Infrastructure Problems in Indonesia: Key Lessons from Phase I of IndII David Ray, IndII Facility Director

Upload: dothu

Post on 30-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

Infrastructure Problems in Indonesia: Key Lessons from Phase I of IndII

David Ray,

IndII Facility Director

Page 2: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

2

Structure of Presentation

• The infrastructure challenge

• Context – Urbanisation pressures

• Expenditure and efficiency – The case of roads

• Institutional problems undermining delivery of infrastructure services – Policies and planning issues, due to institutional failure/dysfunction

– Examples in roads and water

• Results based financing to promote institutional reform (output based aid) – AusAID’s water hibah program (implemented by IndII)

Page 3: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

3

The challenge

“Indonesia has the potential to achieve economic growth of up to 8%. However, so far economic growth has been sub-optimal due to infrastructure constraints”.

“ About 6-7 years ago, the number one business hurdle in the real sector...was the rule of law and corruption. Currently the number one obstacle is inadequate infrastructure”.

Fauzi Ichsan, on the launch of the Standard Chartered report ‘Indonesia: Infrastructure Bottlenecks” (Kompas 22 Feb 2011)

Page 4: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

4

The context: increasingly urbanised nation

2010 2050 Change

Population (millions) 237.6 327 89.4

% Urban 50% 75%

Urban population (millions) 118.8 245.3 126.5

Population growth rate 1.1% 0.5%

0

50

100

150

200

250

300

350

2010

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

2036

2038

2040

2042

2044

2046

2048

2050

Po

pu

lati

on

(mill

ion

s)

Indonesia: Forecast Population Structure 2010 - 2050

Urban

Rural

Page 5: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

5

Piped water urban coverage declining

25%

30%

35%

40%

45% 19

92

1994

1996

1998

2000

2002

2004

2006

Urb

an H

ou

seh

old

s Se

rve

d

Urban Water Coverage

Due to a lack of local govt investment since the late 1990s

Page 6: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

6

Focus on urban transport

•Wealth and motorisation: positive relationship in most cities

0

100

200

300

400

500

600

700

800

900

0 10 20 30 40 50 60

GRP per capita ('000 US $)

No

of c

ars

per 1

000

popu

latio

n

Tokyo

New York

Atlanta

Rome

Singapore

Hong Kong

Taipei

Seoul

Bangkok Athens

Paris

London

JKT BJG

Shanghai MNL

Frankfurt

Houston

Source: STREAM study, EASTS 2008

Page 7: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

7

Indonesian City motorisation rates (car)

• Jakarta well ahead, but motorisation in other cities will

increase as incomes grow

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

400.00

450.00

0.00 0.01 0.02 0.03 0.04 0.05 0.06

Pangkal Pinang

Pontianak Banjarmasin

Malang

Kota Metro

Cilegon

Tegal

Yogyakarta

Semarang

Makassar

Bandung

Bogor

DKI Jakarta

Milyar Rupiah/Orang

Jumlah Kendaraan Roda 4/1000 Penduduk

Perbandingan Jumlah Kendaraan Roda 4 dengan PDRB Perkapita Tahun 2008

PDRB Perkapita

Balikpapan

Source: Kebijakan Pembangunan Infrastruktur Transportasi Massal Berbasis Jalan, A. Aldian Surabaya 2010

Page 8: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

8

Other infrastructure issues

•Sanitation – Only 1% of urban households connected to piped sewerage (only

11 sewerage systems nation-wide).

– Septic tank seepage to aquifers – that also provide primary water source for 50% of urban population.

– Only half to two-thirds of solid waste is collected by LGs, and no sanitary land-fills are in operation (despite legal requirement)

• Inter-urban mobility – Most major airports (terminals) running at 200-300% capacity.

– Road speeds between cities, typically as low as 30-40 kmh (100-200% below capacity).

– Many major national ports have 10-14 days turnaround time.

On the face of it – urgent need for rapid scale up in investment...

Page 9: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

9

Increased expenditure in infrastructure

• Accurately calculating the total public spend on infrastructure is a difficult

and tedious exercise requiring access to detailed information from govt

agencies and enterprises, at all levels of government.

• Safe to assume that the national commitment has increased in recent years,

from around 2% of GDP in 2000, to 4-5% by the end of the decade.

Page 10: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

10

Expenditure efficiency in national roads

While the budget over the past six years has risen significantly, the

actual output has stagnated or fallen over that period and the cost

per unit of output has risen dramatically. The efficiency of

translating budget into output has thus seriously declined.

Increasing budget commitment does not necessarily mean

translate to improved infrastructure outcomes: Consider national

highways

Page 11: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

11

Institutional issues in the roads sector

• Range of issues undermining performance – Widespread neglect of routine maintenance

o Well resourced nationally, but performance not incentivised. $5000 per km should be more than enough to maintain national roads.

o LGs well (over) staffed, but lack budget. Incentive problems with force-account service delivery.

o Opportunities for performance based contracting

– Design failures and overloading o Most roads designed to fail, with only 8 ton axle limit max (should be at

least 16 ton). Coupled with widespread overloading, poor maintenance, roads are only lasting < 8 years (often just 2-4 yrs) instead of 12-20 yrs.

o Weighbridges are effectively revenue raising instruments for provincial governments, not a tool for regulating axle weights on national roads

– Problems in setting priorities o Default incremental approach to defer expenditure. Roads with poor

geometry and weak structure, require longer term renewal and alignment (resulting in higher initial investment, but lower costs overall)

o ‘Worst first’ approach - incentives to reconstruct/rehabilitate small sections rather than focus on maintaining larger network

Page 12: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

12

Institutional issues ...cont’d – Fragmentation and ‘high costs’ in procurement

o Large number of contracts (reportedly up to 7000) to provide 40,000 km of national highways. Contract size: 1-3 km, attracts weak firms.

o High transaction costs, lack of competition, weak fiduciary controls, poor controls on construction quality.

– Human resource management o DG Highways overstaffed: 1 staff per 5 km (versus international

comparators: 1 per 100-400 km). Preference for force account work particularly for maintenance.

o Difficult to promote outsourcing to more efficient private sector providers of maintenance services.

– Budget and planning o Difficult to plan over multi-year cycle. Funds often need to be expended

in short period (of just a few months), further undermining planning and construction quality.

o Budget allocation to fund existing arrangements/structures not desired outcomes.

o Moves to medium term expenditure frameworks (MTEF) and performance based budgeting (PBB).

Page 13: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

Improving Asset Performance

1

1.5

2

2.5

3

3.5

4

4.5

0 5 10 15 20 25 30

EXPECTED LIFE

TARGET EXPECTED LIFE

ASSET AGE (yr)

LOW QUALITY, OVERLOADING ACTUAL

GOOD

FAIR

POOR

BAD

IMPROVED DESIGN, QUALITY

Reform Actions -

• Improve Quality and

Supervision

• Improve design for

loading & drainage

• Extend design life,

stronger designs

Observations –

• Low Survival =

( Actual Life /

Expected Life ) %

• Short Expected Life

ROAD ASSET DETERIORATION

Page 14: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

Improving Asset Life: Budget Implications

0

2

4

6

8

0 5 10 15 20 25 30 35

PAVEMENT AGE (yr)

LOWER LIFE-CYCLE COST

& LESS DISRUPTION

POTENTIAL SAVING

30 PERCENT

CU

MU

LAT

IVE

SPEN

DIN

G

HIGHER INITIAL COST

SHORT LIFE POLICY

LONG LIFE POLICY

Action:

•Extend design life

Result:

•Better road condition

•Less disruption

•Lower life-cycle cost

•Budget savings

But note:

•Higher treatment cost,

shorter length

• Political patience!!

Page 15: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

15

Local water supply

•Range of institutional issues constraining water service delivery at the local level: – Traditional top down approach by central government, but little

incentive for LGs to maintain assets, or to invest own funds.

– Since decentralisation, LG investments have not kept pace with urban growth, and have fallen sharply. o Evidence of negligible investment by LG in PDAM equity (0.37% of

APBD budget funds in 2007).

o Evidence of substantial and growing reserves in LG Accounts (excess of IDR 90 trillion in 2006).

– LGs did see themselves responsible for water service delivery, rather this was the mandate of LG owned PDAMs (water utilities). Common view was that: o The PDAM is a commercial enterprise and should be self-financing,

despite the legislative obligation that LGs have to ensure their constituents have access to acceptable water services.

Page 16: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

16

Local water supply...cont’d

– LGs regulate water prices, and commonly lack the political will to allow their PDAMs to raise tariffs to allow, or go in the direction of cost-recovery (approx Rp 3000 per m3).

o Circular problem: LGs unwilling to raise tariffs due to poor service standards, PDAMs cannot raise standards due to lack of funds.

o Clear lack of mutual trust between PDAMs and their owners. PDAMs complain of LGs don’t understand their problems, and LG complain that PDAMs are not responding to LG needs. Hence any funds invested in water supply at local level often channelled through LG public works agency, creating further ‘ownership’ issues.

– Urgent need to improve the external governance environment for PDAMs, by improving LG commitment to, and investment in PDAMs:

o AusAID water hibah program using ‘results based financing.’

Page 17: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

17

Results-based financing

• Links payment to performance: – “Results based financing is an umbrella term that includes

output-based aid, provider payment incentives, performance-based interfiscal transfers, and conditional cash transfers. What these mechanisms have in common is that a principal entity provides a financial or in-kind reward, conditional on the recipient of that reward undertaking a set of predetermined actions or achieving a predetermined development goal. The ultimate goal is to increase the effectiveness of scarce public resources for the provision of basic services.” (World Bank 2010)

– Output based option used to (re) stimulate new LG equity investment in PDAMs, using new GOI fiscal transfer mechanism known as Hibah.

– Minimises fiduciary risks of using partner government systems: o funds released only after outputs are verified.

Page 18: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

18

AusAID water hibah

•Output based subsidy for water connections for 76,000 poor households: – Designed to stimulate LG equity investment in PDAMs and to

expand PDAM business into low-income segment.

– Uses GOI fiscal transfer systems and is part of broader GOI policy initiative to stimulate water sector.

– Consistent with ‘Jakarta Commitment’ to better use GOI systems and align donor programs with GOI policies and priorities.

– New mechanism, no precedents. Pioneering qualities.

•Key design features – Grant is 35-45%, roughly Rp 2-3 million, of connection cost.

– Paid to LG once connection is verified:

o 3 months working/billable connection,

o LG equity investment in PDAM.

Page 19: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

19

Water Hibah: Overall progress

500 500 383

500

-

750

1,500

1,000

500

1,000

-

1,000 992 850

1,000

600 730

1,150 1,200 1,300

732

2,000 2,000 1,900 2,000

4,779

2,850 2,650

2,404

3,000

2,000

1,500

3,060

2,201

4,000

450

2,041

-

1,000

2,000

3,000

4,000

5,000

6,000

KO

TA B

ALI

KP

AP

AN

KO

TA S

UR

AK

AR

TA

DK

I JA

KA

RTA

KO

TA B

AN

DU

NG

KO

TA B

AN

JAR

MA

SIN

KA

B. L

OM

BO

K T

IMU

R

KO

TA P

EKA

LON

GA

N

KO

TAJA

YAP

UR

A

KA

B. K

AP

UA

S

KA

B. L

AM

PU

NG

UTA

RA

KO

TA P

ALA

NG

KA

RA

YA

KA

B. B

AN

JAR

BA

RU

KO

TA B

OG

OR

KA

B. K

UD

US

KA

B. P

AN

DEG

LAN

G

KA

B. S

ITU

BO

ND

O

KA

B. M

UA

RA

EN

IM

KO

TA B

ALI

KP

AP

AN

KA

B. C

IAN

JUR

KA

B. S

UK

OH

AR

JO

KA

B. D

ON

GG

ALA

KA

B. B

AN

GK

ALA

N

KA

B. B

OYO

LALI

KA

B. J

OM

BA

NG

KA

B. C

ILA

CA

P

KO

TA P

AD

AN

G

KO

TA M

ALA

NG

KA

B. B

AN

JAR

KA

B. W

ON

OG

IRI

KA

B. S

ERA

NG

KA

B. W

ON

OSO

BO

KA

B. G

AR

UT

KA

B. K

UN

ING

AN

KA

B. K

LATE

N

KA

B. K

AR

AW

AN

G

KA

B. S

IDO

AR

JO

KA

B. C

IAM

IS

KA

B. B

OG

OR

KO

TA B

AN

JAR

MA

SIN

KO

TA P

ALE

MB

AN

G

Sanitation Water

Co

nn

ect

ion

s (

Un

it)

Status : 31 March 2011

Additional Hibah

Water Hibah Allocation

Sanitation Hibah Allocation

Installed

Verified

Page 20: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

20

Water Hibah: Cumulative progress

1,350 2,530

4,890

7,840

12,560

19,640

23,552

32,402

44,652

55,722

65,022

71,372

76,000

1,445

4,750

10,756 12,779

17,980

21,528

25,864

33,542

40,263

52,531

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

Co

nn

ect

ion

s (u

nit

)

Status : 31 March 2011

Cum.Target

Cum. Istalled

Pro

ject

De

sig

n A

pp

rais

ed

Fu

nd

ing

Ap

pro

ved

Gra

nt A

wa

rd N

otif

ica

tion

Gra

ntA

gre

em

en

ts S

ign

ed

Page 21: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

21

Lessons learned

•Effective grant program design features: – Outcome, not just output related:

o Ultimate objective should be governance related; i.e. Mainstreaming and promoting stronger LG commitment to road safety, sanitation etc; improving external governance of water utilities.

o Outputs will give us the photo ops, but it is the outcome (such as stronger institutional commitment to sanitation) that will have the long term development impact.

– Additionality, not redundancy:

o Grants should have transformational / catalytic qualities

– Pioneering:

o Paving the way for others to follow (e.g. Donors, GOI).

Page 22: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

22

Effective grant programming...cont’d

•5 “Cs” of effective grant program design o Conditionality: To ensure maximum impact from investment, grants

should have entry requirements that are aligned with developmental, institutional, and governance policy objectives

o Consolidation: Working with less not more LGs

o Contestability: LGs competing for grants by demonstrating capacity, commitment and fitness to execute the grant programs

o Consistency: multi-period grants to ensure longer run incentives

o Communications: building constituency for improved service delivery

0% 200% 400% 600% 800% 1000% 1200%

Average over 22 LGs Kota Malang

Kab. Garut Kab. Karawang Kab. Wonogiri Kab. Kuningan

Kab. Klaten Kab. Wonosobo

Kab. Serang

WSI water connections as a % of annual average, select PDAMs

Page 23: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

23

Page 24: Infrastructure Problems in Indonesia · o Difficult to plan over multi-year cycle. Funds often need to be expended Funds often need to be expended in short period (of just a few …

24

Abstract

Infrastructure Problems in Indonesia: Key Lessons from Phase I of the Indonesia Infrastructure Initiative (IndII) David Ray is the Director of the Indonesia Infrastructure Initiative (IndII), an AusAID-funded facility to promote economic growth through improvements in both the quality and quantity of Infrastructure in Indonesia, particularly in urban areas. To date, IndII has focussed on the water/ sanitation sector and the roads/transport sector as well as a number of cross-sectoral issues, such as infrastructure finance. This presentation will outline key lessons learned from the first phase of IndII, highlighting the main infrastructure problems and constraints; and their potential remedies, from both a policy and donor-action perspective. Central to the presentation, is the argument that institutional problems, rather than resource constraints, is the primary reason for infrastructure failures. Various examples will be drawn from the watsan and transport sectors to show how poor institutional coordination, capacity and commitment have undermined infrastructure delivery and outcomes. Time permitting; the discussion will also consider a new, innovative and promising mechanism for donors in the infrastructure sector known as results-based financing, covering output and performance based aid. The first phase of IndII is scheduled for completion in June 2011. It is expected that IndII will be extended beyond this date for a period of four years.