infn gem front tracker 2012 oct 18 / sbs coll. / jlabe. cisbani1 v. bellini, m. capogni, e. cisbani,...

16
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLab E. Cisbani 1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M. Lucentini, F. Mammoliti, F. Noto, S. Minutoli, P. Musico, R. Perrino, F. Santavenere ... INFN / Bari-Lecce, Catania, Genova, Roma- Sanità SBS Collaboration Meeting Oct 18-19 2012 JLab Readout Electronics development will be presented by Paolo Musico

Upload: clarissa-dickerson

Post on 24-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

INFN GEM Front Tracker

2012 Oct 18 / SBS Coll. / JLab E. Cisbani 1

V. Bellini, M. Capogni, E. Cisbani,S. Colilli, F. Giuliani, M. Gricia,

F. Librizzi, M. Lucentini, F. Mammoliti,F. Noto, S. Minutoli, P. Musico,R. Perrino, F. Santavenere ...

INFN / Bari-Lecce, Catania, Genova, Roma-Sanità

SBS Collaboration Meeting

Oct 18-19 2012

JLab

Readout Electronics development will be presented by Paolo Musico

Front Chamber reqs and design• Hit spatial resolution ~ 70 mm• Stand large background (g ~ 250 MHz/cm2, e/p 160 kHz/cm2)• Transverse area at least 40x120 cm2

• Event rate at the level of 20 kevents/s• Reuse in different configurations

2012 Oct 18 / SBS Coll. / JLab E. Cisbani 2

GEM base module 20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

3

40x50 cm2

• Large GEM module with small dead area • Low material budget/Light Structure• Modular design• Flexible configuration• Balanced weight

• Segmented HVs and individual

protection resistors

• Spacers to keep gap

• Thin PERMAGLAS frame

E. Cisbani 4

Service Frame / Detail

2012 Oct 18 / SBS Coll. / JLab

• External service frame made of smaller segments in

carbon fiber• Rigid structure, can correct small GEM module

bending• Prototyping under production

5

Beam test @ DESY / Full Module Size 40x50 cm22

012

Oct 1

8 / S

BS

Co

ll. / JLa

bE

. Cisb

ani

DGEM = 400, 390, 350 V

3 mm drift gap Ar:CO2 70:304 GeV electron ionization: 28 pairsGain: 17600

charge: 500 ke / 2000 ADC ch

6

Parassitic beam test of new electronics/Jul-Aug 2012 20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

7

2012/CERN Test – Event display 20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

Event

Strip Plane

HV=3750 VSignal > 1000RMS ~ 50

8

2012/CERN Test – Signal development

• Signal saturated, and wrong clock phase both fixed

• However, position information are available

20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

9

Calibration pulse development

• Left: normal signal

• Bottom: «saturated»

• «Saturation» depends on the baseline level

20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

10

Gas Component / Radiation test

• We would like to use differential pressure transmitters at gas inlet and outlet to evaluate pressure drop in the chamber and any potential problem

• Negative Rad Hard Test

20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

11

HV divider and Spark counter

• In lab test we use LNF/GEM-HV module with 7 independent HV levels and current feedback.

• In operation we intend to use a voltage divider (based on Olympus/Abruzzio design);

• Working on asimple sparkcounter based onstandard preamcomponents(CREMAT CR110) +some standardmodules

20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

CREMAT amp. is probably not RAD HARD

12

E. C

isba

ni

DAQ

Bus Interface

Generic Model(virtual class)

MPDLibrary

Low Level

I2C

Trigger

ADC

Other

High Level

Initialize

Configure

Discovery

Read

WrapperDB

Module

Structured text file for

configuration

Based on libconfig++

Main

Implemented on C++

• Run on Linux

• MPD as independent library

• One configuration file (text

format)

• Use open source libconfig++

• Self consistent output binary

raw data

DAQ Software 20

12 O

ct 18

/ SB

S C

oll. / JL

ab

Still some work on event readout library

Tested on 3 VME platforms (Struck, CAEN USB and Optical)bug fixed: clock phase was not set properly.

13

Catania Tools for assembling / READY to go

• Clean room with gas system

• HV probe box and accessories

• GEM foil Stretcher

• Fiducial pin extractors

• Consumables ...

20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

14

Catania Assembling Test and Training

• Used spare/damaged parts of the previous design to get experience in gluing/assembling gems modules (2 dummy modules assembled)

20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

15

Material for 6 chambers (18 GEM modules)Frames

Drift foils

GEM foils

Readout

Honeycomb

Service frame

Required 18 18 54 18 18 6

Spare 4 4 14 22 22 (1)

Procured 18 14 5 7 7 -

Ordered 4 3 10 3 1 1

Budget 2012

1 42 8 10 3

Budget 2013

9 4 4 2 (+1)

20

12 O

ct 18

/ SB

S C

oll. / JL

ab

E. C

isba

ni

1. We have to put a large foils production order before end of Italian

fiscal year, production can be delayed some months (if needed) – in

addition to the CERN «natural» delay

2. We still have some margin for improvements, which will be

considered after assembling and characterization

Short term plan● GEM Chamber:

– Assembling of the first 40x50 cm2 module will start the 22° of October (due to people previous committments)

– Assembling expected to last 2 full weeks (at least)

– characterize the module in lab (with rad. Sources)● Mechanics:

– Service frame prototype in production

– Test service frame on three modules (first proto, training module and first final module)

● Test

– November: Chance to access the RD51 test beam (second week of November)or RICH-CLAS12 at the end of November – most likely

● Electronics

Paolo Talk

Expected to go into «mass» assembling

early next year

2012 Oct 18 / S

BS

Co

ll. / JLab

E. C

isban

i

16