inforln.com erp ln 10.4 usability enhancements in service overview
TRANSCRIPT
1Copyright © 2013. Infor. All Rights Reserved. www.infor.comCopyright © 2013. Infor. All Rights Reserved. www.infor.com 1
LN: v10.4 Usability Enhancements in Service OverviewRollout trainingCampus Course Code: 02_0021040_EEN0453_ELN
July 2014
Gerrit Willem Slotman, Senior Business Analyst, [email protected]
2Copyright © 2013. Infor. All Rights Reserved. www.infor.com
Agenda• Service Contracts• Model/Structure versus Physical
• Serialized Item
• Physical Breakdown
• Screen Configuration• Depot Repair – Work Order
• Demo• Summary
3Copyright © 2013. Infor. All Rights Reserved. www.infor.comCopyright © 2013. Infor. All Rights Reserved. www.infor.com 3
Service Contracts
4Copyright © 2013. Infor. All Rights Reserved. www.infor.com
Service Contracts – Situation in 10.3
5Copyright © 2013. Infor. All Rights Reserved. www.infor.com
Service Contracts – Situation in 10.4
6Copyright © 2013. Infor. All Rights Reserved. www.infor.comCopyright © 2013. Infor. All Rights Reserved. www.infor.com 6
Structure versus Physical
7Copyright © 2013. Infor. All Rights Reserved. www.infor.com
Structure vs Physical - Examples
8Copyright © 2013. Infor. All Rights Reserved. www.infor.comCopyright © 2013. Infor. All Rights Reserved. www.infor.com 8
Screen ConfigurationWork Order in Depot Repair
9Copyright © 2013. Infor. All Rights Reserved. www.infor.com
Screen Configuration – Work OrderLN 10.3 LN 10.4
10Copyright © 2013. Infor. All Rights Reserved. www.infor.comCopyright © 2013. Infor. All Rights Reserved. www.infor.com 10
DemoService Contracts – Physical vs Structure – Screen Configuration
11Copyright © 2013. Infor. All Rights Reserved. www.infor.comCopyright © 2013. Infor. All Rights Reserved. www.infor.com 11
SummaryUsability Enhancements in Service
12Copyright © 2013. Infor. All Rights Reserved. www.infor.com
Summary: • Usability is a requirement for each release• Usability enhancements in LN 10.4 Service:
• Service Contracts
• Screen Configuration• Depot Repair – Work Orders
• Structure versus Physical:• Example:
• Building (S) – Floors (S) – Rooms (S) – Computers (P)
13Copyright © 2013. Infor. All Rights Reserved. www.infor.com