inf smooth sap migration to linux
TRANSCRIPT
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 1/29
SAP Migration to Novell Linux
Value Proposition and Process
Global Fujitsu SAP Competence Center Walldorf, June 2009
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 2/29
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 3/29
Executive Summary – SAP Migration
© Copyright 2009 Fujitsu Technology Solutions2
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 4/29
© Copyright 2009 Fujitsu Technology Solutions
Global and local pool of experiencedand certified migration consultants.
Global Fujitsu SAP Competence Center
supporting the design of the best fit solution.
Standardized & proven toolset for the migration.
SAP OS Migration checks as part of their
safeguarding program (free service).
Fujitsu ensured for 200+ FlexFrame for SAP
customers a smooth transition from “Unix” to “Linux”.The SAP tools have been used in thousands
of customer projects for more than 10 years.
SAP providing
Fujitsu and partners leveraging
Our project experience
A team to ensure smooth transition
3
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 5/29
More than 200 migration projects
Customers who have successfully migrated to FlexFrame and Novell Linux
© Copyright 2009 Fujitsu Technology Solutions
"We migrated from HP-UX to Novell Linux within a
FlexFrame for SAP environment back in 2004. To
be perfectly honest it was simpler than expected,
even with lower efforts on our side than for a usual
SAP upgrade project. The standardized toolset
and services from SAP plus the expertise from
Fujitsu and our System Integrator ensured a very
smooth transition - on time and within budget.“ J.G.M. Kroon, ICT Architect, ICT AS Solutions CC, TNT
Post
“ “Fujitsu even took care of problems they werenot even responsible for. Our experience was
really very positive.” Joachim Friedemann, Team Manager Hosting andDatabase Technology, Rechenzentrum Leipzig e.V.
“Without exception, Fujitsu delivered exactly what was promised in terms of technology and cost.” Christian Baier, IT Manager SAP Base, REHAU AG +Co
Aerospace & Defense
Automotive
Banking & Insurance
Chemical
Consumer
Engineering,
Construction &
Operations
4
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 6/29
SAP migration: overview
History. 15 years ago SAP identified the need for a standardized migration processdue to:
New platform decisions (x86) in a customer data centers Mergers & acquisitions
Objective. Ensure a smooth transition via:
Standardized toolset
Support servicesResult. SAP OS/DB Migration Check as part of SAP’s Safeguarding program. Thisservice is part of standard SAP maintenance contract.
Availability. Toolset available for all major SAP components:
R/3 3.0D, 3.X, 4.X, ECC5, ECC6…
BW, CRM, SCM, SRM,…
Experience:
Thousands of migrations between various platforms (incl. TB databases)
All major SAP consultants offer required Migration Services
© Copyright 2009 Fujitsu Technology Solutions5
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 7/29
SAP OS/DB Migration Check
Description:
The OS/DB Migration Check is mandatory when migrating a productive system. The
service delivery then includes all systems in the system landscape conenrned.If full support for the migration is required (be it a production system or not), theservices of a technical consultant with special certification for OS/DB migration must beensured.
Value proposition:
SAP OS/DB Migration Check minimizes technical risk involved in an operating systemand/or database migration and avoids unforeseen costs that can occur during themigration.
Benefits of SAP OS/DB Migration Check :
Efficient, technically robust operation of the new operating system and/or databaseis achieved with minimum cost
The migration project is accelerated to get a faster return on your investment
Expensive system downtimes during the migration are minimized
System resource usage is optimized to make the most of your IT investment
© Copyright 2009 Fujitsu Technology Solutions6
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 8/29
Migration steps: high-level
1. Select your preferred partner for the migration project -> SAP certified migrationconsultant
2. Initiate SAP OS/DB Migration Service with SAP3. Run Remote Project Audit Session
4. Define joint migration plan
5. Execute test migration
6. Run analysis session (4-6 weeks before final migration)
7. Migrate non-production environments
8. Execute final migration
9. Run verification session (2-4 weeks after migration)
Project timeline:from 6 weeks to 3 months depending on the number of SAP systems to be migratedand availability to test and access the systems.
© Copyright 2009 Fujitsu Technology Solutions7
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 9/29
Project detailsDefinitions, requirements, check services
© Copyright 2009 Fujitsu Technology Solutions8
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 10/29
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 11/29
Successful Migration - Requirements(1)
The Migration has to be done by a certified SAP Technology Consultant
for OS/DB migrations:
Certified Technical consultant (at least 4.x)
Special certification for migration (TABC92)
Consultants are on SAP’s migrations consultant list
Experience in heterogeneous system copies (migrations)
SAP data dictionary knowledge
Advanced knowledge of the source database
Advanced knowledge of the target database and operating system
© Copyright 2009 Fujitsu Technology Solutions10
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 12/29
Successful Migration – Requirements(2)
Establish SAP Migration Project Team
Migration Consultant Project Manager internal/external (depending on project)
Customers technical Consultants (system administrators)
Customers application Consultants (developers)
Customers Power Users for tests and functionality checks
Customers IT management
The migration partner and customer are responsible for the migration.SAP provides back-office support only
© Copyright 2009 Fujitsu Technology Solutions11
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 13/29
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 14/29
Successful Migration – Requirements(4)
SAP’s prerequisites for the SAP OS/DB Migration Check
SAP systems must be SAP R/3 3.0D or newer
The platform combination chosen is supported by SAPhttp://service.sap.com/platforms
Remote connection to SAP and an installed SAProuter
SAP EarlyWatch Alert should be running
SAP strongly recommends an implemented SAP Solution Manager
© Copyright 2009 Fujitsu Technology Solutions13
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 15/29
SAP Migration Check Services (I)
Remote Project Audit
Customer completes a questionnaire before the Remote Project Audit is scheduled Information from the questionnaire is used to determine:
The necessary precautions for a smooth migration
If your requirements are realistic and can be met
Content
Collection of general company data
Checks if the new OS/DB combination is supported by SAP
Checks planning dates for non-productive and productive systems
Checks if the technical consultant is registered as a certified technicalconsultant with additional certification for OS/DB Migration and fulfills the
requirements for executing OS/DB migration projects
© Copyright 2009 Fujitsu Technology Solutions14
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 16/29
SAP Migration Check Services (II)
Analysis Session
Checks whether current hardware is sufficient for the target system Takes place four to six weeks before migrating
Performed on the source system
A report indicates whether hardware is sufficient and if parameter configuration isnecessary
Analyze the performance of your system with respect to the average responsetimes and total workload. The following is analyzed in detail:
Transaction profile check
Top time transactions by response time
R/3 table buffering
© Copyright 2009 Fujitsu Technology Solutions15
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 17/29
SAP Migration Check Services (III)
Verification Session
Checks the new operating system and/or database to verify the assumptions fromthe Analysis Session
Occurs two to four weeks after migration of the production system
Performed on the target system
Final report confirms configuration and makes recommendations for improvement
SAP prefers to schedule the service sessions well in advance. Thus servicecontracts should be signed as early as possible.
© Copyright 2009 Fujitsu Technology Solutions16
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 18/29
Standard SAP OS/DB MigrationProject Phases and Steps
© Copyright 2009 Fujitsu Technology Solutions17
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 19/29
Standard SAP OS/DB Migration
Project Phases and Steps:
PreparationThe preparation phase begins with the decision to move to a different OS or DBplatform. At the end of this phase the equipment is installed, all key players areinvolved and a project plan is ready.
MigrationThe migration phase covers the actual system migrations, first a series of test
migrations (repeated until the process is fully under control), followed by the “live”migration of the development, QA and production system.
Follow-upThe follow-up phase begins when the entire SAP landscape is operational on thenew platform, and covers post-migration, validation and support activities.
© Copyright 2009 Fujitsu Technology Solutions18
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 20/29
Project Steps - Preparation (I)
Item Tasks Responsibility Remarks
1. Decision to migrate Customer Customer must carefully assess the impact that this change will have on his company’s IT.
2.Contact hardware and/or
DBMS vendor Customer Proper sizing is a crucial task in the migration process.
3.Contact SAP contract
adminCustomer SAP must be informed to adapt the license.
4.Order OS/DB Migration Kit
(<= 4.6)Customer
Up to 4.6 migration tools are in the migration kit. From 6.x the tools are on the Installation
Master.
5.Order OS/DB Migration
Check ServiceCustomer
SAP will deliver three service sessions, two before and one after the productive migration.
This is only required for production systems.
6. Select migration partner Customer A Certified Migration Consultant is mandatory.
7. Inform key playersCustomer/
Migration ConsultantManagement, development, key users, technical personnel, etc. should be informed.
8. Create project planCustomer/
Migration Consultant
The project plan should contain information on: HW installation and configuration, timing for
test- and productive system migrations, user acceptance tests, printer configuration, external
communications and interfaces, backup and recovery, clustering and high availability.
© Copyright 2009 Fujitsu Technology Solutions19
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 21/29
Project Steps - Preparation (II)
Item Tasks Responsibility Remarks
9. Return SAP questionnaireCustomer/
Migration ConsultantWith the information of the project plan return the questionnaire to SAP.
10.Order equipment (HW
migration)Customer Review the configuration with the migration consultant.
11.Install equipment (HW
migration)HW partner The HW must be installed and the OS configured in compliance with the requirements of SAP.
12. First SAP check session SAPIn the Remote Project Audit session SAP uses the information provided in the questionnaire to
determine that your configuration fulfills all the requirements.
13. Adapt project plan based
on SAP feedback
Customer/
Migration Consultant
When SAP returns the report of the Remote Project Audit, the necessary technical and / or
planning changes have to be made.
© Copyright 2009 Fujitsu Technology Solutions20
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 22/29
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 23/29
Project Steps - Follow-up
Item Tasks Responsible Remarks
1. Monitoring, tuning, supportCustomer/
Migration Consultant
The system will still need more than the usual attention after the go-live. Performance
monitoring is important in this phase.
2.Final SAP Check Session
(GoingLive Check)SAP
The third SAP Check Session is the Verification Session takes place between two and six
weeks after the migration of the production system. The assumptions of the Analysis session
are verified and the session also identifies and provides corrective advice for any bottlenecks
and problems observed in the system.
3. Keep old system asreference
Customer/Migration Consultant
The old target system should remain available for several weeks after the migration.
© Copyright 2009 Fujitsu Technology Solutions22
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 24/29
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 25/29
F ji Mi i S i (I)
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 26/29
Fujitsu Migration Services (I)
Migration Specification
Our "Migration Specification" Professional Service provides you with a detailedconcept for migrating your SAP systems to your future SAP IT infrastructure.
The "Migration Specification" Service covers three phases:
Phase I: Workshop for coordinating the "Migration Specification"
Phase II: Creation of the document "Migration Specification SAP IT
Infrastructure" Phase III: Acceptance of the "Migration Specification" by the customer
© Copyright 2009 Fujitsu Technology Solutions25
FSC Mi ti S i (II)
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 27/29
FSC Migration Services (II)
Migration Service
Migration of the application from the source system to the target system
Migration services includes:
Basic Preparation
Implementation in accordance with the documentation "Migration Specificationfor SAP IT Infrastructure"
Follow-up activities in accordance with SAP guidelines and the "MigrationSpecification for SAP IT Infrastructure"
© Copyright 2009 Fujitsu Technology Solutions26
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 28/29
Global Fujitsu SAP
Competence Center
7/28/2019 Inf Smooth SAP Migration to Linux
http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 29/29