opening protection at void opening(s). Consult aqualified fire protection engineer to design the required rated construction ofvoid.

Suggested DeadlineDate:

21 Jul 2014

Standard: Reference Alliance Standards Part 4 Section 4.5.7.1 through 4.5.7.3

Question: Is each floor separated with a fire-resistive rated construction barrier?  

Priority Level: High

Non-Compliance Level: 2

Description: Not in compliance with Reference Alliance Standards Part 4 Section 4.5Separation : Typical slab thickness of this building was 125 mm R.C.C slab;however, an unprotected crack was noted in all floors.

Source of Findings: Photograph: Expansion gap on roof slab at 2nd floor

Suggested Plan ofAction:

Properly seal all unprotected openings with a fire resistive rated assembly.Consult a qualified fire protection engineer for the remmediation work.

Suggested DeadlineDate:

21 Jul 2014

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 6/25

Standard: Reference Alliance Standards Part 4 Section 4.5 Separation

Question: Is the fire resistance materials of structural members in good condition andfree of damage?

 

 

Priority Level: Medium

Non-Compliance Level: 3

Description: R.C.C frame building (Ground to 5th floor). From visual inspection all structuralmembers were not found free of damage during assessment. Vertical crackswere noticed in some of the columns and concrete spalling from roof slab insome place. Also the tin shed room on roof deck was non-rated.

Source of Findings: Photograph: 01. Non-rated tin shed on roof, 02. Concrete spalling from roofslab.

Suggested Plan ofAction:

As per Alliance standard part 3 section 3.6.2.4: Non-rated construction shallnot be allowed for high-rise building. As the construction on roof deck (Brickwall with tin shed) is non-rated construction, it needs to be removed. Also adetailed structural assessment and retrofit of the structure per the instruction ofa qualifying structural engineer with full set of documentation needs to beprovided.

Suggested DeadlineDate:

21 Jul 2014

Standard: BNBC Part 3 Chapter 3

Question: Are separations between hazards provided with fire-resistive ratedconstruction barriers.

 

 

 

Priority Level: Medium

Non-Compliance Level: 3

Description: No fire separation has provided between sub-store, finished goods store,fabric store, padding store, maintenance room, boiler room with otherproduction area (finishing section, swing section and daycare etc.) at 3rd and2nd floor. The generator has been placed in the open space near the egresspath discharge for the middle stair at the ground floor. This was not incompliance with Alliance Standard Part: 3 Section: 3.4 Mix Use.

Source of Findings: Photograph: Non-separated padding store with sewing & maintenance sectionat 2nd floor, Unprotected boiler room, and Unprotected generator room.

Suggested Plan ofAction:

Rooms used for storage of combustible materials, boiler, permanent hot workarea (maintenance room with metal cutting, grinding machine) needs to beseparated from the surrounding occupancy with a minimum 1-hour fire ratedconstruction with 0.75-hour fire rated opening protection. Generator needs tobe separated by 2-hour fire rated construction with 1.5-hour fire rated openingprotection. Consult a qualified fire protection engineer to design the requiredrated construction barrier.

Suggested DeadlineDate:

13 Oct 2014

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 7/25

Standard: Reference Alliance Standards Part 4 Section 4.5 Separation

Question: Certificates of Occupancy for each building have been issued and are on file.  

Priority Level: Low

Non-Compliance Level: 1

Description: Not in compliance: No certificates of occupancy have been provided for eachpart of the building.

Source of Findings: Document Review: No occupancy certificate has been shown

Suggested Plan ofAction:

Need to collect Occupancy certificate for each part of the building per buildinguse from approving authority.

Suggested DeadlineDate:

09 Jun 2014

Standard: Are certificates of occupancy provided for each building or ancillary structure?

Question: Occupancy Type  

Priority Level:

Non-Compliance Level:

Description: As per running operation of RMG factory Occupancy Type-G2, Type-A(Residential Hotel), Type-F (Market Place, CA Farm, Travel agency, DoctorsChamber).

Source of Findings:

Suggested Plan ofAction:

Not Applicable

Suggested DeadlineDate:

Standard: Provide Occupancy Type for each building and structure. Reference AllianceStandards Part 3 Use and Occupancy

Question: Construction Type  

Priority Level:

Non-Compliance Level:

Description: Type-1: (R.C.C frame) Ground to 5th floor and Non-Rated: Brick wall with tinshed on roof.

Source of Findings:

Suggested Plan ofAction:

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 8/25

Suggested DeadlineDate:

Standard: Provide construction type for each building and ancillary structure. ReferenceAlliance Standards Table 3.3.1

Question: Height of Highest Occupied Floor Level Above Grade  

Priority Level:

Non-Compliance Level:

Description: The total height of the 6-story building above grade including tin shed on roofwas18.75 m (61.5 ft.) (6-story) and the highest occupied floor level (from gradelevel to roof deck) is 15.75 m (51.66 ft.)

Source of Findings:

Suggested Plan ofAction:

Not Applicable

Suggested DeadlineDate:

Standard: Provide maximum height of highest occupied floor level above grade for eachtype of building and ancillary structure.

Fire Protection Systems

Question: Does the building have a Standpipe System?   

 

Priority Level: High

Non-Compliance Level: 3

Description: The standpipes are not in compliance with the Alliance Standard. Only 25 mmhose connections were found in the 3rd floor and only a hose box withouthoses was found on the 2nd floor. No Class-I (65mm) or Class-II (40mm)standpipes were found in the factory building.

Source of Findings: Photograph: 01. Non class standpipe connection; 02. Hose cabinet withoutstandpipe connection.

Suggested Plan ofAction:

Modify or install the standpipe System (Class-I and class-II) to meet therequirements of Alliance standard's section 5.4. Consult a qualified fireprotection engineer before modifying or installing a new system.

Suggested DeadlineDate:

21 Jul 2014

Standard: Does the building have a standpipe system installed where required. AllianceStandard Part 5 Section 5.4.2

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 9/25

Question: Are notification and initiation devices for the fire alarm system installed atrequired locations based on occupancy type?

 

Priority Level: High

Non-Compliance Level: 3

Description: Not in compliance. Pull stations at egress points: Insufficient number ofmanual fire alarm have been installed. Piano and Push switches have beenused as fire alarm call points. Smoke detectors: Only standalone smokedetectors have been installed at 3rd floor. Audible and Visual devices: Foundat 3rd floor only.

Source of Findings: Photograph: Audible and Visual devices

Suggested Plan ofAction:

Design and install an automatic fire detection and alarm system by a qualifiedfire protection engineer throughout the building. Notification devices shall bespaced appropriately based on NFPA 72.

Suggested DeadlineDate:

21 Jul 2014

Standard: Pull stations at egress points, smoke detectors in air handling equipment,visual and audible devices spaced appropriately based on occupancy type.Reference NFPA 72

Question: Does the building have a fire pump?  

Priority Level: High

Non-Compliance Level: 2

Description: No fire pump was found during this visit.

Source of Findings: Visual Assessment: No dedicated fire pump

Suggested Plan ofAction:

Install a dedicated fire pump in accordance with NFPA 20 to supply the waterdemands for the fire protection systems along with a stored source of water tomeet the demands per NFPA 22.

Suggested DeadlineDate:

21 Jul 2014

Standard: Alliance Standard Part 5 Fire Protection Systems

Question: Portable fire extinguishers have been selected based on potential fire classand hazards?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: ABCE dry powder and CO2 type extinguisher have been provided in theworking area and near boiler room; however, no foam type extinguishers havebeen installed in generator room.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 10/25

Source of Findings: Photograph: ABCE and CO2 type extinguishers

Suggested Plan ofAction:

Need to install Portable fire extinguishers as per potential fire class andhazards in accordance with NFPA 10 Chapter 5

Suggested DeadlineDate:

21 Jul 2014

Standard: NFPA 10 Chapter 5

Question: Standpipe system piping is free of mechanical damage, leakage, andcorrosion?

 

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Not in compliance with NFPA 25 Chapter 6 Standpipe and Hose Systems.Standpipe system piping was not free of mechanical damage and leakage. Inmost of the cases stand pipes have been disconnected with the fire hose and25mm standpipes have been connected with the 40mm fabric hose bysubstandard fittings.

Source of Findings: Photograph: 01. Disconnected stand pipe; 02. 25mm standpipe connectedwith the 40mm fabric hose.

Suggested Plan ofAction:

Repair or replace damaged piping at the noted locations. Repairs andreplacements must comply with NFPA 14 and NFPA 25.

Suggested DeadlineDate:

13 Oct 2014

Standard: NFPA 25 Chapter 6 Standpipe and Hose Systems

Question: Are fire department connections provided and clearly identified for the FireProtection Systems?

 

Priority Level: Medium

Non-Compliance Level: 2

Description: No fire department connections have provided.

Source of Findings: Visual Assessment: No fire department connections were found

Suggested Plan ofAction:

Fire department (Siamese) inlet connections need to be provided to allow firedepartment pumper equipment to supplement the fire protection systems. Firedepartment outlet connections need to be provided to allow fire departmentpumper vehicles to pump water into the standpipe system and another to draftwater from ground-level or underground water storage tanks. Connectionsneed to match the Fire Service and Civil Defence hose thread standard.Ensure reservation of the required amount of water for fire-fighting. Consult aqualified fire protection engineer to design this requirement.

Suggested DeadlineDate:

13 Oct 2014

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 11/25

Standard: Alliance Standard Part 5 Section 5.5.4 Fire Department Connections

Question: Are portable fire extinguishers installed throughout the building at requiredlocations and mounted at the correct height?

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Portable fire extinguishers are only installed in 2nd and 3rd floor of thebuilding.

Source of Findings: Photograph: Portable fire extinguisher

Suggested Plan ofAction:

Install fire extinguishers at correct locations and heights based on hazard typeper BNBC Part 4 and NFPA 10.

Suggested DeadlineDate:

21 Jul 2014

Standard: BNBC Part 4 Section 4.10 and NFPA 10

Question: Fire extinguishers are inspected, tested, and maintained as required.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Only the inspection checklist with the monthly dates on each extinguisher arebeing verified by the fire safety officer. Not all of the requirements of NFPA 10are being checked. While interviewing the person responsible for this it wasfound that only the pressure gauges (where available) and expiration datesare being checked.

Source of Findings: Photograph: Maintenance checklist of extinguisher

Suggested Plan ofAction:

Establish an inspection, testing, and maintenance program for all fireextinguishers. Program needs to comply with the requirements of NFPA 10

Suggested DeadlineDate:

13 Oct 2014

Standard: NFPA 10 Chapter 7

Question: Is the fire alarm and detection system monitored by a central stationmonitoring service or directly connected to the Fire Service and Civil Defense?

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Not in Compliance as per Alliance standard part: 5 section: 5.7.5. No detectionsystem was found at 2nd floor (Jans Fabrics Ltd). Only standalone smokedetectors were available at 3rd floor (Uma Manufacturers & Exporters Ltd.) ofthe building. Manual fire alarm was found at 2nd and 3rd floor of the building.Piano switch was used as fire alarm call point without marking.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 12/25

Source of Findings: Photograph: Fire alarm call point

Suggested Plan ofAction:

Centralized fire alarm and detection system needs to be installed and thecontrol panel of this system shall be monitored by a central station monitoringservice or directly connected to the Fire Service and Civil Defense. Until thattime a central station monitoring service or direct connection to the FireService and Civil Defense can be set up, a person needs to be assigned tocontact the fire department in the event of fire alarm activation. An annunciatorneeds to be located in a constantly attended location to alert this person.

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standard Part 5 Section 5.7.5 Monitoring

Question: Are inspection, maintenance, and testing procedures of the standpipe andhose system documented and up to date? Including inspection and testing ofhoses if provided.

 

Priority Level: Low

Non-Compliance Level: 1

Description: Not in Compliance: Inspection, maintenance, and testing procedures of thestandpipe and hose system per NFPA 25 were not available during visit.

Source of Findings: Document Review: No inspection, maintenance, and testing documents haveshown.

Suggested Plan ofAction:

Establish an inspection, maintenance, and testing program for the standpipeand hose system. Program needs to comply with the requirements of NFPA25.

Suggested DeadlineDate:

13 Oct 2014

Standard: Reference NFPA 25 Chapter 6 Standpipe and Hose Systems Table 6.1.1.2

Question: Is signage for the standpipe system installed at required locations and onrequired components?

 

Priority Level: Low

Non-Compliance Level: 1

Description: Not in compliance with Alliance Standards Part 5 Section 5.4.4 Location ofHose Connections and NFPA 14 Chapter 7. No signage for the standpipesystem has been installed at required locations and on required components.

Source of Findings: Visual Assessment: No signage for the standpipe system was found

Suggested Plan ofAction:

Need to install required signage for the standpipe system identification at thenoted locations. Signage need to be complying with NFPA 14.

Suggested DeadlineDate:

09 Jun 2014

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 13/25

Standard: Reference NFPA 14 Chapter 6

Means of Egress

Question: Occupied roofs are provided with the minimum number of exits required as astory.

 

Priority Level: High

Non-Compliance Level: 3

Description: All four stairs have been constructed up to the occupied roof but only 2 stairswere usable; the other 2 stairs were blocked at the roof level. This is notcompliance with Alliance Standard section 6.6.4.

Source of Findings: Photograph: Stair blocked at roof level

Suggested Plan ofAction:

Provide occupied roofs with the minimum number of exits required as a story.

Suggested DeadlineDate:

21 Jul 2014

Standard: Alliance Standards Part 6 Section 6.6 Number of Means of Egress

Question: Exit access corridors serving an occupant load exceeding 30 are separated bywalls having a fire-resistance rating of 1 hr.

 

Priority Level: High

Non-Compliance Level: 3

Description: Exit access corridor serving an occupant load more than 30 was found at 2nd& 3rd floor of east middle portion of this 6-story building. These corridors werenot separated by proper fire rated barrier as per Alliance standard part 6section 6.3.1.1.

Source of Findings: Photograph: Unprotected exit access corridor.

Suggested Plan ofAction:

Exit access corridors serving an occupant load exceeding 30 need to beseparated by walls having a fire resistance rating of 1-hour and with 0.75-houropening protection or provided with automatic sprinkler protection throughoutthe story or building as per NFPA 13. The rated assembly or sprinkler systemneeds to be approved and/or designed by a qualified fire protection engineer.

Suggested DeadlineDate:

21 Jul 2014

Standard: Alliance Standard Part 6 Section 6.3 and Part 4 Section 4.5. Does not apply ifan automatic sprinkler system is installed throughout the building.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 14/25

Question: Means of egress are free from impediments, obstructions, and storedmaterials.

 

Priority Level: High

Non-Compliance Level: 3

Description: Not in compliance as per Alliance Standard Part 6 Section 6.3.8 Impedimentsto means of egress and Section 6.3.9 Reliability. Some aisles were foundblocked.

Source of Findings: Photograph: Obstruction in means of egress.

Suggested Plan ofAction:

Maintain means of egress continuously free and clear of all obstructions orimpediments to full instant use in the case of fire or other emergency.

Suggested DeadlineDate:

05 May 2014

Standard: Alliance Standard Part 6 Section 6.3.8 Impediments to means of egress andSection 6.3.9 Reliability

Question: Doors are not locked in the direction of egress under any conditions. All hasps,locks, slide bolts, and other locking devices have been removed whererequired.

 

Priority Level: High

Non-Compliance Level: 3

Description: Not in compliance with Alliance standard part 6 section 6.8.2. Doors in thepath of egress were found unlocked in the direction of egress only duringworking hours. Hasps, locks, other locking devices were present on all egressdoors.

Source of Findings: Photograph: Locking devices in doors.

Suggested Plan ofAction:

Doors need to be kept lock free in the direction of egress under all conditions.All hasps, locks, slide bolts, and other locking devices shall be removed whereinstalled.

Suggested DeadlineDate:

12 May 2014

Standard: Alliance Standards Part 6 Section 6.8 Doors and Gates

Question: All doors in a means of egress are of the side-hinged swinging type.  

Priority Level: High

Non-Compliance Level: 3

Description: Not-in compliance with Alliance Standards Part 6 Section 6.8 Doors andGates. Collapsible gates are installed in many of the exits.

Source of Findings: Photograph: Collapsible gate in the means of egress.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 15/25

Suggested Plan ofAction:

All roll-down, collapsible, sliding gates and shutters in the means of egressshall be replaced with side-hinged, fire-rated doors that swing in the directionof egress with fire exit latching panic hardware, automatic closers, and freefrom locking mechanisms.

Suggested DeadlineDate:

21 Jul 2014

Standard: Alliance Standards Part 6 Section 6.8 Doors and Gates

Question: Interior exit stairways and ramps terminate at an exit discharge except whereterminating at a rated exit passageway.

 

Priority Level: High

Non-Compliance Level: 3

Description: Not in compliance with Alliance Standard Part 6 Section 6.14 Exit Enclosures.The East-West middle stair terminates inside the reception area of Raj hotel atground floor which is not separated by rated walls/assemblies.

Source of Findings: Visual Assessment: Picture was not taken for having permission.

Suggested Plan ofAction:

Interior exit stairway and ramps need to terminate directly outside the buildingor at a rated exit passageway which directly terminates outside of the building.Consult a qualified fire protection engineer for these requirements.

Suggested DeadlineDate:

21 Jul 2014

Standard: Alliance Standard Part 6 Section 6.14 Exit Enclosures

Question: Exit discharge is directly to the exterior of the building, unless the requirementsof 6.17.2 are met, at grade or provides direct access to grade. Exit dischargeshall not reenter a building.

 

Priority Level: High

Non-Compliance Level: 1

Description: Exit discharge of East-West middle stair dicharges inside the reception area ofRaj hotel at ground floor which is not separated by rated walls/assemblies asper Alliance Standard Part 6 Section 6.17 Exit Discharge.

Source of Findings: Photograph: Interior exit discharge

Suggested Plan ofAction:

Interior exit stairways and ramps need to terminate at an exit discharge oroutside the building except where terminating at an exit passagewayconstructed to meet the same rating requirement as the exit and that shall notbe less than 1-hr fire-resistance rated construction (NOTE: if sprinklers areinstalled as noted above, this installation will not be necessary per exemptionof code).

Suggested DeadlineDate:

21 Jul 2014

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 16/25

Standard: Alliance Standard Part 6 Section 6.17 Exit Discharge. See Section 16.7.2 and16.7.3 for exceptions.

Question: Handrails are provided on both sides of each stairway. Intermediate handrailsare provided when the stair width exceeds 2.2 m (87 in.). Handrails are notmounted lower than 760 mm (30 in.) or higher than 1100 mm (44 in.).

 

 

 

Priority Level: Medium

Non-Compliance Level: 3

Description: Not in compliance with Alliance Standard Part 6 Section 6.9 Stairs and 6.12Handrails and Guards. Handrails have been provided on only one side of eachstairway having minimum height 711 mm (28 in.) and maximum height 889mm (35 in.); no handrails have been provided in a few levels of stair-01 (north-east corner). Also the spacing between the vertical members of some stairswas 900 mm (36 inch.)

Source of Findings: Photograph: Handrail only on one side, Absence of handrails,Spacing ofvertical member of hand rail.

Suggested Plan ofAction:

Install handrails on the both sides of the stairs. A minimum height of 865 mm(34 in.) and a maximum height of 965 mm (38 in.) as measured from theleading edge of the tread needs to be maintained when installing newhandrails. The spacing of the vertical members of the stair handrail shall notexceed 200 mm (8 in.)

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standard Part 6 Section 6.9 Stairs and 6.12 Handrails and Guards

Question: All occupied roofs are provided with parapets or guards with a minimum heightof 1067 mm (42 in.).

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Not in compliance with Alliance standard part 6 section 6.12.2.4. No parapetsor guards were provided in the occupied roof of the building.

Source of Findings: Photograph: Absence of parapet on occupied roof.

Suggested Plan ofAction:

Provide parapet on every occupied roof with same fire rating of outer wall ofthe building and a minimum height of 1067 mm (42 in.).

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standard Part 6 Section 12 Handrails and Guards

Question: Occupant loads are posted for every assembly and production floor in aconspicuous space near the main point of egress.

 

Priority Level: Medium

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 17/25

Non-Compliance Level: 2

Description: Occupant loads are not posted for any assembly and production floor in aconspicuous space near the main point of egress.

Source of Findings: Visual Assessment: No signage was found during inspection.

Suggested Plan ofAction:

Post the occupant loads for every assembly and production floor in a facility ina conspicuous space near the main exit or exit access doorway for the space.

Suggested DeadlineDate:

12 May 2014

Standard: Alliance Standards Part 6 Section 6.4.4 Posting of Occupant Load

Question: Interior finishes for means of egress meet the rating requirements for Class A,B and C materials.

 

 

Priority Level: Medium

Non-Compliance Level: 2

Description: The egress path between office and finishing section near north-east cornerstair has been separated by particle or artificial wooden board at 2nd floor.This construction material was also noted at the egress path of South-Weststair at 3rd floor. These were not in compliance with Alliance Standard Part 6Section 6.3.2 Interior Finish.

Source of Findings: Photograph: Combustible partition wall beside egress path at 2nd floor,Combustible wooden cabinets on the egress path at 3rd floor.

Suggested Plan ofAction:

Need to test the interior finishes materials for means of egress as per ASTME84. If does not meet the rating requirements for Class A, B and C materialsthen replace non-compliant finishes with finishes that have a maximum flamespread index of 75 and smoke developed index of 450 .

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standard Part 6 Section 6.3.2 Interior Finish

Question: Exits are limited to Class A and Class B interior materials.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Need to test the interior finishes materials for means of egress as per ASTME84. If does not meet the rating requirements for Class A, B and C materialsthen replace non-compliant finishes with finishes that have a maximum flamespread index of 75 and smoke developed index of 450 .

Source of Findings: Photograph: Combustible partition wall beside egress path at 2nd floor

Suggested Plan ofAction:

Need to remove non-compliant materials and replace with materials meetingthe requirements of Class A or Class B materials.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 18/25

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standard Part 6 Section 6.3.2 Interior Finish

Question: All paths of egress are provided with compliant means of illumination.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Not in compliance as per Alliance Standards Part 6 Section 6.7 EgressIllumination and Part 10 Section 10.12 Illumination of Exit Signs and Means OfEscape.: No emergency light provided in this building.

Source of Findings: Visual Assessment: No emergency light was found during inspection.

Suggested Plan ofAction:

Install appropriate means of illumination at the noted locations. Emergencyillumination shall provide not less than 10 lux for corridors, doors, and stairs,and 2.5 lux for aisles. After installing need to develop a testing andmaintenance program that ensures the operation of all exit signs andemergency lighting are verified at least once per year. If battery-operated signsare used, these lights shall be tested on a monthly basis. Functional testing ofbattery powered signs shall be provided for a minimum 90 min once per year.

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standards Part 6 Section 6.7 Egress Illumination and Part 10 Section10.12 Illumination of Exit Signs and Means Of Escape

Question: Illuminated exit signs are placed at entrances to exits and along the path ofegress anywhere the continuation of egress is not obvious or there is a changein the direction of the path of travel.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Illuminated exit signs have been placed only at exits and not at additionallocations where needed throughout the floor.

Source of Findings: Photograph: Illuminated exit sign

Suggested Plan ofAction:

Install Illuminated exit signs with backup power and continuous graphics atentrances to exits and along the path of egress anywhere the continuation ofegress is not obvious or there is a change in the direction of the path of travel.

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standard Part 6 Section 6.11 Exit Signs

Question: Emergency power for exit signs is tested at least once per year. If batteryoperated, these lights are tested on a monthly basis. Functional testing ofbattery powered signs is provided for a minimum 90 min once per year.

 

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 19/25

Priority Level: Medium

Non-Compliance Level: 2

Description: Not in compliance with Alliance standard part 10 section 10.12.1.4; No testingplan and records were available during visit.

Source of Findings: Document Review: Testing records of emergency power for exit signs werenot found.

Suggested Plan ofAction:

Develop a testing and maintenance program that ensures the emergencypower for exit signs are tested at least once per year. If battery operated signsare used, these lights are tested on a monthly basis. Functional testing ofbattery powered signs is provided for a minimum 90 min once per year.

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standard Part 10 Section 10.12 Illumination of Exit Signs and MeansOf Escape.

Question: Compliant guards are provided on the open sides of egress componentswhere the elevation exceeds 760 mm (30 in) above the ground or floor below.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: Not in compliance with Alliance Standard part 6 section 6.3.7, 6.12.2.2 and6.12.2.3.

Source of Findings: Photograph: No compliant guard at stair end

Suggested Plan ofAction:

Guards need to provide at the open side of means of egress that exceed 760mm (30 inch) above the floor or finished ground level. New guard shall have aminimum height of 1067 mm (42 inch) and the spacing between the verticalmembers does not exceed 200 mm (8 inch).

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standard Part 6 Section 6.3.7 Guards

Question: Stair designation signs are provided at each floor entrance from the stair to thefloor in English and Bengali. Signs indicate the name of the stair and the floorlevel. Signs are posted adjacent to the door.

 

Priority Level: Low

Non-Compliance Level: 1

Description: Not provided at any of the stair, which is not incompliance with Alliancestandard Alliance Standard Part 6 Section 6.9.3.1 signs

Source of Findings: Visual Assessment: Stair designation sign was not found

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 20/25

Suggested Plan ofAction:

Stair designation signs need to be provided at each floor entrance from allstairs to the floor in English and Bengali. Signs need to indicate the name ofthe stair and the floor level. Signs shall be posted adjacent to the door.

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standard Part 6 Section 6.9 Stairs

Fire Safety Programs

Question: Are the required number of people trained and certified in fire fighting, first aid,and rescue training by the appropriate authority.

 

Priority Level: High

Non-Compliance Level: 1

Description: No fire safety training has been conducted with any of the workers in thisfacility.

Source of Findings: Worker Interviews: As per worker interview; they didn't get any training on firesafety.

Suggested Plan ofAction:

Provide training for the required number of people certified in firefighting, firstaid, and rescue training by the appropriate authority

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standard Part 13 Human Element Programs

Question: Are there additional areas of non-compliance to report?  

Priority Level: Medium

Non-Compliance Level: 2

Description: This factory is located on the 2nd floor of a 6-story building. The 3rd floor isoccupied by another garment factory, Uma Manufactures & Exporters Ltd. The4th & 5th floors are vacant. The ground and 1st floor are occupied by aresidential hotel, office and market place. The fire safety management forthese facilities are not the same, there is no full separation between thevarious tenants of this building.

Source of Findings: Photograph: Evidence of multiple tenants.

Suggested Plan ofAction:

The factory needs to ensure that building management and factorymanagement are on the same page with regards to fire safety and the fireprotection systems in order to protect the entire building per the Alliancestandard.

Suggested DeadlineDate:

21 Jul 2014

Standard: Not Applicable

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 21/25

Question: An emergency evacuation plan has been developed and communicated to allemployees.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: An emergency evacuation plan has not been developed and communicated toall employees.

Source of Findings: Document Review: No emergency evacuation plan has been developed

Suggested Plan ofAction:

Need to develop an emergency evacuation plan which includes allcomponents required by the Alliance Standards and communicate the plan toall employees.

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standards Part 13 Section 13.1 Fire Safety Director

Question: Emergency egress maps are posted at the entrance to each exit stair or mainpoint of egress.

 

Priority Level: Medium

Non-Compliance Level: 2

Description: No emergency egress maps were found on the 2nd floor.

Source of Findings: Photograph: No emergency egress maps are posted at 2nd floor

Suggested Plan ofAction:

Post emergency egress maps at the entrance to each exit stair or main pointof egress.

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standards Part 13 Section 13.4 Evacuation Plan

Question: Fire Drills are conducted at required intervals based on building use type.  

Priority Level: Medium

Non-Compliance Level: 2

Description: No records of fire drill have been found for Jans Fabrics Ltd. during theinspection.

Source of Findings: Document Review: No documents of fire drill were found.

Suggested Plan ofAction:

Conduct fire drills on a quarterly basis as outlined in BNBC Part 4 Appendix Afor all garment facilities with record keeping .These fire drills need to beconducted under the direction of a Fire Safety Director.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 22/25

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standards Part 13 Section 13.3 Fire Drills

Question: Storage areas underneath the cutting tables are clear of combustibles.  

Priority Level: Medium

Non-Compliance Level: 1

Description: Not-in compliance as per Alliance Standard Part 17 Section 13.7.2 Cuttingtables. Combustibles under cutting table were found in the cutting section of2nd floor.

Source of Findings: Photograph: Combustibles under cutting table

Suggested Plan ofAction:

Keep areas beneath cutting tables clear of combustibles at all times.

Suggested DeadlineDate:

12 May 2014

Standard: Alliance Standard Part 17 Section 13.7.2 Cutting tables.

Question: Training programs are implemented and documented in accordance with theAlliance Safety Training Curriculum.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: The factory has not received the Alliance Safety Training Curriculum fromAlliance at the date of this assessment.

Source of Findings: Document Review: The factory has not received the Alliance Safety TrainingCurriculum from Alliance

Suggested Plan ofAction:

Training programs need to be implemented and documented in accordancewith the Alliance Safety Training Curriculum.

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standards Part 13

Question: A hot-work permit program has been established.  

Priority Level: Low

Non-Compliance Level: 3

Description: No hot-work permit program has been established. During this visit, no hotwork operations were noted; however, the maintenance room has equipmentfor metal grinding, cutting, etc.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 23/25

Source of Findings: Photograph: Provision for hot working at maintenance room.

Suggested Plan ofAction:

Develop a hot work permit program. The program must comply with therequirements of NFPA 51B

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standards Part 13 Section 13.4 Hot Work Permit and NFPA 51B

Question: A Fire Safety Director position has been filled.  

Priority Level: Low

Non-Compliance Level: 1

Description: No fire safety director has been posted in this factory, which is not incompliance with Alliance Standards Part 13 Section 13.1 Fire Safety Director.

Source of Findings: Document Review: No post of fire safety director was available

Suggested Plan ofAction:

Create a Fire Safety Director position and fill the position with an individual thathas had sufficient training to be able to carry the required duties.

Suggested DeadlineDate:

13 Oct 2014

Standard: Alliance Standards Part 13 Section 13.1 Fire Safety Director

Question: Fire Department pre-planning has been completed.  

Priority Level: Low

Non-Compliance Level: 1

Description: Fire Department pre-planning has not been completed.

Source of Findings: Document Review: No pre-plan has been developed.

Suggested Plan ofAction:

Need to complete fire department pre-planning activities with the local FireService and Civil Defence.

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standards Part 13 Section 13.1 Fire Safety Director

Question: A written housekeeping policy is established and enforced.  

Priority Level: Low

Non-Compliance Level: 1

Description: A written housekeeping policy was not established and enforced.

Source of Findings: Document Review: No written housekeeping policy was found.

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 24/25

Suggested Plan ofAction:

Establish written corporate and plant policies on housekeeping to ensurescheduled cleaning for floor, wall, ceiling, supply and return air ventilationsystems. Promptly reschedule skipped cleanings. Provide a documented lineof authority for authorizing a cleaning delay and rescheduling. As a generalrule the maximum tolerable deposit thickness for loose fluffy lint is 13 mm (½in.) over a maximum of 46.5 m2 (500 ft2). Limit dense deposits to 6 mm (¼ in.)and oil saturated deposits to 3.2 mm (⅛ in.).

Suggested DeadlineDate:

05 Jan 2015

Standard: Alliance Standards Part 13 Section 13.6 Housekeeping

Question: Are all applicable permits up to date including Fire License & Boiler License.  

Priority Level: Low

Non-Compliance Level: 1

Description: Not-in compliance. Only fire license was found.

Source of Findings: Photograph: Updated fire license.

Suggested Plan ofAction:

Need to collect boiler license from authority and need to keep it up to date.

Suggested DeadlineDate:

26 May 2014

Standard: Alliance Standard Part 13 Human Element Programs

 

 

FactoryName:

Jan Fabric

Address: Raj Hotel Market( 2nd Floor) 154, Kazi Nazrul Islam Road ChittagongChittagong Chittagong Bangladesh

Assessor: Emkay EnterprisesLTD

Date: 08 Apr 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 25/25