indore smart city development limited - taiwan … · urban form –no vehicle zone ... module...

37
INDORE SMART CITY PROJECT INDORE SMART CITY DEVELOPMENT LIMITED

Upload: vantruc

Post on 05-May-2018

239 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

INDORE SMART CITY PROJECT

INDORE SMART CITY DEVELOPMENT LIMITED

Page 2: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

ABD AREA• TOTAL AREA – 742 ACRE (1.1%)• POPULATION – 1.25 LACS (5%)• PROJECT COST – RS. 1400 CR.

SMART CITY INDORE

PAN CITY AREA

MASTER-PLAN BOUNDARY

PAN CITY AREA – 276 SQ.KM.• POPULATION – 25 LACS

• PROJECT COST – RS. 700 CR. FOR ICT SOLUTIONS

ABD AREA

TOTAL PROJECT COST – Rs. 5099 CR.

PAN CITY AREA

RETROFITTING ABD AREA

REDEVELOPMENT on PPP-mode

Page 3: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SMART CITY INDORE

REDEVELOPMENT AREA- 54 ACRESPROJECT COST – RS 2900 CR. PPP

ABD AREA

MAIN COMPONENTS

• CONSERVATION OF HERITAGE STRUCTURE

• RESTORATION OF CULTURAL HERITAGE

• ECONOMY & EMPLOYMENT

• IT CONNECTIVITY & IT ENABLED GOVT.

SERVICES

• TRANSPORTATION & WALKABILITY

• 24X7 WATER SUPPLY

• SEWERAGE LINE

• SOLID WASTE MANAGEMENT

• 24X7 ELECTRICITY WITH UNDERGROUND

CABLING

• ROADS WITH FOOTPATH

• PARKING

• RIVERFRONT DEVELOPMENT

• VENDOR MARKET

• SECURITY SYSTEM BY CCTV CAMERA

ABD AREA

REDEVELOPMENT AREA

Page 4: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SARAFA

ABD AREAURBAN FORM– PEDESTRIAN ZONE

RAJWADA AREA AND SURROUNDINGS TRANSFORMATION

ABD AREAURBAN FORM– NO VEHICLE ZONE & PLAZARAJWADA AND SURROUNDINGS TRANSFORMATION

RAJWADA

BEFORE

AFTER

BEFORE

AFTER

SMART CITY INDORE

BEFORE

Page 5: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

REDEVELOPMENT AREA

ON TOD PRINCIPLEMOG LINE AREA – 56.5 ACRES

BEFORE

AFTER

MOG LINE AREA –ON PPP

RIVERFRONT DEVELOPMENT

LENGTH - 3.9 KM

BEFORE

AFTER

SMART CITY INDORE

BEFORE

AFTER

RIVER DEVELOPMENT

Page 6: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

MAJOR SMART ROADS IN ABD AREA

11 key roads of length 10.7 km.

Project cost – Rs.135 Crores

Cement concrete pavement (ROW 12 -30MT.)

RCC duct for electrical cables and RCC pipes for OFC on both sides of the

road

RCC median with central LED smart lighting

Page 7: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

MAJOR ROADS IN ABD AREA

EARLIER SCENARIO SITE PREPARATION WORK NEAR COMPLETION

Typical section of the road showing all the utility services

Page 8: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

MAJOR ROADS IN ABD AREA

CENTRAL DIVIDER WITH SMART

STREET LIGHTING

SHIFTING OF RELIGIOUS

STRUCTURESRCC DUCTS FOR UNDERGROUND

CABLING

ROAD CONSTRUCTION IN

PROGRESS

Page 9: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

NMV ROUTE LENGTH : 2.3 KM

TOTAL PROPOSED MLP : 14

REQUIRED PARKING (CARS ) : 1000

PROPOSED PARKING (CARS ) : 1100

REQUIRED PARKING (2-WHEELER ) : 3000

PROPOSED PARKING (2-WHEELER) : 3500

NMV ZONE & MULTI LEVEL PARKING

NMV ROUTE

MLP

Page 10: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

STREET TRANSFORMATION & FAÇADE REDEVELOPMENT

Page 11: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

HERITAGE WALK

3. Ghat

Page 12: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

Present 6.0 M. wide bridge constructed in

year 1901.

To ease traffic congestion, 24.0 M. wide

high level bridge being constructed.

Project cost Rs. 5.026 Crore

Project completion period - 11 Months

CONSTRUCTION OF CHANDRABHAGA BRIDGE

WORK IN PROGRESS

EXISTING PROPOSED

Page 13: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

RIVERFRONT DEVELOPMENT

Page 14: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

No. Phase / SectionEst. Cost

(Rs. Crore)Remarks

1 Phase 1 / Section 1: Subhash Marg Bridge to MG Road Bridge 4.0 LOA Issued.

2 Phase 1 / Section 2: MG Road Bridge to Jawahar Marg Bridge 23.0 RFP Finalized

3 Phase 1 / Section 3: Jawahar Marg Bridge to Chandrabhaga Bridge 17.5RFP Issued on

27th May.

4 Phase 1 / Section 4: Chandrabhaga Bridge to Harsiddhi Bridge 4.5Work in

progress

5Phase 2 : Harsiddhi Bridge,Gangour bridge, jairam bridge, Lalbagh

bridge29.0

DPR under preparation

RIVERFRONT DEVELOPMENT

Length of the river from subhash

marg bridge to lalbagh bridge is

approx 3.9 km.

Total project cost –78.0 Cr.

River width varies

from 15m to 46 m

Total 11 bridges ( 9

vehicular & 2

Pedestrian

Page 15: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

RIVERFRONT DEVELOPMENT

TRANSFORMATION OF RIVERFRONTWORK IN PROGRESS

Page 16: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

PROPOSED VIEW

SECTION

RIVERFRONT DEVELOPMENT

• Park near Krishnapura Chhatri: 4000 sqm.

• Redevelopment of vegetable & fruit market (230 hawker shops & 135 fruit shops)

• Underground parking for 250 4-Wheeler & 800 2-Wheeler

Page 17: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

BUILT HERITAGE

Scientific Conservation

Adaptive Re-use

Comprehensive Approach

Built Heritage projects under Smart City

Conservation

of Chhatri Bagh

Conservation

of Rajwada

Conservation of

Gopal Mandir

Preservation of cultural and historical

values with promotion of Tourism

Page 18: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

1 – CHHATRI BAGH (WORK IN PROGRESS)

Conservation Of Chhatris

Conservation Of Kund

Landscaping

Monument Lighting

Parking And Toilets

TOTAL PROJECT COST INR 4.43 CR.

DURATION 15 MONTHS

Page 19: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

EAST SIDE ELEVATION

RFP ISSUED ON

29th MAY 2017

2 – RAJWADA

Reconstruction Of North Building

Restoration Of Front Façade

Renovation Of Darbar Hall Restoration Of Woodwork

Restoration Of Outer Wall

Redeveloping Peripheral Platform

EST. COST –

INR 20.0 CRORE

Page 20: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

3-GOPAL MANDIR

Est. Cost – Rs. 15 Crore (Phase 1)

RFP Issued on 9th May 2017.

Conservation Restoration Adaptive Reuse

SITE LOCATION

BLOCK C:

PERFORMANCE

PLACE

BLOCK B:

ARTS & CRAFTS

PROMOTION

PLACE

BLOCK A:

TEMPLE

BLOCK

BLOCK D:

SHOPS &

OFFICES

SITE PLAN

Page 21: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

3-GOPAL MANDIR

PROPOSED FOOD COURT AT B BLOCK

PROPOSED AMPHITHEATRE AT C-BLOCK

SHOPPING COMPLEX FOR REHABILITATION OF EXISTING SHOPS

FRONT FAÇADE OF THE TEMPLE COMPLEX

Page 22: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SITE PLAN

JINSI HAAT VENDORS’ MARKET

Inclusive Development

Project Cost – Rs.9.12 Cr

Organic Waste Converter Unit

Skill Development Centre

Development Of Road, Parking And Footpath

Total no. of shops - 510

Page 23: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

JINSI HAAT VENDORS’ MARKET

WORK IN PROGRESS

TRANSFORMATION OF HAAT SPACE

Page 24: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

Total Land Area for Redevelopment23 hectares /

56.5 acres

FAR (incl incentive for

rehabilitation /compensation)3.00

Total Built-up Area 6,30,000 sqm

Residential Built-up Area @ 70% 4,41,000 sqm

Commercial Built-up Area @ 20% 1,26,000 sqm

Institutional Built-up Area @ 10% 63,000 sqm

REDEVELOPMENT: MOG LINES AREA

4 pockets is spread over

56.5 acres.

Mix Land use, TOD, High density, Smart features

Compensatory Housing.

DPR prepared for 1st Land Parcel.

Transfer of land to SPV in process

Page 25: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

HARDWARE AND NETWORK SETUP

AND INSTALLATION.

SMART SOLUTION APPLICATION

WITH ALL MODULES.

MODULE DESIGN / COURSE

CONTENTPROGRAM DEVELOPMENT

SOFTWARE INSTALLATION

DEPLOYMENT AND TRAINING.

SMART EDUCATIONSCOPE OF WORK INCLUDES:

Five bids were received and opened on 20th June 2017.

· Technical presentation scheduled for 28 June.

· Financial Bid opening 05 July.

· Award of contract by 12 July .

Page 26: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

Rationalization of schools in proportion to the strength of students

Construction Of Additional Classrooms

Construction Of Toilet Block

Electrical Works

Construction Of New Compound Wall

Development Of Playground

Miscellaneous Repair Works, Drainage

System.

SC

OP

E O

F W

OR

K:

INFRASTRUCTURAL DEVELOPMENT OF GOVERNMENT SCHOOLS(ABD AREA)

PO

OR

CO

ND

ITIO

NW

OR

K IN

PR

OG

RESS

Page 27: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SMART HEALTH (ATM)

ACTION ITEM STATUS

Assessment of AS-IS situation

completed

Workshop on smart health

completed

Feasibilitystudy

completed

POC to be establish

Last week ofJune by Dell &

Yolo Health.

Page 28: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SMART POLE (PPP)

500 Smart poles of height (12 M. to 15 M)

with Mobile Micro Towers, Wi-Fi Access

Points, Surveillance Camera, Digital

Billboard, Environmental Sensor etc.

500 km OFC with 4 core for ISCDL.

Integration with Central Control &

Command Centre.

O & M of the complete system for 15 years,

at no cost to ISCDL.

RFP in June last week (2nd call)

Page 29: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

INSTALLATION AND O & M OF LED LIGHTS IN PAN-CITY

ISCDL shall give an annual grant per LED fixture as a part contribution towards

CAPEX and OPEX.

Install / Replace 70,000 streetlights in Indore City

Design and supply of energy efficient luminaire with Smart

control including poles, cabling, control panel etc.

Design of Web-based System for complete control over the

streetlights to monitor their operations such as Scheduling, Dimming

Operation and maintenance of the complete system for 7 years.

Page 30: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SMART PBS INDORE (PUBLIC BICYCLE SHARING)

• Planning and installation

of Cycles and Stations

• Central Control System

• Redistribution System

• Depots / Workshops for

maintenance

• Registration of Users

• Fare Collection System

• User Information System

• Advertisement Space

• Marketing and User

Education

CAPEX and OPEX Model with financial

support.

1000 cycles - 100 stations.

Contract Period of 5 +2 years, granted

for the installation and operation of

the Indore Cycle Sharing System

SC

OP

E O

F W

OR

K

RFP ISSUED ON 21ST JUNE 2017

Page 31: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

RFID Tag on

Vehicle

Data Server

GPS-BASED VEHICLE TRACKING & MONITORING SYSTEM

GPS devices installed over 700

vehicles of IMC .

Configuration of cloud based

vehicle tracking system

completed.

Surveillance CCTV Cameras

installed at Landfill site and PT/ CT.

Page 32: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

INTEGRATED SOLID WASTE MANAGEMENT SYSTEM

The objective of ISWM project is to introduce analytical tools for automated decision

making to help in effective monitoring of solid waste management operations.

The project will be implemented in 6 months and the Contractor will provide

O & M Services for 3 years.

Page 33: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SWM TRANSFER STATIONS WITH PORTABLE COMPACTORS

Cylindrical Design prevents

corrosion and Hydraulic

Mounted Compactors

Technology

Capacity – 16/20 CuM.

Efficiency

Transfer Station at Sirpur

Transfer Station at Sanwer Road

Transfer Station at Kabit Khedi

Page 34: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

INDORE 311

CITIZEN REGISTRATION

COMPLAINT CREATION

COMPLAINT SUBMISSION

COMPLAINT SUBMISSION

COMPLAINTNOTIFICATION

COMPLAINT NOTIFICATION

COMPLAINT

RESOLUTION

COMPLAINT

RESOLUTION

311 Is the APP made for people of Indore to log their complain, to track about the project, traffic information, field inspection etc.

Page 35: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

SOLAR POWER

As per Smart City Mission Guideline, to meet 10% of

Indore’s power demand (35 MW) through Solar Power.

ISCDL signed MoU with SECI in August 2016. SECI official visited Indore in March 2017.

ISCDL has identified land areas and roof –tops over

government schools and parking buildings for solar

panel installations.

Sites has been finalised for installation

ISCDL is in discussion with MP Urja Vikas Nigam Ltd. M/s

Mundra Solar Pvt. Ltd. (for 50 KW+)/M/s Ujaas Energy

Ltd. (for < 50 KW) have been selected to assess

suitability of sites.2 MW Solar Power Plant at

Sewerage Treatment Plant, Indore

Cost of Plant -Rs.12Cr. Expected Power Generation

Approx.- 500 Units/hr

Page 36: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training

MUNICIPAL BONDS

Indore would be one of the earliest Smart cities to issue

Municipal Bonds

Tranche 1: Issue Size- INR 250 Crores

for funding specific Projects

Bond rating by CARE and Brickwork

Expected date of Issue - End of June 2017

Plan for TraNCHE ii Municipal Bonds in Jan 2019

Page 37: INDORE SMART CITY DEVELOPMENT LIMITED - Taiwan … · urban form –no vehicle zone ... module design / course content program development software installation deployment and training