SAP Migration to Novell Linux

Value Proposition and Process

Global Fujitsu SAP Competence Center Walldorf, June 2009

Page 2: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 2/29

Page 3: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 3/29

Executive Summary – SAP Migration

© Copyright 2009 Fujitsu Technology Solutions2

Page 4: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 4/29

© Copyright 2009 Fujitsu Technology Solutions

Global and local pool of experiencedand certified migration consultants.

Global Fujitsu SAP Competence Center 

supporting the design of the best fit solution.

Standardized & proven toolset for the migration.

SAP OS Migration checks as part of their 

safeguarding program (free service).

Fujitsu ensured for 200+ FlexFrame for SAP

customers a smooth transition from “Unix” to “Linux”.The SAP tools have been used in thousands

of customer projects for more than 10 years.

SAP providing

Fujitsu and partners leveraging

Our project experience

A team to ensure smooth transition

3

Page 5: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 5/29

More than 200 migration projects

Customers who have successfully migrated to FlexFrame and Novell Linux

© Copyright 2009 Fujitsu Technology Solutions

"We migrated from HP-UX to Novell Linux within a

FlexFrame for SAP environment back in 2004. To

be perfectly honest it was simpler than expected,

even with lower efforts on our side than for a usual 

SAP upgrade project. The standardized toolset 

and services from SAP plus the expertise from

Fujitsu and our System Integrator ensured a very 

smooth transition - on time and within budget.“ J.G.M. Kroon, ICT Architect, ICT AS Solutions CC, TNT

Post

“ “Fujitsu even took care of problems they werenot even responsible for. Our experience was

really very positive.” Joachim Friedemann, Team Manager Hosting andDatabase Technology, Rechenzentrum Leipzig e.V.

“Without exception, Fujitsu delivered exactly what was promised in terms of technology and cost.” Christian Baier, IT Manager SAP Base, REHAU AG +Co

Aerospace & Defense

Automotive

Banking & Insurance

Chemical

Consumer 

Engineering,

Construction &

Operations

4

Page 6: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 6/29

SAP migration: overview

History. 15 years ago SAP identified the need for a standardized migration processdue to:

New platform decisions (x86) in a customer data centers Mergers & acquisitions

Objective. Ensure a smooth transition via:

Standardized toolset

Support servicesResult. SAP OS/DB Migration Check as part of SAP’s Safeguarding program. Thisservice is part of standard SAP maintenance contract.

Availability. Toolset available for all major SAP components:

R/3 3.0D, 3.X, 4.X, ECC5, ECC6…

BW, CRM, SCM, SRM,…

Experience:

Thousands of migrations between various platforms (incl. TB databases)

 All major SAP consultants offer required Migration Services

© Copyright 2009 Fujitsu Technology Solutions5

Page 7: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 7/29

SAP OS/DB Migration Check

Description:

The OS/DB Migration Check is mandatory when migrating a productive system. The

service delivery then includes all systems in the system landscape conenrned.If full support for the migration is required (be it a production system or not), theservices of a technical consultant with special certification for OS/DB migration must beensured.

Value proposition:

SAP OS/DB Migration Check minimizes technical risk involved in an operating systemand/or database migration and avoids unforeseen costs that can occur during themigration.

Benefits of SAP OS/DB Migration Check :

Efficient, technically robust operation of the new operating system and/or databaseis achieved with minimum cost

The migration project is accelerated to get a faster return on your investment

Expensive system downtimes during the migration are minimized

System resource usage is optimized to make the most of your IT investment

© Copyright 2009 Fujitsu Technology Solutions6

Page 8: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 8/29

Migration steps: high-level

1. Select your preferred partner for the migration project -> SAP certified migrationconsultant

2. Initiate SAP OS/DB Migration Service with SAP3. Run Remote Project Audit Session

4. Define joint migration plan

5. Execute test migration

6. Run analysis session (4-6 weeks before final migration)

7. Migrate non-production environments

8. Execute final migration

9. Run verification session (2-4 weeks after migration)

Project timeline:from 6 weeks to 3 months depending on the number of SAP systems to be migratedand availability to test and access the systems.

© Copyright 2009 Fujitsu Technology Solutions7

Page 9: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 9/29

Project detailsDefinitions, requirements, check services

© Copyright 2009 Fujitsu Technology Solutions8

Page 10: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 10/29

Page 11: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 11/29

Successful Migration - Requirements(1)

The Migration has to be done by a certified SAP Technology Consultant

for OS/DB migrations:

Certified Technical consultant (at least 4.x)

Special certification for migration (TABC92)

Consultants are on SAP’s migrations consultant list

Experience in heterogeneous system copies (migrations)

SAP data dictionary knowledge

 Advanced knowledge of the source database

 Advanced knowledge of the target database and operating system

© Copyright 2009 Fujitsu Technology Solutions10

Page 12: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 12/29

Successful Migration – Requirements(2)

Establish SAP Migration Project Team

Migration Consultant Project Manager internal/external (depending on project)

Customers technical Consultants (system administrators)

Customers application Consultants (developers)

Customers Power Users for tests and functionality checks

Customers IT management

The migration partner and customer are responsible for the migration.SAP provides back-office support only

© Copyright 2009 Fujitsu Technology Solutions11

Page 13: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 13/29

Page 14: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 14/29

Successful Migration – Requirements(4)

SAP’s prerequisites for the SAP OS/DB Migration Check

SAP systems must be SAP R/3 3.0D or newer 

The platform combination chosen is supported by SAPhttp://service.sap.com/platforms

Remote connection to SAP and an installed SAProuter 

SAP EarlyWatch Alert should be running

SAP strongly recommends an implemented SAP Solution Manager 

© Copyright 2009 Fujitsu Technology Solutions13

Page 15: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 15/29

SAP Migration Check Services (I)

Remote Project Audit

Customer completes a questionnaire before the Remote Project Audit is scheduled Information from the questionnaire is used to determine:

The necessary precautions for a smooth migration

If your requirements are realistic and can be met

Content

Collection of general company data

Checks if the new OS/DB combination is supported by SAP

Checks planning dates for non-productive and productive systems

Checks if the technical consultant is registered as a certified technicalconsultant with additional certification for OS/DB Migration and fulfills the

requirements for executing OS/DB migration projects

© Copyright 2009 Fujitsu Technology Solutions14

Page 16: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 16/29

SAP Migration Check Services (II)

Analysis Session

Checks whether current hardware is sufficient for the target system Takes place four to six weeks before migrating

Performed on the source system

 A report indicates whether hardware is sufficient and if parameter configuration isnecessary

 Analyze the performance of your system with respect to the average responsetimes and total workload. The following is analyzed in detail:

Transaction profile check

Top time transactions by response time

R/3 table buffering

© Copyright 2009 Fujitsu Technology Solutions15

Page 17: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 17/29

SAP Migration Check Services (III)

Verification Session

Checks the new operating system and/or database to verify the assumptions fromthe Analysis Session

Occurs two to four weeks after migration of the production system

Performed on the target system

Final report confirms configuration and makes recommendations for improvement

SAP prefers to schedule the service sessions well in advance. Thus servicecontracts should be signed as early as possible.

© Copyright 2009 Fujitsu Technology Solutions16

Page 18: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 18/29

Standard SAP OS/DB MigrationProject Phases and Steps

© Copyright 2009 Fujitsu Technology Solutions17

Page 19: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 19/29

Standard SAP OS/DB Migration

Project Phases and Steps:

PreparationThe preparation phase begins with the decision to move to a different OS or DBplatform. At the end of this phase the equipment is installed, all key players areinvolved and a project plan is ready.

MigrationThe migration phase covers the actual system migrations, first a series of test

migrations (repeated until the process is fully under control), followed by the “live”migration of the development, QA and production system.

Follow-upThe follow-up phase begins when the entire SAP landscape is operational on thenew platform, and covers post-migration, validation and support activities.

© Copyright 2009 Fujitsu Technology Solutions18

Page 20: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 20/29

Project Steps - Preparation (I)

Item Tasks Responsibility Remarks

1. Decision to migrate Customer   Customer must carefully assess the impact that this change will have on his company’s IT.

2.Contact hardware and/or 

DBMS vendor Customer Proper sizing is a crucial task in the migration process.

3.Contact SAP contract

adminCustomer SAP must be informed to adapt the license.

4.Order OS/DB Migration Kit

(<= 4.6)Customer 

Up to 4.6 migration tools are in the migration kit. From 6.x the tools are on the Installation

Master.

5.Order OS/DB Migration

Check ServiceCustomer 

SAP will deliver three service sessions, two before and one after the productive migration.

This is only required for production systems.

6. Select migration partner Customer A Certified Migration Consultant is mandatory.

7. Inform key playersCustomer/

Migration ConsultantManagement, development, key users, technical personnel, etc. should be informed.

8. Create project planCustomer/

Migration Consultant

The project plan should contain information on: HW installation and configuration, timing for 

test- and productive system migrations, user acceptance tests, printer configuration, external

communications and interfaces, backup and recovery, clustering and high availability.

© Copyright 2009 Fujitsu Technology Solutions19

Page 21: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 21/29

Project Steps - Preparation (II)

Item Tasks Responsibility Remarks

9. Return SAP questionnaireCustomer/

Migration ConsultantWith the information of the project plan return the questionnaire to SAP.

10.Order equipment (HW

migration)Customer Review the configuration with the migration consultant.

11.Install equipment (HW

migration)HW partner The HW must be installed and the OS configured in compliance with the requirements of SAP.

12. First SAP check session SAPIn the Remote Project Audit session SAP uses the information provided in the questionnaire to

determine that your configuration fulfills all the requirements.

13. Adapt project plan based

on SAP feedback

Customer/

Migration Consultant

When SAP returns the report of the Remote Project Audit, the necessary technical and / or 

planning changes have to be made.

© Copyright 2009 Fujitsu Technology Solutions20

Page 22: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 22/29

Page 23: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 23/29

Project Steps - Follow-up

Item Tasks Responsible Remarks

1. Monitoring, tuning, supportCustomer/

Migration Consultant

The system will still need more than the usual attention after the go-live. Performance

monitoring is important in this phase.

2.Final SAP Check Session

(GoingLive Check)SAP

The third SAP Check Session is the Verification Session takes place between two and six

weeks after the migration of the production system. The assumptions of the Analysis session

are verified and the session also identifies and provides corrective advice for any bottlenecks

and problems observed in the system.

3. Keep old system asreference

Customer/Migration Consultant

The old target system should remain available for several weeks after the migration.

© Copyright 2009 Fujitsu Technology Solutions22

Page 24: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 24/29

Page 25: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 25/29

F ji Mi i S i (I)

Page 26: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 26/29

Fujitsu Migration Services (I)

Migration Specification

Our "Migration Specification" Professional Service provides you with a detailedconcept for migrating your SAP systems to your future SAP IT infrastructure.

The "Migration Specification" Service covers three phases:

Phase I: Workshop for coordinating the "Migration Specification"

Phase II: Creation of the document "Migration Specification SAP IT

Infrastructure" Phase III: Acceptance of the "Migration Specification" by the customer 

© Copyright 2009 Fujitsu Technology Solutions25

FSC Mi ti S i (II)

Page 27: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 27/29

FSC Migration Services (II)

Migration Service

Migration of the application from the source system to the target system

Migration services includes:

Basic Preparation

Implementation in accordance with the documentation "Migration Specificationfor SAP IT Infrastructure"

Follow-up activities in accordance with SAP guidelines and the "MigrationSpecification for SAP IT Infrastructure"

© Copyright 2009 Fujitsu Technology Solutions26

Page 28: Inf Smooth SAP Migration to Linux

7/28/2019 Inf Smooth SAP Migration to Linux

http://slidepdf.com/reader/full/inf-smooth-sap-migration-to-linux 28/29

[email protected]

Global Fujitsu SAP

Competence Center 