LA Metro MicroTransit Pilot Project (MTP) Information Document

1. Industry Forum Attendee List (held August 29, 2017) 2. Questions for Consideration 3. Agenda from Industry Forum 4. Draft Scope of Work (August 2017)

LA Metro MicroTransit Pilot

Industry Forum Attendee List

August 29, 2017

Name Job Title Company

Dale Hulsing Director - Accenture Technology Accenture technology

Walter Allen President & CEO Acumen Building Enterprise, Inc.

David DeRosa Planning Manager AECOM

Carley Markovitz Transportation Planner AECOM

Veronica Siranosian Senior Project Manager AECOM

Jillian Switzer Director of Marketing AirMap

Heather Deutsch Senior Planner Alta Planning and Design

Ryan Taylor-Gratzer Planner I Alta Planning and Design

Brandon Goodwyn Partner Manager Amazon

John Shea Western Sales Executive AngelTrax

Scott Harral Director of Project & Construction Management Anil Verma Associates

Anil Verma President Anil Verma Associates

Edgar Gutierrez Project Manager Arellano Associates

Nobumichi Morishita Student ArtCenter College of Design

Katherine Perez Estolano Associate Principal Arup

Jim Quiter Principal Arup

Shannon Lawrence Inclusion & Diversity Manager Balfour Beatty

Mike Van Horn Vice President, Sales Betterez

Krishna Tabor Regional Vice President, Customer Butterfli Technologies

Michael Ippoliti CTSG Director CALSTART

Anurag Komanduri Consiltant Cambridge Systematics

Jon Overman Associate Cambridge Systematics

Scott Smith Director of Engineering Catchr, Inc.

Kyle Thomas CEO Catchr, Inc.

Melika Jahangiri Enterprise Sales Lead Chariot

Josh Weisman Head of Global Product Chariot

Monique Chen Principal Chen Ryan Associates

Aaron Galinis Chen Ryan Associates Chen Ryan Associates

Erika Bennett Sr Business Development Manager Circlepoint

West Interian Solution Sales Specialist Cisco Systems

Charu Kukreja Vice President Civic Projects

Kati Rubinyi President Civic Projects

michael hart CEO Clearlake Group LLC

Buddy Coleman CCO Clever Devices

Bruce Giebelstein CCAD Product Manager Clever Devices

Tom Smith Strategic Account Manager Clever Devices

Dean Soucy SVP of Engineering Clever Devices

Richard Arenas Contracts Administrator Complete Coach Works

Elliott Carson Bus Acquisitions Complete Coach Works

Ann Muenster-Nuiry Public Sector State and Local Government Solutions Conduent

Charles Favors Architecture Landscape Designer Creations By Favors

Joe Fieck Cubic

Josh List Program Manager Cubic

Mike Margro Director, Operations, Southern California Cubic

Jonathan Rohrer Regional Product Manager North America Cubic

Sai Ivaturi Associate Director - Business Development Datamatics Global Services Inc

Roger Teal President DemandTrans Solutions

Travis Gleason Chief Operation Officer Downtowner

Mike Monaco CTO Downtowner

Hilary Norton President Effect Strategies

Kris Bailey COO Electric Cab of North America

Norman Emerson Principal Emerson & Associates

Jaime de la Vega Sr. VP Englander Knabe & Allen

Justin Emerson Presales Director ePlus Technologies

Winnie Fong Estolano LeSar Perez

Christina Cardenas Project Manager evan brooks associates

Amanda Heinke Senior Transportation Planner Fehr & Peers

Jeremy Klop Principal Fehr & Peers

Chelsea Richer Transportation Planner Fehr & Peers

Ravi Swamy Swamy Director of Business Development Flatiron

Reed Alvarado Transit Blogger Getting There

Arjan VanAndel Director of Mobility on Demand and Paratransit GIRO

Gustavo Occhiuzzo Ceo Green Commuter

Ryan Westrom Mobility Partnerships Lead Greenfield Labs

Tesse Rasmussen Vice President HDR

Dan Louis VP PM/CM Director HNTB

Mohit Mangal Managing Partner IIS Inc

ali altaha Owner Infrawest

Viggen Davidian Vice President Iteris, Inc.

Antonino Geneose Transportation Planner Jacobs

Zachary Warma Senior Associate JLL

LA Metro MicroTransit Pilot

Industry Forum Attendee List

August 29, 2017

Name Job Title Company

Kathleen Jensen Business Owner Kathleen Jensen Home Rentals

Maurice Bell VP of Mobility Solutions Keolis

Mark Peabody Vice President Kleinfelder

Carlos Velasquez Transportation Planner KOA Corporation

Iris Yuan Mgr. Transportation Projects Lea+Elliott, Inc.

Tom Benson President and CEO Leighton Consulting, Inc.

Lisa Gritzner CEO LG Strategies

Sherman Gay Event Chairman Los Angeles Sustainability Coalition

Paul Davis Transit Partnerships Manager Lyft

Marlene Connor Principal Marlene Connor Associates

Zachary Ascher Business Development Manager Masabi

Doug Thomas VP, Business Development Masabi

Andrew Kugler Partner Mayer Brown LLP

Raul-David Poblano Designer, Engineer, Project Manager, Strategist Mobilitycouture.com

Kathy Chambers Senior Associate Moore & Associates, Inc.

Derek Fretheim Director, Business Development moovel NA

David Klein Manager North America Moovit

Carlos Morgner Construction Management Morgner

Isaac Segovia Vice President Morgner

Joe Warner Account Executive Motorola Solutions

Darlene Gonzalez Transportation Planner Mott MacDonald

Neal Richman Consultant Move LA

Susan Hafne Principal Multimodal Solutions

Hazel Scher Senior Associate Nelson Nygaard

Terra Curtis Senior Associate Nelson Nygaard

Eric Natwig President New West Partners, Inc.

Nicole Eng Product Design Nicole ENG

Omone Livingston President/CEO O2EPCM, Inc. dba O2 Engineering, Projects & Construction Management

Philip Adams President P H Adams and Associates, LLC

Roy Kim Principal PacRim Engineering, Inc.

Jennifer Anthony Senior Planner Parsons

Daniel Pearsall Sr. Director of Government Programs PREMIER Management Corp

Charles Devlin President/CEO R&D Transportation Services, Inc.

Leticia Leon Director of Operations R&D Transportation Services, Inc.

Seon Kim Systems Group Leader Rani Engineering

Matthew Monteyne VP Operations and Business Development RideCo

Clayton Goes Technical Product Manager RideCo

Pepper Howard VP Transit Solutions Routematch

Ben Ault Solutions Engineering Salesforce

Mary Ferguson California Program Coordinator Shared Use Mobility Center

Gary Hall Partner, National Head of Investment Banking Siebert Cisneros Shank & Co., LLC

Julia Thayne Director of Urban Development Siemens

Dennis Rodriguez Chief City Executive - LA/SF/SD/Pho Siemens Corporation

Lew Gaskell Sr. Business Development Manager Siemens ITS

Rajesh Soneja President Simplex Construction Management, Inc.

Steve Agor Director Business Development Skanska

Juan Luis Sampedro CEO SKYBUS

Matthew Gerard SVP Solutions International

Vida Mannings Stantec Consulting

Katie Wilson Marketing Manager steer davies gleave

Paul Menaker Northern California Transportation Manager STV Incorporated

Alex Fay Vice President Syncromatics

Ron Carter Managing Director The Carter Agency

Paula Campos Partner The Glue

Dennis Wang Chief Possibilities Officer The Mo Studio

Gary Hamm Senior Vice President The Solis Group

Bart Reed Executive Director The Transit Coalition

Jorge Leandros Tovar CEO Tovar Geospatial Services

Sean Quigley Business Development Manager Transdev North America

Lisa Young Principal/Owner TransLink Consulting, LLC

Lenae Boykin Lead Product Owner TransLoc

Ron Cygnarowicz Director Business Development TransLoc

Cat Mette Account Executive TransLoc

Jarryd Davis Regulatory Partnerships Manager Uber Technologies, Inc.

Juan Matute Associate Director UCLA Institute of Transportation Studies

Leslie Finnigan Vice President, Western Region Universal Field Services, Inc.

Thomas Pringle Account Executive Universal Reprographics, Inc.

Louis Pappas Business Development Principal Via

Rob Fisher Director Warner Center Association

Michael Shapiro Executive Design Drictor Walsh Group

LA Metro MicroTransit Pilot

Industry Forum Attendee List

August 29, 2017

Name Job Title Company

Cliff Henke WSP

Salvador Montes Senior Planner WSP

Kyra Tao Transportation Consultant WSP

Seth Torma Senior Planning Manager WSP

Rachel Zack Innovative Mobility Lead WSP

Janet Rhee Principal Yung Architects

LA Metro MicroTransit Pilot Project (MTP) Draft Scope Questions for Consideration

General Questions

1. LA Metro, based on our research, has identified three key disciplines – transportation planning, technology, and marketing – as critical to project success. Are there other disciplines we have overlooked?

2. The success of the MTP relies on a joint effort between a public and private partner/contractor team. Does the proposed scope give a sufficient and appropriate role in the project to the private partner/contractor team? If not, what additional responsibilities should be shared with or assigned fully to the private partner/contractor team?

3. Alternatively, does the proposed scope assign too much responsibility to the private

partner/contractor team. If so, how?

4. Designing a project of the scope and nature envisioned by LA Metro will involve balancing factors unique to public transportation service (which are generally well understood) with others unique to for-hire or on-demand services (which may not be widely understood or studied in the public realm). Does the scope for project design appropriately balance such standard transportation planning practices with additional factors unique to this type of service? If not, how should the scope be amended to strike this balance?

5. LA Metro considers private sector insight into on-demand, dynamically routed transit operations –

both publicly and privately operated - to be critical to designing the best project with the highest likelihood of success. Does the draft scope give the private sector/contractor team a sufficient role in project design, including input on the key factors that will determine project feasibility and success?

6. LA Metro intends for both partners to share in both the risks and rewards of this initiative through

implementation and operation, including such components as performance incentives and revenue sharing. Does the draft scope allow sufficient input into ongoing operation and management of the service to enable the private partner/contractor team to maximize project performance? If not, what additional roles should be afforded to the private partner/contractor team?

Specific Questions

1. Is 6 months a sufficient amount of time for the private partner/contractor team to complete the service feasibility study (Part A)? If not, what do you advise?

2. The current scope is neutral on vehicle procurement. Would it be more effective for LA Metro assume responsibility for procuring vehicles (specs developed jointly with private sector/contractor team based on Part A), or would procurement/provision by the private sector/contractor team be more effective?

3. What labor categories should be included for Part B, Task 1? (e.g., lead software engineer, product

manager, etc.)

4. For the technology/software platform, in Part B, would you prefer a fixed-term or perpetual license?

5. LA Metro is looking for this project to be defined and driven by a range of performance factors relating to customer experience, financial feasibility, and enhancement of public goods. What are the performance factors LA Metro should be considering?

Industry Forum on MicroTransit Pilot Project

Please join LA Metro as we introduce a groundbreaking pilot project to design and test a new

complementary transit service which will dynamically route vehicles to pick-up and drop-off customers at

virtual stops within Los Angeles County.

To ensure success of this new service called MicroTransit, LA Metro seeks private sector partner(s) to

team with LA Metro to design, plan, implement, and evaluate the pilot. LA Metro intends to issue the

Request for Proposal (RFP) for a Contractor Team in September. To learn more about this project, a draft

copy of the Statement of Work for this solicitation has been attached for review.

On Tuesday, August 29th, the Office of the Office of Extraordinary Innovation will host a half-day

Industry Forum for and with the private sector to learn about the MicroTransit Pilot project, ask questions

to staff directly regarding the Statement of Work, make recommendations to the scope, and meet

potential partners to build a Contractor Team for the RFP solicitation.

The interactive networking session called, ”Building the Contractor Team,” will be operated similar to

speed-dating and pre-registration is required no later than 5.p.m. Pacific Time on Wednesday, August 23,

2017. Please pre-register for this event. Your partnership and expertise are essential to the success of the

MicroTransit Pilot project.

Schedule

10:00 a.m. Networking and Coffee Outside Board Room

10:30 a.m. Welcome and Kick-Off Board Room (Dr. Joshua Schank, Chief Innovation Officer)

11:00 a.m. Presentation of Scope for MicroTransit Pilot project Board Room (Rani Narula-Woods,

Project Manager)

11:30 a.m. Questions and Answers - Board Room

12:30 p.m. Lunch & Building the Contractor Team Plaza View, 4th Floor (Pre-Registration Required

with Lunch to be Served)

Go Metro - Guests are encouraged to take the Metro Red, Purple, or Gold Line to Union Station and head

to Metro headquarters Parking. Parking is also available at Union Station, Gateway Plaza.

Draft 8/22/2017—RNW

1

LA METRO MICROTRANSIT PILOT PROJECT (MTP) SCOPE

INTRODUCTION

The Los Angeles County Metropolitan Transportation Authority (“LA Metro”) is inviting proposals from

qualified firms of teams to partner with LA Metro for the design, build, and testing of a new and

complementary service to LA Metro’s existing system (“the “MicroTransit Pilot project”).

LA Metro aims to improve the customer experience and service level for current LA Metro riders and drive

new customer acquisition by operating a new service which provides demand-responsive pick-ups and

drops-offs, with real-time customer information. This new service will connect more people and places to

our existing system. The new service will be responsive to customer demand by providing riders the

ability to reserve and pay for a ride in real-time through a software/technology platform. The new service

will perform like a continuous vanpool and will dynamically route vehicles to meet LA Metro riders

demand, saving riders time compared to fixed-route options and replacing single-occupancy vehicle trips.

The new public transportation service will be called “MicroTransit,” because the service will be used for

short trips under 20 minutes in duration and will use vehicles that are smaller than traditional transit

vehicles.

The purpose of this solicitation is to select a Contractor Team with the experience and ability to provide

planning, design, implementation, and evaluation services for the MicroTransit Pilot project to LA Metro.

The Contractor Team must include a company with a demand-responsive software/ technology platform

and may include specialists in transportation planning and analysis, outreach, and marketing.

The Tasks outlined in this Request for Proposal (RFP) are expected to be executed during two parts;

(Part A, “Planning and Design” and Part B, “Implementation and Evaluation”). Part B may be exercised

with a right-of-first negotiation for the Contractor Team awarded Part A. Part B will include performance

incentives for attaining and exceeding project performance goals. The pilot period is not to exceed 4

years for completion of Part A and Part B. LA Metro will own all deliverables, work product, and

customizations to any software provided by or generated by the Contractor Team from Part A (“Planning

and Design”) and Part B (“Implementation and Evaluation”), including all associated intellectual property

rights, as further set in the Required Contract.

BACKGROUND

Private sector “new mobility” services are rapidly changing the transportation landscape by expanding the

types of travel options available to riders using an internet-enabled smartphone. In the United States,

private, multi-passenger, demand-responsive services in major cities such as Chicago, New York, San

Francisco, Seattle, and Washington DC, have expanded in popularity among transit riders and non-transit

riders alike because they offer service options in areas difficult to serve through traditional high capacity

arterial services. In 2016, LA Metro received and reviewed an Unsolicited Proposal to test demand-

responsive software/technology. An internal Review Team determined that a pilot to test this

software/technology would be valuable to the Agency and its customers. LA Metro CEO agreed with this

recommendation.

Draft 8/22/2017—RNW

2

The Opportunity

Advances in customer-facing transportation technology have set new expectations for riders about how to

plan trips, pay for services, and travel. Riders expect to be decision makers about where they go and how

they get there, whether or not they are sitting at the wheel.

While the private sector has been the leader in developing and testing customer-facing transportation

technology, new partnerships between the private and public sector have the potential to revolutionize the

way customers experience public transportation.

With real-time information on pick-up and drop-offs, an option for mobile payment, and nearby “virtual

MicroTransit stops” within the service zones, LA Metro MicroTransit customers will benefit from a new

level of customized travel. Whether beginning a trip, completing a trip or seeking a complete trip solution,

riding LA Metro MicroTransit will be intuitive, user-friendly, and designed to encourage the use of multiple

modes of public transportation, rather than single-occupancy vehicles.

The Agency anticipates LA Metro MicroTransit service may provide a flexible feeder for high capacity,

high frequency services such as rail, bus rapid transit (BRT), and rapid bus.

Through execution of the planning, design, implementation, and evaluation phases of the LA MicroTransit

Pilot project, LA Metro will gain groundbreaking insights into the effectiveness and utility of the large-scale

deployment of demand-responsive technology. If successful, LA Metro MicroTransit service will increase

the use of LA Metro services and system for both current and new customers and more broadly support a

user-centric approach to future service planning and operations. If cost effective and widely utilized, this

service could also improve upon fixed-route transit service and be permanently integrated into LA Metro’s

service policy and transit services.

FRAMEWORK

LA Metro seeks to partner with a private sector firm or team to design a new service that is financially

feasible for the Agency and effectively balances commercial feasibility with public policy considerations.

To drive the best value in pilot design, LA Metro is using a pre-development public-private partnership

(P3) contracting model that will allow LA Metro to maximize integration of privately developed

technologies and approaches, promote shared risk and reward with the private partner, and drive

attainment of project performance goals. For the public good, LA Metro will own the resulting deliverables

and work product for Part A and Part B, and the resulting customized software application built to operate

the LA Metro MicroTransit service, if Part B is exercised in LA Metro’s sole discretion. While the

Contractor Team will be permitted to provide a license to any underlying software application in Part B,

LA Metro desires to own any customizations to the underlying software created by the Contractor Team

as required by the scope of Part B, including any customized payments or electronic processing

functions. LA Metro further desires that any customizations of the software product be built in a manner

so that LA Metro may operate the MicroTransit system/application on any software platform of any third

party, or LA Metro’s own software platform that it may build in the future.

To foster innovation and partnership, this RFP is being executed in two parts: Part A (“Planning and

Design”) and Part B (“Implementation and Evaluation”). The MicroTransit Pilot project period is not to

exceed 4 years.

Draft 8/22/2017—RNW

3

Part A (“Planning and Design”)

LA Metro seeks a Contractor Team to produce a service feasibility study including budgets and timelines

that will determine parameters for service implementation in Part B. Service zones will be identified and

determined for the pilot during Part A.

● Contracting. Part A will be governed by an interim Pre-Development Agreement, which will outline

compensation, project work plan, deliverables, and timelines. The interim agreement will be

developed to set forth terms for Part A and the option for Part B.

● Payment. The Contractor Team will be paid as agreed upon in the interim Pre-Development

Agreement and may include risk sharing elements.

● Timeline. Part A is expected to be completed within 6 months of contract execution. LA Metro

anticipates Part A will be completed in FY 2018.

Part B (“Implementation and Evaluation”)

Upon attainment of project feasibility thresholds, LA Metro may exercise an option to award a right-of-first-

negotiation for Part B (“Implementation and Evaluation”) to the Contractor Team awarded Part A. Part B

will include performance incentives for attaining and exceeding project performance goals.

In Part B, LA Metro seeks a Contractor Team to develop, deliver, and maintain a software/technology

platform and application. The Contractor Team will also provide guidance on the implementation,

operations, and ongoing evaluation, and refinement and reiteration of the service in Part B. Findings from

Part A will be used to further refine the scope of Part B.

● Contracting. Part A will be awarded with a right-of-first-negotiation for Part B upon attainment of

feasibility criteria. The award of Part A does not guarantee the award of Part B. Advancement to

Part B will be determined at LA Metro’s sole discretion and based on the ability of the Contractor

Team to drive project design to technical and financial feasibility in Part A.

● Payment. The Contractor Team shall be compensated for Part B based on performance in

achieving pre-defined service levels which will be outlined and established as a deliverable of

Part A. As part of this, revenue sharing models may also be considered.

● Timeline. Part B is estimated not to exceed 3.5 years in duration with a minimum of 2 years of

service operation.

Alongside LA Metro, the Contractor Team shall be responsible for adhering to all regulatory policies,

permitting requirements, and approvals pre-launch and while operational. Part A and Part B shall meet

regional, state, and federal regulations including the needs of riders under the Americans with Disabilities

Act, Title VI of the Civil Rights Act of 1964, and the Federal Executive Order on Environmental Justice. To

the extent possible, outreach and marketing materials and communications for and about the service

should be available in English, French, Spanish, Mandarin Chinese, Japanese, Vietnamese, Thai, Khmer,

Armenian, Korean, and Russian.

Draft 8/22/2017—RNW

4

CONCEPT

The goal of the LA Metro MicroTransit service is to replace local single-occupancy vehicle trips with mass

transit or shared vehicle options for riders traveling short distances within the pre-defined service zones.

If successfully deployed, depending on the service area(s), the LA Metro MicroTransit service could be

used by customers to address:

● short trip types (for example, nearby destinations such as employment centers, educational

institutions, retail, medical facilities, recreation, etc.):

● gaps in service such as connections to/from transit stops/stations of up to several miles: and

● service within low-density areas or areas with dispersed destinations not along a linear corridor.

As part of LA Metro’s commitment to workforce development, the Agency intends to provide operators

and routine maintenance (e.g., clean, wash, fuel, cosmetic repairs) of the vehicles for the service. This

expectation must be considered in the planning and pricing of the LA Metro MicroTransit service and the

pilot design must comply with LA Metro’s related collective bargaining agreements.

LA Metro will work with the Contractor Team in Part A to develop vehicle specifications for the pilot. While

LA Metro may select to lease or purchase the vehicles directly or indirectly, the Contractor Team must be

willing and able to act as an agent for lease or purchase of vehicles to qualify for this solicitation.

PROJECT GOALS

By integrating a new transportation technology-enabled service, LA Metro aims to improve the customer

experience by providing a range of benefits to Metro customers, including:

● real-time pick-up and drop off data

● demand responsive service

● managed and reduced overall wait times

● managed and reduced in-vehicle time

● faster trip overall times

● reduced distance to transit access

● dynamically routed trips

● reduced number of transfers

● improved experience when transferring across LA Metro services

● point-to-point service to and from LA Metro’s fixed-route transit system

● point-to-point service locally within a pre-defined service areas

● an alternative to single-occupancy vehicle use for short trips

● meeting or exceeding ADA requirements

LA Metro seeks to identify:

● popular use cases/trip types for demand responsive services

● popular origin and destination pairs or travel patterns for demand responsive services a variety of

use cases for demand responsive services (.e.g., moving beyond millennials)

● customers’ priorities (e.g., wait time, transfers, reliability, security, lighting)

● popular transfer points within LA Metro’s service area for demand responsive trips

Draft 8/22/2017—RNW

5

LA Metro aims to learn:

● cutting-edge insights into how new tools and technology can enhance our service offerings

● how an LA Metro-operated service compares with private sector operations

● the roles and responsibilities of a private-public partnership that will yield a service that is

financially and technically feasible strategies to balance market considerations (e.g., pricing) and

public policy considerations (e.g., equity) for technology solutions

CONTRACTOR TEAM REQUIREMENTS

The Contractor Team shall report to LA Metro’s Project Manager and shall work closely with a number of

LA Metro departments as well as representatives of LA Metro’s employees to ensure successful design

and if selected, continuous improvement to the service throughout implementation and testing phases of

the pilot.

The Contractor Team might include individuals with specialized expertise in:

● demand responsive operations

● transit service planning

● private sector service planning

● transportation modeling

● software development

● analytics

● GIS analysis

● marketing

● outreach

● transit requirements of ADA

Qualified firms or teams shall demonstrate:

● Qualification, Project Management, Staffing Capacity & Partnerships ○ Demonstrated technical expertise; experience with transit agencies or DOTs; record of

completing work on time and under budget; operational experience providing on-demand services; financial stability of the Contractor Team. Qualifications and availability of Contractor Team, particularly project manager and key personnel; subcontractors’ specialty expertise. Review of client references.

● Work Plan and Methodology ○ Strategies for completing deliverables (e.g., selecting a MTP service zone) and overall

project management ● Approach to Customer Experience (User Experience)

○ Creativity, innovation, application of user experience (UX) and user interface (UI) principles and tactics

● Pricing for Part A and Part B ○ Cost estimates and price reasonableness

Draft 8/22/2017—RNW

6

CONTRACTOR TEAM RESPONSIBILITIES

The Contractor Team shall coordinate with LA Metro to:

● identify a range of services zones and propose zones for deployment of the service

● identify vehicle type(s) and number of vehicles for the service

● research and select the target market segments to use the service

● identify performance measures for the service

● outline and propose service levels for operations

● identify space requirements and facilities for operations and maintenance

● procure vehicles for the service (leased or owned directly or indirectly by LA Metro)

● conduct quarterly review of service zones and service parameters to ensure successful

implementation

● design a financing model promoting shared risk and reward for Metro and partner

The Contractor Team shall be required to:

develop, deliver, and maintain the technology platform utilized for dispatching and monitoring

real-time dynamic vehicle routing

train LA Metro project staff, operators and partners on the software/technology platform

offer a mobile payment system

integrate the regional TAP account as a payment option

identify and implement strategies to meet or exceed pre-set performance targets, working with LA

Metro

coordinate with, advertise in, or connect to Google maps

PART A

LA Metro and the Contractor Team shall coordinate on the delivery of Part A (service feasibility study)

which is divided into 7 tasks. Each task requires a timeline with cost estimates to be developed for each

task.

Part A Project Tasks are:

● Task 1: Transportation Analysis & Modeling

● Task 2: Technology Solution Plan

● Task 3: Performance Plan

● Task 4: Cost Structure, Payment & Recovery

● Task 5: Capital Programming

● Task 6: Outreach & Marketing Plans

● Task 7: Reporting & Timeline

Draft 8/22/2017—RNW

7

The Contractor Team shall be responsible for the following:

TASK 1: TRANSPORTATION ANALYSIS & MODELING

A. Service Design & Siting Analysis. The Contractor Team together with LA Metro shall identify up to

six service zones (“MTP Zones”) with utilization opportunities for short trip types and first/last mile

service. MTP Zones should include transit stations and stops as well as places of interest (for

example, universities, stadiums, major employers, hospitals, etc.). MTP Zone types could be

suburban, urban, university, low-density, high-density areas. Analysis should highlight key

corridors and provide justifications for service within each zone. MTP Zones may solve for a

specific connection issue.

B. Mapping. The Contractor Team shall produce GIS maps and make available raw files for the MTP

Zones. Layers should include: origin and destination pairs, travel patterns, traffic levels,

employment density, residential density, retail and entertainment density, parking availability,

shared mobility services, and demographics.

C. Service Hours. The Contractor Team shall examine transportation patterns at the MTP Zones and

propose optimal service hours for services in each zone.

D. Service Interoperability. The Contractor Team shall examine and plan for opportunities to

coordinate with LA Metro’s existing and proposed operations such as LA Metro’s bus restructure

study and BRT plan.

E. Pilot Length: The Contractor Team should propose duration of Part B that would effectively

demonstrate the value of the service including a final evaluation period. The length of operations

should not exceed 3 years in duration including a final evaluation period.

F. Customer Typology. The Contractor Team shall develop customer profiles with segmentation of

key demographics including, but not limited to: geography, age, gender, income, cargo (luggage,

car seat), and limited mobility (mobile aid or device such as wheelchair, service animal), vocation

(student), and trip type and mode preferences. This typology will inform the selection of MTP

Zones and modeling demand for the service.

G. Suitability Index: The Contractor Team shall assemble figures to compare the 6 MTP zones to

current and past demand-responsive operations and assess the best fit with LA Metro’s project

goals.

H. Estimates and Forecasting. The Contractor Team shall model the demand of the 6 MTP Zones

and produce utilization estimates specific to the customer profiles developed in the Customer

Typology.

I. Outreach. The Contractor Team shall conduct direct outreach in each of the MTP Zones and may

include focus group(s). Outreach tactics should include a digital and in-person presence and be

informed by the agency. Outreach efforts should include tactics to reach residents, riders,

community-based organizations, business improvement districts, and local employers in each of

the MTP Zones.

J. Timeline. The Contractor Team shall draft a timeline for this Task and should outline estimated

hours and budget to achieve the Task 1 deliverables outlined above.

TASK 2: TECHNOLOGY SOLUTION PLAN

A. Software Features & Functionality: The Contractor Team shall produce an analysis of key

features of a technology platform and recommend a technology platform that supports demand-

responsive operations. Features may include, but are not limited to:

Draft 8/22/2017—RNW

8

● Routing and dispatch of vehicles in the form of a mobile application

● Remote real time monitoring and analytics for service operations

● Operator-facing application available for download in the Apple and Android stores

● Customer-facing application available for download in the Apple and Android stores

● Dashboard for analysis of service operations available to LA Metro staff and leadership

● User-friendly and apply user experience and user interface principles

● Customizations for riders with limited use of smartphone technology

● Customizations for riders with advanced use of smartphone technology

● Application Programming Interface (API) enabled to connect with Metro app, TAP system,

and Google maps

B. Software Customizations: The Contractor Team shall identify and recommend software

improvements and customizations to ensure successful usage of the technology platform for the

pilot.

C. Software Training: The Contractor Team shall identify and produce training materials required for

preparing LA Metro project staff, operators, and partners for service implementation.

D. Software Communications: The Contractor Team shall recommend and produce communications

materials to LA Metro’s multi-lingual call center in compliance with Limited English Proficiency

regulations to ensure all customers including those without smart phone access or technology,

can access information about the service.

E. Timeline. The Contractor Team shall draft a timeline for this Task and should outline estimated

hours and budget to achieve the Task 2 deliverables outlined above.

TASK 3: PERFORMANCE PLAN

A. Performance Measurement Plan. The Contractor Team shall summarize private industry

standards and develop a detailed performance measurement plan, with defined key

performance indicators, data collection methodology and benchmarks, to consistently capture

all relevant data sources to measure impact of the service.

B. Utilization. The Contractor Team shall develop a strategy to project usage of the service,

establish a baseline for utilization and design a tool to capture and track utilization figures

throughout operations of the pilot. Projections for usage will be used to set performance

targets for the service.

C. Performance Targets. The Contractor Team with LA Metro shall evaluate and set

performance targets to guide Part B.

D. Data Collection. The Contractor Team shall provide a real-time data portal where all relevant

data sources are housed and the LA Metro Project Manager and LA Metro staff can track

pre-determined metrics.

E. Timeline. Contractor Team shall draft a timeline for this Task and should outline estimated

hours and budget to achieve the Task 3 deliverables outlined above.

All external communications about the service shall be subject to LA Metro’s input, final review, and

approval.

Draft 8/22/2017—RNW

9

TASK 4: COST STRUCTURE, PAYMENT & RECOVERY PLAN

A. Fare Analysis. The Contractor Team shall produce an analysis and recommendations on a

fare structure which will evaluate and assess opportunities to incorporate LA Metro’s rate

structure for students, low-income, seniors/Medicare card holders and persons with

disabilities (LACTOA) or Access Services while also maintaining financial viability. Proposed

fares for this LA Metro MicroTransit service may exceed the Agency’s existing public transit

fares.

B. Interoperability. The Contactor Team shall ensure LA Metro riders can pay for the service

using a TAP account. The Contractor Team shall work with TAP to establish a strategy to

integrate the private technology platform with TAP operations.

C. Fare Communications. The Contractor Team shall work with LA Metro Communications to

integrate fare information into existing agency communications both internal and external.

The Contractor Team shall also design and develop new customer-facing communications

materials including digital and print resources.

D. Mobile Payment. The Contractor Team shall design payment to ensure smartphone users will

be able to pay for this service by using a mobile application.

E. Modeling. Contractor Team shall develop a strategy to track cost recovery for the service.

F. Financing Model: The Contractor Team with LA Metro shall determine a structure for revenue

sharing options to promote attainment of performance targets. The structure for revenue

sharing will provide a basis for payment in Part B.

G. Timeline. The Contractor Team shall draft a timeline for this Task and should outline

estimated hours and budget to achieve the Task 4 deliverables outlined above.

The cost structure for the LA Metro MicroTransit service will be subject to LA Metro’s final

review and approval.

TASK 5: CAPITAL PROGRAMMING

LA Metro intends to operate and maintain the vehicles for the service and may select to lease or

purchase the vehicles for the service directly or indirectly. This expectation must be considered in the

planning and pricing of the service and the pilot must comply with applicable LA Metro related collective

bargaining agreements.

A. Vehicle Procurement. The Contractor Team shall develop analysis on vehicle types, costs, and

provide recommendation on vehicles for purchase or lease (not to exceed 30 vehicles). Vehicles

should be selected based on use cases being tested as determined by Task 1: Transportation

Modeling and Analysis. Recommendations must be fully ADA compliant for public transit use.

Identification of potential vehicles shall include engagement with LA Metro Operations and

Vehicle Acquisition.

B. Vehicle Facilities. The Contractor Team shall identify available facilities to-house and perform

routine maintenance on the vehicles. Analysis should include, but not be limited to: LA Metro

owned, leased or to-be owned or leased properties.

C. Vehicle Branding and Graphics: The Contractor Team shall develop a brand and logo that builds

upon, integrates with, LA Metro’s existing Brand. The Contractor Team shall coordinate with

Metro’s Creative Services to ensure consistency and price with LA Metro and TAP branded

products and services for vehicles and payment tools used for the new service.

Draft 8/22/2017—RNW

10

D. Transit Station/Stop Integration: The Contractor Team shall identify and assess potential physical

improvements required to deploy vehicles in the MTP Zones. Recommendations should include a

method for prioritizing curb space including drop-off and loading zones.

E. Wayfinding and Signage. The Contractor Team shall develop a proposal for communicating the

service including maps, decals, and related elements. The proposal should be informed by LA

Metro departments and potentially, local cities and departments of transportation.

F. Risk Management. The Contractor Team shall produce cost estimates for insurance for the

service using the proposed vehicles with guidance from LA Metro’s Risk Management

Department. The Contractor Team shall work closely with LA Metro’s Risk Management

Department throughout Part A.

G. Timeline. The Contractor Team shall draft a timeline for this Task should outline estimated hours

and budget to achieve the Task 5 deliverables outlined above.

TASK 6: OUTREACH & MARKETING PLAN

A. Outreach. The Contractor Team shall define outreach tactics and plan for implementation

required for successful launch of the service in two MTP zones. Plan should include ongoing

engagement with existing and new customers throughout the pilot period.

B. Branding and Graphics. The Contractor Team shall develop a brand and logo suitable for

multilingual users and campaigns that builds upon, and integrates with, LA Metro’s existing brand,

subject to Metro’s design standards and approval.

C. Marketing. The Contractor Team shall design a strategic marketing plan with tactical

implementation strategies. The Contactor Team shall coordinate with LA Metro Communications

and Marketing on developing the cost estimates (for example, ad buy, street teams, billboards) as

well as a sponsorship plan

D. Timeline. The Contractor Team shall draft a timeline for this Task and should outline estimated

hours and budget to achieve the Task 6 deliverables outlined above.

All external communications about the LA Metro MicroTransit service shall be subject to LA

Metro’s input, final review, and approval.

TASK 7: PROJECT MANAGEMENT

A. Communications. Contractor Team shall assign a project manager to coordinate with the LA

Metro Project Manager and act as the point person for the Contractor Team in all communications

with LA Metro.

B. Weekly Meetings. The Contractor Team’s project manager shall coordinate and participate in

weekly meetings with LA Metro’s Project Manager.

C. Reports. The Contractor Team shall produce two reports (one interim and one final) in Part A. The

final report should be no more than 75 pages including appendices with all relevant findings and

completed at the conclusion of Part A. Coordination. Contractor Team shall work with LA Metro

Project Manager to ensure effective and efficient coordination with key departments listed within

the Statement of Work.

D. Presentations. The Contractor Team shall assemble a PowerPoint with recommendations from

the final report in coordination with the LA Metro Project Manager at the conclusion of Part A.

Draft 8/22/2017—RNW

11

E. Briefings. The Contractor Team shall co-present with the LA Metro Project Manager at in-person

briefing(s) to key stakeholders (internal and external, if appropriate) at the mid-point of Part A and

when Part A is completed.

F. Master Timeline. The Contractor Team shall combine all task specific timelines (Tasks 1-6) to

produce a master timeline. The master timeline will need to be agile and flexible as project design

and operations may be adjusted to ensure successful implementation.

All external communications about the LA Metro MicroTransit service shall be subject to LA Metro’s

input, final review, and approval.

PART B

Initial tasks for Part B are outlined below and will be refined and finalized based upon deliverables from

Part A. The primary tasks for Part B will be to deliver the software/technology platform, procure the

vehicles and establish service adjustment to increase performance, evaluate the implementation of the

service, and report project updates and outcomes.

Part B Project Tasks are:

● TASK 1: SOFTWARE/TECHNOLOGY PLATFORM

● TASK 2: IMPLEMENTATION

● TASK 3: PROJECT MANAGEMENT

TASK 1: SOFTWARE/TECHNOLOGY PLATFORM

A. Software Development & Licensing. The Contractor Team shall deliver and license to LA Metro a

software/technology platform that supports demand-responsive routing and dispatch of vehicles.

B. Software Platform: The Contractor Team shall provide a technology platform which is available in

the form of an application for riders and operators alike. The application should be available for

download with public-facing version accessible in the Apple and Android stores, and to the extent

the application is a customization of the underlying software/technology platform, it shall be

owned by LA Metro. The application will also be designed and built in a manner that allows the

application to run on any software platform from any third party, and on any future LA Metro

software platform that may be built directly by LA Metro.

C. Software Design. The Contractor Team shall provide a technology platform which is user-friendly

and applies user experience and user interface principles to ensure a high quality experience for

riders with both limited and advanced use of smartphone technology.

D. Software Customization: The Contractor Team shall customize software to meet the project

design elements identified in Part A. Such software customizations, including for customized

payments and electronic processing of the MicroTransit system and service, shall be owned by

LA Metro.

E. Software Maintenance. The Contractor Team shall be solely responsible for maintaining,

managing, updating, and upgrading the platform. The technology platform must consist of a user

interface, operator interface, and dashboard for analysis and administrative oversight to Metro

staff.

Draft 8/22/2017—RNW

12

F. Software Functionality. The Contactor Team shall ensure the real-time analytics dashboard for

administrative oversight is available for tracking, monitoring, reporting, operations, and will be

available 24 hours a day with access to LA Metro Operations and LA Metro Project Manager.

G. Software API and Web Service. The Contractor Team shall provide an access to data and

functionality through a text-based Application Programming Interface (API) that may be readily

consumed by LA Metro and external developers.

H. Software/Technology Training: The Contractor Team shall provide training for LA Metro staff and

partners as needed.

I. Customer Relations: The Contractor Team shall provide communications materials to Metro’s

multi-lingual call center in compliance with Limited English Proficiency regulations to ensure all

customers including those without smart phone access or technology are aware of the service.

TASK 2: IMPLEMENTATION

A. Marketing and Outreach Campaigns. The Contractor Team under direction of LA Metro shall

assist with implementation of strategic marketing and outreach plan and if agreed upon,

Contractor Team shall secure sponsorships for the service with review and final sign-off from LA

Metro.

B. Vehicle Procurement: The Contractor Team may secure vehicles and related insurance for the

pilot. LA Metro will be responsible for costs, management, and contracts for operations and

maintenance.

C. Service Zone and Parameter Adjustments: The Contractor Team shall advise LA Metro on

adjustments to increase utilization which may include adjusting the service zones and parameters

(but not performance metrics) up to 4 times annually.

D. Data Collection. The Contractor Team shall be responsible for tracking data such as origin,

destination, time of day, route, age, gender, race/ethnicity, and the income level/household size in

the data portal established in Part A.

TASK 3: PROJECT MANAGEMENT

A. Coordination. The Contractor Team shall work with LA Metro Project Manager to ensure effective

and efficient coordination with LA Metro departments. s

B. Service Evaluation & Analysis. The Contractor Team shall produce an analysis and evaluation of

the service. The analysis will be ongoing throughout Part B.

C. Reports. The Contractor Team with LA Metro Project Manager shall produce two reports (one

interim and one final) in Part B. The final report should be no more than 50 pages including

appendices with all relevant findings and completed at the conclusion of Part A.