informal quote: modular bidg x/ x mini ^ nortex modular lease of 24 x 60 mobile office 24mo 1926.00...

2
Informal Quote: Modular BIdg Athletics STEPHEN F. AUSTIN STATE UNIVER^JTy-^'^^^r"^^ Nacogdoches, TX HUB Status Bidder Address M/HI X/ X F/WO Targ CON WITH et Response Date: MMG Modular Mgmt Group Mini ^ Nortex Modular FIRMATION OF ORDER PLACED ON hrmmQ0)sbcqlobal.net / ilafleurfQimobilemini.com ron.sawickka).nortexmodular.com Ft Worth / Houston Houston DO NOT DUPLICATE FAX / Phone 817-740-9767/cell 817-564-641 3 866-344-4092 '281-213-8232/cell 832-293-2984 Hector JoAnne LaFleur / Ron Sawicki Item Description Qty & Unit Unit Price Extens Unit Price Extens / Unit Price Extens 1 lease of 24 x 60 mobile office 24 mo 1926.00 49320.0<lt 830.00 20^0.00 1250.00 30000.00 property tax 129.00 \ 12.50 y no property tax 2 steps 24 mo N/C 30.00 ^ 720.00 70.00 1680.00 1 lot ^ 3 skirting 1 lot 2400.00 2400.00 1680.00 1680.00 1210.00 1210.00 4 delivery, set-up and anchoring 1 lot 5400.00 5400.00 4800.00 4800.00 7150.00 7150.00 Including installation of steps, and skirting 5 tear-down and removal 1 lot 3700.00 3700.00 4200.00 4200.00 6700.00 6700.00 60820.00 31620.00 46740.00 TERMS VENDOR YES NO F.O.B. DELIVERY FAX SEND ATTACHED 45 days 2 weeks 10/01/2007 1 certify that the above included all firms that have been contacted for bids, and their replies are exactly as stated. Reason for award to other than low bidder Why Emergency Exists: Signature

Upload: dangnhi

Post on 23-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Informal Quote: Modular BIdgAthletics

STEPHEN F. AUSTIN STATE UNIVER^JTy-^'^^^r"^^ Nacogdoches, TXHUB Status

Bidder

Address

M/HI X/ X F/WO

Targ

CON

WITH

et Response Date: MMG Modular Mgmt Group Mini ^ Nortex Modular

FIRMATION OF ORDER PLACED

ON

hrmmQ0)sbcqlobal.net / ilafleurfQimobilemini.com ron.sawickka).nortexmodular.com

Ft Worth/Houston Houston

DO NOT DUPLICATE FAX / Phone 817-740-9767/cell 817-564-641 3 866-344-4092 '281-213-8232/cell 832-293-2984

Hector JoAnne LaFleur /Ron Sawicki

Item Description Qty & Unit Unit Price Extens Unit Price Extens / Unit Price Extens

1 lease of 24 x 60 mobile office 24 mo 1926.00 49320.0<lt 830.00 20^0.00 1250.00 30000.00

property tax 129.00 \ 12.50 y no property tax

2 steps 24 mo N/C 30.00̂ 720.00 70.00 1680.00

1 lot ^

3 skirting 1 lot 2400.00 2400.00 1680.00 1680.00 1210.00 1210.00

4 delivery, set-up and anchoring 1 lot 5400.00 5400.00 4800.00 4800.00 7150.00 7150.00

Including installation of steps,

and skirting

5 tear-down and removal 1 lot 3700.00 3700.00 4200.00 4200.00 6700.00 6700.00

60820.00 31620.00 46740.00

TERMS

VENDOR YES NO F.O.B.

DELIVERYFAX SEND ATTACHED 45 days 2 weeks 10/01/2007

1 certify that the above included all firms that have been contacted for bids, and their replies are exactly as stated.Reason for award to other than low bidderWhy Emergency Exists:

Signature

Informal Quote; Modular BIdgAthletics

STEPHEN F. AUSTIN

STATE UNIVERSITY

NON-RESPONDING VENDORS SOLICITED HUB STATUS

1 The Warrior Group F/BL

2 Bay Modular F/HI

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Signature