INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO AI CAMBIAMENTI CLIMATICI DEI COMPARTI PRODUTTIVIModena, 22 Novembre 2019 Ing. Tommaso Musner
![Page 2: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/2.jpg)
Context analysis/ CLIMATE IS CHANGING AND WE EXPERIENCE IT
Esondazione fluviale 2014
Tromba d’aria 2014
![Page 3: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/3.jpg)
Context analysis / WHAT IS THE PERCEPTION OF COMPANIES?
Esondazione fluviale 2014
Tromba d’aria 2014
Ricerca C2ES (2012) basata sui dati del Carbon Disclosure Project
![Page 4: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/4.jpg)
Esondazione fluviale 2014
Tromba d’aria 2014
Research C2ES (2012) on data of the Carbon Disclosure Project
Context analysis / WHAT IS THE PERCEPTION OF COMPANIES?
![Page 5: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/5.jpg)
Esondazione fluviale 2014
Tromba d’aria 2014
Adapting for a Green Economy of WorldResources Institute (2012)
Context analysis / WHAT IS THE PERCEPTION OF COMPANIES?
![Page 6: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/6.jpg)
Risk analysis/ VULNERABILITY
PRECIPITAZIONI
ESTREMEHEAT WAVE ONDATA DI
FREDDO TROMBAD'ARIA
SICCITA’
Vvulnerabilità
rispetto a REPUTAZIONE
Vvivibilità spazi
pubblici
Vvulnerabilità
rispetto a STRUMENTI DI LAVORO,CONTINUITÀ DELL'ATTIVITÀ
STABILITÀ FINANZIARIASICUREZZA E SALUTE DEI LAVORATORI
INFRASTRUTTURE
![Page 7: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/7.jpg)
Climatic Events/ Effect on companies
Continuità del business Responsabilità legale Reputazione
Risposta del mercato Stabilità finanziariaSalute e sicurezza lavoratori
Infrastrutture
Integrità mezzi di
produzione
![Page 8: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/8.jpg)
Context Analysis/ BOMPORTO: PUBLIC SPACES
![Page 9: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/9.jpg)
Context Analysis/ BOMPORTO: PUBLIC SPACES
![Page 10: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/10.jpg)
Context Analysis/ BOMPORTO: Perceived risks
![Page 11: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/11.jpg)
Le mappe restituiscono il rischio percepito in funzione della collocazione della ditta e del processo produttivo
Context Analysis/ BOMPORTO: Perceived risks
![Page 12: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/12.jpg)
Adaptation Plan / BOMPORTO
Tot n.13 ACTIONS> training seminars / awarness-raising activites for industries> technical services for industries> urban rigeneration actions
10 YEARS OF ACTUATION [January 2017 – December 2026]
> 2017-2019: n.6 actions with a defined preliminary feasibility study
> from 2020: n.7 actions to plan/define/finance
PLAN AND MONITORING INDICATORS> of ‘actuation’> of ‘effectiveness’
Spatial limits> Bomporto industrial site
![Page 13: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/13.jpg)
01 - INFO POINT
> Dedicated technical office to answer the needs of Bomporto firms on climate adaptation measures
> Front office activites and organization of the initiatives scheduled in the Adaptation Plan;
> Unified portal for the activies addressed to local companies (info, training seminars, etc.)
![Page 14: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/14.jpg)
02 – TRAINING SEMINARS FOR LOCAL COMPANIES
CAP Modena and S.I.P.R.O. Ferrara with AESS
Organization of TRAINING SEMINARS and WORKSHOPS:> thematic meetings on different climate events and their impacts on industrial areas;> presentation of local companies that produce/install ad hoc technical solutions;> presentation of subventions, fundings, incentive bonuses or tax deductions
to contribute to private expenses.
Active with 2 seminars per year from 2017 in sinergy with the other seminars organized in Ferrara by S.I.P.R.O.
![Page 15: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/15.jpg)
02 – TRAINING SEMINARS FOR LOCAL COMPANIES
1^ meeting: 20th April 2017 in BomportoCool Materials> about 20 participants among firms and professionals
2^ meeting: 29th June 2017 in Ostellato• Regeneration with green
3^ meeting: 21st November 2017 in BomportoIntence precipitations and floods> about 40 participants among firms and professionals
4^ meeting: 18 th October in ModenaResilience and Adaptation in industry sector> participants among firms, professionals and other projects
![Page 16: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/16.jpg)
03 – CLIMATE AGENCY
CAP Modena by the headoffices of the industries in Bomporto
SERVICE OF EVALUATION OF BUSINESS VULNERABILITY to climate events :> technical assistance to underline critical situations / threats and to propose adaptation/mitigation measures;> gathering information and fill-in check-list with data on the company;> site visit to the company with 2 technicians/experts;> editing of a final report with the evaluation and intervention proposals.
Service active from December 2017 (8 companies interviewed)
![Page 17: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/17.jpg)
03 – CLIMATE AGENCY
1 Caratteristiche del capannone/degli spazi esterni
1 Sono disponibili dati di temperatura interna? NO 1
2Quanto vale l'indice wet bulbe globe temperature (WBGT, Norma UNI EN 27243:1996)?
Definire una scala/ valore soglia
3 Qual è l'uso del suolo delle superfici esposte al sole??Definire una scala/ valore soglia
4 Qual è l'orientamernto del sito produttivo?Definire una scala/ valore soglia
5Sono presenti superfici schermanti naturali (piante, siepi) o artificiali (teli ombreggianti, impianti solari termici)
NO 1
6 Sono presenti superfici riflettenti? NO 17 Sono presenti superfici con inerzia termica alta?? SI 18 Le superfici del fabbricato sono isolate?? SI 0
9Sono presenti altri edifici che schermano l'edificio dall'irraggiamento solare?
NO 1
10Sono presenti superfici vetrate di grandi dimensioni?(effetto serra)
SI 1
SITE VISIT AUDIT CHECKLIST REPORT
![Page 18: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/18.jpg)
Analysis of the company scale/ METHODOLOGICAL APPROACH
> Hot
Wave
> Cold
Wave
> Droughts and
Heavy Rains
➢ Whirl-
wind
AChoose the climatic event, you want to consider• Based on: events already occured, future scenarios in the industrial area
B
Collect information on the climatic event and on the company• Climatic event: Variability in space and time (mathematical models)
• Company: production process, sector, area covered by the plant, revenues, number of workers..
C
Build a model of the company• Create a conceptual model of the company and expose it to the effect of the event driven
by the climate change
• The model should be simple (verifiable) but representative of the company
• You can create in this way a specific checklist for each event to evaluate the company risk
D
Visit the company (field inspection)• Through the field inspection it is possible to identify risks and gives the opportunity to
choose a first set of adaptation measures
• The interview with the company owners let you check the representativeness of the cheklist
![Page 19: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/19.jpg)
Analysis of the company scale/ HEAVY RAINS
A
C
EXTERNAL STRUCTURE
• Maintenance of the drainage network notcontinuous
• The ground floor is positioned belo the averageground level or is exposed to floodings
• Acces to the company is protected/not protectedby gates or draining devices
• Presence of auxiliary electric generators in case of black-out
• Presence of non-return valves or accumulationtanks
• Presence of impermeable surfaces
Potential
criticalities
> Heavy Rains /
Droughts
![Page 20: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/20.jpg)
Analysis of the company scale/ HEAVY RAINS
INTERNAL STRUCTURE
• Position of the electrical devices and systems
• Presence of entry points (water entering from outside)
• Positioning of the machinery and of the goods
• Presence of basement spaces
• Access to the company in case of flooding: possible/impossible
A
C Potential
criticalities
> Heavy Rains /
Droughts
![Page 21: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/21.jpg)
Analysis of the company scale/ HEAVY RAINS
Fixed gates
Mobile gatesInflatable
gates
Transient storage
Non-return
valves
early-warning
systems
Sealing of
entry points
A
D Potential
criticalities
> Heavy Rains /
Droughts
![Page 22: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/22.jpg)
Valutazione del rischio aziendale / TEMI
![Page 23: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/23.jpg)
Valutazione del rischio aziendale / TEMI
![Page 24: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/24.jpg)
04 – EMERGENCY AND ALERT PLAN
CAP ModenA with Municipality of BomportoRegione Emilia-Romagna, ARPA and Protezione Civile (civil defence)
COORDINATION of information among the different alert plans managed by various territorial entities:> recollection of existing emergency systems and plans;> coordination of information among public entities and private companies;> update of municipality database to send alert messagges.
Started in December 2017 (gathering data from companies)
![Page 25: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/25.jpg)
04 – EMERGENCY AND ALERT PLAN
![Page 26: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/26.jpg)
Misure / SPAZI PUBBLICI
![Page 27: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/27.jpg)
06 – URBAN FORESTATION
07 – POCKET GARDEN
08 – PERMEABLE PAVING
09 – RAIN GARDENS
![Page 28: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/28.jpg)
06 – URBAN FORESTATION
Municipality of Bomporto with CAP Modena
PLANTING OF NEW TREES:> summer comfort / cooling;> directiong/channeling of summer breezes;> protection from dominant winds in winter.
Regenaretion of a green area in the Bomporto’s industrial site
![Page 29: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/29.jpg)
06 – URBAN FORESTATION
![Page 30: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/30.jpg)
07 – POCKET GARDENMunicipality of Bomporto with CAP Modena
TRANSFORMATION OF A BROWN FIELD IN VIA FERMO CORNI:> urban regeneration and cleaning of an unused area;> equipped/high quality area for the workers of the industrial site;> improvement of environmental comfort of the entire area;
> integration of the industrial site with the green corridor along the cavo Fiumicello
Because of its multifunctionality, the action as an ecosistemic approach.
Ongoing / preparation of the terrein carried on in collaboration with Municipality / commission for final design and working plan
![Page 31: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/31.jpg)
07 – POCKET GARDEN
![Page 32: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/32.jpg)
07 – POCKET GARDEN
![Page 33: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/33.jpg)
07 – POCKET GARDEN
![Page 34: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/34.jpg)
08 – PERMEABLE PAVINGS
Municipality of Bomporto with CAP Modena
DE-SEALING AND DE-PAVING ACTION:> improving soil permeability;> increase thermal comfort;> improvement of environmental comfort of the entire site.
From 2019 (according to technical-economical feasibility plan)
![Page 35: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/35.jpg)
08 – PERMEABLE PAVINGS
![Page 36: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/36.jpg)
09 – RAIN GARDENS
Municipality of Bomporto with CAP Modena
REALIZATION OF PLANTED DEPRESSIONS ALONG THE STREETS TO ABSORBE RAINWATER FROM ROOFS, DRIVEWAYS, WALKWAYS, PARKING LOTS:> reducing run-off filtering rainwater more slowly;> reducing water flow;> reducing floods in case of intense rainstorms.
From 2019 (according to technical-economical feasibility plan)
![Page 37: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/37.jpg)
09 – RAIN GARDENS
![Page 38: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/38.jpg)
10 – WATER BASIN
Municipality of Bomporto with CAP Modena
REALIZATION OF A BASIN FOR THE STORAGE, FILTERING/CLEANING AND/OR INFILTRATION OF RAINWATERS:> diminishing the water stream in the cavo Fiumicello during extreme rainfalls;> water storage in summer to be used for irrigation;> improvement of quality of water thanks to constructed wetlands;
From 2019 (according to technical-economical feasibility plan)
![Page 39: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/39.jpg)
10 – WATER BASIN
![Page 40: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/40.jpg)
11 – COOL MATERIALS
Private companies with public subsidy / tax bonus / funding
TAX REDUCTION FOR PRIVATE COMPANIES THAT REPLACE EXTERNAL SURFA WITH COOL MATERIALS WITH A HIGH SOLAR REFLEX INDEX:> ordinary maintainace of roofs/facedes;> limited costs but great benefits to contrast inner overheating;> diminishing the costs for summer cooling.
From 2019 (according to technical-economical feasibility plan)
![Page 41: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/41.jpg)
11 – COOL MATERIALS
![Page 42: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/42.jpg)
12 – PLANNING RULES AND REGULATIONS
Municipality of Bomporto with CAP Modena
UPDATE PLANNING TOOLS WITH THE INTEGRATION/IMPLEMENTATION OF OBJECTIVES AND RULES FOR MICRO-CLIMATIC AND ENVIRONMENTAL IMPROVEMNTS AND BIODIVERSITY CONSERVATION:> update PSC+RUE from 2015 (water-works study);> integrations measure to contrast heat/cold waves, whirlwinds or droughts.
From 2019 (according to technical-economical feasibility plan)
![Page 43: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/43.jpg)
13 – LED LIGHTS
Municipality of Bomporto with CAP Modena
REPLACEMENT OF LAMP POSTS WITH POLES USING LED TECHNOLOGY:> better light quality, longer duration and higher power;> more efficiency (‘smart poles’ and systems for the movement control)> integration with monitoring sensor
(consumptions, weather/climate data, pollution, wifi, etc..)
From 2019 (according to technical-economical feasibility plan)
![Page 44: INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO … · 1^ meeting: 20th April 2017 in Bomporto Cool Materials > about 20 participants among firms and professionals 2^ meeting:](https://reader034.vdocuments.us/reader034/viewer/2022051410/6032821fc575e515b11db5a2/html5/thumbnails/44.jpg)
Consorzio Attività Produttive Aree e ServiziStrada S. Anna n. 210 (c/o Palazzina SETA)41122 ModenaTel.: +39 059.454.608Fax: +39 059.312.109
E-mail: [email protected]: [email protected]: www.capmodena.it/fondi-ue-progetto-life