LA Metro MicroTransit Pilot Project (MTP) Information Document
1. Industry Forum Attendee List (held August 29, 2017) 2. Questions for Consideration 3. Agenda from Industry Forum 4. Draft Scope of Work (August 2017)
LA Metro MicroTransit Pilot
Industry Forum Attendee List
August 29, 2017
Name Job Title Company
Dale Hulsing Director - Accenture Technology Accenture technology
Walter Allen President & CEO Acumen Building Enterprise, Inc.
David DeRosa Planning Manager AECOM
Carley Markovitz Transportation Planner AECOM
Veronica Siranosian Senior Project Manager AECOM
Jillian Switzer Director of Marketing AirMap
Heather Deutsch Senior Planner Alta Planning and Design
Ryan Taylor-Gratzer Planner I Alta Planning and Design
Brandon Goodwyn Partner Manager Amazon
John Shea Western Sales Executive AngelTrax
Scott Harral Director of Project & Construction Management Anil Verma Associates
Anil Verma President Anil Verma Associates
Edgar Gutierrez Project Manager Arellano Associates
Nobumichi Morishita Student ArtCenter College of Design
Katherine Perez Estolano Associate Principal Arup
Jim Quiter Principal Arup
Shannon Lawrence Inclusion & Diversity Manager Balfour Beatty
Mike Van Horn Vice President, Sales Betterez
Krishna Tabor Regional Vice President, Customer Butterfli Technologies
Michael Ippoliti CTSG Director CALSTART
Anurag Komanduri Consiltant Cambridge Systematics
Jon Overman Associate Cambridge Systematics
Scott Smith Director of Engineering Catchr, Inc.
Kyle Thomas CEO Catchr, Inc.
Melika Jahangiri Enterprise Sales Lead Chariot
Josh Weisman Head of Global Product Chariot
Monique Chen Principal Chen Ryan Associates
Aaron Galinis Chen Ryan Associates Chen Ryan Associates
Erika Bennett Sr Business Development Manager Circlepoint
West Interian Solution Sales Specialist Cisco Systems
Charu Kukreja Vice President Civic Projects
Kati Rubinyi President Civic Projects
michael hart CEO Clearlake Group LLC
Buddy Coleman CCO Clever Devices
Bruce Giebelstein CCAD Product Manager Clever Devices
Tom Smith Strategic Account Manager Clever Devices
Dean Soucy SVP of Engineering Clever Devices
Richard Arenas Contracts Administrator Complete Coach Works
Elliott Carson Bus Acquisitions Complete Coach Works
Ann Muenster-Nuiry Public Sector State and Local Government Solutions Conduent
Charles Favors Architecture Landscape Designer Creations By Favors
Joe Fieck Cubic
Josh List Program Manager Cubic
Mike Margro Director, Operations, Southern California Cubic
Jonathan Rohrer Regional Product Manager North America Cubic
Sai Ivaturi Associate Director - Business Development Datamatics Global Services Inc
Roger Teal President DemandTrans Solutions
Travis Gleason Chief Operation Officer Downtowner
Mike Monaco CTO Downtowner
Hilary Norton President Effect Strategies
Kris Bailey COO Electric Cab of North America
Norman Emerson Principal Emerson & Associates
Jaime de la Vega Sr. VP Englander Knabe & Allen
Justin Emerson Presales Director ePlus Technologies
Winnie Fong Estolano LeSar Perez
Christina Cardenas Project Manager evan brooks associates
Amanda Heinke Senior Transportation Planner Fehr & Peers
Jeremy Klop Principal Fehr & Peers
Chelsea Richer Transportation Planner Fehr & Peers
Ravi Swamy Swamy Director of Business Development Flatiron
Reed Alvarado Transit Blogger Getting There
Arjan VanAndel Director of Mobility on Demand and Paratransit GIRO
Gustavo Occhiuzzo Ceo Green Commuter
Ryan Westrom Mobility Partnerships Lead Greenfield Labs
Tesse Rasmussen Vice President HDR
Dan Louis VP PM/CM Director HNTB
Mohit Mangal Managing Partner IIS Inc
ali altaha Owner Infrawest
Viggen Davidian Vice President Iteris, Inc.
Antonino Geneose Transportation Planner Jacobs
Zachary Warma Senior Associate JLL
LA Metro MicroTransit Pilot
Industry Forum Attendee List
August 29, 2017
Name Job Title Company
Kathleen Jensen Business Owner Kathleen Jensen Home Rentals
Maurice Bell VP of Mobility Solutions Keolis
Mark Peabody Vice President Kleinfelder
Carlos Velasquez Transportation Planner KOA Corporation
Iris Yuan Mgr. Transportation Projects Lea+Elliott, Inc.
Tom Benson President and CEO Leighton Consulting, Inc.
Lisa Gritzner CEO LG Strategies
Sherman Gay Event Chairman Los Angeles Sustainability Coalition
Paul Davis Transit Partnerships Manager Lyft
Marlene Connor Principal Marlene Connor Associates
Zachary Ascher Business Development Manager Masabi
Doug Thomas VP, Business Development Masabi
Andrew Kugler Partner Mayer Brown LLP
Raul-David Poblano Designer, Engineer, Project Manager, Strategist Mobilitycouture.com
Kathy Chambers Senior Associate Moore & Associates, Inc.
Derek Fretheim Director, Business Development moovel NA
David Klein Manager North America Moovit
Carlos Morgner Construction Management Morgner
Isaac Segovia Vice President Morgner
Joe Warner Account Executive Motorola Solutions
Darlene Gonzalez Transportation Planner Mott MacDonald
Neal Richman Consultant Move LA
Susan Hafne Principal Multimodal Solutions
Hazel Scher Senior Associate Nelson Nygaard
Terra Curtis Senior Associate Nelson Nygaard
Eric Natwig President New West Partners, Inc.
Nicole Eng Product Design Nicole ENG
Omone Livingston President/CEO O2EPCM, Inc. dba O2 Engineering, Projects & Construction Management
Philip Adams President P H Adams and Associates, LLC
Roy Kim Principal PacRim Engineering, Inc.
Jennifer Anthony Senior Planner Parsons
Daniel Pearsall Sr. Director of Government Programs PREMIER Management Corp
Charles Devlin President/CEO R&D Transportation Services, Inc.
Leticia Leon Director of Operations R&D Transportation Services, Inc.
Seon Kim Systems Group Leader Rani Engineering
Matthew Monteyne VP Operations and Business Development RideCo
Clayton Goes Technical Product Manager RideCo
Pepper Howard VP Transit Solutions Routematch
Ben Ault Solutions Engineering Salesforce
Mary Ferguson California Program Coordinator Shared Use Mobility Center
Gary Hall Partner, National Head of Investment Banking Siebert Cisneros Shank & Co., LLC
Julia Thayne Director of Urban Development Siemens
Dennis Rodriguez Chief City Executive - LA/SF/SD/Pho Siemens Corporation
Lew Gaskell Sr. Business Development Manager Siemens ITS
Rajesh Soneja President Simplex Construction Management, Inc.
Steve Agor Director Business Development Skanska
Juan Luis Sampedro CEO SKYBUS
Matthew Gerard SVP Solutions International
Vida Mannings Stantec Consulting
Katie Wilson Marketing Manager steer davies gleave
Paul Menaker Northern California Transportation Manager STV Incorporated
Alex Fay Vice President Syncromatics
Ron Carter Managing Director The Carter Agency
Paula Campos Partner The Glue
Dennis Wang Chief Possibilities Officer The Mo Studio
Gary Hamm Senior Vice President The Solis Group
Bart Reed Executive Director The Transit Coalition
Jorge Leandros Tovar CEO Tovar Geospatial Services
Sean Quigley Business Development Manager Transdev North America
Lisa Young Principal/Owner TransLink Consulting, LLC
Lenae Boykin Lead Product Owner TransLoc
Ron Cygnarowicz Director Business Development TransLoc
Cat Mette Account Executive TransLoc
Jarryd Davis Regulatory Partnerships Manager Uber Technologies, Inc.
Juan Matute Associate Director UCLA Institute of Transportation Studies
Leslie Finnigan Vice President, Western Region Universal Field Services, Inc.
Thomas Pringle Account Executive Universal Reprographics, Inc.
Louis Pappas Business Development Principal Via
Rob Fisher Director Warner Center Association
Michael Shapiro Executive Design Drictor Walsh Group
LA Metro MicroTransit Pilot
Industry Forum Attendee List
August 29, 2017
Name Job Title Company
Cliff Henke WSP
Salvador Montes Senior Planner WSP
Kyra Tao Transportation Consultant WSP
Seth Torma Senior Planning Manager WSP
Rachel Zack Innovative Mobility Lead WSP
Janet Rhee Principal Yung Architects
LA Metro MicroTransit Pilot Project (MTP) Draft Scope Questions for Consideration
General Questions
1. LA Metro, based on our research, has identified three key disciplines – transportation planning, technology, and marketing – as critical to project success. Are there other disciplines we have overlooked?
2. The success of the MTP relies on a joint effort between a public and private partner/contractor team. Does the proposed scope give a sufficient and appropriate role in the project to the private partner/contractor team? If not, what additional responsibilities should be shared with or assigned fully to the private partner/contractor team?
3. Alternatively, does the proposed scope assign too much responsibility to the private
partner/contractor team. If so, how?
4. Designing a project of the scope and nature envisioned by LA Metro will involve balancing factors unique to public transportation service (which are generally well understood) with others unique to for-hire or on-demand services (which may not be widely understood or studied in the public realm). Does the scope for project design appropriately balance such standard transportation planning practices with additional factors unique to this type of service? If not, how should the scope be amended to strike this balance?
5. LA Metro considers private sector insight into on-demand, dynamically routed transit operations –
both publicly and privately operated - to be critical to designing the best project with the highest likelihood of success. Does the draft scope give the private sector/contractor team a sufficient role in project design, including input on the key factors that will determine project feasibility and success?
6. LA Metro intends for both partners to share in both the risks and rewards of this initiative through
implementation and operation, including such components as performance incentives and revenue sharing. Does the draft scope allow sufficient input into ongoing operation and management of the service to enable the private partner/contractor team to maximize project performance? If not, what additional roles should be afforded to the private partner/contractor team?
Specific Questions
1. Is 6 months a sufficient amount of time for the private partner/contractor team to complete the service feasibility study (Part A)? If not, what do you advise?
2. The current scope is neutral on vehicle procurement. Would it be more effective for LA Metro assume responsibility for procuring vehicles (specs developed jointly with private sector/contractor team based on Part A), or would procurement/provision by the private sector/contractor team be more effective?
3. What labor categories should be included for Part B, Task 1? (e.g., lead software engineer, product
manager, etc.)
4. For the technology/software platform, in Part B, would you prefer a fixed-term or perpetual license?
5. LA Metro is looking for this project to be defined and driven by a range of performance factors relating to customer experience, financial feasibility, and enhancement of public goods. What are the performance factors LA Metro should be considering?
Industry Forum on MicroTransit Pilot Project
Please join LA Metro as we introduce a groundbreaking pilot project to design and test a new
complementary transit service which will dynamically route vehicles to pick-up and drop-off customers at
virtual stops within Los Angeles County.
To ensure success of this new service called MicroTransit, LA Metro seeks private sector partner(s) to
team with LA Metro to design, plan, implement, and evaluate the pilot. LA Metro intends to issue the
Request for Proposal (RFP) for a Contractor Team in September. To learn more about this project, a draft
copy of the Statement of Work for this solicitation has been attached for review.
On Tuesday, August 29th, the Office of the Office of Extraordinary Innovation will host a half-day
Industry Forum for and with the private sector to learn about the MicroTransit Pilot project, ask questions
to staff directly regarding the Statement of Work, make recommendations to the scope, and meet
potential partners to build a Contractor Team for the RFP solicitation.
The interactive networking session called, ”Building the Contractor Team,” will be operated similar to
speed-dating and pre-registration is required no later than 5.p.m. Pacific Time on Wednesday, August 23,
2017. Please pre-register for this event. Your partnership and expertise are essential to the success of the
MicroTransit Pilot project.
Schedule
10:00 a.m. Networking and Coffee Outside Board Room
10:30 a.m. Welcome and Kick-Off Board Room (Dr. Joshua Schank, Chief Innovation Officer)
11:00 a.m. Presentation of Scope for MicroTransit Pilot project Board Room (Rani Narula-Woods,
Project Manager)
11:30 a.m. Questions and Answers - Board Room
12:30 p.m. Lunch & Building the Contractor Team Plaza View, 4th Floor (Pre-Registration Required
with Lunch to be Served)
Go Metro - Guests are encouraged to take the Metro Red, Purple, or Gold Line to Union Station and head
to Metro headquarters Parking. Parking is also available at Union Station, Gateway Plaza.
Draft 8/22/2017—RNW
1
LA METRO MICROTRANSIT PILOT PROJECT (MTP) SCOPE
INTRODUCTION
The Los Angeles County Metropolitan Transportation Authority (“LA Metro”) is inviting proposals from
qualified firms of teams to partner with LA Metro for the design, build, and testing of a new and
complementary service to LA Metro’s existing system (“the “MicroTransit Pilot project”).
LA Metro aims to improve the customer experience and service level for current LA Metro riders and drive
new customer acquisition by operating a new service which provides demand-responsive pick-ups and
drops-offs, with real-time customer information. This new service will connect more people and places to
our existing system. The new service will be responsive to customer demand by providing riders the
ability to reserve and pay for a ride in real-time through a software/technology platform. The new service
will perform like a continuous vanpool and will dynamically route vehicles to meet LA Metro riders
demand, saving riders time compared to fixed-route options and replacing single-occupancy vehicle trips.
The new public transportation service will be called “MicroTransit,” because the service will be used for
short trips under 20 minutes in duration and will use vehicles that are smaller than traditional transit
vehicles.
The purpose of this solicitation is to select a Contractor Team with the experience and ability to provide
planning, design, implementation, and evaluation services for the MicroTransit Pilot project to LA Metro.
The Contractor Team must include a company with a demand-responsive software/ technology platform
and may include specialists in transportation planning and analysis, outreach, and marketing.
The Tasks outlined in this Request for Proposal (RFP) are expected to be executed during two parts;
(Part A, “Planning and Design” and Part B, “Implementation and Evaluation”). Part B may be exercised
with a right-of-first negotiation for the Contractor Team awarded Part A. Part B will include performance
incentives for attaining and exceeding project performance goals. The pilot period is not to exceed 4
years for completion of Part A and Part B. LA Metro will own all deliverables, work product, and
customizations to any software provided by or generated by the Contractor Team from Part A (“Planning
and Design”) and Part B (“Implementation and Evaluation”), including all associated intellectual property
rights, as further set in the Required Contract.
BACKGROUND
Private sector “new mobility” services are rapidly changing the transportation landscape by expanding the
types of travel options available to riders using an internet-enabled smartphone. In the United States,
private, multi-passenger, demand-responsive services in major cities such as Chicago, New York, San
Francisco, Seattle, and Washington DC, have expanded in popularity among transit riders and non-transit
riders alike because they offer service options in areas difficult to serve through traditional high capacity
arterial services. In 2016, LA Metro received and reviewed an Unsolicited Proposal to test demand-
responsive software/technology. An internal Review Team determined that a pilot to test this
software/technology would be valuable to the Agency and its customers. LA Metro CEO agreed with this
recommendation.
Draft 8/22/2017—RNW
2
The Opportunity
Advances in customer-facing transportation technology have set new expectations for riders about how to
plan trips, pay for services, and travel. Riders expect to be decision makers about where they go and how
they get there, whether or not they are sitting at the wheel.
While the private sector has been the leader in developing and testing customer-facing transportation
technology, new partnerships between the private and public sector have the potential to revolutionize the
way customers experience public transportation.
With real-time information on pick-up and drop-offs, an option for mobile payment, and nearby “virtual
MicroTransit stops” within the service zones, LA Metro MicroTransit customers will benefit from a new
level of customized travel. Whether beginning a trip, completing a trip or seeking a complete trip solution,
riding LA Metro MicroTransit will be intuitive, user-friendly, and designed to encourage the use of multiple
modes of public transportation, rather than single-occupancy vehicles.
The Agency anticipates LA Metro MicroTransit service may provide a flexible feeder for high capacity,
high frequency services such as rail, bus rapid transit (BRT), and rapid bus.
Through execution of the planning, design, implementation, and evaluation phases of the LA MicroTransit
Pilot project, LA Metro will gain groundbreaking insights into the effectiveness and utility of the large-scale
deployment of demand-responsive technology. If successful, LA Metro MicroTransit service will increase
the use of LA Metro services and system for both current and new customers and more broadly support a
user-centric approach to future service planning and operations. If cost effective and widely utilized, this
service could also improve upon fixed-route transit service and be permanently integrated into LA Metro’s
service policy and transit services.
FRAMEWORK
LA Metro seeks to partner with a private sector firm or team to design a new service that is financially
feasible for the Agency and effectively balances commercial feasibility with public policy considerations.
To drive the best value in pilot design, LA Metro is using a pre-development public-private partnership
(P3) contracting model that will allow LA Metro to maximize integration of privately developed
technologies and approaches, promote shared risk and reward with the private partner, and drive
attainment of project performance goals. For the public good, LA Metro will own the resulting deliverables
and work product for Part A and Part B, and the resulting customized software application built to operate
the LA Metro MicroTransit service, if Part B is exercised in LA Metro’s sole discretion. While the
Contractor Team will be permitted to provide a license to any underlying software application in Part B,
LA Metro desires to own any customizations to the underlying software created by the Contractor Team
as required by the scope of Part B, including any customized payments or electronic processing
functions. LA Metro further desires that any customizations of the software product be built in a manner
so that LA Metro may operate the MicroTransit system/application on any software platform of any third
party, or LA Metro’s own software platform that it may build in the future.
To foster innovation and partnership, this RFP is being executed in two parts: Part A (“Planning and
Design”) and Part B (“Implementation and Evaluation”). The MicroTransit Pilot project period is not to
exceed 4 years.
Draft 8/22/2017—RNW
3
Part A (“Planning and Design”)
LA Metro seeks a Contractor Team to produce a service feasibility study including budgets and timelines
that will determine parameters for service implementation in Part B. Service zones will be identified and
determined for the pilot during Part A.
● Contracting. Part A will be governed by an interim Pre-Development Agreement, which will outline
compensation, project work plan, deliverables, and timelines. The interim agreement will be
developed to set forth terms for Part A and the option for Part B.
● Payment. The Contractor Team will be paid as agreed upon in the interim Pre-Development
Agreement and may include risk sharing elements.
● Timeline. Part A is expected to be completed within 6 months of contract execution. LA Metro
anticipates Part A will be completed in FY 2018.
Part B (“Implementation and Evaluation”)
Upon attainment of project feasibility thresholds, LA Metro may exercise an option to award a right-of-first-
negotiation for Part B (“Implementation and Evaluation”) to the Contractor Team awarded Part A. Part B
will include performance incentives for attaining and exceeding project performance goals.
In Part B, LA Metro seeks a Contractor Team to develop, deliver, and maintain a software/technology
platform and application. The Contractor Team will also provide guidance on the implementation,
operations, and ongoing evaluation, and refinement and reiteration of the service in Part B. Findings from
Part A will be used to further refine the scope of Part B.
● Contracting. Part A will be awarded with a right-of-first-negotiation for Part B upon attainment of
feasibility criteria. The award of Part A does not guarantee the award of Part B. Advancement to
Part B will be determined at LA Metro’s sole discretion and based on the ability of the Contractor
Team to drive project design to technical and financial feasibility in Part A.
● Payment. The Contractor Team shall be compensated for Part B based on performance in
achieving pre-defined service levels which will be outlined and established as a deliverable of
Part A. As part of this, revenue sharing models may also be considered.
● Timeline. Part B is estimated not to exceed 3.5 years in duration with a minimum of 2 years of
service operation.
Alongside LA Metro, the Contractor Team shall be responsible for adhering to all regulatory policies,
permitting requirements, and approvals pre-launch and while operational. Part A and Part B shall meet
regional, state, and federal regulations including the needs of riders under the Americans with Disabilities
Act, Title VI of the Civil Rights Act of 1964, and the Federal Executive Order on Environmental Justice. To
the extent possible, outreach and marketing materials and communications for and about the service
should be available in English, French, Spanish, Mandarin Chinese, Japanese, Vietnamese, Thai, Khmer,
Armenian, Korean, and Russian.
Draft 8/22/2017—RNW
4
CONCEPT
The goal of the LA Metro MicroTransit service is to replace local single-occupancy vehicle trips with mass
transit or shared vehicle options for riders traveling short distances within the pre-defined service zones.
If successfully deployed, depending on the service area(s), the LA Metro MicroTransit service could be
used by customers to address:
● short trip types (for example, nearby destinations such as employment centers, educational
institutions, retail, medical facilities, recreation, etc.):
● gaps in service such as connections to/from transit stops/stations of up to several miles: and
● service within low-density areas or areas with dispersed destinations not along a linear corridor.
As part of LA Metro’s commitment to workforce development, the Agency intends to provide operators
and routine maintenance (e.g., clean, wash, fuel, cosmetic repairs) of the vehicles for the service. This
expectation must be considered in the planning and pricing of the LA Metro MicroTransit service and the
pilot design must comply with LA Metro’s related collective bargaining agreements.
LA Metro will work with the Contractor Team in Part A to develop vehicle specifications for the pilot. While
LA Metro may select to lease or purchase the vehicles directly or indirectly, the Contractor Team must be
willing and able to act as an agent for lease or purchase of vehicles to qualify for this solicitation.
PROJECT GOALS
By integrating a new transportation technology-enabled service, LA Metro aims to improve the customer
experience by providing a range of benefits to Metro customers, including:
● real-time pick-up and drop off data
● demand responsive service
● managed and reduced overall wait times
● managed and reduced in-vehicle time
● faster trip overall times
● reduced distance to transit access
● dynamically routed trips
● reduced number of transfers
● improved experience when transferring across LA Metro services
● point-to-point service to and from LA Metro’s fixed-route transit system
● point-to-point service locally within a pre-defined service areas
● an alternative to single-occupancy vehicle use for short trips
● meeting or exceeding ADA requirements
LA Metro seeks to identify:
● popular use cases/trip types for demand responsive services
● popular origin and destination pairs or travel patterns for demand responsive services a variety of
use cases for demand responsive services (.e.g., moving beyond millennials)
● customers’ priorities (e.g., wait time, transfers, reliability, security, lighting)
● popular transfer points within LA Metro’s service area for demand responsive trips
Draft 8/22/2017—RNW
5
LA Metro aims to learn:
● cutting-edge insights into how new tools and technology can enhance our service offerings
● how an LA Metro-operated service compares with private sector operations
● the roles and responsibilities of a private-public partnership that will yield a service that is
financially and technically feasible strategies to balance market considerations (e.g., pricing) and
public policy considerations (e.g., equity) for technology solutions
CONTRACTOR TEAM REQUIREMENTS
The Contractor Team shall report to LA Metro’s Project Manager and shall work closely with a number of
LA Metro departments as well as representatives of LA Metro’s employees to ensure successful design
and if selected, continuous improvement to the service throughout implementation and testing phases of
the pilot.
The Contractor Team might include individuals with specialized expertise in:
● demand responsive operations
● transit service planning
● private sector service planning
● transportation modeling
● software development
● analytics
● GIS analysis
● marketing
● outreach
● transit requirements of ADA
Qualified firms or teams shall demonstrate:
● Qualification, Project Management, Staffing Capacity & Partnerships ○ Demonstrated technical expertise; experience with transit agencies or DOTs; record of
completing work on time and under budget; operational experience providing on-demand services; financial stability of the Contractor Team. Qualifications and availability of Contractor Team, particularly project manager and key personnel; subcontractors’ specialty expertise. Review of client references.
● Work Plan and Methodology ○ Strategies for completing deliverables (e.g., selecting a MTP service zone) and overall
project management ● Approach to Customer Experience (User Experience)
○ Creativity, innovation, application of user experience (UX) and user interface (UI) principles and tactics
● Pricing for Part A and Part B ○ Cost estimates and price reasonableness
Draft 8/22/2017—RNW
6
CONTRACTOR TEAM RESPONSIBILITIES
The Contractor Team shall coordinate with LA Metro to:
● identify a range of services zones and propose zones for deployment of the service
● identify vehicle type(s) and number of vehicles for the service
● research and select the target market segments to use the service
● identify performance measures for the service
● outline and propose service levels for operations
● identify space requirements and facilities for operations and maintenance
● procure vehicles for the service (leased or owned directly or indirectly by LA Metro)
● conduct quarterly review of service zones and service parameters to ensure successful
implementation
● design a financing model promoting shared risk and reward for Metro and partner
The Contractor Team shall be required to:
develop, deliver, and maintain the technology platform utilized for dispatching and monitoring
real-time dynamic vehicle routing
train LA Metro project staff, operators and partners on the software/technology platform
offer a mobile payment system
integrate the regional TAP account as a payment option
identify and implement strategies to meet or exceed pre-set performance targets, working with LA
Metro
coordinate with, advertise in, or connect to Google maps
PART A
LA Metro and the Contractor Team shall coordinate on the delivery of Part A (service feasibility study)
which is divided into 7 tasks. Each task requires a timeline with cost estimates to be developed for each
task.
Part A Project Tasks are:
● Task 1: Transportation Analysis & Modeling
● Task 2: Technology Solution Plan
● Task 3: Performance Plan
● Task 4: Cost Structure, Payment & Recovery
● Task 5: Capital Programming
● Task 6: Outreach & Marketing Plans
● Task 7: Reporting & Timeline
Draft 8/22/2017—RNW
7
The Contractor Team shall be responsible for the following:
TASK 1: TRANSPORTATION ANALYSIS & MODELING
A. Service Design & Siting Analysis. The Contractor Team together with LA Metro shall identify up to
six service zones (“MTP Zones”) with utilization opportunities for short trip types and first/last mile
service. MTP Zones should include transit stations and stops as well as places of interest (for
example, universities, stadiums, major employers, hospitals, etc.). MTP Zone types could be
suburban, urban, university, low-density, high-density areas. Analysis should highlight key
corridors and provide justifications for service within each zone. MTP Zones may solve for a
specific connection issue.
B. Mapping. The Contractor Team shall produce GIS maps and make available raw files for the MTP
Zones. Layers should include: origin and destination pairs, travel patterns, traffic levels,
employment density, residential density, retail and entertainment density, parking availability,
shared mobility services, and demographics.
C. Service Hours. The Contractor Team shall examine transportation patterns at the MTP Zones and
propose optimal service hours for services in each zone.
D. Service Interoperability. The Contractor Team shall examine and plan for opportunities to
coordinate with LA Metro’s existing and proposed operations such as LA Metro’s bus restructure
study and BRT plan.
E. Pilot Length: The Contractor Team should propose duration of Part B that would effectively
demonstrate the value of the service including a final evaluation period. The length of operations
should not exceed 3 years in duration including a final evaluation period.
F. Customer Typology. The Contractor Team shall develop customer profiles with segmentation of
key demographics including, but not limited to: geography, age, gender, income, cargo (luggage,
car seat), and limited mobility (mobile aid or device such as wheelchair, service animal), vocation
(student), and trip type and mode preferences. This typology will inform the selection of MTP
Zones and modeling demand for the service.
G. Suitability Index: The Contractor Team shall assemble figures to compare the 6 MTP zones to
current and past demand-responsive operations and assess the best fit with LA Metro’s project
goals.
H. Estimates and Forecasting. The Contractor Team shall model the demand of the 6 MTP Zones
and produce utilization estimates specific to the customer profiles developed in the Customer
Typology.
I. Outreach. The Contractor Team shall conduct direct outreach in each of the MTP Zones and may
include focus group(s). Outreach tactics should include a digital and in-person presence and be
informed by the agency. Outreach efforts should include tactics to reach residents, riders,
community-based organizations, business improvement districts, and local employers in each of
the MTP Zones.
J. Timeline. The Contractor Team shall draft a timeline for this Task and should outline estimated
hours and budget to achieve the Task 1 deliverables outlined above.
TASK 2: TECHNOLOGY SOLUTION PLAN
A. Software Features & Functionality: The Contractor Team shall produce an analysis of key
features of a technology platform and recommend a technology platform that supports demand-
responsive operations. Features may include, but are not limited to:
Draft 8/22/2017—RNW
8
● Routing and dispatch of vehicles in the form of a mobile application
● Remote real time monitoring and analytics for service operations
● Operator-facing application available for download in the Apple and Android stores
● Customer-facing application available for download in the Apple and Android stores
● Dashboard for analysis of service operations available to LA Metro staff and leadership
● User-friendly and apply user experience and user interface principles
● Customizations for riders with limited use of smartphone technology
● Customizations for riders with advanced use of smartphone technology
● Application Programming Interface (API) enabled to connect with Metro app, TAP system,
and Google maps
B. Software Customizations: The Contractor Team shall identify and recommend software
improvements and customizations to ensure successful usage of the technology platform for the
pilot.
C. Software Training: The Contractor Team shall identify and produce training materials required for
preparing LA Metro project staff, operators, and partners for service implementation.
D. Software Communications: The Contractor Team shall recommend and produce communications
materials to LA Metro’s multi-lingual call center in compliance with Limited English Proficiency
regulations to ensure all customers including those without smart phone access or technology,
can access information about the service.
E. Timeline. The Contractor Team shall draft a timeline for this Task and should outline estimated
hours and budget to achieve the Task 2 deliverables outlined above.
TASK 3: PERFORMANCE PLAN
A. Performance Measurement Plan. The Contractor Team shall summarize private industry
standards and develop a detailed performance measurement plan, with defined key
performance indicators, data collection methodology and benchmarks, to consistently capture
all relevant data sources to measure impact of the service.
B. Utilization. The Contractor Team shall develop a strategy to project usage of the service,
establish a baseline for utilization and design a tool to capture and track utilization figures
throughout operations of the pilot. Projections for usage will be used to set performance
targets for the service.
C. Performance Targets. The Contractor Team with LA Metro shall evaluate and set
performance targets to guide Part B.
D. Data Collection. The Contractor Team shall provide a real-time data portal where all relevant
data sources are housed and the LA Metro Project Manager and LA Metro staff can track
pre-determined metrics.
E. Timeline. Contractor Team shall draft a timeline for this Task and should outline estimated
hours and budget to achieve the Task 3 deliverables outlined above.
All external communications about the service shall be subject to LA Metro’s input, final review, and
approval.
Draft 8/22/2017—RNW
9
TASK 4: COST STRUCTURE, PAYMENT & RECOVERY PLAN
A. Fare Analysis. The Contractor Team shall produce an analysis and recommendations on a
fare structure which will evaluate and assess opportunities to incorporate LA Metro’s rate
structure for students, low-income, seniors/Medicare card holders and persons with
disabilities (LACTOA) or Access Services while also maintaining financial viability. Proposed
fares for this LA Metro MicroTransit service may exceed the Agency’s existing public transit
fares.
B. Interoperability. The Contactor Team shall ensure LA Metro riders can pay for the service
using a TAP account. The Contractor Team shall work with TAP to establish a strategy to
integrate the private technology platform with TAP operations.
C. Fare Communications. The Contractor Team shall work with LA Metro Communications to
integrate fare information into existing agency communications both internal and external.
The Contractor Team shall also design and develop new customer-facing communications
materials including digital and print resources.
D. Mobile Payment. The Contractor Team shall design payment to ensure smartphone users will
be able to pay for this service by using a mobile application.
E. Modeling. Contractor Team shall develop a strategy to track cost recovery for the service.
F. Financing Model: The Contractor Team with LA Metro shall determine a structure for revenue
sharing options to promote attainment of performance targets. The structure for revenue
sharing will provide a basis for payment in Part B.
G. Timeline. The Contractor Team shall draft a timeline for this Task and should outline
estimated hours and budget to achieve the Task 4 deliverables outlined above.
The cost structure for the LA Metro MicroTransit service will be subject to LA Metro’s final
review and approval.
TASK 5: CAPITAL PROGRAMMING
LA Metro intends to operate and maintain the vehicles for the service and may select to lease or
purchase the vehicles for the service directly or indirectly. This expectation must be considered in the
planning and pricing of the service and the pilot must comply with applicable LA Metro related collective
bargaining agreements.
A. Vehicle Procurement. The Contractor Team shall develop analysis on vehicle types, costs, and
provide recommendation on vehicles for purchase or lease (not to exceed 30 vehicles). Vehicles
should be selected based on use cases being tested as determined by Task 1: Transportation
Modeling and Analysis. Recommendations must be fully ADA compliant for public transit use.
Identification of potential vehicles shall include engagement with LA Metro Operations and
Vehicle Acquisition.
B. Vehicle Facilities. The Contractor Team shall identify available facilities to-house and perform
routine maintenance on the vehicles. Analysis should include, but not be limited to: LA Metro
owned, leased or to-be owned or leased properties.
C. Vehicle Branding and Graphics: The Contractor Team shall develop a brand and logo that builds
upon, integrates with, LA Metro’s existing Brand. The Contractor Team shall coordinate with
Metro’s Creative Services to ensure consistency and price with LA Metro and TAP branded
products and services for vehicles and payment tools used for the new service.
Draft 8/22/2017—RNW
10
D. Transit Station/Stop Integration: The Contractor Team shall identify and assess potential physical
improvements required to deploy vehicles in the MTP Zones. Recommendations should include a
method for prioritizing curb space including drop-off and loading zones.
E. Wayfinding and Signage. The Contractor Team shall develop a proposal for communicating the
service including maps, decals, and related elements. The proposal should be informed by LA
Metro departments and potentially, local cities and departments of transportation.
F. Risk Management. The Contractor Team shall produce cost estimates for insurance for the
service using the proposed vehicles with guidance from LA Metro’s Risk Management
Department. The Contractor Team shall work closely with LA Metro’s Risk Management
Department throughout Part A.
G. Timeline. The Contractor Team shall draft a timeline for this Task should outline estimated hours
and budget to achieve the Task 5 deliverables outlined above.
TASK 6: OUTREACH & MARKETING PLAN
A. Outreach. The Contractor Team shall define outreach tactics and plan for implementation
required for successful launch of the service in two MTP zones. Plan should include ongoing
engagement with existing and new customers throughout the pilot period.
B. Branding and Graphics. The Contractor Team shall develop a brand and logo suitable for
multilingual users and campaigns that builds upon, and integrates with, LA Metro’s existing brand,
subject to Metro’s design standards and approval.
C. Marketing. The Contractor Team shall design a strategic marketing plan with tactical
implementation strategies. The Contactor Team shall coordinate with LA Metro Communications
and Marketing on developing the cost estimates (for example, ad buy, street teams, billboards) as
well as a sponsorship plan
D. Timeline. The Contractor Team shall draft a timeline for this Task and should outline estimated
hours and budget to achieve the Task 6 deliverables outlined above.
All external communications about the LA Metro MicroTransit service shall be subject to LA
Metro’s input, final review, and approval.
TASK 7: PROJECT MANAGEMENT
A. Communications. Contractor Team shall assign a project manager to coordinate with the LA
Metro Project Manager and act as the point person for the Contractor Team in all communications
with LA Metro.
B. Weekly Meetings. The Contractor Team’s project manager shall coordinate and participate in
weekly meetings with LA Metro’s Project Manager.
C. Reports. The Contractor Team shall produce two reports (one interim and one final) in Part A. The
final report should be no more than 75 pages including appendices with all relevant findings and
completed at the conclusion of Part A. Coordination. Contractor Team shall work with LA Metro
Project Manager to ensure effective and efficient coordination with key departments listed within
the Statement of Work.
D. Presentations. The Contractor Team shall assemble a PowerPoint with recommendations from
the final report in coordination with the LA Metro Project Manager at the conclusion of Part A.
Draft 8/22/2017—RNW
11
E. Briefings. The Contractor Team shall co-present with the LA Metro Project Manager at in-person
briefing(s) to key stakeholders (internal and external, if appropriate) at the mid-point of Part A and
when Part A is completed.
F. Master Timeline. The Contractor Team shall combine all task specific timelines (Tasks 1-6) to
produce a master timeline. The master timeline will need to be agile and flexible as project design
and operations may be adjusted to ensure successful implementation.
All external communications about the LA Metro MicroTransit service shall be subject to LA Metro’s
input, final review, and approval.
PART B
Initial tasks for Part B are outlined below and will be refined and finalized based upon deliverables from
Part A. The primary tasks for Part B will be to deliver the software/technology platform, procure the
vehicles and establish service adjustment to increase performance, evaluate the implementation of the
service, and report project updates and outcomes.
Part B Project Tasks are:
● TASK 1: SOFTWARE/TECHNOLOGY PLATFORM
● TASK 2: IMPLEMENTATION
● TASK 3: PROJECT MANAGEMENT
TASK 1: SOFTWARE/TECHNOLOGY PLATFORM
A. Software Development & Licensing. The Contractor Team shall deliver and license to LA Metro a
software/technology platform that supports demand-responsive routing and dispatch of vehicles.
B. Software Platform: The Contractor Team shall provide a technology platform which is available in
the form of an application for riders and operators alike. The application should be available for
download with public-facing version accessible in the Apple and Android stores, and to the extent
the application is a customization of the underlying software/technology platform, it shall be
owned by LA Metro. The application will also be designed and built in a manner that allows the
application to run on any software platform from any third party, and on any future LA Metro
software platform that may be built directly by LA Metro.
C. Software Design. The Contractor Team shall provide a technology platform which is user-friendly
and applies user experience and user interface principles to ensure a high quality experience for
riders with both limited and advanced use of smartphone technology.
D. Software Customization: The Contractor Team shall customize software to meet the project
design elements identified in Part A. Such software customizations, including for customized
payments and electronic processing of the MicroTransit system and service, shall be owned by
LA Metro.
E. Software Maintenance. The Contractor Team shall be solely responsible for maintaining,
managing, updating, and upgrading the platform. The technology platform must consist of a user
interface, operator interface, and dashboard for analysis and administrative oversight to Metro
staff.
Draft 8/22/2017—RNW
12
F. Software Functionality. The Contactor Team shall ensure the real-time analytics dashboard for
administrative oversight is available for tracking, monitoring, reporting, operations, and will be
available 24 hours a day with access to LA Metro Operations and LA Metro Project Manager.
G. Software API and Web Service. The Contractor Team shall provide an access to data and
functionality through a text-based Application Programming Interface (API) that may be readily
consumed by LA Metro and external developers.
H. Software/Technology Training: The Contractor Team shall provide training for LA Metro staff and
partners as needed.
I. Customer Relations: The Contractor Team shall provide communications materials to Metro’s
multi-lingual call center in compliance with Limited English Proficiency regulations to ensure all
customers including those without smart phone access or technology are aware of the service.
TASK 2: IMPLEMENTATION
A. Marketing and Outreach Campaigns. The Contractor Team under direction of LA Metro shall
assist with implementation of strategic marketing and outreach plan and if agreed upon,
Contractor Team shall secure sponsorships for the service with review and final sign-off from LA
Metro.
B. Vehicle Procurement: The Contractor Team may secure vehicles and related insurance for the
pilot. LA Metro will be responsible for costs, management, and contracts for operations and
maintenance.
C. Service Zone and Parameter Adjustments: The Contractor Team shall advise LA Metro on
adjustments to increase utilization which may include adjusting the service zones and parameters
(but not performance metrics) up to 4 times annually.
D. Data Collection. The Contractor Team shall be responsible for tracking data such as origin,
destination, time of day, route, age, gender, race/ethnicity, and the income level/household size in
the data portal established in Part A.
TASK 3: PROJECT MANAGEMENT
A. Coordination. The Contractor Team shall work with LA Metro Project Manager to ensure effective
and efficient coordination with LA Metro departments. s
B. Service Evaluation & Analysis. The Contractor Team shall produce an analysis and evaluation of
the service. The analysis will be ongoing throughout Part B.
C. Reports. The Contractor Team with LA Metro Project Manager shall produce two reports (one
interim and one final) in Part B. The final report should be no more than 50 pages including
appendices with all relevant findings and completed at the conclusion of Part A.