    Consolidated Statement on various Environmental Aspects for

    Industrial Projects

    Important Note before filling the form:

    1. Fill the form in the same format (i.e. Font: Times New Roman and font size: 12)2. Do not edit / delete the columns if its not applicable3. Send soft copy to the [email protected] and [email protected] in the

    word format (doc file)

    Sr.

    No.

    Particulars Commitment On

    1 Name of the Project

    2 Name, address, e-mail &

    contact number of

    Proponent

    Name: Address: Telephone number: Mobile number: Email ID:

    3 Name, address, e-mail &contact number of

    Consultant

    Name: Address: Telephone number: Mobile number: Email ID:

    4 Accreditation of

    consultant (NABET

    Accreditation)

    QCI NABET List for the proposed category of the project

    5 New Project / Expansionin existing project/

    Modernization/

    Diversification in exiting

    project

    6 If expansion/

    Diversification, whetherenvironmental clearance

    has been obtained forexisting project (If yes,

    enclose a copy with

    compliance table)

  • 8/22/2019 Industrial Projects 090512

    2/9

    7 Activity schedule in the

    EIA Notification

    8 Area Details Total plot area (sq. m.): Built up area (Sq. m.):

    9 Name of the Notified

    Industrial area / MIDC

    area

    10 TOR given by

    SEAC? (If yeas thenspecify the meeting)

    11 Estimated capital cost ofthe Project (including cost

    for land, building, plantand machinery

    separately)

    12 Location details of

    the project : Latitude Longitude Location Elevation above Mean Sea Level (metres)

    13 Distance from ProtectedAreas / Critically Pollutedareas / Eco-sensitive areas

    / inter-State boundaries

    14 Raw materials (including

    process chemicals,catalysts, & additives).

    List ofraw

    materials

    tobe used

    Physical andchemical

    nature of raw

    material

    Quantity(tonnes/

    year) full

    productioncapacity

    Sourceof

    materi

    als

    Means oftransportat

    ion

    (Source tostoragesite) with

    justification

    15 Production details

    Name of Products,

    By products andIntermediate

    Products

    Existing

    (T/Year)

    Proposed

    activity(new/

    modernization

    / expansion)

    Total

    (T/Year)

  • 8/22/2019 Industrial Projects 090512

    3/9

    (T/Year)

    Main Products

    By-Products

    IntermediateProducts

    16 Process details /

    manufacturing details

    17 Rain Water Harvesting(RWH)

    Level of the Ground water table

    Size and no of RWH tank(s) and Quantity Location of the RWH tank(s) Size, nos of recharge pits and Quantity Budgetary allocation (Capital cost and O&M cost)

    18 Total Water Requirement Total water requirement:

    Fresh water (CMD): & Source Recycled water (CMD):Use of the water:

    Process (CMD): Cooling water (CMD): DM Water (CMD): Dust Suppression (CMD): Drinking (CMD): Green belt (CMD): Fire service (CMD): Others (CMD):

    19 Storm water drainage Natural water drainage pattern quantity of storm water Size of SWD

    20 Sewage generation and

    treatment

    Amount of sewage generation (CMD) Proposed treatment for the sewage Capacity of the STP (CMD) (If applicable)

    21 Effluent characteristic

    Sr.

    No.

    Parameters

    (pH, BOD,COD, heavy

    metal, etc)

    Inlet effluent

    Characteristic

    Outlet

    effluentCharacte

    ristic

    Effluent

    dischargestandards

    (CPCB /

  • 8/22/2019 Industrial Projects 090512

    4/9

    MPCB)

    1

    2

    22 ETP details Amount of effluent generation (CMD) Capacity of the ETP (CMD) Amount of treated effluent recycled (CMD): Amount of water send to the CETP (CMD): Membership of the CETP (If require): If yes then attach the

    letter submit the letter

    23 Note on ETP technology

    to be used24 Disposal of the ETP

    sludge (If applicable)

    25 Solid waste Management Sr.No

    Source Qty(TPM)

    Form(Sludge / Dry /

    Slurry etc.)

    Composition

    1 Raw water

    treatment

    plant

    2 ETP

    3 Process

    4 Spent

    Catalyst

    5 Oily

    Sludge

    6 Others like

    Battery

    waste,e wasteetc (Pl.

    Specify)

    If waste(s) contain any hazardous/toxic substance/radioactive

    materials or heavy metals then provide quantity, disposal data

    and proposed precautionary measures.

    What are the possibilities of recovery and recycling of wastes?

  • 8/22/2019 Industrial Projects 090512

    5/9

    Possible users of solid waste

    Method of disposal of solid waste

    26 Atmospheric Emissions(Flue gas characteristicsSPM, SO2, NOx, CO, etc.)

    Sr.No

    .

    Pollutant Sourceof

    Emission

    Emissionrate

    (kg/hr)

    Concentrationin flue gas

    (g/m3)

    1 SPM

    2 SO2

    3 NOx

    4 CO

    5 Others

    27 Stack emission Details:

    (All the stacks attached to

    process units, Boilers,

    captive power plant, D.G.

    Sets, Incinerator both for

    existing and proposed

    activity). Please indicate

    the specific section to

    which the stack is attached.

    e.g.: Process section, D.G.

    Set, Boiler, Power Plant,

    incinerator etc. Emission

    rate (kg/hr.) for each

    pollutant (SPM, SO2, NOx

    etc. should be specified

    Plant

    Section

    & units

    Stack

    No.

    Height

    from

    ground

    level(m)

    Internal

    Diameter

    (Top)(m)

    Emission

    Rate

    Temp. of

    Exhaust

    Gases

    1st

    & soon

  • 8/22/2019 Industrial Projects 090512

    6/9

    28 Emission Standard Pollutants

    (SPM, SO2,etc)

    Emission

    StandardLimit

    (mg/Nm3)

    Proposed

    Limit(mg/Nm3)

    MPCB Consent

    (mg/Nm3)

    29 Ambient Air Quality Data Pollutant Permissible

    Standard

    Proposed

    Concentration

    (in

    g/m3)

    Remarks

    SPM

    RPM

    SO2

    NOx

    CO

  • 8/22/2019 Industrial Projects 090512

    7/9

    30 Details of Fuel to be used:

    Sr.No

    Fuel Daily Consumption(TPD/KLD)

    Calorificvalue

    (Kcals

    /kg)

    %Ash

    %Sulph

    ur

    Existing Proposed

    1 Gas

    2 Naphtha

    3 HSD

    4 Fuel Oil

    5 Coal

    6 Lignite

    7 Other(Pl.

    specify)

    Source of fuel:

    Mode of transportation of fuel to site:

    31 Energy Power supply:

    Existing power requirement: Proposed power requirement:DG sets:

    Number and capacity DG sets to be used (existing andproposed)

    Details of the non-conventional renewable energy proposed to

    be used :

    32 Green Belt Development Green belt area (Sq. m.): Number and species of trees to be planted Number, size, age and species of trees to be cut, trees to be

    transplanted

  • 8/22/2019 Industrial Projects 090512

    8/9

    33 Details of Pollution

    Control Systems:Sr.

    No.

    Existing

    pollutioncontrol

    system

    Proposed to be

    installed

    1 Air

    2 Water

    3 Noise

    4 Solid Waste

    34 EnvironmentalManagement plan

    Budgetary Allocation

    Capital cost (With break up):

    O&M cost (With break up):

    Sr.No.

    Recurring Costper annum

    CapitalCost

    1 Air Pollution Control

    2 Water Pollution Control

    3 Noise Pollution Control

    4 Environment Monitoringand Management

    5 Reclamation

    borrow/mined area (Ifapplicable)

    6 Occupational Health

    7 Green Belt

    8 Solid waste management

    9 Others ( Pl. Specify)

    Total

    35 EIA Submitted (If yesthen submit the salient

    features)

    Period of data collected Details of the primary data collection (i.e. location of the

    sample collection, number of visit, etc)

    Details of the secondary data collection (i.e. Source and yearof data)

  • 8/22/2019 Industrial Projects 090512

    9/9

    Potential hazard and mitigation measures Conclusion of the EIA study

    36 Public hearing report (Ifpublic hearing conducted

    then submit the salient

    features)

    Date of the public hearing Name of the news paper in which the advertisement appeared

    (Please attach the copy)

    Location of the public hearing Number of people attended the hearing Objection(s) / Suggestion(s) if any

    37 Air pollution, water

    pollution issues in the

    project area, If any

    38 . Storage of chemicals (inflammable/explosive/hazardous/toxic substances)

    Sr.

    No.

    Name Number

    ofStorages

    Capacity

    (TPD)

    Physical and

    ChemicalComposition

    Consumption

    (in TPD)

    Maximum

    Quantityof storage

    at any

    point of

    time

    Source

    ofSupply

    Means

    oftransportation

    Declaration

    I hereby declare that no work has been initiated for the said project.

    Date:

    Place:

    Name & Signature Name & Signature

    of the project proponent of the consultant