information paper: strategy for nav-aids validation during
TRANSCRIPT
Page 1
Navigation Aids Flight Inspection Webinar(24 - 25 November 2020)
Information Paper:
Strategy for NAV-AIDs ValidationDuring Covid19 Pandemic
Presented by Islamic Republic of Iran’s ANSP
Page 2Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
Content
INTRODUCTION
DISCUSSION
MEASURMENTS
CONCLUSIONS
Page 3Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION,DISCUSSON,MEASURMENTS,CONCLUSIONS
Issues During Covid19 Pandemic:Probability of getting sick for flight crew and electronic
personnel.Decreasing in civil flights. Issues related to flight inspection aircraft. Increasing NAVAIDs expiration and IR of IRAN has over 250 NAVAIDs and many of them
encountered to expiration.
Page 4Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
Safety management office in
IAC was responsible to
conduct meetings and
gathering information to
assess possibility of any
action.
Page 5Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
CNS Department specified the
parameters that secure reliability
and stability of NAVAIDs then
graded and listed.
Air traffic control department
graded the flight plans with regard
of terrain and restrictions.
Page 6Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
After two months discussion, the program
submitted to CAO and it adopted. Iran
CAO admitted exemption of CAD 4410,
Items 6-1 and 6-3 that permitting NAVAIDs
validity duration increased up to 100%
from expiration date.
All documents and verifications had to
report every 15 days.
Page 7Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
Example in Doc. 8071 – Volume 1 – 1.15
Page 8Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
Why a NAV-AID become out of service?
Malfunction or Technical issues
FLCK expiration
Is it reasonable that we put this system out of service?
Page 9Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
First step:
The NAVAIDs which were expired,
addressed for assessment in terms of :
STABILITY
MAINTENANCE QUALITY
AGE OF SYSTEM
REDUNDANCY
TEST INSTRUMENT
TECHNOLOGY
OPERATION
Page 10Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
NAV-AIDs Reliability Assessment
Parameters Low Risk Medium Risk High Risk
StabilityNo changes in 3 previous flight
inspection
No changes in critical parameters
in 3 previous flight inspection
Changes in critical parameters in
3 previous flight inspection
Maintenance QualityPresence of trained and adequate
NAV maintenance in every shift
work
Presence of CNS maintenance in
every shift workNav. Maintenance Staff shortage
Age of System Less than 15 years15-22 years with acceptable
resumeOver 22 years
Redundancy Both TX Normal Single transmitterSingle and not too much
consistence transmitter
Test Instruments Dedicated test instrument Undedicated test instrument N/A
Technology- ILS 2 frequency
- DVOR
- VOR used for en-route
- ILS single frequency
- VOR used for terminalN/A
Operation- Glide angle less than 3.5°
- The airport categorized at A*- The airport categorized at B*
- Glide angle more than 3.5°
- The airport categorized at C*
* Categorize is according to OM of IR IRAN Air Line.
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
Page 11Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
NAV-AIDs Assessment Form
How did these parameters evaluate?
Page 12Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
NAV-AIDs Nominal Interval Extension
RISKExtend Nominal Extension Up to (Month)
ILS/DME VOR/DME DVOR/DME
LOW 6 12 18
MEDIUM 4 7 10
HIGH 45(Days) 3 4
Page 13Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
Acceptable ground check which
demonstrates NAVAID has sufficient
accuracy.
No changes in environment should be
verified in ground check form.
Confirmation by three arrival flights about
NAVAID/NAVAIDs operation in approach and
landing phase of flight.
Other condition :
Page 14Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
All measurements were based on :
Knowledge Experience DocumentsFactory
Recommendation
Page 15Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
In full compliance with safety consideration the following results
have achieved:
1. It helped breaking the chain of outbreak
and save personnel.
2. The validity of over 100 NAVAIDs
system which were involve of the
program are extended up to twice.
Page 16Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
In full compliance with safety consideration the following results
have achieved:
3. Work load of flight inspection office
decreased.
2. time and costs saved as well.
INTRODUCTION-DISCUSSON-MEASURMENTS-CONCLUSIONS
Page 17Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
Future Plan
Using Unmanned aerial Vehicle (UAV) Drone (Ref Doc.8071-V1 , 1.18)
We are going to use drone with additional test equipment
because:
1- Easy to conduct.
2- Cost effective.
3- Some terrain influence into signal in
space.
4- More accurate and more reliable with
regard to ground check.
Page 18Navigation Aids Flight Inspection Webinar
(24 - 25 November 2020)
Question??