industrial projects 090512
TRANSCRIPT
-
8/22/2019 Industrial Projects 090512
1/9
Consolidated Statement on various Environmental Aspects for
Industrial Projects
Important Note before filling the form:
1. Fill the form in the same format (i.e. Font: Times New Roman and font size: 12)2. Do not edit / delete the columns if its not applicable3. Send soft copy to the [email protected] and [email protected] in the
word format (doc file)
Sr.
No.
Particulars Commitment On
1 Name of the Project
2 Name, address, e-mail &
contact number of
Proponent
Name: Address: Telephone number: Mobile number: Email ID:
3 Name, address, e-mail &contact number of
Consultant
Name: Address: Telephone number: Mobile number: Email ID:
4 Accreditation of
consultant (NABET
Accreditation)
QCI NABET List for the proposed category of the project
5 New Project / Expansionin existing project/
Modernization/
Diversification in exiting
project
6 If expansion/
Diversification, whetherenvironmental clearance
has been obtained forexisting project (If yes,
enclose a copy with
compliance table)
-
8/22/2019 Industrial Projects 090512
2/9
7 Activity schedule in the
EIA Notification
8 Area Details Total plot area (sq. m.): Built up area (Sq. m.):
9 Name of the Notified
Industrial area / MIDC
area
10 TOR given by
SEAC? (If yeas thenspecify the meeting)
11 Estimated capital cost ofthe Project (including cost
for land, building, plantand machinery
separately)
12 Location details of
the project : Latitude Longitude Location Elevation above Mean Sea Level (metres)
13 Distance from ProtectedAreas / Critically Pollutedareas / Eco-sensitive areas
/ inter-State boundaries
14 Raw materials (including
process chemicals,catalysts, & additives).
List ofraw
materials
tobe used
Physical andchemical
nature of raw
material
Quantity(tonnes/
year) full
productioncapacity
Sourceof
materi
als
Means oftransportat
ion
(Source tostoragesite) with
justification
15 Production details
Name of Products,
By products andIntermediate
Products
Existing
(T/Year)
Proposed
activity(new/
modernization
/ expansion)
Total
(T/Year)
-
8/22/2019 Industrial Projects 090512
3/9
(T/Year)
Main Products
By-Products
IntermediateProducts
16 Process details /
manufacturing details
17 Rain Water Harvesting(RWH)
Level of the Ground water table
Size and no of RWH tank(s) and Quantity Location of the RWH tank(s) Size, nos of recharge pits and Quantity Budgetary allocation (Capital cost and O&M cost)
18 Total Water Requirement Total water requirement:
Fresh water (CMD): & Source Recycled water (CMD):Use of the water:
Process (CMD): Cooling water (CMD): DM Water (CMD): Dust Suppression (CMD): Drinking (CMD): Green belt (CMD): Fire service (CMD): Others (CMD):
19 Storm water drainage Natural water drainage pattern quantity of storm water Size of SWD
20 Sewage generation and
treatment
Amount of sewage generation (CMD) Proposed treatment for the sewage Capacity of the STP (CMD) (If applicable)
21 Effluent characteristic
Sr.
No.
Parameters
(pH, BOD,COD, heavy
metal, etc)
Inlet effluent
Characteristic
Outlet
effluentCharacte
ristic
Effluent
dischargestandards
(CPCB /
-
8/22/2019 Industrial Projects 090512
4/9
MPCB)
1
2
22 ETP details Amount of effluent generation (CMD) Capacity of the ETP (CMD) Amount of treated effluent recycled (CMD): Amount of water send to the CETP (CMD): Membership of the CETP (If require): If yes then attach the
letter submit the letter
23 Note on ETP technology
to be used24 Disposal of the ETP
sludge (If applicable)
25 Solid waste Management Sr.No
Source Qty(TPM)
Form(Sludge / Dry /
Slurry etc.)
Composition
1 Raw water
treatment
plant
2 ETP
3 Process
4 Spent
Catalyst
5 Oily
Sludge
6 Others like
Battery
waste,e wasteetc (Pl.
Specify)
If waste(s) contain any hazardous/toxic substance/radioactive
materials or heavy metals then provide quantity, disposal data
and proposed precautionary measures.
What are the possibilities of recovery and recycling of wastes?
-
8/22/2019 Industrial Projects 090512
5/9
Possible users of solid waste
Method of disposal of solid waste
26 Atmospheric Emissions(Flue gas characteristicsSPM, SO2, NOx, CO, etc.)
Sr.No
.
Pollutant Sourceof
Emission
Emissionrate
(kg/hr)
Concentrationin flue gas
(g/m3)
1 SPM
2 SO2
3 NOx
4 CO
5 Others
27 Stack emission Details:
(All the stacks attached to
process units, Boilers,
captive power plant, D.G.
Sets, Incinerator both for
existing and proposed
activity). Please indicate
the specific section to
which the stack is attached.
e.g.: Process section, D.G.
Set, Boiler, Power Plant,
incinerator etc. Emission
rate (kg/hr.) for each
pollutant (SPM, SO2, NOx
etc. should be specified
Plant
Section
& units
Stack
No.
Height
from
ground
level(m)
Internal
Diameter
(Top)(m)
Emission
Rate
Temp. of
Exhaust
Gases
1st
& soon
-
8/22/2019 Industrial Projects 090512
6/9
28 Emission Standard Pollutants
(SPM, SO2,etc)
Emission
StandardLimit
(mg/Nm3)
Proposed
Limit(mg/Nm3)
MPCB Consent
(mg/Nm3)
29 Ambient Air Quality Data Pollutant Permissible
Standard
Proposed
Concentration
(in
g/m3)
Remarks
SPM
RPM
SO2
NOx
CO
-
8/22/2019 Industrial Projects 090512
7/9
30 Details of Fuel to be used:
Sr.No
Fuel Daily Consumption(TPD/KLD)
Calorificvalue
(Kcals
/kg)
%Ash
%Sulph
ur
Existing Proposed
1 Gas
2 Naphtha
3 HSD
4 Fuel Oil
5 Coal
6 Lignite
7 Other(Pl.
specify)
Source of fuel:
Mode of transportation of fuel to site:
31 Energy Power supply:
Existing power requirement: Proposed power requirement:DG sets:
Number and capacity DG sets to be used (existing andproposed)
Details of the non-conventional renewable energy proposed to
be used :
32 Green Belt Development Green belt area (Sq. m.): Number and species of trees to be planted Number, size, age and species of trees to be cut, trees to be
transplanted
-
8/22/2019 Industrial Projects 090512
8/9
33 Details of Pollution
Control Systems:Sr.
No.
Existing
pollutioncontrol
system
Proposed to be
installed
1 Air
2 Water
3 Noise
4 Solid Waste
34 EnvironmentalManagement plan
Budgetary Allocation
Capital cost (With break up):
O&M cost (With break up):
Sr.No.
Recurring Costper annum
CapitalCost
1 Air Pollution Control
2 Water Pollution Control
3 Noise Pollution Control
4 Environment Monitoringand Management
5 Reclamation
borrow/mined area (Ifapplicable)
6 Occupational Health
7 Green Belt
8 Solid waste management
9 Others ( Pl. Specify)
Total
35 EIA Submitted (If yesthen submit the salient
features)
Period of data collected Details of the primary data collection (i.e. location of the
sample collection, number of visit, etc)
Details of the secondary data collection (i.e. Source and yearof data)
-
8/22/2019 Industrial Projects 090512
9/9
Potential hazard and mitigation measures Conclusion of the EIA study
36 Public hearing report (Ifpublic hearing conducted
then submit the salient
features)
Date of the public hearing Name of the news paper in which the advertisement appeared
(Please attach the copy)
Location of the public hearing Number of people attended the hearing Objection(s) / Suggestion(s) if any
37 Air pollution, water
pollution issues in the
project area, If any
38 . Storage of chemicals (inflammable/explosive/hazardous/toxic substances)
Sr.
No.
Name Number
ofStorages
Capacity
(TPD)
Physical and
ChemicalComposition
Consumption
(in TPD)
Maximum
Quantityof storage
at any
point of
time
Source
ofSupply
Means
oftransportation
Declaration
I hereby declare that no work has been initiated for the said project.
Date:
Place:
Name & Signature Name & Signature
of the project proponent of the consultant