Page 1: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

Indoor Hardware

Quality Standard

Prepared By QC Department

Page 2: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 2

Content

Rack & Cabinet

Power & Grounding Cables

Fibers

Signal Cables

Labels

Example Inspection Report

Page 3: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 3

Rack & Cabinet

Page 4: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 4

Cabinet Type

Page 5: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 5

Cabinet Type

Page 6: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 6

Indoor Environment

Rack & Cabinet

Page 7: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 7

Cabinet Fixation on Cement Floor

Rack & Cabinet

4. Insulating Plate

Baut Expansi harus terinstall

dengan baik

Page 8: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 8

Cabinet Fixation on Antistatic Floor

Rack & Cabinet

Page 9: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 9

Cabinet Fixation

Rack & Cabinet

Cabinet yang berdampingan

harus sejajar dan lurus

sehingga terlihat rapi.

Cabinet yang mempunyai tinggi

yang sama harus sejajar dan

lurus.

Tidak boleh ada goresan atau

kerusakan pada cabinet, jika

terdapat kerusakan pada cat

maka harus dilakukan

pengecatan ulang.

Kesalahan pada ketinggian

Cabinet harus kurang dari

3 mm.

Kesalahan jarak antar rack

cabinet harus kurang dari 5 mm.

Page 10: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 10

Inlet/Outlet

Rack & Cabinet

All of the inlet/outlet cable holes of the cabinet should be blocked out.

Antistatic Wrist strap harus dalam keadaan terpasang di lubang instalasi antistatic pada rack.

Page 11: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 11

Power & Grounding Cables

Page 12: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 12

Power & Grounding Cables

Connection

Kabel Power dan Grounding harus terkoneksi dengan benar dan kuat.

Tidak boleh ada kawat tembaga yang terbuka pada koneksi kabel power dan Grounding.

Page 13: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 13

Power & Grounding Cables

Connection

Semua jenis perangkat

dengan keseluruhan atau

sebagian dari metal pada

rack dan chassis

harus dihubungkan ke

protection ground dengan

benar dan relative kuat.

Koneksi Protection

Ground (PGND) dari 1

cabinet ke Busbar

Customer di-standardkan

1 (satu) tarikan kabel

seperti ditunjukkan pada

gambar disamping.

Cabinet

PGND BAR

Page 14: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 14

Power & Grounding Cables

Connection

Koneksi Grounding cabinet doors harus

terkoneksi dengan benar dan kuat.

Grounding protection pada AC dan DC power

supply harus dikoneksikan pada grounding

bar. GND dan PGND harus dikoneksikan

pada grounding body yang sama.

Page 15: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 15

Power & Grounding Cables

Routing & Distribution

Routing Kabel Power dan Ground

harus dilakukan dengan lurus

tanpa bending dan silang serta

diikat dengan kabel Ties

Bila jarak antara Cable Ladder dengan

bagian atas cabinet lebih dari 80 cm, harus

ditambahkan Cable Ladder dengan

menggunakan support yang kuat

Page 16: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 16

Power & Grounding Cables

Contoh yang salah (signal cable

dan power cable di ikat

bersamaan)

Contoh yang benar (signal cable dan power cable

di beri jarak 3cm)

Note: Untuk instalasi indoor gunakan tie wrap warna putih. Potong ujung sisa sampai habis.

Routing & Distribution

Page 17: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 17

Power & Grounding Cables

When making lugs for the power and ground cables, the lugs should be soldered or crimped firmly.

No Copper Wire naked

(Good Example)

1 2

3

Page 18: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 18

Dua alasan utama untuk Instalasi Grounding system pada site

(2 Main clause for install grounding system at Site)

Power & Grounding Cables

1. Untuk mengurangi resiko cedera akibat petir

For decrease risk injury from thunderbolt

2. Untuk memproteksi peralatan pada OptiX yang disebabkan karena tegangan tinggi dan arus yang besar yang disebabkan oleh petir

For protect equipment of OptiX causes High voltage and high current from thunderbolt

Page 19: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 19

Fibers

Page 20: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 20

Distribusi Fibers Kabel tidak cross/menghalangi board sehingga dapat menyulitkan pada saat expand

modul. Label di tempatkan sejajar/rapih

Common

Fibers

Page 21: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 21

Apabila terdapat coil box, fiber

cable dapat digulung dengan rapih

di coil box

Distribusi fiber kabel harus menggunakan protection tube apabila di

distribusikan ke luar kabinet

Pada ujung protection tube untuk fiber diberikan insulating tape untuk

mencegah gesekan yang tajam pada Fiber Cable.

Panjang protection tube yang masuk kedalam cabinet tidak lebih dari 10

cm dan diikat dengan kuat.

Common

Fibers

Page 22: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 22

Common

The connection point of tail fiber must be clean without any dust.

The unused optical fiber head and board optical port must be

covered with protection caps (plugs).

Fibers

Page 23: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 23

Signal Cables

Page 24: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 24

Routing Subscriber cables must be tidy

Jalur / rute kabel Signal / Kabel E1 harus rapi

Signal Cables

Routing & Distribution

Page 25: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 25

Distribution signal cable on DDF

Distribusi signal tidak rapih

Distribusi signal rapih, di

buat spare secukupnya,

hasil pemotongan ujung

kabel di isolasi/ditutup

Signal cable disusun sejajar (tidak saling

cross), dengan label yang jelas

Signal Cables

Routing & Distribution

Page 26: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 26

Labels

Page 27: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 27

Labels

Labels of Cabinet

LABELS SUB RACK LABELS RACK

Page 28: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 28

Labels

Labels of Power Cables & Ground

General use Label Ties for Power Cables

• Power cable menggunakan label ties.

• Diletakan 2 cm setelah konektor.

• Di Print, bukan tulis tangan.

Horizontal position

Vertical Position

Page 29: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 29

Labels

Labels of Power Cables & Ground

The label of power cables are filled in and pasted correctly and reliably.

(Stick cable label at cabinet, power supply and grounding bar: for easy

Identification )

Explanation to the label example:

The contents of the label on the load cabinet side is “A01/B08- –48V2 ”, indicating that this

power cable is the –48V2 that comes from 8th connecting terminal on the second row of –

48V bus bar in the power distribution box, which is located in row A and line 01.

The contents of the label on the power distribution cabinet side is “B03- –48V2 ”,

indicating that this power cable is the –48V2 that comes from the load cabinet, which is

located in row B and line 03.

Page 30: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 30

Labels

Labels of Power Cables & Ground

The label of power cables are filled in and pasted correctly and reliably.

(Stick cable label at cabinet, power supply and grounding bar: for easy

Identification )

Page 31: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 31

Labels

Labels of Signal Cables

• Pada label diatas “A01-03-01-01” meng-indikasikan bahwa ujung pangkal dari kabel dikoneksikan

dengan Terminal 01 pada Slot 01, Subrack 03 dari kabinet pada Baris A dan Kolom 01.

• Sedangkan pada “MDF-G01-01-01” meng-indikasikan bahwa ujung sisi yang lain dari kabel

dikoneksikan dengan Terminal pada Baris 01, Kolom 01 dari MDF pada Baris G dan Kolom 01.

Labels for Cable Posisi Pemasangan Label

General Labels for Signal Cables

Page 32: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 32

Labels of Subscribers Cables

Labels

• Label untuk Kabel Subcribers dipasang diujung kabel disisi Konektor Equipment MA5605 (Access)

dan diujung kabel disisi Main Distribution Frame (MDF).

• Untuk Labels di MDF, cukup jelas.

Page 33: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 33

MUST BE USE LABELS INFORMATION

Labels of Subscribers Cables

Labels

Page 34: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 34

Labels

Labels of E1 Cables

LABELS NEAR DDF

Page 35: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 35

Labels

Labels of E1 Cables

MUST BE USE LABELS INFORMATION

Page 36: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 36

Labels

Labels of DDF

LABELS ON DDF LABELS ON DDF

Page 37: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 37

Labels

• Pada label diatas “A01-01-05-05-R” meng-indikasikan bahwa ujung pangkal dari Optical Fiber

dikoneksikan dengan Interface Penerima (Receiving) Optical 05 pada Slot 05, Frame 01 dari Kabinet

pada Baris A, Kolom 01.

• Sedangkan pada “G01-01-01-01-T” meng-indikasikan bahwa ujung sisi yang lain dari Optical Fiber di

koneksikan dengan Interface Pengirim (Transmitting) Optical 01 pada Slot 01, Frame 01 dari Kabinet

pada Baris G, Kolom 01.

Labels for Cable Posisi Pemasangan Label

Labels of Fibers

General Labels for Optical Fibers

Page 38: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 38

Labels

Labels of Fibers

The label of Fibers are filled in and pasted correctly and reliably.

Page 39: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 39

Labels

Labels of Fibers

The label of Fibers are filled in and pasted correctly and reliably.

Page 40: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 40

Labels

Labels on Alarm Box

The label of Fibers are filled in and pasted correctly and reliably.

Page 41: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 41

Examples Hardware

Quality Inspection Report

Page 42: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 42

No. Check Content Suggestion for Modification Subcontractor

1

The labels of rack not yet attached.

Problem Analysis:

Installation Team still not yet attached

The labels of rack shall be placed neat and clean

-

Clause List

Labels

Location

Cabinet

Status

OPEN

QAM

7

Batch

2

Defect Quantity

2

Appraisal

Code 7.1.011

Score 0.2

Sample

Examples Hardware Quality Inspection Report

Page 43: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 43

No. Check Content Suggestion for Modification Subcontractor

2

Some materials and redundant cable ties still exist

inside cabinet and on the top of the subrack.

Problem Analysis:

Installation Team still not recheck after finish

installation

The sundries of redundant cable ties and screws and

other things must not exist inside, or at the bottom, or

on the top of the rack.

-

Clause List

Rack & Cabinet

Location

Inside Cabinet

Status

CLOSED

QAM

1

Batch

2

Defect Quantity

4

Appraisal

Code 1.1.009

Score 0.5

Sample

Sample

Examples Hardware Quality Inspection Report

Page 44: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 44

Examples Hardware Quality Inspection Report

No. Check Content Suggestion for Modification Subcontractor

3

Fibers and signal cables not have fixed printed

labels.

Problem Analysis:

Installation Team not yet attached

The labels of cable are filled in and stuck correctly

and reliably. They must be tidy position and same

direction. They must be stuck on a position 2cm away

from their connectors. They can be made in a uniform

way according to customer requirement.

-

Clause List

Labels

Location

Signal Cables

Status

OPEN

QAM

7

Batch

2

Defect Quantity

4

Appraisal

Code 7.1.005

Score 0.5

Good Sample

Good Sample

Good Sample

Page 45: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 45

No. Check Content Suggestion for Modification Subcontractor

4

DDF Rack not connected to the protection ground.

Problem Analysis:

Installation Team not recheck after finish

installation

The shell of maintenance terminal must be connected

to the protection ground:

1. when the network interface between the

maintenance terminal and major equipment uses a

RJ45 connector, The electric isolation between them

is realized. Thus it does not need to have the same

ground with the major equipment.

2. when the network interface between the

maintenance terminal and major equipment does not

use a RJ45 connector. It needs to have the same

ground with the major equipment.

Dian Karya

Clause List

Power & Grounding Cables

Location

DDF

Status

OPEN

QAM

3

Batch

2

Defect Quantity

1

Appraisal

Code 3.1.001

Score 0.5

Examples Hardware Quality Inspection Report

Page 46: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 46

No. Check Content Suggestion for Modification Subcontractor

2

The DDF and OTB rack not connected to

protection grounding.

Problem Analysis:

Installation Team not rechecking after finished

installation

All kinds of equipment with a complete or part of

metal shell of rack and chassis must be connected to

the protection ground in a correct and reliable way.

Procon

Clause List

Power & Grounding Cables

Location

On DDF

Status

OPEN

QAM

3

Batch

1

Defect Quantity

1

Appraisal

Code 3.2.020

Score 1

Good Sample

Examples Hardware Quality Inspection Report

Page 47: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 47

No. Check Content Suggestion for Modification Subcontractor

5

Ground cable of cabinet door not reliable and have

no connected.

Problem Analysis:

Installation Team forget to installed

The ground cable of cabinet door must be connected

in a correct and reliable way.

-

Clause List

Power & Grounding Cable

Location

Inside Cabinet

Status

OPEN

QAM

3

Batch

2

Defect Quantity

3

Appraisal

Code 3.2.030

Score 0.5

Examples Hardware Quality Inspection Report

Page 48: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 48

No. Check Content Suggestion for Modification Subcontractor

3

Ground cable of cabinet door not reliable.

Problem Analysis:

Installation Team not recheck after finish

installation

The ground cable of cabinet door must be connected

in a correct and reliable way.

Procon

Clause List

Power & Grounding Cable

Location

Inside Cabinet

Status

OPEN

QAM

3

Batch

1

Defect Quantity

1

Appraisal

Code 3.2.030

Score 0.5

Examples Hardware Quality Inspection Report

Page 49: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 49

No. Check Content Suggestion for Modification Subcontractor

6

Power cable and PGND cables still use temporary

labels or not have fixed labels.

Problem Analysis:

Installation Team still not yet attached

The labels of power cable and ground cable are filled

in and stuck correctly and reliably. They must be in a

tidy position and the same direction. They must be

stuck on a position about 2cm away from their

connectors. They can be made in a uniform way

according to customer requirements, including the

label for power distribution switch.

-

Clause List

Labels

Location

Power Cables

Status

OPEN

QAM

7

Batch

2

Defect Quantity

4

Appraisal

Code 7.1.006

Score 0.3 x 3 times

(0.9)

Examples Hardware Quality Inspection Report

Page 50: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 50

No. Check Content Suggestion for Modification Subcontractor

7

Many redundant parts of cable ties still not cut.

Problem Analysis:

Installation Team not rechecking after finish

installation

Cables must be tied with uniform spacing and

appropriate tightness. Cable ties must be arranged in

a tidy way. Their redundant parts must be cut from

their bottom after they are tied so that any sharp

edges do not exist.

-

Clause List

Signal Cables

Location

Cable Ladder

Status

OPEN

QAM

4

Batch

2

Defect Quantity

4

Appraisal

Code 4.1.014

Score 0.5

Examples Hardware Quality Inspection Report

Page 51: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 51

No. Check Content Suggestion for Modification Subcontractor

8

Discarded marking still exist under the floor.

Problem Analysis:

Installation Team not rechecking after finish

installation

The floor gaps around the rack should be blocked up.

Discarded cable ties, screws and other sundries

should not be found under the floor.

-

Clause List

Site Clean

Location

Under The Floor

Status

OPEN

QAM

19

Batch

2

Defect Quantity

4

Appraisal

Code 19.1.004

Score 0.2

Examples Hardware Quality Inspection Report

Page 52: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 52

No. Check Content Suggestion for Modification Subcontractor

10

Discarded marking and packing materials still exist

under the floor.

Problem Analysis:

Installation Team not rechecking after finish

installation

The floor gaps around the rack should be blocked up.

Discarded cable ties, screws and other sundries

should not be found under the floor.

-

Clause List

Site Clean

Location

Under The Floor

Status

OPEN

QAM

19

Batch

2

Defect Quantity

4

Appraisal

Code 19.1.004

Score 0.2

Examples Hardware Quality Inspection Report

Page 53: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 53

No. Check Content Suggestion for Modification Subcontractor

9

Copper wire naked..

Problem Analysis:

Installation Team not rechecking after finish

installation

No copper wire is naked in the plugs of power cable

and grounding cable. Cable plugs must be installed

according to specification.

-

Clause List

Power & Grounding Cables

Location

OSN 6800

Status

OPEN

QAM

3

Batch

2

Defect Quantity

1

Appraisal

Code 3.2.026

Score 0.5

Examples Hardware Quality Inspection Report

Page 54: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 54

No. Check Content Suggestion for Modification Subcontractor

12

PGND cables and Power cables of battery have

bad arrangement (not tidy).

Problem Analysis:

Installation Team forget to installed

Power cable and grounding cable arrangement must

accord with engineering design document. Easy to

expansion or maintenance.

-

Clause List

Power & Grounding Cables

Location

Under Cabinet & Battery

Status

OPEN

QAM

3

Batch

4

Defect Quantity

4

Appraisal

Code 3.2.025

Score 0.5

Examples Hardware Quality Inspection Report

Page 55: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 55

No. Check Content Suggestion for Modification Subcontractor

11

Insulation Pad not yet installed.

Problem Analysis:

Installation Team forget to installed

Support parts of rack must be installed correctly and

firmly, all of the bolts must be fixed according with

criterion. If have insulation parts must be also

installed and assure insulation result. The support

made by customer must be installed according to

customer’s request.

-

Clause List

Rack & Cabinet

Location

Under Cabinet

Status

OPEN

QAM

1

Batch

4

Defect Quantity

4

Appraisal

Code 1.1.003

Score 1.5

Examples Hardware Quality Inspection Report

Page 56: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 56

No. Check Content Suggestion for Modification Subcontractor

13

Wrong battery setting on Rectifier by customer.

Problem Analysis:

Wrong setting

Re-setting Battery setting become 650 Ah – 650 Ah.

-

Clause List

Indoor Auxiliary

Location

Rectifier

Status

CLOSED

QAM

2

Batch

1

Defect Quantity

1

Appraisal

Code -

Score -

Rework

Battery Capacity 650Ah

Examples Hardware Quality Inspection Report

Page 57: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 57

No. Check Content Suggestion for Modification Subcontractor

14

Materials unused, rubbish inside MKCS cabinets

The equipment room should be

neatness and tidy. Discarded packing

materials should be cleaned. Spare

parts should be arranged in a tidy

way after installation

PT. Dian Karya

Clause List

19.1.005

Category

MIN

Status

OPEN

QAM

19

Batch

2

Defect Quantity

7

Appraisal

Code 000000L

Score 0,2

Examples Hardware Quality Inspection Report

Page 58: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 58

No. Check Content Suggestion for Modification Subcontractor

15

Inlet outlet cable holes not yet block

properly.

All of the input/output cable holes of

the rack (except N68E) must be

blocked out

PT. Dian Karya

Clause List

1.1.007

Category

MED

Status

OPEN

QAM

1

Batch

2

Defect Quantity

1

Appraisal

Code 000000I

Score 1

Examples Hardware Quality Inspection Report

Page 59: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 59

No. Check Content Suggestion for Modification Subcontractor

16

Labels on DDF & Fibers not yet attached

Problem Analysis:

Waiting provide Optic Cables by Customer

On the DDF, trunk cable labels must be easily viewed

for going to problem location.

Adyawinsa

Clause List

Labels

Location

On DDF

Status

OPEN

QAM

7

Batch

1

Defect Quantity

3

Appraisal

Code 7.1.008

Score 0.3

Examples Hardware Quality Inspection Report

Page 60: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 60

No. Check Content Suggestion for Modification Subcontractor

2

The labels attached not good or not same direction

Problem Analysis:

Installation Team not rechecking after finish

installation

The labels of cable are filled in and stuck correctly

and reliably. They must be tidy position and same

direction. They must be stuck on a position 2cm away

from their connectors. They can be made in a uniform

way according to customer requirement.

Adyawinsa

Clause List

Labels

Location

On Cables

Status

OPEN

QAM

7

Batch

1

Defect Quantity

3

Appraisal

Code 7.1.005

Score 0.5

Examples Hardware Quality Inspection Report

Page 61: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 61

No. Check Content Suggestion for Modification Subcontractor

1

Some screws still not tightness

Problem Analysis:

Installation Team not rechecking after finished

installation

The board can be plugged and unplugged smoothly.

Its panel screws must have appropriate tightness if

they exist. The steel wire of spring is perfect

SWATAMA

Clause List

Rack & Cabinet

Location

Inside Cabinet

Status

CLOSED

QAM

1

Batch

1

Defect Quantity

2

Appraisal

Code 1.1.016

Score 0.5

Examples Hardware Quality Inspection Report

Page 62: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 62

No. Check Content Suggestion for Modification Subcontractor

4

Some panel screws still loosen.

Problem Analysis:

Installation Team not rechecking after finish

installation

The board can be plugged and unplugged smoothly.

Its panel screws must have appropriate tightness if

they exist. The steel wire of spring is perfect.

Procon

Clause List

Rack & Cabinet

Location

Module Power

Status

CLOSED

QAM

1

Batch

1

Defect Quantity

3

Appraisal

Code 1.1.016

Score 0.5

Rework

Page 63: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 63

No. Check Content Suggestion for Modification Subcontractor

5

No covered with the adhesive tape

Problem Analysis:

Installation Team not rechecking after finish

installation

The peeled place of subscriber cable at the MDF

should be covered with the adhesive tape or heat-

shrinkable tube

Procon

Clause List

Signal Cables

Location

Cables near DDF

Status

CLOSED

QAM

4

Batch

1

Defect Quantity

3

Appraisal

Code 4.1.023

Score 0.2

Rework

Page 64: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 64

No. Check Content Suggestion for Modification Subcontractor

2

Labels on the alarm box still not have and also not

yet attached on the door.

Problem Analysis:

Installation not complete yet

Labels must be stuck on the alarm box according to

specifications, easy to maintenance

Adyawinsa

Clause List

Labels

Location

On Alarm Box

Status

OPEN

QAM

7

Batch

1

Defect Quantity

2

Appraisal

Code 7.1.007

Score 0.3

Page 65: Indoor Hardware Quality Standard

HUAWEI TECHNOLOGIES CO., LTD. Page 65

No. Check Content Suggestion for Modification Subcontractor

2

No Insulating tape of the cut of protection tube.

Problem Analysis:

Installation Team still not yet attached

The cut of protection tube for tail fiber must be

smooth. Otherwise, the insulating tape must be used

to avoid hurting anyone.

Adyawinsa

Clause List

Fibers

Location

Cabinet

Status

CLOSED

QAM

5

Batch

1

Defect Quantity

2

Appraisal

Code 5.1.005

Score 0.5

Rework

Rework

Page 66: Indoor Hardware Quality Standard

www.huawei.com

Thanks

-------------------------------------------------------------------------------

"Quality is not a result of Inspection,