Board of Supervisors Robert “Bob” Thomas, Jr., Chairman
Laura A. Sellers, Vice Chairman Meg Bohmke Jack R. Cavalier Wendy Maurer Paul V. Milde, III Gary F. Snellings
Anthony J. Romanello, ICMA‐CM
County Administrator
Infrastructure Committee AGENDA
June 7, 2016 @ 1:00 p.m. ABC Conference Room, Second Floor
Committee Members: Paul Milde, III, Chairman; Laura Sellers; Jack Cavalier
Agenda Item
Introduction
Welcome
1. 2015 HB2 Project Awards
2. Potential 2016/2017 HB2 Projects
3. Gateway Cleanup Strategy
4. BFF Trail Phase 6 River Alignment
5. Brooke Road – James Hill Safety Improvements
6. Next Meeting – July 6, 2016
Adjourn
2015 HB2 Project Awards
The Board selected three projects for submission for funding under the HB2 District
Grant funding program developed by the state, as follows
o Route 1 Corridor Improvements in the Courthouse Area
o Safety Improvements along Route 1 near Woodstock Lane & Telegraph Road
o Intersection Improvements at Route 1 and Potomac Creek Drive
While we received word that each of these projects were successful in being selected
for funding, the Commonwealth Transportation Board (CTB) hadn’t officially acted,
and we were uncertain when the funding would be available
The draft funding plan for HB2 projects was presented at the May CTB meeting. The
proposed funding for Stafford projects and the fiscal year we receive it is provided
below.
Both the Route 1 corridor improvements in the Courthouse area and the and the Route
1 and Woodstock Lane/Telegraph Road projects received funding in FY 2017,
allowing these projects to advance immediately.
Initiation of the Potomac Creek intersection improvements will wait until the initial
funding is available in FY2018.
The proposed commuter lot expansion at Route 630 also received funding as shown
below. This project was submitted by FAMPO under the Corridor of Statewide
Significance program. Construction of this project will be coordinated with the Exit
140 Interchange improvements
Estimate Previous FY17 FY18 FY19 FY20 FY21 FY22 Balance
Report Note
T17433
HB2 - FY17 - SAFETY IMPRV RTE 1
TELEGRAPH/WOODSTOCK 1 Fredericksburg Primary Stafford County $8,800 $0 $1,874 $671 $3,000 $1,980 $0 $0 $1,275
Additional $1,275,000
committed by applicant.
100449
HB2 - FY17 - ROUTE 1 @ POTOMAC CREEK DR TURN
LANE 1 Fredericksburg Primary Stafford County $1,800 $0 $0 $331 $340 $621 $507 $0 $0 MPO Project
103085
HB2 - FY17 - RTE 1/630 AREA CORRIDOR ROAD
IMPROVEMENTS 1 Fredericksburg Primary Stafford County $13,280 $6,352 $2,282 $2,646 $2,000 $0 $0 $0 $0
UPC Description Route District Road System Jurisdiction (Values in Thousands of Dollars)
Estimate Previous FY17 FY18 FY19 FY20 FY21 FY22 Balance
Report Note
108573
HB2 - FY17 - COMMUTER LOT EXPANSION I-95 E OF
EXIT 140 95 Fredericksburg Primary Stafford County $9,719 $884 $325 $3,625 $3,375 $1,510 $0 $0 $0
UPC Description Route District Road System Jurisdiction (Values in Thousands of Dollars)
Stafford also was awarded Highway Safety Improvement funding by the CTB for an
extension of a sidewalk along Courthouse Road, and bike/pedestrian improvements
along Leeland Road as shown below.
Given the funding levels and timing of the awards, the Courthouse Road sidewalk
extension project can be initiated immediately after July 1, and design of the Leeland
Road improvements will likely start in FY2019.
The CTB is scheduled to consider the award of the funding for the projects listed
above at the June 14 meeting.
Estimate Previous FY17 FY18 FY19 FY20 FY21 FY22 Balance
Report Note
T17901 BIKE AND PEDESTRIAN UPGRADES ON LEELAND ROAD 626 Fredericksburg Secondary Stafford County $3,350 $0 $120 $60 $370 $800 $950 $1,050 $0
T17897 CONSTRUCT SIDEWALK ON COURTHOUSE ROAD 630 Fredericksburg Secondary Stafford County $455 $310 $0 $235 $0 $0 $0 $0 ($90)
Jurisdiction (Values in Thousands of Dollars)UPC Description Route District Road System
Potential 2016/2017 HB2 Projects
Staff has been working with VDOT and FAMPO to develop the regions HB2 project
list for the upcoming cycle of funding awards. We expect the deadline for submission
for this round of HB2 evaluation will be in October, for funding to be made available
in the last years of the 6 year funding period. Funding levels have not been announced
Given the level of detail necessary to complete a successful HB2 application,
development of the application materials is already underway for some potential
projects
Based upon previous consultation, the Board may wish to consider submitting for the
two recently deferred road improvement projects; Brooke Road safety improvements,
and the Route 1 and Enon Road intersection improvements as District Grant projects
The Brooke Road Safety Improvement Project would be a strong candidate for HB2
funding given the amount of previous funding expended by the County and the state,
the level of detail developed with respect to study and design, and the shovel-ready
status of the project.
Staff estimates we require approximately $5,700,000 to complete the project, of which
half could be funded with revenue sharing.
Similarly, the Enon Road and Route 1 project is well advanced, with significant state
and local funding previously expended.
Staff estimates approximately $3,212,000 is required to complete this project, half of
which could be funded with revenue sharing.
Whereas the current round of HB2 funding is expected to be allocated primarily for
FY2022 and FY2023, these estimates will be adjusted for inflation prior to submitting
the HB2 application.
The Board had previously authorized the study of the Butler Road widening as
another HB2 candidate project. This study is currently underway, and we expect the
results this summer.
Staff suggests that Butler Road could be submitted by Stafford under the Corridor of
Statewide Significance and the District Grant programs.
FAMPO currently has a regional study underway which will identify other potential
HB2 projects that could help relieve traffic congestion along the I-95 corridor in the
Fredericksburg region.
1300 Courthouse Road, P. O. Box 339, Stafford, VA 22555‐0339 Phone: (540) 658-4541 Fax: (540) 720-4572 www.staffordcountyva.gov
Board of Supervisors Robert “Bob” Thomas, Jr., Chairman Laura A. Sellers, Vice Chairman Meg Bohmke Jack R. Cavalier Wendy E. Maurer Paul V. Milde, III Gary F. Snellings
Anthony J. Romanello, ICMA‐CM
County Administrator
To: Infrastructure Committee
From: Cathy Vollbrecht
Interim Director of Parks, Recreation and Community Facilities
Date: May 31, 2016
Re: Gateways Update
Stafford County implemented a Gateway cleanup program to supplement efforts of the Virginia Department of
Transportation (VDOT) and the R-Board litter crew in enhancing the first impression of visitors to Stafford
County. Our Gateway areas include every main highway entering Stafford County, along with the four I-95
exits. Gateway enhancement efforts include regular mowing, landscaping of cultivated areas, street sweeping
and litter removal. The County is currently providing these maintenance efforts at 15 individual Gateway areas
for an annual cost of $140,000. Of this, $100,000 is funded by the Transportation Fund, with the balance
funded from the Parks, Recreation and Community Facilities operating budget.
The Board of Supervisors also approved Stafford County’s Wayfinding System in November 2009 (R09-402)
to increase tourism, provide a cohesive directional sign program and enhance community identity. Stafford’s
Wayfinding sign system welcomes motorists to our community and also encourages visitation to significant
points of interest throughout the County including parks, tourism sites, wineries, marinas and golf courses. The
signs reflect the County’s branding with dark blue and maroon colors and a young colonial boy, representative
of George Washington in his youth. Phase 1 of this program was the “Gateway” signs that were installed in
2012 at major highways leading into the County to welcome visitors to Stafford. There are 10 Gateway signs
at various sites where major roads enter the County.
Phase 2 of the Wayfinding sign system consists of a unified system of “Trailblazing signs” to highlight
Stafford’s many visitor attractions. The signs are part of the Virginia Department of Transportation’s (VDOT)
Wayfinding Program and join the installed “Gateway” signs that welcome visitors to Stafford. The new signs
also reflect the County’s branding and are replacing the brown VA Logos signs sold by VDOT.
Phase 2A of this project consists of 39 signs and is almost complete. Phase 2B has 15 signs. Phase 2B signs
have not been installed and are still under design prior to submitting to VDOT for approval. All of these signs
will be maintained by Stafford’s Department of Parks, Recreation and Community Facilities (PRCF), at an
additional cost.
Infrastructure Committee Memo
Page 2
May 31, 2016
1300 Courthouse Road, P. O. Box 339, Stafford, VA 22555‐0339 Phone: (540) 658-4541 Fax: (540) 720-4572 www.staffordcountyva.gov
With the expected completion of the Route 17 widening project in August 2016 and the role of Route 17 as a
major gateway to Stafford County, consideration should be given to how the road’s landscaping will be
maintained once the Virginia Department of Transportation’s work is done. VDOT plans to install small trees
and shrubs along the length of its project. VDOT does has a maintenance program for landscaping within the
Right of Way; however, the level of care and maintenance is generally minimal similar to the level we
observed at our other Gateway areas. The Board may wish to consider a supplemental maintenance program.
Please let me know if you have any questions.
Belmont-Ferry Farm Trail Phase 6
Staff provided the Infrastructure Committee with a briefing (attached) on the alignment
alternatives for Phase 6 of the Belmont Ferry Farm Trail at the April 5th and May 3
rd
meetings.
The Infrastructure Committee selected the trail along the Rappahannock River as the
preferred option. Furthermore, the Committee suggested the development of an
alignment that followed the river for a longer distance before connecting with the parking
facilities under development by the George Washington Foundation at the Ferry Farm
site.
The initial river alignment is attached, which follows the river for just over .5 miles
before passing under the CSX railroad bridge, and then leaving the river in a series of
switchbacks to eventually follow a path parallel to Route 3.
We prepared another alternative alignment (also attached) that continues approximately
800’ further on a parallel track to the river, traversing the steep slope without the use of
switchbacks, before turning towards Route 3 and the Ferry Farm parking area.
This route allows the slope to be climbed with the use of a single resting area which
would also be very attractive as an observation platform for scenic views of the river and
the City of Fredericksburg.
This alignment has the added advantage of shortening the trail distance by 1,300’,
thereby reducing the cost.
Staff suggests investigating this option as a boardwalk as well as an asphalt trail, as the
boardwalk may allow construction with fewer impacts to the environment. Staff
recommends keeping three options for VDOT review. Estimated costs for the three
options are as follows:
Alignment A $2,553,000
Alignment B (boardwalk) $2,320,000
Alignment B (asphalt) $2,141,000
Next Steps
Complete study and submit to VDOT for review
Following approval of the study, request authorization from the Board for a contract to
design the preferred option.
Investigate sources of grant funding for the additional project cost. This includes
Transportation Alternative Program, and Land and Water Conservation Fund (LWCF)
Grants
1
2
2
1
0
8
8
1
0
8
1
0
1
2
1
0
8
1
0
1
2
18
2
0
1
6
1
0
40
5
2
6
0
66
72
7
8
8
4
9
4
7
4
6
8
6
2
9
0
7
2
5
2
3
4
4
4
6
0
1
8
2
0
1
2
2
1
0
1
2
3
0
3
4
38
1
4
8
10
1
2
20
14
48
44
4
4
4
4
1
2
1
2
1
4
1
2
1
8
14
1
6
1
2
1
6
1
4
3
8
5
4
4
2
2
4
2
8
3
0
7
0
1
0
8
3
6
4
8
4
6
4
4
34
24
2
0
3
4
4
4
5
6
14
2
2
6
4
1
4
92
9
0
8
4
7
8
7
0
9
2
8
4
8
8
8
6
8
2
2
1
2
1
6
1
4
3
2
8
2
1
0
0
0
1
0
1
0
1
0
6
0
72
7
0
6
6
54
5
4
5
0
1
8
1
4
1
4
1
6
6
0
7
4
8
0
8
2
8
0
6
8
5
2
4
6
42
36
44
7
8
8
2
5
2
5
2
80
8
0
23
6
1
2
4
2
3
8
4
2
1
0
10
1
2
10
6
2
7
0
9
0
9
0
7
8
8
6
8
2
8
686
88
9
2
8
2
8
2
7
4
66
6
4
7
6
60
9
0
5
8
56
1
2
5
0
6
2
7
0
5
4
5
8
4
2
5
2
54
7
4
78
84
9
2
80
84
2
1
0
3
6
1
4
1
4
20
4
8
5
0
4
6
0
0
10
1
2
5
0
5
0
5
2
4
2
18
8
4
2
4
14
1
4
1
2
1
0
8
1
0
1
4
18
2
2
6
2
6
2
6
8
7
4
8
6
8
0
7
8
6
0
6
4
6
6
7
2
74
7
6
1
6
56
6
6
7
8
82
6
4
R
A
P
P
A
H
A
N
N
O
C
K
R
I
V
E
R
K
IN
G
S
H
W
Y
N
A
O
M
I
R
D
1
6
8
8
1
6
1
0
1
2
4
8
5
8
7
0
8
0
9
4
8
8
8
6
9
0
9
2
92
6
6
7
2
66
76
9
2
9
4
9
2
1
0
1
2
8
8
2
6
1
6
1
4
8
1
2
1
6
4
4
4
4
4
4
4
4
4
6
14
5
0
5
0
5
0
3
6
3
8
2
6
2
0
2
2
1
8
4
0
4
8
6
0
6
6
2
4
3
6
4
0
2
6
5
4
5
8
3
0
3
0
6
0
42
5
8
4
8
7
0
7
2
S
H
A
W
C
T
S
H
A
W
C
T
KIN
GS
H
WY
R
A
IL
R
O
A
D
L
N
J
E
T
T
D
R
C
S
X
R
A
I
L
R
O
A
D
C
S
X
R
A
I
L
R
O
A
D
KIN
G
S H
W
Y
S
O
P
H
I
A
S
T
F
E
R
R
Y
R
D(
R
T
6
0
6
)
26
2
0
7
0
7
0
6
0
7
0
8
4
1
2
82
50
6
8
2
8
4
12
1
2
4
6
1
0
1
6
12
2
2
4
6
6
5
6
1
0
8
2
3
4
5
0
50
1
8
64
7
4
8
2
90
7
8
D
A
I
R
Y
L
N
.
R
U
N
5
8
1
0
8
2
2
3
4
16
2
2
K
I
N
G
S
H
W
Y
C
LA
IB
O
R
N
E
C
L
A
IB
O
R
N
E
RU
N
P
O
T
E
N
T
IA
L
S
W
M
A
R
E
A
GEORGE WASHINGTON
WAY (FUTURE)
POTENTIAL TRAIL
CONNECTION TO
FERRY FARM
C
O
O
L
S
P
R
I
N
G
R
O
A
D
TIE TO PHASE
4 TRAIL
GEORGE WASHINGTON
WAY (FUTURE)
POTENTIAL TRAIL
CONNECTION TO
FERRY FARM
MINOR CLEARING
REQUIRED
PRIVATE DRIVE
CROSSING
PRIVATE DRIVE
CROSSING
AVOID CULTURAL
RESOURCE AREA
EVERGREEN SCREENING
FROM RESIDENCE
SWITCHBACKS REQUIRED
ON SLOPE (MAX. 4%)
WETLAND IMPACTS
WETLAND IMPACTS
70'+/- BRIDGE REQUIRED
80'+/- BRIDGE REQUIRED
TRAIL TO PARALLEL
PRIVATE DRIVE
WETLAND IMPACTS
TRAIL UNDER CSX
RAILROAD BRIDGE
BURIED PETROLEUM
PIPELINE
30% +/- SLOPE
BELMONT FERRY FARM TRAIL
PHASE 6
STAFFORD COUNTY, VIRGINIA
PURPLE OPTION A
PURPLE TRAIL A - 5,725 LN. FT.
PARCELS
WATER
SANITARY SEWER
PROPOSED RPA
WETLANDS
FEMA FLOODPLAIN
GAS LINE
ELECTRIC
EASEMENT
LEGEND
CULTURAL
RESOURCE AREA
CONTOUR LINE12
MAY 13, 2016
1
2
2
1
0
8
8
1
0
8
1
0
1
2
1
0
8
1
0
1
2
18
2
0
1
6
1
0
40
5
2
6
0
66
72
7
8
8
4
9
4
7
4
6
8
6
2
9
0
7
2
5
2
3
4
4
4
6
0
1
8
2
0
1
2
2
1
0
1
2
3
0
3
4
38
1
4
8
10
1
2
20
14
48
44
4
4
4
4
1
2
1
2
1
4
1
2
1
8
14
1
6
1
2
1
6
1
4
3
8
5
4
4
2
2
4
2
8
3
0
7
0
1
0
8
3
6
4
8
4
6
4
4
34
24
2
0
3
4
4
4
5
6
14
2
2
6
4
1
4
92
9
0
8
4
7
8
7
0
9
2
8
4
8
8
8
6
8
2
2
1
2
1
6
1
4
3
2
8
2
1
0
0
0
1
0
1
0
1
0
6
0
72
7
0
6
6
54
5
4
5
0
1
8
1
4
1
4
1
6
6
0
7
4
8
0
8
2
8
0
6
8
5
2
4
6
42
36
44
7
8
8
2
5
2
5
2
80
8
0
23
6
1
2
4
2
3
8
4
2
1
0
10
1
2
10
6
2
7
0
9
0
9
0
7
8
8
6
8
2
8
686
88
9
2
8
2
8
2
7
4
66
6
4
7
6
60
9
0
5
8
56
1
2
5
0
6
2
7
0
5
4
5
8
4
2
5
2
54
7
4
78
84
9
2
80
84
2
1
0
3
6
1
4
1
4
20
4
8
5
0
4
6
0
0
10
1
2
5
0
5
0
5
2
4
2
18
8
4
2
4
14
1
4
1
2
1
0
8
1
0
1
4
18
2
2
6
2
6
2
6
8
7
4
8
6
8
0
7
8
6
0
6
4
6
6
7
2
74
7
6
1
6
56
6
6
7
8
82
6
4
R
A
P
P
A
H
A
N
N
O
C
K
R
I
V
E
R
K
IN
G
S
H
W
Y
N
A
O
M
I
R
D
1
6
8
8
1
6
1
0
1
2
4
8
5
8
7
0
8
0
9
4
8
8
8
6
9
0
9
2
92
6
6
7
2
66
76
9
2
9
4
9
2
1
0
1
2
8
8
2
6
1
6
1
4
8
1
2
1
6
4
4
4
4
4
4
4
4
4
6
14
5
0
5
0
5
0
3
6
3
8
2
6
2
0
2
2
1
8
4
0
4
8
6
0
6
6
2
4
3
6
4
0
2
6
5
4
5
8
3
0
3
0
6
0
42
5
8
4
8
7
0
7
2
S
H
A
W
C
T
S
H
A
W
C
T
KIN
GS
H
WY
R
A
IL
R
O
A
D
L
N
J
E
T
T
D
R
C
S
X
R
A
I
L
R
O
A
D
C
S
X
R
A
I
L
R
O
A
D
KIN
G
S H
W
Y
S
O
P
H
I
A
S
T
F
E
R
R
Y
R
D(
R
T
6
0
6
)
26
2
0
7
0
7
0
6
0
7
0
8
4
1
2
82
50
6
8
2
8
4
12
1
2
4
6
1
0
1
6
12
2
2
4
6
6
5
6
1
0
8
2
3
4
5
0
50
1
8
64
7
4
8
2
90
7
8
D
A
I
R
Y
L
N
.
R
U
N
5
8
1
0
8
2
2
3
4
16
2
2
K
I
N
G
S
H
W
Y
C
LA
IB
O
R
N
E
C
L
A
IB
O
R
N
E
RU
N
P
O
T
E
N
T
IA
L
S
W
M
A
R
E
A
GEORGE WASHINGTON
WAY (FUTURE)
POTENTIAL TRAIL
CONNECTION TO
FERRY FARM
C
O
O
L
S
P
R
I
N
G
R
O
A
D
TIE TO PHASE
4 TRAIL
GEORGE WASHINGTON
WAY (FUTURE)
POTENTIAL TRAIL
CONNECTION TO
FERRY FARM
OBSERVATION / REST AREA
MIDWAY UP BOARDWALK
AVOID DISTURBANCE
TO CEMETARY LOT
800' LONG X 14' WIDE
BOARDWALK (MAX. 6%)
WETLAND IMPACTS
WETLAND IMPACTS
70'+/- BRIDGE REQUIRED
80'+/- BRIDGE REQUIRED
WETLAND IMPACTS
TRAIL UNDER CSX
RAILROAD BRIDGE
BURIED PETROLEUM
PIPELINE
30% +/- SLOPE
RAIN SHELTER
UNDER CSX BRIDGE
PANORAMIC VIEWS
FROM BOARDWALK
TRAIL IS SCREENED FROM
VIEW BY DENSE FOREST
BELMONT FERRY FARM TRAIL
PHASE 6
STAFFORD COUNTY, VIRGINIA
PURPLE OPTION B
PURPLE TRAIL "B" - 4,390 LN. FT.
PARCELS
WATER
SANITARY SEWER
PROPOSED RPA
WETLANDS
FEMA FLOODPLAIN
GAS LINE
ELECTRIC
EASEMENT
LEGEND
CULTURAL
RESOURCE AREA
CONTOUR LINE12
MAY 13, 2016
Attachment 1 R16-187
BACKGROUND REPORT The Board previously approved completion of the Brooke Road Safety Improvement Project (Project) to improve motorist safety along Brooke Road (SR 608) between Stagecoach Road on the south, and Bexley Lane on the north, a distance of approximately 1.8 miles. The Project is identified as a dangerous section of road by the Youth Driver Task Force, and approved by County residents for funding in the 2008 Transportation Bond Referendum. This section of road has narrow lane widths with virtually no shoulders, and has seen a significant increase in vehicle traffic for motorists accessing the Brooke VRE Station and others seeking an alternate north-south route to avoid I-95 and U. S. Route 1 traffic congestion. As a result, this section of road has had 57 vehicle accidents since 1996 in the vicinity of James Hill alone, and remains one of the more hazardous stretches of rural road in the County. The Board has taken steps to correct these deficiencies by approving the design of safety improvements, acquisition of right-of-way, easements necessary to improve the road, and has funded utility relocation throughout the Project limits. Recent reductions in fuels tax revenues have caused a shortage in the funds necessary to complete construction of the Project, which was scheduled to be underway later this year. Fifty percent of the estimated $5,700,000 cost for construction of the Project would have been funded through the use of the State’s Revenue Sharing Program, with the remainder funded from the County’s Transportation Fund. Lacking sufficient revenues to fund the construction contract, the adopted Capital Improvement Program (CIP) deferred completion of the Project until sufficient funds could be identified.
Funds reserved from FY2015 could be used to fully fund the County’s match, and allow completion of the Project. The Revenue Sharing funds from the State are still available for use on the Project. If these funds are allocated to the Project, staff would direct the completion of the design, and seek bids for the work later this year to take advantage of a favorable wintertime bidding climate, with construction commencing in 2017. The Board would then consider authorizing the contract for construction of the Project, and budgeting and appropriating the funds at that time. Staff recommends approval of proposed Resolution R16-187, which authorizes the allocation of $2,850,000 in reserved funds towards the completion of the Brooke Road Safety Improvement Project.
R16-187
PROPOSED
BOARD OF SUPERVISORS COUNTY OF STAFFORD STAFFORD, VIRGINIA
RESOLUTION
At a regular meeting of the Stafford County Board of Supervisors (the Board) held in the Board Chambers, George L. Gordon, Jr., Government Center, Stafford, Virginia, on the 7th day of June, 2016: ---------------------------------------------------------------------------------------------------------- MEMBERS: VOTE: Robert “Bob” Thomas, Jr., Chairman Laura A. Sellers, Vice Chairman Meg Bohmke Jack R. Cavalier Wendy E. Maurer Paul V. Milde, III Gary F. Snellings ---------------------------------------------------------------------------------------------------------- On motion of , seconded by , which carried by a vote of , the following was adopted:
A RESOLUTION ALLOCATING UNSPENT FUNDS FROM FY2015 TOWARDS THE COMPLETION OF THE BROOKE ROAD SAFETY IMPROVEMENT PROJECT, WITHIN THE AQUIA ELECTION DISTRICT
WHEREAS, the section of Brooke Road (SR 608) between Stagecoach Road and Bexley Lane was identified as unsafe by the County’s Youth Driver Task Force, and was approved for funding by the citizens of Stafford County in the 2008 Transportation Bond Referendum; and WHEREAS, the Board identified the completion of road safety improvements on approximately 1.8 miles of Brooke Road between Stagecoach Road and Bexley Lane (Project), as a critical part of the County’s road improvement plan; and WHEREAS, the Board authorized funds for the design of the Project, and has acquired the right-of-way and easements necessary to complete the Project; and WHEREAS, fuels tax revenues have declined such that the previously identified source of funding is no longer sufficient for construction of the Project; and WHEREAS, the Board desires to allocate funds to complete the safety improvements associated with the Project;
R16-187 Page 2 NOW, THEREFORE, BE IT RESOLVED by the Stafford County Board of Supervisors on this the 7th day of June, 2016, that reserved funds in the amount of Two Million Eight Hundred Fifty Thousand Dollars ($2,850,000) be and they hereby are allocated for the completion of the Brooke Road Safety Improvement Project. AJR:KCD:kd
RAV
BR
OO
KE R
D
RAVEN RD
LEELAN
D R
D
POTO
MAC
RUN
RD
REVE
LL R
D
GR
AYS
RD
DOKE LN
SMITH ST
RIVER FARM DR
RUSTIC RIDGE RD
STAG
ECO
AC
H R
D
OLD BRIDGE RD
BEXLEY LN
FLEETWO
OD LN
PINE
KNO
LL R
D
R16-187Brooke Road Safety Improvements
ESKIMO HILL RD
0.64 miles S of Eskimo Hill Rd
2.44 miles S ofEskimo Hill Rd