INDORE SMART CITY PROJECT
INDORE SMART CITY DEVELOPMENT LIMITED
ABD AREA• TOTAL AREA – 742 ACRE (1.1%)• POPULATION – 1.25 LACS (5%)• PROJECT COST – RS. 1400 CR.
SMART CITY INDORE
PAN CITY AREA
MASTER-PLAN BOUNDARY
PAN CITY AREA – 276 SQ.KM.• POPULATION – 25 LACS
• PROJECT COST – RS. 700 CR. FOR ICT SOLUTIONS
ABD AREA
TOTAL PROJECT COST – Rs. 5099 CR.
PAN CITY AREA
RETROFITTING ABD AREA
REDEVELOPMENT on PPP-mode
SMART CITY INDORE
REDEVELOPMENT AREA- 54 ACRESPROJECT COST – RS 2900 CR. PPP
ABD AREA
MAIN COMPONENTS
• CONSERVATION OF HERITAGE STRUCTURE
• RESTORATION OF CULTURAL HERITAGE
• ECONOMY & EMPLOYMENT
• IT CONNECTIVITY & IT ENABLED GOVT.
SERVICES
• TRANSPORTATION & WALKABILITY
• 24X7 WATER SUPPLY
• SEWERAGE LINE
• SOLID WASTE MANAGEMENT
• 24X7 ELECTRICITY WITH UNDERGROUND
CABLING
• ROADS WITH FOOTPATH
• PARKING
• RIVERFRONT DEVELOPMENT
• VENDOR MARKET
• SECURITY SYSTEM BY CCTV CAMERA
ABD AREA
REDEVELOPMENT AREA
SARAFA
ABD AREAURBAN FORM– PEDESTRIAN ZONE
RAJWADA AREA AND SURROUNDINGS TRANSFORMATION
ABD AREAURBAN FORM– NO VEHICLE ZONE & PLAZARAJWADA AND SURROUNDINGS TRANSFORMATION
RAJWADA
BEFORE
AFTER
BEFORE
AFTER
SMART CITY INDORE
BEFORE
REDEVELOPMENT AREA
ON TOD PRINCIPLEMOG LINE AREA – 56.5 ACRES
BEFORE
AFTER
MOG LINE AREA –ON PPP
RIVERFRONT DEVELOPMENT
LENGTH - 3.9 KM
BEFORE
AFTER
SMART CITY INDORE
BEFORE
AFTER
RIVER DEVELOPMENT
MAJOR SMART ROADS IN ABD AREA
11 key roads of length 10.7 km.
Project cost – Rs.135 Crores
Cement concrete pavement (ROW 12 -30MT.)
RCC duct for electrical cables and RCC pipes for OFC on both sides of the
road
RCC median with central LED smart lighting
MAJOR ROADS IN ABD AREA
EARLIER SCENARIO SITE PREPARATION WORK NEAR COMPLETION
Typical section of the road showing all the utility services
MAJOR ROADS IN ABD AREA
CENTRAL DIVIDER WITH SMART
STREET LIGHTING
SHIFTING OF RELIGIOUS
STRUCTURESRCC DUCTS FOR UNDERGROUND
CABLING
ROAD CONSTRUCTION IN
PROGRESS
NMV ROUTE LENGTH : 2.3 KM
TOTAL PROPOSED MLP : 14
REQUIRED PARKING (CARS ) : 1000
PROPOSED PARKING (CARS ) : 1100
REQUIRED PARKING (2-WHEELER ) : 3000
PROPOSED PARKING (2-WHEELER) : 3500
NMV ZONE & MULTI LEVEL PARKING
NMV ROUTE
MLP
STREET TRANSFORMATION & FAÇADE REDEVELOPMENT
HERITAGE WALK
3. Ghat
Present 6.0 M. wide bridge constructed in
year 1901.
To ease traffic congestion, 24.0 M. wide
high level bridge being constructed.
Project cost Rs. 5.026 Crore
Project completion period - 11 Months
CONSTRUCTION OF CHANDRABHAGA BRIDGE
WORK IN PROGRESS
EXISTING PROPOSED
RIVERFRONT DEVELOPMENT
No. Phase / SectionEst. Cost
(Rs. Crore)Remarks
1 Phase 1 / Section 1: Subhash Marg Bridge to MG Road Bridge 4.0 LOA Issued.
2 Phase 1 / Section 2: MG Road Bridge to Jawahar Marg Bridge 23.0 RFP Finalized
3 Phase 1 / Section 3: Jawahar Marg Bridge to Chandrabhaga Bridge 17.5RFP Issued on
27th May.
4 Phase 1 / Section 4: Chandrabhaga Bridge to Harsiddhi Bridge 4.5Work in
progress
5Phase 2 : Harsiddhi Bridge,Gangour bridge, jairam bridge, Lalbagh
bridge29.0
DPR under preparation
RIVERFRONT DEVELOPMENT
Length of the river from subhash
marg bridge to lalbagh bridge is
approx 3.9 km.
Total project cost –78.0 Cr.
River width varies
from 15m to 46 m
Total 11 bridges ( 9
vehicular & 2
Pedestrian
RIVERFRONT DEVELOPMENT
TRANSFORMATION OF RIVERFRONTWORK IN PROGRESS
PROPOSED VIEW
SECTION
RIVERFRONT DEVELOPMENT
• Park near Krishnapura Chhatri: 4000 sqm.
• Redevelopment of vegetable & fruit market (230 hawker shops & 135 fruit shops)
• Underground parking for 250 4-Wheeler & 800 2-Wheeler
BUILT HERITAGE
Scientific Conservation
Adaptive Re-use
Comprehensive Approach
Built Heritage projects under Smart City
Conservation
of Chhatri Bagh
Conservation
of Rajwada
Conservation of
Gopal Mandir
Preservation of cultural and historical
values with promotion of Tourism
1 – CHHATRI BAGH (WORK IN PROGRESS)
Conservation Of Chhatris
Conservation Of Kund
Landscaping
Monument Lighting
Parking And Toilets
TOTAL PROJECT COST INR 4.43 CR.
DURATION 15 MONTHS
EAST SIDE ELEVATION
RFP ISSUED ON
29th MAY 2017
2 – RAJWADA
Reconstruction Of North Building
Restoration Of Front Façade
Renovation Of Darbar Hall Restoration Of Woodwork
Restoration Of Outer Wall
Redeveloping Peripheral Platform
EST. COST –
INR 20.0 CRORE
3-GOPAL MANDIR
Est. Cost – Rs. 15 Crore (Phase 1)
RFP Issued on 9th May 2017.
Conservation Restoration Adaptive Reuse
SITE LOCATION
BLOCK C:
PERFORMANCE
PLACE
BLOCK B:
ARTS & CRAFTS
PROMOTION
PLACE
BLOCK A:
TEMPLE
BLOCK
BLOCK D:
SHOPS &
OFFICES
SITE PLAN
3-GOPAL MANDIR
PROPOSED FOOD COURT AT B BLOCK
PROPOSED AMPHITHEATRE AT C-BLOCK
SHOPPING COMPLEX FOR REHABILITATION OF EXISTING SHOPS
FRONT FAÇADE OF THE TEMPLE COMPLEX
SITE PLAN
JINSI HAAT VENDORS’ MARKET
Inclusive Development
Project Cost – Rs.9.12 Cr
Organic Waste Converter Unit
Skill Development Centre
Development Of Road, Parking And Footpath
Total no. of shops - 510
JINSI HAAT VENDORS’ MARKET
WORK IN PROGRESS
TRANSFORMATION OF HAAT SPACE
Total Land Area for Redevelopment23 hectares /
56.5 acres
FAR (incl incentive for
rehabilitation /compensation)3.00
Total Built-up Area 6,30,000 sqm
Residential Built-up Area @ 70% 4,41,000 sqm
Commercial Built-up Area @ 20% 1,26,000 sqm
Institutional Built-up Area @ 10% 63,000 sqm
REDEVELOPMENT: MOG LINES AREA
4 pockets is spread over
56.5 acres.
Mix Land use, TOD, High density, Smart features
Compensatory Housing.
DPR prepared for 1st Land Parcel.
Transfer of land to SPV in process
HARDWARE AND NETWORK SETUP
AND INSTALLATION.
SMART SOLUTION APPLICATION
WITH ALL MODULES.
MODULE DESIGN / COURSE
CONTENTPROGRAM DEVELOPMENT
SOFTWARE INSTALLATION
DEPLOYMENT AND TRAINING.
SMART EDUCATIONSCOPE OF WORK INCLUDES:
Five bids were received and opened on 20th June 2017.
· Technical presentation scheduled for 28 June.
· Financial Bid opening 05 July.
· Award of contract by 12 July .
Rationalization of schools in proportion to the strength of students
Construction Of Additional Classrooms
Construction Of Toilet Block
Electrical Works
Construction Of New Compound Wall
Development Of Playground
Miscellaneous Repair Works, Drainage
System.
SC
OP
E O
F W
OR
K:
INFRASTRUCTURAL DEVELOPMENT OF GOVERNMENT SCHOOLS(ABD AREA)
PO
OR
CO
ND
ITIO
NW
OR
K IN
PR
OG
RESS
SMART HEALTH (ATM)
ACTION ITEM STATUS
Assessment of AS-IS situation
completed
Workshop on smart health
completed
Feasibilitystudy
completed
POC to be establish
Last week ofJune by Dell &
Yolo Health.
SMART POLE (PPP)
500 Smart poles of height (12 M. to 15 M)
with Mobile Micro Towers, Wi-Fi Access
Points, Surveillance Camera, Digital
Billboard, Environmental Sensor etc.
500 km OFC with 4 core for ISCDL.
Integration with Central Control &
Command Centre.
O & M of the complete system for 15 years,
at no cost to ISCDL.
RFP in June last week (2nd call)
INSTALLATION AND O & M OF LED LIGHTS IN PAN-CITY
ISCDL shall give an annual grant per LED fixture as a part contribution towards
CAPEX and OPEX.
Install / Replace 70,000 streetlights in Indore City
Design and supply of energy efficient luminaire with Smart
control including poles, cabling, control panel etc.
Design of Web-based System for complete control over the
streetlights to monitor their operations such as Scheduling, Dimming
Operation and maintenance of the complete system for 7 years.
SMART PBS INDORE (PUBLIC BICYCLE SHARING)
• Planning and installation
of Cycles and Stations
• Central Control System
• Redistribution System
• Depots / Workshops for
maintenance
• Registration of Users
• Fare Collection System
• User Information System
• Advertisement Space
• Marketing and User
Education
CAPEX and OPEX Model with financial
support.
1000 cycles - 100 stations.
Contract Period of 5 +2 years, granted
for the installation and operation of
the Indore Cycle Sharing System
SC
OP
E O
F W
OR
K
RFP ISSUED ON 21ST JUNE 2017
RFID Tag on
Vehicle
Data Server
GPS-BASED VEHICLE TRACKING & MONITORING SYSTEM
GPS devices installed over 700
vehicles of IMC .
Configuration of cloud based
vehicle tracking system
completed.
Surveillance CCTV Cameras
installed at Landfill site and PT/ CT.
INTEGRATED SOLID WASTE MANAGEMENT SYSTEM
The objective of ISWM project is to introduce analytical tools for automated decision
making to help in effective monitoring of solid waste management operations.
The project will be implemented in 6 months and the Contractor will provide
O & M Services for 3 years.
SWM TRANSFER STATIONS WITH PORTABLE COMPACTORS
Cylindrical Design prevents
corrosion and Hydraulic
Mounted Compactors
Technology
Capacity – 16/20 CuM.
Efficiency
Transfer Station at Sirpur
Transfer Station at Sanwer Road
Transfer Station at Kabit Khedi
INDORE 311
CITIZEN REGISTRATION
COMPLAINT CREATION
COMPLAINT SUBMISSION
COMPLAINT SUBMISSION
COMPLAINTNOTIFICATION
COMPLAINT NOTIFICATION
COMPLAINT
RESOLUTION
COMPLAINT
RESOLUTION
311 Is the APP made for people of Indore to log their complain, to track about the project, traffic information, field inspection etc.
SOLAR POWER
As per Smart City Mission Guideline, to meet 10% of
Indore’s power demand (35 MW) through Solar Power.
ISCDL signed MoU with SECI in August 2016. SECI official visited Indore in March 2017.
ISCDL has identified land areas and roof –tops over
government schools and parking buildings for solar
panel installations.
Sites has been finalised for installation
ISCDL is in discussion with MP Urja Vikas Nigam Ltd. M/s
Mundra Solar Pvt. Ltd. (for 50 KW+)/M/s Ujaas Energy
Ltd. (for < 50 KW) have been selected to assess
suitability of sites.2 MW Solar Power Plant at
Sewerage Treatment Plant, Indore
Cost of Plant -Rs.12Cr. Expected Power Generation
Approx.- 500 Units/hr
MUNICIPAL BONDS
Indore would be one of the earliest Smart cities to issue
Municipal Bonds
Tranche 1: Issue Size- INR 250 Crores
for funding specific Projects
Bond rating by CARE and Brickwork
Expected date of Issue - End of June 2017
Plan for TraNCHE ii Municipal Bonds in Jan 2019